Apollo 12
Pete Conrad
Surveyor 3
November 1969
STAGE THREE
Cost Factors
Performance
455 sec Isp
Development
4,459.91 m/s Ve (exhaust velocity)
$4,687.50 per kg structure
5,333.33 m/s Vf (stage velocity (ideal))
Development Budget
Mass Budget
300 kg payload (2 astronauts)
$7.50 million Payload
200 kg stage 3 structure
$4.93 million Stages
980 kg oxygen
160 kg hydrogen
Production Budget
STAGE TWO
Development Budget
Performance
$27.04 million
455 sec Isp
4,459.91 m/s Ve (exhaust velocity)
5,333.33 m/s Vf (stage velocity (ideal))
Production Budget
$5.41 million
Mass Budget
1,080 kg structure (stage 2)
5,390 kg oxygen
900 kg hydrogen
STAGE THREE
MOKAEROSPACE
COMMERCIAL LUNAR FLIGHT
STAGE ONE
TOTALS
Production Budget
Preliminary figures based on
$39.03 million
Karen Willcox MIT
Aerospace Computational Design Laboratory
16.885 Aircraft Systems Engineering Notes
PROJECT TOTAL
$343.78 million
Five tickets
Eighty-Five Million Dollars Each
$425.00 million total reserve
MOKAEROSPACE
COMMERCIAL LUNAR FLIGHT
Staging Requirement
Three Stages
STAGE 2
Delta Vee Requirement
5.334 km/sec
u = 1 - 1/exp(Vf/Ve)
Exhaust Velocity
4,459.91 m/sec
Propellant Fraction
0.697595
Structural Fraction
0.121842
Payload Fraction
0.180563
Vehicle Layout
Passenger
Operator
Lunar Lander
Capsule
Hydrogen
Oxygen
Booster
Hydrogen
Oxygen
Mass Table
Payload 300.0 - - -
In addition, Mok uses gases that are normally vented from the
lunar stage to provide essential life support elements
Consumables
Totals
49.60 kg - consumables
25.00 kg - biosuit
6.40 kg - toiletries
69.00 kg - astronaut
Micro-Electro-Mechanical Systems
Range of
MEMS
Robotic
Hands
MOKAEROSPACE
COMMERCIAL LUNAR FLIGHT