ESTIMATED PROJECT COST

Basis:
1 Material and Construction/ Installation cost, excluded VAT 10%.
2 No Scoping document and MTO are available yet.

No

Description of Work

Unit

I
A
1
2
3
4
5

CIVIL WORKS
PRELIMINARIES
Land Acquisition
Risk Assessment
Investigation
Survey & Setting Out
Project Management
Equipments for Construction
Temporary Facilities
Supervision
Administrations, insurances & bonds
6 Demolition Existing Building & Facilities

B
1
2
3
4
5
6
7
8
9
10
C
1
2
3
4
5

Ls
Ls
Ls
Ls
Ls
Ls
Ls

PLANT WORKS
Earth Filling Work
GT Foundation & Assesories (HSD Fuel Un1t & Gas Fuel Unit)
Trafo Foundation & Area
Fin Fan Cooler Foundation
Raw Water & Demin Wa1er Foundatton & Shelter
Waste Water Foundation & Shelter
WTP, Warehouse, Oil Compresor, Fuel Oil Treatment & Forwarding Pumps
Gas Compressor
Liquid Fuel Storage Tank & Liquid Fuel Clean Tank
Cable Duct, Pipe Support, etc

Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls

NON PLANT WORKS


Ouside Plant Road Works
Fencing Works
Gate Works
Guard Post, Internal Road, Drainage, Curb. Landscape, etc
Building (Control Room, Office & Camp)

Ls
Ls
Ls
Ls
Ls
TOTAL CIVIL WORKS

II MECHANICAL, ELECTRICAL & INSTRUMENTATION


A MAIN EQUIPMENTS

Complete GT type SGT-700


Exhaust Stack, including Silencer
Trial Run
Training
Erection and Commissioning
Back up Spares
Consumables for Operations
Transportation
Import Tax, PPN Import and PPH Import
Custom Clearance, Handling Local Transport

Unit
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls

B BALANCE OF PLANT
1 Auxiliary System, Closed Cooling Water System, Control System, Electrical System and
Production Database system
2 Fuel Supply and Residues Dispossal
3 Water Supply and Dispossal
4 Lifting Devices Cranes
5 Workshop, Stores and laboratory Equipments
6 Fire and gas Detection Central Equipments
7 CCTV, SCADA, DCS and Communication System
8 LAN Network System
9 Erection and Commissioning
TOTAL MECHANICAL, ELECTRICAL AND INSTRUMENTATION WORKS

Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls

TOTAL PROJECT COST


Analisis:
20 MW PLTG Cost @ 1.4 Juta USD/ MW

List of other project


1 kantor mewah Jakarta * (Maximal 1000 m2)
1 rumah Pondok Indah'
6 Mobil mewah
s Medcomm Power's Others

SUMMARY CALCULATION
1 EPCI of PLTG 20 MW Subcontractor cost (with Main Equipment is included) =
2 EPCI of PLTG 20 MW Subcontractor cost (with Main Equipment is excluded) =
Management Fee Medcomm Power 10%
Submitted EPCI of PLTG 20 MW Subcontractor cost (with Main Equipment is excluded) =
3 Main Equipment (SGT 700 Siemens) is under Cahaya Sakti supplied =
4 Other project cost

12,

Subtotal Cost
4 Approved Budget
Saldo

Factor =
Qty

1
1

Unit Price
USD

0.75

Amount
IDR

USD

1
1
1
1
1

12,794
4,139
10,668
12,295
-

223,487,327
24,078,362
1,612,065,126
521,497,183
1,344,160,333
1,549,145,606
131,313,065

1
1
1
1
1
1
1
1
1
1

35,486
84,234
6,938
4,761
6,947
4,024
11,267
681
70,239
9,413

239,527,877
568,579,219
46,828,934
32,138,673
46,891,358
27,161,979
76,050,556
4,596,118
474,114,122
63,538,432

1
1
1
1
1

45,864
10,365
1,325
75,152
189,811

309,578,936
69,964,839
8,943,392
507,276,439
1,281,225,169

IDR

Excluded, by Cahaya Sakti


Excluded, by Cahaya Sakti
223,487,327
24,078,362
12,794
1,612,065,126
4,139
521,497,183
10,668
1,344,160,333
12,295
1,549,145,606
131,313,065

35,486
84,234
6,938
4,761
6,947
4,024
11,267
681
70,239
9,413

239,527,877
568,579,219
46,828,934
32,138,673
46,891,358
27,161,979
76,050,556
4,596,118
474,114,122
63,538,432

45,864
10,365
1,325
75,152
189,811
596,402

309,578,936
69,964,839
8,943,392
507,276,439
1,281,225,169
9,162,163,046

1
1
1
1
1
1
1
1
1
1

1,278,300,024
-

By Cahaya Sakti

385,253,787

9,562,500.30

1
1
1
1
1
1
1
1

400,000
-

28,000,000

391,273,377
743,419,416
450,000,000
460,636,257
721,920,879
64,495,612
37,500,000
945,419,672

Subcontractor Cost =>

9,562,500

1,278,300,024
385,253,787

400,000
9,962,500

391,273,377
743,419,416
450,000,000
460,636,257
721,920,879
64,495,612
37,500,000
945,419,672
5,478,219,024

10,558,902

14,640,382,070
1,626,709.12

12,185,611

45,000,000

32,814,389
Actual cost
1200
1
6
1

50,000,000
20,000,000,000
1,500,000,000
10,000,000,000

60,000,000,000
20,000,000,000
9,000,000,000
10,000,000,000
99,000,000,000

Other Project Cost =>

11,000,000

12,185,611
12,185,611
1,218,561
13,404,172
19,908,439
11,000,000

USD
USD
USD
USD
USD
USD

44,312,612 USD
45,000,000 USD
687,388 USD

Unit Price
USD

Amount
IDR

297,983,103
32,104,483

USD

IDR

Excluded, by Cahaya Sakti


Excluded, by Cahaya Sakti
297,983,103
32,104,483

17,059
5,518
14,224
16,393

2,149,420,168
695,329,578
1,792,213,778
2,065,527,475
175,084,087

17,059
5,518
14,224
16,393

2,149,420,168
695,329,578
1,792,213,778
2,065,527,475
175,084,087

47,314
112,312
9,250
6,348
9,262
5,365
15,022
908
93,652
12,551

319,370,503
758,105,625
62,438,579
42,851,564
62,521,810
36,215,972
101,400,741
6,128,157
632,152,162
84,717,909

47,314
112,312
9,250
6,348
9,262
5,365
15,022
908
93,652
12,551

319,370,503
758,105,625
62,438,579
42,851,564
62,521,810
36,215,972
101,400,741
6,128,157
632,152,162
84,717,909

61,151
13,820
1,767
100,203
253,082

412,771,914
93,286,453
11,924,522
676,368,586
1,708,300,226

61,151
13,820
1,767
100,203
253,082

412,771,914
93,286,453
11,924,522
676,368,586
1,708,300,226
12,216,217,394

14,452,555
306,570
41,607
116,789
1,313,870
408,761
87,593
583,942

1,704,400,032

23,370,776,775.00
513,671,716

11,950,000

533,333

14,452,555
306,570
41,607
116,789
1,313,870
408,761
87,593
583,942
-

11,950,000
521,697,836
991,225,889
600,000,000
614,181,677
962,561,172
85,994,150
50,000,000
1,260,559,562

1,704,400,032
23,370,776,775
513,671,716

533,333
29,795,020

521,697,836
991,225,889
600,000,000
614,181,677
962,561,172
85,994,150
50,000,000
1,260,559,562
30,675,068,808

29,795,020

42,891,286,202
4,765,698.47

ESTIMATED PROJECT COST


Basis:
1 Material and Construction/ Installation cost, excluded VAT 10%.
2 No Scoping document and MTO are available yet.

No

Description of Work

Unit

Qty

Ls
Ls

1
1

Ls
Ls
Ls
Ls
Ls

PLANT WORKS
Earth Filling Work
GT Foundation & Assesories (HSD Fuel Un1t & Gas Fuel Unit)
Trafo Foundation & Area
Fin Fan Cooler Foundation
Raw Water & Demin Wa1er Foundatton & Shelter
Waste Water Foundation & Shelter
WTP, Warehouse, Oil Compresor, Fuel Oil Treatment & Forwarding Pumps
Gas Compressor
Liquid Fuel Storage Tank & Liquid Fuel Clean Tank
Cable Duct, Pipe Support, etc
NON PLANT WORKS
Ouside Plant Road Works
Fencing Works
Gate Works
Guard Post, Internal Road, Drainage, Curb. Landscape, etc
Building (Control Room, Office & Camp)

I
A
1
2
3
4
5

CIVIL WORKS
PRELIMINARIES
Land Acquisition
Risk Assessment
Investigation
Survey & Setting Out
Project Management
Equipments for Construction
Temporary Facilities
Supervision
Administrations, insurances & bonds
6 Demolition Existing Building & Facilities

B
1
2
3
4
5
6
7
8
9
10
C
1
2
3
4
5

Unit Price
USD

Amount
IDR

USD

B
1
2
3
4
5
6
7
8
9

BALANCE OF PLANT
Auxiliary System, Closed Cooling Water System, Control System and Electrical System
Fuel Supply and Residues Dispossal
Water Supply and Dispossal
Lifting Devices Cranes
Workshop, Stores and laboratory Equipments
Fire and gas Detection Central Equipments
Communication System
LAN Network System
Erection and Commissioning
TOTAL MECHANICAL, ELECTRICAL AND INSTRUMENTATION WORKS

Excluded, by Cahaya Sakti


Excluded, by Cahaya Sakti
297,983,103
32,104,483
17,059
2,149,420,168
5,518
695,329,578
14,224
1,792,213,778
16,393
2,065,527,475
175,084,087

1
1
1
1
1

17,059
5,518
14,224
16,393
-

297,983,103
32,104,483
2,149,420,168
695,329,578
1,792,213,778
2,065,527,475
175,084,087

Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls

1
1
1
1
1
1
1
1
1
1

47,314
112,312
9,250
6,348
9,262
5,365
15,022
908
93,652
12,551

319,370,503
758,105,625
62,438,579
42,851,564
62,521,810
36,215,972
101,400,741
6,128,157
632,152,162
84,717,909

47,314
112,312
9,250
6,348
9,262
5,365
15,022
908
93,652
12,551

Ls
Ls
Ls
Ls
Ls

1
1
1
1
1

61,151
13,820
1,767
100,203
253,082

412,771,914
93,286,453
11,924,522
676,368,586
1,708,300,226

Unit
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls

1
1
1
1
1
1
1
1
1
1

14,452,555
306,570
41,607
116,789
1,313,870
408,761
87,593
583,942
-

Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls

1
1
1
1
1
1
1
1
1

11,950,000
-

47,314
112,312
9,250
6,348
9,262
5,365
15,022
908
93,652
12,551

319,370,503
758,105,625
62,438,579
42,851,564
62,521,810
36,215,972
101,400,741
6,128,157
632,152,162
84,717,909

47,314
112,312
9,250
6,348
9,262
5,365
15,022
908
93,652
12,551

319,370,503
758,105,625
62,438,579
42,851,564
62,521,810
36,215,972
101,400,741
6,128,157
632,152,162
84,717,909

61,151
13,820
1,767
100,203
253,082
795,202

412,771,914
93,286,453
11,924,522
676,368,586
1,708,300,226
12,216,217,394

61,151
13,820
1,767
100,203
253,082

412,771,914
93,286,453
11,924,522
676,368,586
1,708,300,226

61,151
13,820
1,767
100,203
253,082

412,771,914
93,286,453
11,924,522
676,368,586
1,708,300,226
12,216,217,394

1,704,400,032
23,370,776,775
513,671,716

14,452,555
306,570
41,607
116,789
1,313,870
408,761
87,593
583,942
-

1,704,400,032
23,370,776,775
513,671,716

14,452,555
306,570
41,607
116,789
1,313,870
408,761
87,593
583,942

14,452,555
306,570
41,607
116,789
1,313,870
408,761
87,593
583,942
-

1,704,400,032
23,370,776,775
513,671,716

521,697,836
991,225,889
400,000,000
614,181,677
962,561,172
85,994,150
50,000,000
1,260,559,562

11,950,000
29,261,687

521,697,836
991,225,889
400,000,000
614,181,677
962,561,172
85,994,150
50,000,000
1,260,559,562
30,475,068,808

11,950,000

11,950,000
29,261,687

521,697,836
991,225,889
600,000,000
614,181,677
962,561,172
85,994,150
50,000,000
1,260,559,562
30,675,068,808

30,056,889

42,691,286,202

29,261,687

42,891,286,202

Subcontractor Cost =>

50,000,000
20,000,000,000
1,100,000,000
5,000,000,000

75,000,000,000
20,000,000,000
5,500,000,000
5,000,000,000
105,500,000,000

Other Project Cost =>

11,722,222

SUMMARY CALCULATION
1 EPCI of PLTG 20 MW Subcontractor cost (with Main Equipment is included) =
2 EPCI of PLTG 20 MW Subcontractor cost (with Main Equipment is excluded) =
Management Fee Medcomm Power 10%
Submitted EPCI of PLTG 20 MW Subcontractor cost (with Main Equipment is excluded) =
3 Main Equipment (SGT 700 Siemens) is under Cahaya Sakti supplied =
4 Other project cost
Subtotal Cost
4 Approved Budget
Saldo

34,800,366
17,800,366
1,780,037
19,580,402
17,000,000
11,722,222
48,302,624
45,000,000
(3,302,624)

USD
USD
USD
USD
USD
USD
USD
USD
USD

Excluded, by Cahaya Sakti


Excluded, by Cahaya Sakti
297,983,103
32,104,483

319,370,503
758,105,625
62,438,579
42,851,564
62,521,810
36,215,972
101,400,741
6,128,157
632,152,162
84,717,909

Actual cost
1500
1
5
1

IDR

2,149,420,168
695,329,578
1,792,213,778
2,065,527,475
175,084,087

17,800,366

45,000,000
27,199,634

List of other project


1 kantor mewah Jakarta * (Maximal 1000 m2)
1 rumah Pondok Indah'
5 Mobil mewah
1 Software operation maintainance

297,983,103
32,104,483

USD

17,059
5,518
14,224
16,393

4,743,476.24
28,000,000

Amount
IDR

2,149,420,168
695,329,578
1,792,213,778
2,065,527,475
175,084,087

TOTAL PROJECT COST


Analisis:
20 MW PLTG Cost @ 1.4 Juta USD/ MW

USD

17,059
5,518
14,224
16,393

TOTAL CIVIL WORKS


II MECHANICAL, ELECTRICAL & INSTRUMENTATION
A MAIN EQUIPMENTS
Complete GT type SGT-700
Exhaust Stack, including Silencer
Trial Run
Training
Erection and Commissioning
Back up Spares
Consumables for Operations
Transportation
Import Tax, PPN Import and PPH Import
Custom Clearance, Handling Local Transport

Unit Price
IDR

Exclude:
17,000,000.00 (Main Eqs. Cost)

38,438,532
6,561,468

1,704,400,032

23,370,776,775.00
513,671,716

521,697,836
991,225,889
600,000,000
614,181,677
962,561,172
85,994,150
50,000,000
1,260,559,562

4,765,698.47

No

Description of Work

Unit

I
A
1
2
3
4
5

CIVIL WORKS
PRELIMINARIES
Land Acquisition
Risk Assessment
Investigation
Survey & Setting Out
Project Management
Equipments for Construction
Temporary Facilities
Supervision
Administrations, insurances & bonds
6 Demolition Existing Building & Facilities

B
1
2
3
4
5
6
7
8
9
10
C
1
2
3
4
5

Ls
Ls
Ls
Ls
Ls
Ls
Ls

PLANT WORKS
Earth Filling Work
GT Foundation & Assesories (HSD Fuel Un1t & Gas Fuel Unit)
Trafo Foundation & Area
Fin Fan Cooler Foundation
Raw Water & Demin Wa1er Foundatton & Shelter
Waste Water Foundation & Shelter
WTP, Warehouse, Oil Compresor, Fuel Oil Treatment & Forwarding Pumps
Gas Compressor
Liquid Fuel Storage Tank & Liquid Fuel Clean Tank
Cable Duct, Pipe Support, etc

Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls

NON PLANT WORKS


Ouside Plant Road Works
Fencing Works
Gate Works
Guard Post, Internal Road, Drainage, Curb. Landscape, etc
Building (Control Room, Office & Camp)

Ls
Ls
Ls
Ls
Ls
TOTAL CIVIL WORKS

II MECHANICAL, ELECTRICAL & INSTRUMENTATION


A MAIN EQUIPMENTS
Complete GT type SGT-700
Exhaust Stack, including Silencer
Trial Run
Training
Erection and Commissioning
Back up Spares
Consumables for Operations
Transportation

Unit
Ls
Ls
Ls
Ls
Ls
Ls
Ls

Import Tax, PPN Import and PPH Import


Custom Clearance, Handling Local Transport

Ls
Ls

B BALANCE OF PLANT
1 Auxiliary System, Closed Cooling Water System, Control System and Electrical System

Ls

2
3
4
5
6
7
8
9

Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls

Fuel Supply and Residues Dispossal


Water Supply and Dispossal
Lifting Devices Cranes
Workshop, Stores and laboratory Equipments
Fire and gas Detection Central Equipments
Communication System
LAN Network System
Erection and Commissioning
TOTAL MECHANICAL, ELECTRICAL AND INSTRUMENTATION WORKS

TOTAL PROJECT COST


Analisis:
20 MW PLTG Cost @ 1.4 Juta USD/ MW

1 kantor mewah Jakarta


5 Mobil mewah
2 Software operation maintainance

Qty

Unit Price
USD

Amount
IDR

USD

IDR

1
1

425,690,147
45,863,547

Excluded, by Cahaya Sakti


Excluded, by Cahaya Sakti
425,690,147
45,863,547

1
1
1
1
1

3,070,600,240
993,327,968
2,560,305,397
2,950,753,536
291,806,812

3,070,600,240
993,327,968
2,560,305,397
2,950,753,536
291,806,812

1
1
1
1
1
1
1
1
1
1

1,064,568,343
2,527,018,751
208,128,596
142,838,545
208,406,034
120,719,907
338,002,470
20,427,191
2,107,173,874
282,393,029

1,064,568,343
2,527,018,751
208,128,596
142,838,545
208,406,034
120,719,907
338,002,470
20,427,191
2,107,173,874
282,393,029

1
1
1
1
1

1,375,906,381
310,954,842
39,748,407
2,254,561,953
5,694,334,085

1,375,906,381
310,954,842
39,748,407
2,254,561,953
5,694,334,085
27,033,530,055

1
1
1
1
1
1
1
1

17,003,006
360,671
48,949
137,399
1,545,729
480,895
103,050
686,991

2,434,857,188

17,003,006
360,671
48,949
137,399
1,545,729
480,895
103,050
686,991

2,434,857,188
-

1
1

Excluded, by Cahaya Sakti


733,816,737

733,816,737

14,058,824

14,058,824

1
1
1
1
1
1
1
1

695,597,115
1,321,634,518

695,597,115
1,321,634,518
Excluded, by Cahaya Sakti
818,908,902
1,283,414,896
114,658,866
Excluded, by Cahaya Sakti
1,680,746,083
34,425,514
9,083,634,305

818,908,902
1,283,414,896
114,658,866
1,680,746,083

34,425,514

36,117,164,360
4,013,018.26

28,000,000

38,438,532
10,438,532

Sisa

2000
5
1

40,000,000

1,561,468

12,000,000
108,000,000,000
Palsu Cost

Actual cost
45,000,000
90,000,000,000
1,100,000,000
5,500,000,000
5,000,000,000
5,000,000,000
100,500,000,000

11,166,667
om

BUDGET EXPENDITURE PLAN


A. Startup Cost
1 Gedung (Penambahan Sewa 1 Tahun)
2 Office space renovasion/Equipment/ Furniture/ Other
3 PC and Software
New Server + UPS 25 KVA
PC and Note book
Printer/ Scan/ Fax A4 Color (1 buah) - Laser jet Duplex
Printer A3 (1 buah) - Laser jet Duplex
Plotter A0
Fotocopy 1 buah - Duplex
Software - Hysis (Rental)
Sofware - Pipesym/Pipephase (Rental)
Software - Etab (Rental)
Software - SAB (Rental)
Software - Primavera (Rental)
Software - InstCalc (Rental)
Software - Microsoft Office
Sofware - smartsheet
Software - Aveva Solution (Rental)
Software Auto Cad (5 copies)
Software PDS (Rental)
Software Bid4Build Cost Estimator
Software Best EstimatePro
4 WAN/ LAN facilities
SUBTOTAL

400,000,000
169,500,000
1,228,342,000
40,000,000
270,000,000
60,000,000
40,000,000
50,000,000
25,000,000
75,000,000
30,000,000
30,000,000
15,000,000
15,000,000
15,000,000
54,000,000
29,592,000
75,000,000
180,000,000
150,000,000
13,500,000
11,250,000
50,000,000
1,847,842,000

B. Over Head Cost


1 Man Power for 3 Months
a. Professional Staff
b. Non Professional Staff
2 Operational Cost for 3 Months
a. Project Management
b. Survey
c. Engineering
Transport and Accomodation at site
Office and Project Overhead

1,290,000,000
105,000,000

1,236,000,000
471,500,000

SUBTOTAL

3,102,500,000

TOTAL

4,950,342,000

ANNUAL OVERHEAD (MAN POWER, OFFICE AND PROJECT OPERATION COST)


A. Man Power (Including Office Overhead And Personnal Benefit)
1 REMUNIRATION OF EXPERTS
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

PERSONNEL
Project Manager
Contract Specialist
Project Support
Project Control and Scheduler
HSE
IT
Power Plant Equipment Specialist - Main Equipment
Power Plant Equipment Specialist - Utility and Fuel System
Power Plant Equipment Specialist - SCADA/ Control/ Instrumentation
Power Plant Equipment Specialist - Electrical
Sr Engineer - System Design
Sr Engineer - Process
Sr Engineer - Mechanical
Sr Engineer - Piping
Sr Engineer - Electrical
Sr Engineer - Control and SCADA
Sr Construction Engineer - Civil and Structure
Sr Construction Engineer - Mechanical
Sr Construction Engineer - Piping
Sr Construction Engineer - Electrical
Sr Construction Engineer - Control and instrumentation
Sr QA Engineer
Sr QC Engineer
Sr. Inspectors
Finance Cost Control
Finance Accountant
Sr. Commissioning Engineers
Sr. Operation/ Reliability Engineering Specialist
Sr. Maintenance Specialist

QTY
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1

1
1
20

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

UNIT
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
Man Month
SUBTOTAL

UNIT PRICE (Rp)


50,000,000
25,000,000
10,000,000
15,000,000
10,000,000
10,000,000
25,000,000
25,000,000
25,000,000
25,000,000
20,000,000
20,000,000
20,000,000
20,000,000
20,000,000
20,000,000
20,000,000
20,000,000
20,000,000
20,000,000
20,000,000
20,000,000
20,000,000
20,000,000
10,000,000
10,000,000
25,000,000
25,000,000
25,000,000
595,000,000

COST (Rp)
150,000,000
75,000,000
30,000,000
45,000,000
30,000,000
30,000,000
75,000,000
75,000,000
75,000,000
75,000,000
60,000,000
60,000,000
60,000,000
60,000,000
60,000,000
60,000,000
60,000,000
60,000,000
75,000,000
75,000,000
1,290,000,000

SUBTOTAL

UNIT PRICE (Rp)


8,000,000
4,000,000
4,000,000
3,000,000
19,000,000

COST (Rp)
48,000,000
12,000,000
36,000,000
9,000,000
105,000,000

UNIT PRICE (Rp)

COST (Rp)

2 REMUNIRATION OF SUPPORTING STAFF


NO.
1
2
3
4

PERSONNEL

QTY

Drafter/ CAD Operator


Administration
Driver
Secretary

2
1
3
1
7

3
3
3
3

UNIT
Man Month
Man Month
Man Month
Man Month

B. Site Visit, Space Rental, Equipment Rental, Field Operation Cost And Miscellaneous Items (Within 3 Months only)
1 TRANSPORTATIONS AND ACCOMODATIONS DURING SITE VISIT
NO.
A.
1
2
3

DESCRIPTIONS
Transportations Cost
Jakarta - Site return for team (Medan-Balikpapan/Tarakan)
Baggage Excess Cargo
Transportation on site
- Car rental 4x4 WD including gasoline and park
4 Jakarta and Site Transportation
- Car rental 2x4 WD including gasoline and tol fee

UNIT

QTY
4
4

12 Trips
12 Lots

60 Ea Days

B. Accomodation Cost
1 Lodging (Hotel - 3 star)
2 Meal

4
4

3,000,000
500,000

144,000,000
24,000,000

10,000,000

600,000,000

20,000,000

240,000,000

SUBTOTAL

750,000
200,000
34,450,000

180,000,000
48,000,000
1,236,000,000

SUBTOTAL
TOTAL COST

UNIT PRICE (Rp)


66,666,667
50,000,000
2,000,000
2,500,000
121,166,667
769,616,667

COST (Rp)
200,000,000
150,000,000
54,000,000
67,500,000
471,500,000
3,102,500,000

3 Ea Months

60 Night
60 days

2 EQUIPMENT RENTAL, COMMUNICATIONS, Etc.


NO.
1
2
3
4

DESCRIPTIONS
Office Working Space
Project and site office operation cost
Medicare
Insurance

UNIT

QTY
1
1
27
27

3
3
1
1

Months
Months
Lot
Packs

Asumsi:
A.
B.

Budget yang disediakan untuk PLTG oleh Medcomm Power adalah =


1
2
3
4
5
6

Harga penawaran lumpsum subcontractor


Komitmen Fee untuk Boss (Dibayar saat terima PO)
Cost of money untuk subcontractor/ investor
Harga Premium untuk Subcontractor
Biaya PMC EPRO
Biaya Overhead untuk Project Life Time Operation
TOTAL
SALDO

1
2
3
4

BENEFIT EPRO
KF
PMC Fee
Fee Gema sebagai PMC dan Engineering
Bonus saldo 30%
Subtotal
Total

1
2
3
4

BENEFIT MEDCOMM POWER


Commitment Fee 50% Cash in advance, 50% by progress payment)
Operation Saving Cost (Promised target from EPRO of Over Head = 25%)
Bonus saldo 70% - EPRO 30%
Cash at Project Account Medcomm Power
Subtotal

PLTG Tarakan
17,000,000

LPG Terminal
36,000,000

LPG Terminal

12,185,611
3,000,000
600,000
15,785,611
222,222
855,130
16,862,963
137,037

30,857,143
3,000,000
600,000
34,457,143
444,444
1,026,156
35,927,743
72,257

2,000,000
222,222
821,355
41,111
3,084,688
10,051,445

2,000,000
444,444
1,722,857.14
21,677.14
4,188,979

2,777,778
2,777,778

1,000,000
213,782
95,926
949,410.02
2,259,118

1,000,000
256,539
50,580
2,072,257.14
3,379,376

2,777,778
2,777,778
5,555,556

PLTG Tarakan
Factor =
LPG Terminal
Price Factor =

2,777,778
2,777,778

0.75

86%

Cash Flow Analisys

March

April

A. MEDCOMM POWEL
Modal

28,000,000
17,000,000
15,785,611
222,222
11,000,000
42,756
949,410

Not to exeed value


Biaya Proyek PLTG
Biaya Proyek PMC
Biaya Proyek Others
Monthly Overhead
Sisa di Kas Medcomm

1 Cash-In
Dana dari Cahaya Sakti
Subtotal
2 Cash-Out
PLTG-Subcontractor
PLTG-PMC
Other Project
Over Head

8,400,000
8,400,000

1,400,000
1,400,000

44,444

23,704
2,200,000
42,756
2,223,704
8,438,505

42,756
44,444
9,262,209

Subtotal
Accumulatived Cash

B. MARIS AND SUWINO - LPG TERMINAL MEDAN


Modal

38,000,000
36,000,000
34,457,143
444,444
42,756
2,072,257.14

Not to exeed value


Biaya Proyek PLTG
Biaya Proyek PMC
Monthly Overhead
Sisa di Kas Medcomm

1 Cash-In
Dana dari JOE
Subtotal
2 Cash-Out
LPG-Subcontractor
LPG-PMC
Over Head
Subtotal

Accumulatived Cash

C. EPRO
A
1
2
3
4
5

Cash-In
KF
Operation Cost
PMC Fee
Fee Gema sebagai PMC dan Engineering
Bonus saldo 30%
Subtotal
B Cash-Out
Over Head
Subtotal
Accumulatived Cash

4,000,000
#REF!
3,444,444
2,544,212
62,788
#REF!

42,756
44,444
-

42,756
23,704
-

87,201

66,460

34,205.19
34,205
52,996

34,205.19
34,205
85,251

2012
May

1,400,000
1,400,000
3,157,122
23,704
1,100,000
42,756
4,280,826
5,557,679

June

July

1,400,000
1,400,000

1,400,000
1,400,000

August

September

October

1,400,000
1,400,000

1,400,000
1,400,000

1,400,000
1,400,000

23,704
1,100,000
42,756
1,123,704
5,833,976

1,683,799
5,926
1,100,000
42,756
2,789,724
4,444,251

5,926
1,100,000
42,756
1,105,926
4,738,325

1,683,799
5,926
1,100,000
42,756
2,789,724
3,348,601

1,683,799
5,926
1,100,000
42,756
2,789,724
1,958,876

11,400,000
11,400,000

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

133,333
42,756
176,090

6,891,429
14,815
42,756
6,949,000

2,297,143
14,815
42,756
2,354,714

2,297,143
14,815
42,756
2,354,714

2,297,143
14,815
42,756
2,354,714

NAL MEDAN

13,296,167

7,503,689

6,305,497

5,107,304

3,909,112

3,000,000
42,756
23,704
157,856

3,000,000
85,513
157,037
-

85,513
406,543
428,761

85,513
97,901
114,857

85,513
97,901
199,047

85,513
97,901
199,047

3,224,316

3,242,550

920,818

298,271

382,461

382,461

59,859.07
59,859
3,249,708

59,859.07
59,859
6,432,399

59,859.07
59,859
7,293,357

59,859.07
59,859
7,531,770

59,859.07
59,859
7,854,372

59,859.07
59,859
8,176,974

2
November

December

January

February

March

April

1,400,000
1,400,000

1,400,000
1,400,000

1,400,000
1,400,000

1,400,000
1,400,000

1,400,000
1,400,000

1,400,000
1,400,000

420,950
11,852
1,100,000
42,756
1,532,801
1,826,075

420,950
11,852
1,100,000
42,756
1,532,801
1,693,273

420,950
11,852

420,950
11,852

841,899
11,852

841,899
11,852

42,756
432,801
2,660,472

42,756
432,801
3,627,670

42,756
853,751
4,173,919

42,756
853,751
4,720,168

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

2,297,143
14,815
42,756
2,354,714

2,297,143
14,815
42,756
2,354,714

2,297,143
14,815
42,756
2,354,714

1,148,571
14,815
42,756
1,206,143

1,148,571
14,815
42,756
1,206,143

1,148,571
14,815
42,756
1,206,143

2,710,920

1,512,727

314,535

264,914

215,293

165,672

85,513
103,827
135,905

85,513
103,827
135,905

85,513
103,827
135,905

85,513
103,827
78,476

85,513
103,827
99,524

85,513
103,827
99,524

325,245

325,245

325,245

267,816

288,864

288,864

59,859.07
59,859
8,442,360

59,859.07
59,859
8,707,745

59,859.07
59,859
8,973,131

59,859.07
59,859
9,181,088

59,859.07
59,859
9,410,093

59,859.07
59,859
9,639,097

2013
May

1,400,000
1,400,000

June

July

August

September

October

841,899
5,926

841,899
5,926

841,899

841,899

420,950

420,950

42,756
847,825
5,272,343

42,756
847,825
4,424,518

42,756
841,899
3,582,619

42,756
841,899
2,740,719

42,756
420,950
2,319,770

42,756
420,950
1,898,820

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,148,571
14,815
42,756
1,206,143

1,148,571
14,815
42,756
1,206,143

1,148,571
14,815
42,756
1,206,143

1,148,571
14,815
42,756
1,206,143

1,148,571
14,815
42,756
1,206,143

574,286
14,815
42,756
631,857

116,051

66,430

16,809

(32,812)

(82,433)

442,232

85,513
97,901
99,524

85,513
97,901
99,524

85,513
91,975
99,524

85,513
91,975
99,524

85,513
91,975
78,476

282,938

282,938

277,012

277,012

255,964

85,513
91,975
49,762
41,111
268,361

59,859.07
59,859
9,862,176

59,859.07
59,859
10,085,255

59,859.07
59,859
10,302,407

59,859.07
59,859
10,519,560

59,859.07
59,859
10,715,665

59,859.07
59,859
10,924,167

2
November

December

January

February

March

April

May

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

1,156,522
1,156,522

574,286
14,815
42,756
631,857

574,286
14,815
42,756
631,857

574,286
14,815
42,756
631,857

574,286
7,407
42,756
624,450

574,286
7,407
42,756
624,450

574,286
7,407
42,756
624,450

574,286
7,407
42,756
624,450

966,896

1,491,561

2,016,226

2,548,298

3,080,370

3,612,442

4,144,514

42,756
91,975
28,714

42,756
91,975
28,714

42,756
91,975
28,714

42,756
84,568
28,714

42,756
84,568
28,714

42,756
84,568
28,714

163,446

163,446

163,446

156,039

156,039

156,039

42,756
84,568
28,714
21,677
177,716

59,859.07
59,859
11,027,754

59,859.07
59,859
11,131,341

59,859.07
59,859
11,234,928

59,859.07
59,859
11,331,108

59,859.07
59,859
11,427,288

59,859.07
59,859
11,523,467

59,859.07
59,859
11,641,324

2014
June

July

August

September

October

November

December

77,160

154,320

77,160

77,160

77,160

77,160

154,321

77,160

154,320

77,160

77,160

77,160

77,160

154,321

59,859.07
59,859
11,658,625

59,859.07
59,859
11,753,087

59,859.07
59,859
11,770,388

59,859.07
59,859
11,787,690

59,859.07
59,859
11,804,991

59,859.07
59,859
11,822,292

59,859.07
59,859
11,916,754

ESTIMATED PROJECT COST


Basis:
1 Material and Construction/ Installation cost, excluded VAT 10%.
2 No Scoping document and MTO are available yet.

Factor =
No

Description of Work

Unit

I
A
1
2
3
4
5

CIVIL WORKS
PRELIMINARIES
Land Acquisition
Risk Assessment
Investigation
Survey & Setting Out
Project Management
Equipments for Construction
Temporary Facilities
Supervision
Administrations, insurances & bonds
6 Demolition Existing Building & Facilities

B
1
2
3
4
5
6
7
8
9
10
C
1
2
3
4
5

Qty

Ls
Ls

1
1

Ls
Ls
Ls
Ls
Ls

PLANT WORKS
Earth Filling Work
GT Foundation & Assesories (HSD Fuel Un1t & Gas Fuel Unit)
Trafo Foundation & Area
Fin Fan Cooler Foundation
Raw Water & Demin Wa1er Foundatton & Shelter
Waste Water Foundation & Shelter
WTP, Warehouse, Oil Compresor, Fuel Oil Treatment & Forwarding Pumps
Gas Compressor
Liquid Fuel Storage Tank & Liquid Fuel Clean Tank
Cable Duct, Pipe Support, etc
NON PLANT WORKS
Ouside Plant Road Works
Fencing Works
Gate Works
Guard Post, Internal Road, Drainage, Curb. Landscape, etc
Building (Control Room, Office & Camp)

Unit Price
USD

IDR

USD

B BALANCE OF PLANT
1 Auxiliary System, Closed Cooling Water System, Control System, Electrical System and
Production Database system
2 Fuel Supply and Residues Dispossal
3 Water Supply and Dispossal
4 Lifting Devices Cranes
5 Workshop, Stores and laboratory Equipments
6 Fire and gas Detection Central Equipments
7 CCTV, SCADA, DCS and Communication System
8 LAN Network System
9 Erection and Commissioning
TOTAL MECHANICAL, ELECTRICAL AND INSTRUMENTATION WORKS

IDR

Excluded, by Cahaya Sakti


Excluded, by Cahaya Sakti
223,487,327
24,078,362
12,794
1,612,065,126
4,139
521,497,183
10,668
1,344,160,333
12,295
1,549,145,606
131,313,065

1
1
1
1
1

12,794
4,139
10,668
12,295
-

223,487,327
24,078,362
1,612,065,126
521,497,183
1,344,160,333
1,549,145,606
131,313,065

Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls

1
1
1
1
1
1
1
1
1
1

35,486
84,234
6,938
4,761
6,947
4,024
11,267
681
70,239
9,413

239,527,877
568,579,219
46,828,934
32,138,673
46,891,358
27,161,979
76,050,556
4,596,118
474,114,122
63,538,432

35,486
84,234
6,938
4,761
6,947
4,024
11,267
681
70,239
9,413

239,527,877
568,579,219
46,828,934
32,138,673
46,891,358
27,161,979
76,050,556
4,596,118
474,114,122
63,538,432

Ls
Ls
Ls
Ls
Ls

1
1
1
1
1

45,864
10,365
1,325
75,152
189,811

309,578,936
69,964,839
8,943,392
507,276,439
1,281,225,169

45,864
10,365
1,325
75,152
189,811
596,402

309,578,936
69,964,839
8,943,392
507,276,439
1,281,225,169
9,162,163,046

Unit
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls

1
1
1
1
1
1
1
1
1
1

Ls

9,562,500.30

Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls

1
1
1
1
1
1
1
1

400,000
-

TOTAL CIVIL WORKS


II MECHANICAL, ELECTRICAL & INSTRUMENTATION
A MAIN EQUIPMENTS
Complete GT type SGT-700
Exhaust Stack, including Silencer
Trial Run
Training
Erection and Commissioning
Back up Spares
Consumables for Operations
Transportation
Import Tax, PPN Import and PPH Import
Custom Clearance, Handling Local Transport

0.75

Amount

1,278,300,024
-

By Cahaya Sakti

385,253,787

391,273,377
743,419,416
450,000,000
460,636,257
721,920,879
64,495,612
37,500,000
945,419,672

TOTAL PROJECT COST


Analisis:
20 MW PLTG Cost @ 1.4 Juta USD/ MW

28,000,000

Subcontractor Cost =>

9,562,500

1,278,300,024
385,253,787

400,000
9,962,500

391,273,377
743,419,416
450,000,000
460,636,257
721,920,879
64,495,612
37,500,000
945,419,672
5,478,219,024

10,558,902

14,640,382,070
1,626,709.12

12,185,611

45,000,000

32,814,389

List of other project


Actual cost
1 kantor mewah Jakarta * (Maximal 1000 m2)
1 rumah Pondok Indah'
6 Mobil mewah
s Medcomm Power's Others

1200
1
6
1

50,000,000
20,000,000,000
1,500,000,000
10,000,000,000

60,000,000,000
20,000,000,000
9,000,000,000
10,000,000,000
99,000,000,000

Other Project Cost =>

11,000,000

SUMMARY CALCULATION
1 EPCI of PLTG 20 MW Subcontractor cost (with Main Equipment is included) =
2 EPCI of PLTG 20 MW Subcontractor cost (with Main Equipment is excluded) =
Management Fee Medcomm Power 10%
Submitted EPCI of PLTG 20 MW Subcontractor cost (with Main Equipment is excluded) =
3 Main Equipment (SGT 700 Siemens) is under Cahaya Sakti supplied =
4 Other project cost
Subtotal Cost
4 Approved Budget
Saldo

12,185,611
12,185,611
1,218,561
13,404,172
19,908,439
11,000,000
44,312,612
45,000,000
687,388

USD
USD
USD
USD
USD
USD
USD
USD
USD

Asumsi:
A.
B.

Budget yang disediakan untuk PLTG oleh Medcomm Power adalah =


1
2
3
4
5
6

Harga penawaran lumpsum subcontractor


Komitmen Fee untuk Boss (Dibayar saat terima 50% setelah PO, 50% progress)
Cost of money untuk subcontractor/ investor
Harga Premium untuk Subcontractor adalah= HP + 1.2 kali KF
Biaya PMC EPRO
Biaya Overhead untuk Project Life Time Operation
TOTAL
SALDO

1
2
3
4

BENEFIT EPRO
KF
PMC Fee
Fee Gema sebagai PMC dan Engineering
Bonus saldo 30%
Subtotal
Total

1
2
3
4

BENEFIT MEDCOMM POWER


Commitment Fee 50% Cash in advance, 50% by progress payment)
Operation Saving Cost (Promised target from EPRO of Over Head = 25%)
Bonus saldo 70% - EPRO 30%
Cash at Project Account Medcomm Power
Subtotal

PLTG Tarakan
17,000,000
11,067,050
3,000,000
600,000
14,667,050
222,222
855,130
15,744,402
1,255,598
2,000,000
222,222
821,355
376,679
3,420,256
3,420,256

1,000,000
213,782
878,919
949,410.02
3,042,111

PLTG Tarakan
Factor =

0.75

CASH FLOW ANALISYS OF PLTG TARAKAN PROJECT


DETAIL FINANCIAL CALCULATION
Prep
Prep

PROJECT SCHEDULE
FINANCE SCHEDULE
100%

0%

15%

15%
80%
90%
95%
100%
100%

13
13

14
14

15
15

5%

5%

5%

5%

5%

5%

5%

5%

20%

10%

5%

5%

5%

5%

5%

5%

5%

5%

5%
10%
5%

5%

0%

0%

0%

0%

0%

0%

0%

0%

0%

10%

0%

0%

5%

10%

0%

0%

0%

0%

0%

15.0%

5.0%

10.0%

5.0%

5.0%
5.0%
5.0%

5.0%

5.0%
5.0%

5.0%

5%
5%

Critical Progress Phase (Using Investor Cost)


0.0%
0.0%
5.0%
5.0%

5%

25%

20%

10.0%
10.0%

5.0%

0.0%

0.0%

Construction Start

Critical Progress Phase (Using Investor Cost)


6.7%
6.7%
6.7%
6.7%
0.9%
0.9%
0.9%
0.9%
1.4%
1.4%
1.4%
1.4%
4.3%
4.3%
4.3%
4.3%

5%

6.7%
0.9%
1.4%
4.3%

15.0%

15.0%

15.0%

5.0%
10.0%

10.0%

5.0%
5.0%
5.0%

5.0%

6.7%
0.9%
1.4%
4.3%

6.7%
0.9%
1.4%
4.3%

6.7%
0.9%
1.4%
4.3%

1
2
3

0.17
0.33
0.50

6.7%
0.9%
1.4%
4.3%

6.7%
0.9%
1.4%
4.3%

6.7%
0.9%
1.4%
4.3%

6.7%
0.9%
1.4%
4.3%

6.7%
0.9%
1.4%
4.3%

6.7%
0.9%
1.4%
4.3%

PROJECT PREPARATION

6.7%
0.9%
1.4%
4.3%

Critical Progress Phase (Using Investor Cost)


2,933
-

CASH IN SCHEDULE
BASED ON PROJECT PROGRESS

2,699
180
23
39
117

B. Over Head Cost


Man Power for 3 Months
Professional Staff
Non Professional Staff
Operational Cost
Site Survey
Transport and Accomodation at site
Office and Project Overhead

12
12

10%

Pengeluaran (Estimated)
A. Startup Cost
Gedung (Penambahan Sewa 1 Tahun)
Office space renovasion/Equipment/ Furniture/ Other
PC and Software
WAN/ LAN facilities
PPE (Personal Protection Equipment)
Personnel Uniform

11
11

20%

3,520

USD Thousand
1,500
440
1,760
1,320
5,020

10
10

5%

469

Working Capital from Investor (Estimated)


Comittment Fee
Project Preparation
Materials Only
Construction (Rental, Services, etc)

5%

Critical Progress Phase (Using Investor Cost)


10%
10%
35%
5%
5%
10%
35%

0%

352
2,933

14,667

9
9

5.0%

USD Thousand
352
469
4,693
3,520
352
587
1,760
11,734

Gross Revenue

8
8

10%

14,667,050
2,933,410
11,733,640

7
7

5%

USD Thousand
440
587
5,867
4,400
440
733
2,200
14,667

4,693

6
6

25%

13%
35%
100%

Project Management
Down Payment
Monthly Progress
Kick-off and Planning/ Down Payment Inisiated
Execution Management
Commissioning/ Startup
Training
Close Out report
Engineering Design
Monthly Progress
Start drafting
Drawn, not checked
Complete for office check
To owner for approval
First Issue
Final Issue*
Procurement
Monthly Progress
Bidders list developed
Inquiry documents complete
Bids analyzed
Contract awarded
Vendor drawings submitted
Vendor drawings approved
Equipment shipped
Equipment Received
Construction
Monthly Progress
Mobilization
Received and inspected
Setting/ Installation complete
Alignment complete
Internals installed
Testing complete
Accepted by owner
Other Cost
Monthly Progress
PPH 21 and PPH 23
Contingency 5%
Profit

5
5

5%

15%
25%
50%
60%
75%
90%
100%
100%

NILAI PROJECT
DP 20% After PO and Contract are signed
Progress Payment Subtotal
Total Progress Payment Based on Project Phases
Nilai Project (Offered)
Project Management
Engineering (FEED+Detail+offshore)
Materials
Construction
PPH 21 and PPH 23
Contingency 5%
Profit, Tax, Contingency, Other

5%

Critical Progress Phase (Using Investor Cost)


20%
15%
35%
5%
15%
15%
35%

0.0%

Nilai Project (Offered)


Project Management
Engineering (FEED+Detail+offshore)
Materials
Construction
PPH 21 and PPH 23
Contingency 5%
Profit

4
4

5%

PROJECT PROGRESS
BASIS FOR INVOICES

5%
10%
20%
55%
75%
85%
90%
100%
100%

3
3

15%

0%
5%
20%
35%
70%
95%
100%
100%

2
2

Critical Progress Phase (Using Investor Cost)

14,667

3,113

53
18
18
53
18
18
Critical Progress Phase (Using Investor Cost)
94
70
164
23
70
70
164
Critical Progress Phase (Using Investor Cost)
469
469
1,643
235
235
469
1,643
Critical Progress Phase (Using Investor Cost)
176
176
Critical Progress Phase (Using Investor Cost)
180
180
180
23
23
23
39
39
39
117
117
117

18
18
-

18
18
-

18
18
-

18
18
-

18
18
-

18
18
-

18
18
-

18
18
-

18
18
-

70
18
35
18
-

35
18
18

117
117
-

23
23

939
939
-

469
469
-

235
235
-

469
469

176
176
-

528
176
352
-

528
352
176
-

528
176
176
176
-

528
176
176
176
-

176
176
-

352
176
176

176
176

180
23
39
117

180
23
39
117

180
23
39
117

180
23
39
117

180
23
39
117

180
23
39
117

180
23
39
117

180
23
39
117

180
23
39
117

180
23
39
117

180
23
39
117

2,181

1,606

843

198

198

960

1,195

726

726

374

602

415

352
352
-

Construction Start

Project Management
Monthly Progress
Kick-off and Planning/ Down Payment Inisiated
Execution Management
Commissioning/ Startup
Training
Close Out report
Engineering Design
Monthly Progress
Start drafting
Drawn, not checked
Complete for office check
To owner for approval
First Issue
Final Issue*
Procurement
Monthly Progress
Bidders list developed
Inquiry documents complete
Bids analyzed
Contract awarded
Vendor drawings submitted
Vendor drawings approved
Equipment shipped
Equipment Received
Construction
Monthly Progress
Mobilization
Received and inspected
Setting/ Installation complete
Alignment complete
Internals installed
Testing complete
Accepted by owner
Other Cost
Monthly Progress
PPH 21 and PPH 23
Contingency 5%
Profit

1
1

796

737

34.23% of Project Cost

44
19
154
6
1
1
Subtotal

44
19
154
6
1
1
225

1,058
34

66
2

66
2

66
2

66
2

66
2

66
2

66
2

66
2

66
2

66
2

66
2

66
2

66
2

66
2

66
2

66
2

622
61
215
Subtotal

565
4
13
650

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

4
4
13
89

875

3,000
23
39
3,063
3,152

45
80
23
39
187
277

15
60
23
39
137
227

15
140
150
150
23
39
516
606

15
100
299
299
23
39
776
865

15
150
150
23
39
377
466

15
23
39
78
167

15
23
39
78
167

15
449
449
23
39
975
1,065

15
449
449
23
39
975
1,065

15
449
449
23
39
975
1,065

15
449
449
23
39
975
1,065

15
150
150
23
39
377
466

60
299
299
23
39
721
810

30
20
150
150
23
39
412
501

C. Project Cost
Commitment Fee
Project Management
Engineering (FEED+Detail+offshore)
Materials
Construction
PPH 21 and PPH 23
Contingency 5%
TOTAL PENGELUARAN (CASH-OUT)

3,000
299
399
2,992
2,992
352
587
Subtotal
12,837

SUMMARY OF CASH FLOW


A. Cash In
5,020

Investment
Project Revenue
Subtotal

14,667
5,020

3,113
3,113

796
796

737
737

2,181
2,181

1,606
1,606

843
843

198
198

198
198

960
960

1,195
1,195

726
726

726
726

374
374

602
602

415
415

Subtotal
CASH FLOW

225
650
875
4,145

89
3,063
3,152
4,106

89
187
277
4,625

89
137
227
5,136

89
516
606
6,711

89
776
865
7,451

89
377
466
7,828

89
78
167
7,859

89
78
167
7,889

89
975
1,065
7,785

89
975
1,065
7,915

89
975
1,065
7,576

89
975
1,065
7,237

89
377
466
7,145

89
721
810
6,937

89
412
501
6,851

B. Cash Out
Project Startup
Overhead Cost
Project Cost
12,837
1,830
2,200
370

INVESTOR SUMMARY
Investor Payback:
Investment Cost
Profit Sharing 75%
Subtotal

5,020 Profit of Investor :


1,650
33% of Investment Cost
6,670
14% of Project Cost

Subtotal
TOTAL

550
550
7,220

EPRO:
Profit Sharing 25%