Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

CHAPTER -3
REQUIREMENT OF ELECTRICAL EQUIPMENTS

In this Chapter, the requirement of electrical and mechanical equipments has been assessed for power generation stations, both hydro and thermal plants, as well as for power substations. This requirement has been worked out corresponding to the tentative capacity addition during the 11th and 12th lans. !quipment for nuclear stations has not been considered as the same is separately e"pected to be done by #uclear ower Corporation. $lso the requirement of equipments and materials for nuclear plants is difficult to estimate which in any case is e"pected to be %2&& '( and ))&& '( in the 11th and 12th lans respectively and therefore a small fraction of the total tentative capacity addition. 3.1 REQUIREMENT OF ELECTRICAL EQUIPMENTS FOR GENERATION PLANTS (INCLUDING SWITCHYARD EQUIPMENT)

The estimated requirement of electrical equipments for generation plants coming up during the 11th lan and 12th lans has been worked out considering tentative capacity addition identified for these lans, details of which have been furnished in Chapter 2. Thermal pro*ects for commissioning during the 11th and 12th lan have been categori+ed in five ma*or groups on the basis of their unit si+es. In case of thermal plants, requirement of ma*or electrical equipment has been worked out for one unit of each of these categories and subsequently depending on the number of units in the respective categories, the total requirement has been assessed for 11th and 12th lans. In case of hydro units such categorisation is not tenable since each pro*ect is site specific and therefore the total requirement of ma*or equipments has been worked out for the 11 th and 12th lan. ,witchyard equipment at the generating stations has also been included. -etails of the above assessment are given below. 3.1.1 Therm ! P"#er P! $%& (I$'!()*$+ S#*%'h, r) E-(*.me$%) The thermal plants have been categori+ed into five categories based on the unit si+e i.e. ..&/)&& '(, 0&& '(, %&&/20&/21& '( class and 120 '( for coal/lignite plants, and gas/1#2 modules. In case of 2as/1#2 based power pro*ects, numbers of modules3 comprising of 22Ts and 1 ,T4 corresponding to each pro*ect have been assessed for 11th 5 12th plans separately and as per the norms of equipment required for a typical %.& '( gas module, the total requirement of electrical equipment has been assessed. The requirement of electrical equipments for switchyards at the generating station has also been indicated. i4 Item wise requirement of equipment for ..&/)&& '( category of thermal plants during 11th and 12th lans is given in Table %.1.

3.1

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

Table;%.1 Requirement of Equipments for 660/800 Mw Coal/Lignite Based Units of 11th lan and 1!th lan Capa"it# $ddition rogramme
Re-(*reme$% /"r O$e ($*% "/ 001 MW 11%h P! $ 12 U$*%& (0 Pr"3e'%&) 12%h P! $ 41 U$*%& (11 Pr"3e'%&) T"% ! 52 U$*%& (10 Pr"3e'%&)

I%em GT6 201M7A Ge$ 78421893:7 Three .h &e ; $:


ST <1845845 M7A 132811.5811.5 :7

% 1 2 ; ; < ) .) )< 1<. 1<&< %2 %0& 1&& 0 = % 21 2< ) 12 2%% %.= 1 <2 12 2< . . <) >. )1. 1&&) 1=02 1.)<) %)< <2&& 12&& .& )< %. 202 2)) >. 1<< 2=>. <<&<
18

UT 35M7A Ge$ 7811.5:7 ICT 211M7A 4118132:7 M*&'. Ser=*'e Tr $&/"rmer 21 M7A 132834.5:7 A(>. Tr $&/"rmer 1183.45:7 33:7 S#*%'h+e r 11 :7 S#*%'h+e r 3.3 :7 S#*%'h+e r HT M"%"r& LT M"%"r& LT Tr $&/"rmer& LT MCC P $e!& 415 7 S#*%'h+e r P $e! DC ? %%er, ? %%er, Ch r+er 33 :7 S*$+!e C"re C ;!e (:m) 11:7 S*$+!e C"re C ;!e (:m) 11:7 M(!%* C"re C ;!e (:m) 3.3 :7 S*$+!e C"re C ;!e (:m) 3.3 :7 M(!%* C"re C ;!e (:m) 1.1 :7 P"#er C ;!e (:m) 1.1 :7 C"$%r"! C ;!e(:m) Emer+e$', DG Se% 1511@7A6

1%& <& )& 1& 1& 1.& %2& 2=2& %%.& 0)<& 0.1.& 12)& 1<&&& <&&& 2&& 2)& 12& )<& >.& %2& <)& >%2& 1<.)& 0&

1=2 02 1&< 1. 1. 2&) <1. %0%. <%.) =0>2 =%&&) 1..< 1)2&& 02&& 2.& %.< 10. 1&>2 12<) <1. .2< 1211. 1>&)< .)

? 1 no. spare 2T and 1 no. spare -2 is considered for each pro*ect **) Item wise requirement of electrical equipments for 0&& '( category of thermal plants during 11th and 12th lans is given in Table %.2.

3.2

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

%a&le'()! Requirement of Equipment for *00 M+ Coal/Lignite Based Units of 11th lan and 1!th lan Capa"it# $ddition rogramme
Re-(*reme$% /"r O$e ($*% "/ 511 MW

11%h P! $ 4A U$*%& (31 Pr"3e'%&)

12%h P! $ 1B U$*%& (11 Pr"3e'%&)

T"% ! 05 U$*%& (41 Pr"3e'%&)

I%em
GT6 211M7A Ge$ 78421893:7 Three Phase Bank

% 1 1 ; 0 .% .. 11) 11%0 %& 2)= =0 < . 1% 1) 12 ) 2&& %=0 1

1=1 <= <= %& 2%0 2>.1 %1&2 00<. 0%%<0 1<1& 1%<)> %020 1)) 2)2 .11 )<. 0.< %=. ><&& 1=.20 ==

.< 1) 1) 1& >& 11%< 11)) 212< 2&<%& 0<& 01.. 1%0& =2 1&) 2%< %2< 21. 1<< %.&& .=0& 2)

2%0 .0 .0 <& %20 <&>0 <2>& =.=& =%==0 1>0& 1).00 <)=0 2.& %>& )<0 11=& =)& 02& 1%&&& 2<%=0 1&0

ST B1841841M7A 132811.5811.5 :7 UT 51 M7A Ge$ 7811.5:7 ICT 125 M7A 4118132:7 A(>. Tr $&/"rmer 11 :7 S#*%'h+e r 3.3 :7 S#*%'h+e r HT M"%"r& LT M"%"r& LT Tr $&/"rmer& LT MCC P $e!& 415 7 S#*%'h+e r P $e! DC ? %%er, ? %%er, Ch r+er 11 7 S*$+!e C"re C ;!e(:m) 11 :7 M(!%* C"re C ;!e( :m) 3.3 :7 S*$+!e C"re C ;!e ( :m) 3.3 :7 M(!%* C"re C ;!e (:m) 1.1 :7 P"#er C ;!e( :m) 1.1 :7 C"$%r"! C ;!e (:m) Emer+e$', DG Se% 1511@7A6

? 1 no. spare 2T and 1 no. spare -2 have been considered for each pro*ect

3.%

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

***) Item wise requirement of equipment for %&&/20&/ 21& '( category of thermal plants during 11th and 12th lans is given in Table %.%. Table-3.3 Requirement of Equipment for (00/!*0/!10 M+ Class Coal/Lignite Based Units of 11th lan and 1!th lan Capa"it# $ddition rogramme
Re-(*reme$% /"r O$e ($*% "/ 31182518211 MW 1 1 2 1 10 >. >% 1&<1 2. 220 =0 . . 2 2 1. 1. 2&& <&& 1 11%h P! $ 12%h P! $ T"% ! 45 U$*%& 14 U$*%& 5< U$*%& (2A Pr"3e'%&) (12 Pr"3e'%&) (31 Pr"3e'%&) =2 <0 >& <0 .=0 <%2& <1)0 <.)<0 11=& 1&120 %%=0 2=& 2=& >& >& =2& =2& >&&& 1)&&& =2 1) 1< 2) 1< 21& 1%<< 1%&2 1<0=< %.< %10& 1&0& )< )< 2) 2) 22< 22< 2)&& 0.&& 1) >& 0> 11) 0> ))0 0..< 0<)= .1<1> 10%< 1%2=0 <<20 %0< %0< 11) 11) ><< ><< 11)&& 2%.&& >&

I%em GT6 315M7A Ge$ 7823A:7 Three Ph &e ST 5582A.582A.5 M7A 22180.<80.< :7 UT 21 M7A Ge$ 780.< :7 M*&' Ser=*'e Tr $& 11M7A 0.0811.5 11 :7 S#*%'h+e r 0.0 :7 S#*%'h+e r HT M"%"r& LT M"%"r& LT Tr $&/"rmer& LT MCC P $e!& 415 7 S#*%'h+e r P $e! DC ? %%er, ? %%er, Ch r+er 11:7 S*$+!e C"re C ;!e( :m) 11:7 M(!%* C"re C ;!e( :m) 0.0:7 S*$+!e C"re C ;!e(:m) 0.0:7 M(!%* C"re C ;!e( :m) 1.1:7 P"#er C ;!e (:m) 1.1 :7 C"$%r"! C ;!e(:m) Emer+e$', DG Se% 1511@7A6

1 no. spare 2T and 1 no. spare -2 have been considered for each pro*ect

*=) Item wise requirement of equipment for 120 '( categories of thermal plants during 11th is given in Table%.<. 6equirement of 120 '( sets is nil during the 12th lan.

3.<

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

T ;!e-3.4 Requirement of Equipment for 1!* M+ Coal/Lignite Based Units ,f 11th lan Capa"it# $ddition rogramme
Re-(*reme$% /"r O$e ($*% "/ 125 MW 1 1 2 1 10 >. <0 %2< 20 1= =0 . . 2 2 1. 1. 2&& <&& 1 11%h P! $ A U$*% ( 4 Pr"3e'%&) 11 = 1< = 1&0 .=2 %10 22.) 1=0 11> 020 <2 <2 1< 1< 112 112 1<&& 2)&& 11

ITEM GT6 101M7A Three Ph &e ST 5582A.582A.5 M7A UT 21M7A M*&' Ser=*'e Tr $& 21 M7A 11 :7 S#*%'h+e r 0.0 :7 S#*%'h+e r HT M"%"r& LT M"%"r& LT Tr $&/"rmer& LT MCC P $e!& 415 7 S#*%'h+e r P $e! DC ? %%er, ? %%er, Ch r+er 11:7 S*$+!e C"re C ;!e (:m) 11:7 M(!%* C"re C ;!e (:m) 0.0 :7 S*$+!e C"re C ;!e (:m) 0.0 :7 M(!%* C"re C ;!e (:m) 1.1:7 P"#er C ;!e(:m) 1.1 :7 C"$%r"! C ;!e(:m) Emer+e$', DG Se% 1511@7A6

? 1 no. spare 2T and 1 no. spare -2 have been considered for each pro*ect =) Item wise requirement of equipment for gas based thermal plants during and 12th lans is given in Table%.0.

11

th

3.0

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

T ;!e-3.5 Requirement of Equipment for -as/L.- Based Units of 11th lan and 1!th lan Capa"it# $ddition rogramme
11%h P! $ Re-(*reme$% /"r O$e m")(!e < m")(!e& (301 MW) (A .r"3e'%&) % 2 1% %. 1& 1= = 11 1 . %1 2&& 0&& %<
18 117 324 90 153 63 99 16 54 279 1800 4500

I%em Ge$. Tr $&/"rmer (2 $"&. 114 M7A C 1 $"&.140 M7A) U$*% A(> Tr $&/"rmer 21 M7A HT M"%"r& LT M"%"r& LT Tr $&/"rmer& 415 7 S#*%'h+e r P $e! DC ? %%er, ? %%er, Ch r+er Emer+e$', DG Se% Ge$. C*r'(*% ?re :er 0.0 :7 S#*%'h+e r HT P"#er C ;!e (:m) LT P"#er C C"$%r"! C ;!e (:m)

) 1 no. spare 2T and 1 no. spare -2 have been considered for each pro*ect =*) Total requirement of equipment 3Item wise4 for thermal plants during lans is given in Table %... 11and

12

th

3..

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

T ;!e-3.0 %otal Requirement of Equipment for %hermal /)E) Coal0 Lignite0 -as/L.Based Units of 11th lan and 1!th lan Capa"it# $ddition rogramme
T"% ! Re-(*reme$% /"r G &8LNG ? &e) P! $%& %< 1)

I%em GT ST UT ICT M*&' Ser=*'e Tr $& 21M7A A(>. Tr $&/"rmer 33:7 S#*%'h+e r 11 :7S#*%'h+e r 0.0 :7 S#*%'h+e r 3.3 :7 ?re :er HT M"%"r& LT M"%"r& LT Tr $&/"rmer& LT MCC P $e!& 415 7 S#*%'h+e r P $e! DC ? %%er, ? %%er, Ch r+er 33:7 S*$+!e C"re C ;!e (:m) 11:7 S*$+!e C"re C ;!e (:m) 11:7 M(!%* C"re C ;!e (:m) 0.0:7 S*$+!e C"re C ;!e (:m) 0.0:= M(!%* C"re C ;!E (:m) 3.3:7 S*$+!e C"re C ;!e (:m) 3.3:7 M(!%* C"re C ;!e (:m) HT P"#er C ;!e LT P"#erCC"$%r"! C ;!e (:m) Ge$. C*r'(*% ?re :er 1.1:7 P"#er C ;!e (:m) 1.1:7 C"$%r"! C ;!e (:m) Emer+e$', DG Se% 1511@7A

T"% ! Re-(*reme$% /"r C" !8 L*+$*%e ? &e) P! $%& 0&) 1)% %&1 0. )2 0%% <1. ).21 .%%. ).0) 21&.< 21&<=& 0%2% 0&2<> 10&20 >1. 110& 10. 2&.> 200& 1&0. 1&0. 11>. 11<<

2=> 11= %2< >& 10% .% >>

1)&& <0&& 0< %)%1. .>)0> 2=<

1.

T"% ! 0<2 1)% %1> 0. )2 0%% <1. ).21 ..10 ).0) 211)1 21&=>< 0<1% 0&2<> 101=) >=> 12<> 10. 2&.> 200& 1&0. 1&0. 11>. 11<< 1)&& <0&& 0< %)%1. .>)0> 2>&

1 no. spare 2T and 1 no. spare -2 have been considered for each pro*ect

3.=

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

=**) 6equirement of ,witchyard equipments for different voltage levels corresponding to the unit si+e of each generation pro*ect have been assessed. :or pro*ects having unit si+e of )&& '(, switchyard equipments at voltage levels =.0 k@ and 1%2 k@ have been considered. ,imilarly, for pro*ects having unit si+e of ..& '( and 0&& '(, switchyard equipments at voltage levels <&&k@ and 1%2 k@ have been considered. :or pro*ects having unit si+e of %&&/20&/21& '( 5 2as modules having unit si+e of %.& '(, switchyard equipments at voltage levels 22& k@ have been considered. :or pro*ects having unit si+e of 120 '( requirement of switchyard equipment has not been considered since it would normally be at a voltage level of lesser than 1%2 k@. :or assessment of electrical equipments for switchyard of generating stations, . bays have been considered for each coal/1ignite based pro*ect, and ) bays for each module of gas pro*ect. The layout of the substations has been considered according to the prevailing practice for respective voltage levels. $ Areaker and a half scheme has been assumed at =.0 k@ 5 <&& k@ levels. :or 22& k@ level, -ouble main and transfer bus scheme has been assumed. 'ain and transfer bus scheme has been assumed at 1%2 k@. 6equirement of electrical equipment 3Item wise4 for switchyard associated with thermal plants during 11th and 12th lans is given in Table%.= %a&le'()1 Requirement of Ele"tri"al Equipments for 2wit"h#ards asso"iated with %hermal 2tations A. 765 kV Switchyard Equipment-Breaker and a half scheme (For projects having unit size of 800 MW) ""th #lan "%th #lan equirement f!r Item $% #r!&ects' $( #r!&ects' !ne Bay $"% Bays ' $5) Bays ' +ircuit ,eaker 3 nos. per 2 bays 18 81 iso!ators per Is!lat!rs bay 8 21" +urrent 2 sets per bay *ransf!rmer 2 108 1 set per !ine bay +V*-#* # 1 set per bus bar 1" $2 .i/htnin/ 1 set per bay arrest!r 12 % 0a1e *rap 2 nos. per bay 2 108 )22 kV Switchyard Equipments- Breaker and a half scheme (For projects having unit size of ""0 MW # %00 MW) ""th #lan "%th #lan equirement f!r $3) Item $"" #r!&ects' !ne Bay #r!&ects' $(6 Bays ' $%2) Bays '
3.)

*!tal $""#r!&ects' $66 Bays '


99 264 132

a. ,. c. d. e. f. B.

88 66 132

*!tal
$53 #r!&ects'

$3"4 Bays '

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

a. ,. c. d. e. f. +.

+ircuit ,eaker Is!lat!rs +urrent *ransf!rmer +V*-#* 5apless li/htnin/ arrest!r 0a1e *rap

3 nos. per 2 bays iso!ators per bay 2 sets per bay 1 set per !ine bay # 1 set per bus bar 1 set per bay

30" 81" 08

&& 2" 132

405 1080 540

2$2 20

88 ""

360

270 540

a. ,. c. d. e. f. <.

08 132 "3% 6V Equipments- 7ain and transfer Scheme $8!r pr!&ects ha1in/ unit si9e !f 422 70: 662 70 ; 522 70' ""th #lan "%th #lan equirement f!r $36 Item $%2#r!&ects' !ne Bay #r!&ects' $"%2 Bays ' $%"6 Bays ' +ircuit ,eaker 1 no. per bay 21" 120 3 iso!ators per Is!lat!rs bay " 8 3"0 +urrent 1 sets per bay *ransf!rmer 21" 120 1 set per !ine bay +V*-#* # 1 set per bus bar 32 180 5apless li/htnin/ 1 set per bay arrest!r 21" 120 0a1e *rap 2 nos. per bay 32 2 0

2 nos. per bay

*!tal
$66 #r!&ects'

$336 Bays'
336 1008 336

504

336 672

a. ,. c. d. e.

%%2 kV Switchyard equipment-<!u,le main and transfer (For projects having unit size of 300'2%0 MW # (as )o*u!es having unit size of 3"0 MW) ) ""th #lan "%th #lan *!tal equirement f!r $3) Item $) #r!&ects' $)6 #r!&ects' !ne Bay #r!&ects' $%) Bays' $%(2 Bays' $%"4 Bays' +ircuit ,eaker 1 nos. per bays 218 2 242 3 iso!ators per Is!lat!rs bay "% $2 726 +urrent 1 sets per bay *ransf!rmer 218 2 242 1 set per !ine bay +V*-#* # 1 set per bus bar 320 3" 356 5apless li/htnin/ 1 set per bay arrest!r 218 2 242
3.>
6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

f.

0a1e *rap

2 nos. per bay

3"

484

N"%eD 1 &e% E 3 &*$+!e .h &e ($*%& 3.1.2 H,)r" P"#er P! $%&( *$'!()*$+ &#*%'h, r) e-(*.me$%)

:or hydro plants, requirement of equipment has been assessed corresponding to a capacity addition of 1=,1)> '( during 11th lan and a capacity addition of about %&,&&& '( during 12th lan. ,ince each hydro ;plant is site specificB there is no set rule or norms for estimation. The broad basis followed in the estimation of the other components of hydro pro*ects for 11th 5 12th lan is as under. *) G %e& C H"*&%&D The number of radial gates roughly varies between % 5 1< numbers depending on type of hydro scheme. #umber of 2ates depends on length of dam and type of scheme i.e. storage scheme or 6un;of;6iver schemes. The number of spillway radial gates is more for storage scheme compared with 696 ,cheme. 7er%*' ! L*/% G %e&D @ertical gift gates are normally installed for overflow spillway, intake structures, desilting chamber outlets, surge shaft outlets, draft tube, tail race outfall etc. -epending on type of scheme it may vary between 0 5 2&. :or 696 scheme with C6T, the number of vertical lift gates is more compared with storage scheme. H,)r" T(r;*$e $) A(>*!* r*e& (M"%"r& .!(& C"$%r"! Ce$%re&)D 9ne set of Turbine and au"iliaries have been considered for each unit. The '( output rating of turbine shall match unit rating. M *$ I$!e% 7 !=e (MI7)D 2enerally, 9ne 'I@, in each unit is provided in penstock e"cept for low head C! schemes/-am Toe C! ,chemes. D*+*% ! G"=er$"rD 9ne set of -igital 2overnor with accessories is provided for each 2enerating 8nit. S,$'hr"$"(& Ge$er %"r $) A&&"'* %e) A(>*!* r*e&D The '@$ capacity of synchronous generator has been estimated considering power factor of &.>. S% %*' E>'*% %*"$ S,&%emD 9ne set of !"citation !quipment with accessories is considered for each 2enerating 8nit. D,$ m*' ?r :*$+ E-(*.me$%D -ynamic braking equipment is generally provided with large hydro generating units with high speed machines. The number has been estimated accordingly. U$*% C"$%r"! ?" r) (UC?)D 9ne set of 8CA is considered with each generating unit.

**)

***)

*=) =) =*) =**) =***)

*>)

3.1&

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

>)

I&"! %e) Ph &e ?(& D('% $) %erm*$ ! 8 % .-"// "/ e-(*.me$%&D The length of I A- depends on layout of power house and varies from scheme to scheme. The estimation is based on e"perience. 11:7813.B:7824:7 CTF&D #umber of CTDs depends on protection and metering scheme of particular plant, however, for estimation purposes 1& to 1> CTED per phase per unit has been considered depending on unit si+e. Ne(%r ! Gr"($)*$+ C(;*'!eD 9ne set of #eutral grounding cubicle is considered for each generating unit. 132:78221:78411:7 Ge$er %"r Tr $&/"rmer&D The '@$ 2enerator transformer rating is normally taken as 11&F of generator rating, the same has been considered in estimation. U$*% $) L*$e Pr"%e'%*"$ P $e!&D 9ne set of protection panels are considered each for 2enerating 8nits, Aus;bar, outgoing feeder, !C@ cable / bus;duct, 6eactors etc. C"m.(%er*Ge) C"$%r"! S,&%em (CCS)D 9ne set of CC, equipment has been considered for each hydro station. A*r I$&(! %e) S#*%'h+e r $) G & I$&(! %e) S#*%'h+e rD 2I, has been considered for under;ground 22&k@ / <&&k@ switchyard, while conventional outdoor switchyard for surface / semi underground schemes. EOT Cr $e&D The total installed tonnage capacity of !9T cranes is based on broad estimation of stator and rotor weights, though these weights may vary drastically even for machines of similar rating.

>*)

>**) >***)

>*=)

>=) >=*)

>=**)

>=***) EH7H ILPE ' ;!e&H EH7 ?(& D('%D The cable requirement depends on layout of power house and varies from scheme to scheme. The estimation is based on e"perience. >*>) U$*% A(>*!* r, $) S% %*"$ Ser=*'e Tr $&/"rmer&D The total capacity of unit and station au"iliary transformers has been considered as 1.2F of installed capacity. 11:7 S#*%'h+e r ?" r)G The 11k@ switchgear boards vary from station to station depending on 11k@ scheme. Cowever for estimation purposes two 1T boards per unit has been considered. P"#er $) C"$%r"! C ;!e&D There is no set rule for estimating power and control cable lengths as it depends on layout and control philosophy. The estimation is based on e"perience. 111782217 DC S,&%em (? %%er*e&H Ch r+er $) DCD?)D The battery capacity varies between <&&$C to 1)&&$C, and battery chargers from 2 to < numbers depending on number of units and total installed capacity.

>>)

>>*)

>>**)

>>***) Gr"($)*$+ S,&%emG The total tonnage of grounding material vary from station to station depending on layout of power plant, fault level, soil resistivity etc.
3.11
6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

>>*=) DG Se%&G The '@$ capacity on -2 sets for C! plants vary between 0&&H@$ to 2&&&H@$ depending on requirements worked out during detailed engineering. >>=) I!!(m*$ %*"$ S,&%emH F*re Pr"%e'%*"$ S,&%emH Ser=*'e W %er S,&%emH O*! H $)!*$+ $) P(r*/*' %*"$ S,&%emH 7e$%*! %*"$ S,&%emH A*r C"$)*%*"$*$+ S,&%emH L*/%&H C"mm($*' %*"$ S,&%em $) M*&'e!! $e"(& *%em& !*:e 7*)e" C mer H S*!% M"$*%"r*$+ S,&%emH GPS S,&%emH S.e'* ! C ;!e& !*:e OPGW e%'.G These systems are provided in power plant as per requirement.

-etails of the various equipments are as followsG

3.12

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

%a&le'()8 %otal Requirement of Equipment for 3#dro ro4e"ts of 11th lan and 1!th lan Capa"it# $ddition rogramme
N". 1. E-(*.me$% 11%h P! $
(1AH1B< MW)

12%h P! $
(31H111 MW)

T"% !

2 % < 0 . = ) > 1& 11 12 1% 1< 10 1. 1= 1) 1> 2&

21 22 2% 2<

Cydro;'echanical 2ates 5 Coist 3sets4 3i4 6adial spillway 2ates 276 3ii4 @ertical 1ift 2ates 403 Autterfly @alve 3,ets4 31 'ain Inlet @alve 3,ets4 115 !lectro;'echanical Turbine 3'(4 17189 Turbine 3#o.4 1>> -igital 2overnors 3#os.4 1>> ,yn. 2enerator 3'@$4 18908 ,yn. 2enerator3#o.4 1>> 8nit Control Aoard 3sets4 1>> 'otor 5 'otor Control Centres 38nits4 1366 Transformers 38$T 5 ,,T4 3'@$4 228 ,tatic !"citation ,ystem 3,ets4 1>> -ynamic Araking Isolators 3,ets4 60 #2 cubicle incl. Transformer 3,et4 1>> 11/1%.) k@/2<k@ Isolated hase Aus -ucts 3I A-4 3metres4 38367 11/1%.)/2< k@ CTs 3 1; hase 8nits4 9208 ,$@T Cubicle 3,ets4 1>> 1%2k@/22&k@/<&& k@ 2enerator Transformer 3'@$4 21026 11k@ ,witchgear Aoards 38nits4 207 1%2k@/22&k@/<&& k@ 9utdoor switchgear 38nits4 Circuit breaker 476 Capacitor voltage 323 transformer3C@T4 !C@ @oltage Transformers 161 1ighting $rresters31$4 967 Isolators 497 !C@ Current Transformers 1128 <10 @ ,witchgear Aoard 8nits 555 22&/<&& k@ 2I, 3Aays4 134 !C@ I1 ! Cable 3Hm4 42 !C@ Aus -uct 3Hm4 18

482 704 54 200 30000

=0= 11&= )0 %10 <=,1)> 0<> 0<> 01,>&= 0<> 0<> %,=0& .2= 0<> 1.0 0<> 1&0,%2) 20,2)& 0<> 0=,=2% 0.)

%0& %0&
32999

%0& %0&
2384 398

%0&
105

%0&
66962 16072

%0&
36697 361 831 565 281 1687 868 1968 968 234 73 32

1%&= ))) <<% 2.0< 1%.0 %&>. 102% %.) 110 01

3.1%

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

3.2

REQUIREMENT OF ELECTRICAL EQUIPMENTS FOR POWER SYSTEM

The requirement of electrical requirement for power system has been estimated based on the transmission e"pansion plans corresponding to tentative capacity addition during the 11th lan. In case of 12th lan, the transmission e"pansion has been assumed to be same as for the 11th lan. The transmission e"pansion plans include the circuit length of transmission lines at respective voltage levels and details of substation requirement for the entire transmission system. Aased on the number of substations and the voltage levels at each substation, the total number of bays at each voltage level has been estimated as shown below in the table %.>. %a&le ()5 %otal .um&er of Ba#s at ea"h 6oltage Le7el

S.N ". 1. 2. %. <.

7"!% +e Le=e! =.0 k@ <&&k@ 22&k@ 1%2k@

N". "/ ? ,& 11 P! $ 12%h P! $ .2 .2 ==< ==< %&.& %&.& =2)& =2)&
%h

T"% ! 12< 10<) .12& 1<0.&

The layout of the substations has been considered according to the prevailing practice for respective voltage levels. Areaker and half scheme has been assumed at =.0 k@ 5 <&& k@ level. :or 22& k@ level, -ouble main and transfer bus scheme has been assumed. 'ain and transfer bus scheme has been assumed at 1%2 k@ Aased on the substation layout schemes for each voltage level as detailed above, the normative requirement of substation equipment for each bay corresponding to each voltage level have been evolved. The total requirement of substation equipment has been assessed based on these norms. -etails of the same are as furnished in the following paras.

3.1<

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

3.2.1

E&%*m %e) Re-(*reme$% "/ E!e'%r*' ! E-(*.me$% /"r 7"!% +e Le=e! A05 :7 C 411 :7

The estimated requirement of electrical equipments for the transmission e"pansion planned for voltage levels =.0 k@ 5 <&& k@ for 11th and 12th lan is given below in the Table %.1&. %a&le'()10 Estimated Requirement of Ele"tri"al Equipment for 6oltage Le7el 16* 86 9 :00 86
A05 :7 11%h 12%h P! $ P! $ (211A- (2112NORMS 2112) 211A) T"% ! N"&. T"% ! N". "/ ? ,& C*r'(*% ?re :er I&"! %"r CT PT8C7T L*+h%e$*$+ Arre&%"r W =e Tr . % nos. per 2 bays < isolators per bay 2 sets per/ bay 1 set per line bay 5 1 set per bus bar 1 set per bay 2 nos. per bay .2 >% 2<) 12< =1 .2 12< .2 >% 2<) 12< =1 .2 12< % nos. per 2 bays < isolators per bay 2 sets per bay 1 set per line bay 5 1 set per bus bar 1 set per bay 2 nos. per bay 411 :7 11%h 12%h P! $ P! $ (211A(21122112) 211A) T"% ! N"&. ==< 11.1 %&>. 10<) )>& ==< 10<) ==< 11.1 %&>. 10<) )>& & ==< 10<)

NORMS

N"%eD 1 &e% E 3 &*$+!e .h &e ($*%&

3.10

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

3.2.2

E&%*m %e) Re-(*reme$% "/ E!e'%r*' ! E-(*.me$% /"r 7"!% +e Le=e! 221 :7 C 132 :7

The estimated requirement of electrical equipments for the transmission e"pansion planned for voltage levels 22& k@ 5 1%2 k@ for 11 th and 12th lan is given below in the following table %.11 . Table-3.11 Estimated Requirement of Electrical Equipment for Voltage Level 220 V ! 132 V for 11t" and 12t" #lan
221 :7 N"&. 132 :7 N"&.

11%h P! $ (211A2112)

12%h P! $ (2112211A)

11%h P! $ (211A2112)

T"% ! N"&. T"% ! N". "/ ? ,& C? I&"! %"r CT PT8C7T LA W =e Tr . 1no. per bay < isolators per bay 1 set per bay 1 set per line bay 5 1 set per bus bar 1 set per bay 2 nos. per bay %&.& %&.& 122<& %&.& %&.& %&.& .12& %&.& %&.& 122<& %&.& %&.& %&.& .12& 1no. per bay % isolators per bay 1 set per bay 1 set per line bay 5 1 set per bus bar 1 set per bay 2 nos. per bay

12%h P! $ (2112211A) T"% ! N"&. =2)& =2)& 21)<& =2)& =2)& =2)& 1<0.&

=2)& =2)& 21)<& =2)& =2)& =2)& 1<0.&

N"%eD 1 &e% E 3 &*$+!e .h &e ($*%& 3.2.3 S(mm r, "/ Re-(*reme$% "/ E!e'%r*' ! E-(*.me$% /"r !! 7"!% +e Le=e!& (A05 :7H 411 :7H 221 @= C 132 :7) The total requirement of various substation equipments like circuit breaker, isolators etc. as per the transmission e"pansion plan during 11th 5 12th lan is summari+ed in Table %.12.

3.1.

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

%a&le ()1! %otal Ele"tri"al Equipment for ower 2#stem S.N". 1. 2. %. <. 0. .. I%em Circuit Areaker Isolator CT T/C@T 1ightening $rrestor (ave Trap 11%h P! $ 110>< %=<2< 12&12 11%&1 111=. 22%02 12%h P! $ 110>< %=<2< 12&12 11%&1 111=. 22%02 T"% ! 2%1)) =<)<) 2<&2< 22.&2 22%02 <<=&<

(hile assessing the above requirement, Areaker and Calf scheme has been considered for =.0 k@ 5 <&& k@ level. :or 22& k@ level, -ouble 'ain and Transfer bus scheme has been considered and for 1%2 k@, 'ain and Transfer Aus scheme has been considered. SUMMARY In this Chapter, requirement of electrical equipments for hydro and thermal power pro*ects, along with the corresponding switchyard equipments for different voltage levels, coming up during the 11th 5 12th lan have been assessed based on certain norms. The substation equipments have also been estimated as per the transmission e"pansion plan for 11th and 12th lan.

3.1=

6!78I6!'!#T 9: !1!CT6IC$1 !78I '!#T,