You are on page 1of 2

Ceramic Schedule HCC SEE CLASS SITE FOR UPDATED ACTIVITIES AND REVISIONS TO SCHEDULE Spring *A schedule can

be printed from class site 2014 Last Wet Work = last day for wet clay, trimming, carving, slip decorating, etc. Ceramics Deadline applies in our studio AND at home. On this day, remove all plastic and move pieces from greenware room to drying carts. Schedule: Subject to change wk 1 Homework is due the class period after it is assigned unless otherwise noted Homework is due AT THE BEGINNING of class unless otherwise noted Missing intro, demo and critique days will effect your participation grade It is YOUR responsibility to know what is happening on any given day. Additional lectures, demos and videos will be added as needed. TBA Firings, Critiques HW = homework, INTRO = introduction, DEMO = demonstration, LECT = lecture, CRIT = critique Ceramics II Intro class, syllabus, studio tour Need clay and supplies for Sept. 5th HW: Proposal 1

Date Jan. 17

Ceramics I Intro class, syllabus, studio tour Need clay and supplies for Jan 24 INTRO: Project 1- Pinch Pots Sculptures HW: Sketches for Pinch Pot Sculptures, 4 pinched spheres DUE: Sketches for Pinch Pot Sculptures, supplies, contract, 4 pinched spheres, clay mark LECTURE: Clay Tools and Studio Safety test 1/31 DEMO: Slip and Score, Shape, Centering on the wheel Homework: put spheres together and shape. Have ready for attachments TEST: Clay tools and Studio Safety DEMO: Attaching appendages, Opening a vessel HW: 4 thrown cylinders LECTURE: Clay and Time and Temperature- test 2/14 DEMO: Trimming, Handles Homework: Finish Pinch Pot Sculptures and Cups TEST: Clay and Time and Temperature DUE: Project #1 and #2 must be finished by end of class. INTRO: Abstract coil HW:3 images for coil abstraction DUE: 3 images for coil abstraction DEMO: template, coil HW: Sketches for abstract coil

Jan. 24

DUE: Proposal 1

Jan 31

HW: Proposal 2 DEMO: Molds

Feb 7

DUE: Proposal 2

Feb 14

DUE: Project 1

Feb 21

HW: Proposal 3

Feb 28 Mar 7

7 8

DUE: Sketches for abstract coil DUE at beginning of class: Abstract Coil INTRO: Soft slab planter HW: textures SPRING BREAK - studio closed DEMO: Soft slab LAST WET WORK DAY 3/31 DUE: Soft slab planter at end of class LECT: Clay and key terms LAST DAY FOR WITHDRAWAL 3/31 DEMO: Glaze Student show piece due LAST GLAZE DAY LECTURE: Glaze test 4/18 Raku Mandatory Studio Clean up (grade drop if you do not show) TEST: Glaze DUE: Ceramics Folder Field trip for paper Glue, paint, raku? DUE: Ceramics Folder, paper Mandatory Studio Clean up (grade drop if you do not show)

DUE: Proposal 3 DUE: Project 2

Mar 14 Mar 21 Mar 28

9 10 11

SPRING BREAK studio closed Work on proposed LAST WET WORK DAY 3/31 Glaze LAST DAY FOR WITHDRAWAL 3/31 Glaze LAST GLAZE DAY Raku Mandatory Studio Clean up (grade drop if you do not show) DUE: Ceramics Folder Field trip for paper Glue, paint, raku? DUE: Ceramics Folder, paper Mandatory Studio Clean up (grade drop if you do not show) Final Critique No Class - exam week

Apr 4 Apr 11

12 13

Apr 18

14

Apr 25

May 2 May 9

15 16

Final Critique No Class - exam week

You might also like