You are on page 1of 23

-.

--

CHINA HARBOUR ENGINEEFUNG COMPANY (GROUP)


REPRESENTATIVE OFFICE IN SRI LANKA

SOUTHERN TRANSPORT DEVELOPMENT PROJECT CONTRACT NO. RDA/STDP/JBIC/K-D2 JBIC FUNDED: KOTTAWA TO DODANGODA SECTION
Method Statement

Document No.

MS03

Page 1 Revision 01

Title: Method Statement for E a r t h Work

Method Statement for Earth Work

'

Southern Transport Development Project JBIC Funded: Kottawa to Dodangoda Section

MS-3: Method Statement for Earth Work

CONTENTS
Section 1.0 2.0 Purpose of method statement Scope of method statement Documents to be referenced with this method statement Responsibilities for activity described within this method statement Detailed method of carrying out method statement
(1) Material

Page

3 3 3
3

3 .O
4.0 5.0

3
4

(2) Equipment
(3) Excavation of Accepted Materials

4
4-5 5-6 6 6 6-7

(4) Excavation of Unaccepted Materials (5) Excavation Rock Boulders (6) Excavation - Hard Rock

(7) Embankment
(8) Soft Ground Treatment

8-9

6.0 7.0

Record documentation andlor output@) which c o b completion of method statement. Appendices A B C D E Inspection and Test Plan Construction Flow Chart Construction Procedure for Rock Blasting Drawings & Required Formats Risk Assessment

':='

:aa+,, ..~
.,
2.;:

., . . . . ....

: !,~.. : .

....~. , . , . . .,.. , i,. ,.. . . ~ . .: >.,:;..j~'d>.<.~.-+ ,<.:<A? .' ~.'. ;:-'.;~;: . ...1 I,' .......;.. :.. , . . _ ' .~ .. , . :... .,
> .
:~

Page 2

. , . . ~ ~ : ~ . ~ ~ ~ ~ ;; . ? : ~ : . ; $ . , : ; , i ~ - ~.;.~ ~ .

..
!

. , ,~

.. .

Soothem Transport Development Project JBIC Funded: Kottawa to Dodangoda Section

MS-3: Method Statement for Earth Work

..

1.0 Purpose of method statement


This method statement provides the details of the materials, the equipment, the procedure and relevant documents related to the Earth Work activities, including the quality control verifications, the measurement verifications, and also the safety precautions to be implemented for this work.
2.0 Scope of method statement

Scope of this method statement applies to rock and soil excavation, embankment filling and soft ground treatment within the Right of Way (ROW). Contract Drawings provides information as to the indicative location where excavation works, and embankment filling works, soft ground treatment works and they are shown in the following drawings. C4 to C7 Typical Cross Section for excavation in rock, soil and embankments D l to D7 Typical Cross Section for soft ground treatment: F1 t o F 52 Plan and Profile: 3.0 Documents to be referenced with this method statement List of relevant referenced documents are appended below a. Project Quality Plan b. Construction Procedure for Earthworks c. Construction Procedure for Blasting at Quarry Site & within ROW d. Method Statement for Replacement & Rock Fill Method e. Method Statement for Geotextile & Gravel mat method f. Site Safety Plan g. Technical Specification 1. Section 2.2 -Earth Work 2. Section 2.3 Earth work 3. Section 2.6 Soft Ground Treatment

4.0 Responsibilities for method statement activity

Construction Manager and relevant Section Agent within whose scope of works shall be responsible for referred construction activities in related to Earthworks are carried out according to the method stipulated in this statement unless otherwise changed by the Engineer. Further detail in respect of sign off of the works is outlined in the inspection and test plan in appendix.
5.0 Detailed method of carrying out this activity The sequence involve in canying out earthwork activity is outlined below. A Flowchart is prepared and is shown in the appendix-B to supplement the information provided in this section.

Before the commencement of the work and after the completion of the related clearing & Gmbbing operation as well as the top soil removal works, the Engineer will be notified of the areas where to be undertaken any of the item related to the earthworks, to enable to the Engineer to inspect the area before commencement of the works.

Page 3

Southern Trar~sport Development Project JBIC Funded: Konawa to Dodangoda Section

MS-3: Method Statement for Ealh Work

Soil classification will be carried out on samples taken along the road excavation area The internal of sampling will be determined by the changing nature of the soil encountered. Tests to classifl the soil types encountered will include one or more of the following, as required (ie. CBR, PI, Gradation, OMCIMDD etc.)as in thk table 2.2.1 and 2.2.2 of th6 Technical S@cifications 5.1 Materials The major materials used for the excavation and embankment works include, but are not limited to the following. Accepted Materials ( Soil, Granular Materials, Soft Shale ) Unaccepted Materials (Peat etc.,) Hard & Soft Rock Geotextile Blasting Materials Water 5.2 Equipment The major equipment used for the excavation and embankment works includes, but are not limited to the following. JCB, and/or Backhoes, and/or Dozers, and or Loadres DumpTmcks Motorised Scraper Oiant Breaker RockDrills RockHammers Rollers Rammers I Plate Compactors Water Browsers Sampling & Testing quipment Other minor tools
5.3

Excavation of Acceptable Materials


5.3.1 Earth material which will be classified as acceptable material and conforming to

specification requirements will be excavated using Excavators.


5.3.2

The excavated acceptable material will be transported directly to areas for use in
forming embankments for the roadways, connecting roads, ramps and approaches; in constructing sub grade and shoulders; backfilling around structures or for any other purpose necessary for the completion of the project in accordance with the drawings.

5.3.3

If the material observed as weathered rock or granular material it would be detailed to use as a gravel mat and rock replacement activities in the soft ground treatment works. Special care will be taken to identify the nature of the soil while on excavation too.
Page 4

5.3.4

Southern Transport Development Project JBIC Funded: Komiwa to Dodangoda Section

MS-3: Method Statement for Earth Work

The dump trucks used to transport the excavated materials will minimise their average hauling distance by arranging the closest fill location simultaneously. The works are envisaged such that no unnecessary double handling is involved. Notwithstanding,
5.3.5

In areas where the situation arises, excess material will be stockpiled temporarily within the ROW or alternatively in selected areas adjacent to the site, approved by the Engineer. Excavation will be undertaken down to the approved lines and levels.

5.3.6 If the sub grade level is reached within the acceptable material strata, the bottom layer will be compacted to the density specified (Refer specification section 2.2, Clause 3.7). If material at the bottom is found to be soft and fail to compact to the

required density and CBR values, and then seek for further instruction of the Engineer to further excavation to a required depth md replace with Selected Material, or as otherwise instructed. Detail of such additional works will be recorded jointly. If hard rock is reached and eicavation needs to continue in the new strata, unclassified excavation will be halt in those areas.
A request will be made to the Engineer to carry out a joint survey of the area where

excavation is completed, for the purpose of measurements.


5.4

Excavation of Unacceptable Materials-Class U-1 & U-2


5.4.1 Earth material which will be identified on investigations as unacceptable for

embankment will be excavated using excavators. Such materials will be transported directly to disposal areas approved by the Engineer as much as possible to avoid double handling. Unlikely, if there is no such location in close proximity temporary stocking would be done within the ROW but outside the construction areas. The selection and management of disposal areas will be as follows. Before the disposal of waste materials or selected vegetation, a request will be made to the Engineer for approval of a location for disposal when such a location is in the ROW. Alternatively, if an area outside the site is considered, the necessary steps will be taken to obtain approval &om land owners and of the CEA. Disposal of all unacceptable materials other than the materials which can process for re-use, and other foreign matter will be removed to the approved locations with the help of excavators, dump trucks, JCB,tractor and manpower or other

If any material is identified as may be suitable to use in permanent works after making some process, that would be stockpiled separately and arrange the chemical or mechanical process and re check the properties to make use for fill areas which in this stage would directly transport to the filling locations. 5.4.3 To minimise hauling distances, every attempt is made to identify the disposal sites within close area to the excavation points.
5.4.2 5.4.4

If any borrow areas are observed in close areas to the excavation, the unsuitable material will be transported and stockpiled on the edge of borrow area for later backfilling. Once excavation of the borrow pit is cogplete, the stockpiled spoil material will be dozed to the pit and topsoil will be spread over evenly.
Page 5

Southern Transport Development Project

JBIC Funded: Konawa to Dodangoda Section

MS-3: Method Statement for Earth Work

5.4.5 Engineer's inspection would be requested in prior to the excavation of unacceptable materials in the particular area. 5.4.6 After the completion of excavation of unsuitable material within a particular area a request will be made to the Engineer to carry out a joint Cross Sectional survey of the area for the purpose of measurements.

5.5 Excavation -Rock Boulders 5.5.1 Boulders as referred in the section 2.2,clause 2.7 of the specification that are having a solid volume greater than 0.251113 and smaller to 1.0m3 will be arranged to remove. Joint measurements will be recorded in every such boulder independently and place an "X" mark to identify the measured once. Excavator will be used for removal of these boulders from its location and either directly transported to the locations identified in the soft ground areas or stockpiled in closer areas to use in other locations. Boulders which are found greater than to the above requirement are also jointly measured with different identification in which later be broken into pieces using giant breaker or blasting. 5.6 Excavation -Hard Rock In accordance with morphology of the rock and our assessment of its general characteristics, excavation by blasting with explosives will be required, however all blasting will be limited to daytime only. The location of the areas to be quarried would be determined through our analysis of the contract drawings and geo-technical information. For the details of the blasting procedure please refer o w Construction Procedure for Blasting at Quarry Sites and within ROW, which is annexed to this Method Statement. Once the blasting operation is completed, Giant Breakers and Rock Hammers will be used to break the rock boulders into pieces as required for embankment filling and crusher plants. The muck will be generally being transported directly to areas for use in soft ground treatment works in forming embankment foundations. Joint survey will be requested from the Engineer after completion of all rock excavations and as built Cross Section drawings would be prepared accordingly for the purpose of calculating the excavated rock volume. 5.7 Embankment 5.7.1 General Embankment work will follow the site clearance works described in the Method Statement No. 1 for site clearance. All top soil materials would be removed as instructed before starts earth work operations.
Page 6

Southern Transport Development Project JBIC Funded: Koaawa to Dodangoda Section

MS-3: Method Statement for Earth Work

In order to minimize number of transport equipment and hence the cost of operation, hauling of fill material between uncMfied excavation / h m w excavation and embankment will be planned in such a way as to have the shortest possible hading distance
5.7.2

Embankments on Natural Ground When the natural ground is within a height of 1.5 m from the sub grade elevation, all the organic matter will be removed and ripped off the surface with tynes attached to the ripper of the dozer or tractor. That would be compacted to specified requirements. If the depth is exceeding the 1.5m, remaining sods will be disc thoroughly and compact. When specified in the Contract, or directed by the Engineer, the slopes will be benched before the embankment is placed.

Toe lines of the embankment with necessary slopes will be set it-out on the ground.
keeping 0.250m extension in horizontal plane on either side. The first of this kind of embankment section would be considered as a trial to ascertain the required compaction efforts and layer thicknesses etc., Material derived h m excavation of acceptable material including weathered rock as well as any other borrow excavation, which confirms the suitability on canyhg out the specified tests in section 8 of the specification would be transported to the fill location. Initial layer in this instance would be spread to a variable un-compacted thichess but not exceeding 400mm to facilitate a levelled surface on top to form up the subsequent layers. Next layers there onwards will be un-compact thickness of 250mm.until reach up to the sub grade elevations. Density requirement detailed in table 2.2.1 of the specification would be maintained in each layer. Seperate triab would be arranged for each type of compacting equipment to get the layer thickness increased while processing the constructions and the extended portion would be trimmed off at the time of slope protection works or grassing. If necessary, moisture will be added with sprinklers attached to the water tankers, to bring the moisture content of fill material close to the optimum. Water will be thoroughly incorporated into the material, which is to be compacted, by the use of ploughs, discs or other methods. The material laid will be flattened with dozers and compacted with 9-10 ton vibrating rollers.

Swampy ground conditions which are not covered under any of Soft Ground Treatment method is to be filled d i i t l y with accepted general fill materials. Setting out and all embankment constructions are similar to item 8.2 except the thickness of initial layer. Initial layer in this regard would be 500600mm to make sufficient to support the equipments. (Refer Sec-2.2, Clause. 3.6 of specification) Compaction over this layer to be carried out until it satisfies that no ruts are visible under loaded hauling equipments.

Southern Transport Development Project IBlC Funded: Kottawa to Dodangoda Section

MS-3: Method Statement for Earth Work

5.8 Soft Ground Treatment General descriptions and the criteria detailed in the section 2.6 of the Technical specifications would be followed up to identify the method of improvements of the embankment foundations in the specified areas and would be submitted to Engineer for review and approval in prior to arrange this work. Out of the methods specified in the contract documents for this work our suggestions to selected locations are detailed as follows. 5.8.1 5.8.2 5.8.3 Remove and Replacement with Rock fill Geotextile & Gravel mat (Surcharge) Band Drains

5.8.1 Remove and Replacement Method


Method Statement No.2 detailed all procedures involved in the Removal of Unsuitable soil and Replacement with Rock fill materials. 5.8.2 Geotextile and Gravel Mat

In this method of treatment, Geotextile material is spread over the existing surface and places a 1.0 m thick gravel layer on the geotextile, after keeping the water table in a lower level by using water pumps.
Method of this construction is detailed in the Method Statement No. 4 which would be p r e p a d for Soft Ground Treatment works with Geo Textile & Gravel Mat.

5.7.4.3 Band Drain Construction Separate Method Statement will be submitted in prior to commencement of this activity.

Southern Transport Development Project

MS-3:Method Statment for Earth Work

IBIC Funded: Kottawa to Dodangoda Section


6.0

Record Documentation and /or out puts which confirm completion of Method Statement

6.1 Survey Records for Joint Measurement of a l l Excavation works 6.2Survey Rewrds for Joint Measurement of all fill works 6 . 3 Field Measurement Record for Rock Boulders 6.4 Survey Measurement for Rock Excavation 6.5Field Measurement of Area of Geo-Textile Materials
7.0 Appendices
7.1 Inspection and T e s t Plan 7 . 2 Construction Flow Chart 7.3 Construction Procedure for Rock Blasting 7.4 Drawings & Required Formats 7.5 Risk ~Gessmeni

Southern Transport Development Project JBIC Funded: Kottawa to Dodangoda Section

MS-3: Method Statement for Earth Work

APPENDIX - 7.1
INSPECTION AND TEST PLAN FOR

EARTH WORK
(IPT No: 2, IPT No: 7 & P T No: 9)

CHINA HARBOUR ENGINEERING COMPANk (GROUP)


REPRESENTATIVE OFFICE IN SRI LANKA Document No.
ITP-09

I I

SOUTHERN TRANSPORT DEVELOPMENT PROJECT CONTRACT NO. RDAISTDPIJBICIK-D2 JBIC FUNDED: KOTTAWA TO DODANGODA SECTION Inspection & Test Plan Title: Inspection & Test Plan for Earth Work (Soft Ground Treatment-Geotextile & Gravel Mat Method)

1
i

Page 1
Revision 0

Ii

Southern Transport Development Project JBIC Funded: Kottawa to Dodangoda Section

MS-3: Method Statement for Earth Work

APPENDIX 7.2 CONSTRUCTION FLOW CHART

Southern Transport Development Project IBIC Funded: Kottawa to Dodangoda Section

MS-3: Method Statement for Earth Work

APPENDIX - 7.3
CONSTRUCTION PROCEDURE FOR ROCK BLASTING (Attached a copy in original submission)

v;
...
6
8'

Southern Transport Development Project

MS-3: Method Statement for Earth Work

JBIC Funded: ~ottawa to ~ o d a n ~ o d Section a s . ' '., , . . . .: . . r , . . . . . . . . , . ...... < . . : : . . . ., .. ... . . . ... .

--.

...
.

....
,

+ f ; . ; A+.

. : , : . ; ,

lz

,;

APPENDM - 7.4 DRAWINGS & REQUIRED FORMATS

SOUTHERN TRANSPORT DEVELOPMENT PROJECT (JBIC SECTION) : Contract Ko.RDAI:.;TDPNGICII<-02 KOlTAWA TO DODANGODA MEASUREMENT SUMMARY CONTRACTOR
China Harbar Enphsering Cmpany (Grmp)Ud

Sheet : Date : ENGINEER:


Pa& ConsuLnb InIemahallRe~*nesr Omb~unent Consultanla (etu nrm : (pay~ n : n

of

Road :
DESCRIPTION

QvAKmy

---

-------------Quantity this Month Previous Cumulative Quantlty CumulaUve Quanlity lo Date

Payment requested for the Conlractor :

Payment approved for the Engheer :

Name

............................................

Name

............................................
......

..

I'
, /

SOUTHERN TRANSPORT DEVELOPMENT PROJECT (JBIC SESTiOt*) :Contract No.RDNS~DPl.I~lCl!C-D2 !<OTTAWA TO DODANGODA CROSS SECTION MEASUREMEN7'
CONTRACTOR C h b Hsrba* Enghedl(ng Cmpany (Group)Ltd

Sheet : Date :
ENGINEER:
PBdflc Consullanb n It e m a -

of

Owelopment Consulmnlrr

Road :

IBN Ifem :

Payment requested for me Contractor : Signature Name

Payment approved for the Engineer : Signature

...........................................
.

............................................

Name
. . . . .

............................................ ............................................

/.
Contract no. RDAISTDPIJBICIK-D2 Southern Transport Development Project Kottawa to Dodangoda Section

Request Number
CHECl RlCFlOOOOOl / A

REQUEST FOR INSPECTION CHECK FORM (RltCF)


Pmlour SubmbdanNo. (Ifndimblr) :

I
.

- . ..

.. . . .

Data:

T i m :

C.D@IY

~.r-1

PO&

Quality Hold Pofnt

QaalIty Witness Polnt

OUlen

M r .

pk.mhrpoc(U.lbovowak lchctrictliqaa#

Plrt Cl

I!'
NUm:
Sipnahlro :

Porih:

cute :

Time:

FolmmQF1lPequerl lor hapecuon Check Fwn (RICF)

,.
Southern Transport Development F'roject JBIC Funded. Kottawa to Dodangoda Section

MS-3:Method Statement for Earth Work

RISK ASSESMENT @ t @ h tod @e ooriginal submission)