You are on page 1of 6

RESUME

M.RASIKRAJA
No. 92/C, Christavar street, Gudalur-Theni DT Tamilnadu-625518 India Professional Objective

Mobile: +91-9789021307 (INDIA) +91-9531860467 rasik_nis@yahoo.com rasiknis@gmail.com

E-mail:

A prospective career in the field of Civil Engineering amidst challenging environments that would utilize and hone my professional and interpersonal skills and in the process augment values to the concern. / Experience Summary

With 8 years of experience in the field of infrastructures, I.T Parks ,residential, commercial buildings. Educational Qualifications B.E H.S.E SSLC Government college of Engineering, Salem-11,April 2004 with 71.72% N.S.k.Ponniah Gowder Higher secondary school,Gudalur,April 1999 with 89.08%. N.S.K.Ponniah Gowder Higher Secondary school,Gudalur with 78.9%

Professional Experience Worked as an Assistant Engineer in M/s EAST COAST CONSTRUCTION & INDUSTRIES Ltd., Chennai from August 2004 Sep 2007 Worked as an Site Engineer in ALDAR LAING O ROURKE-ABUDHABI-UAE from sep2007-Aug2009 Worked as a Project Engineer in EMIRATES CODE COMPANY-ABUDHABI from Oct 2009 to Jan2011 (ADNOC PROJECT) Working as a Civil Engineer in GPM LOOMBA SA-JV ,New Delhi from April 2011 to till date.

Software Skills Packages List of Projects Construction of Married Accomodation Project for Army/Airforce/Navy in hilly terrain area including allied services at Portblair. : Microsoft Office, Autocad 2004, .Ms project.

Construction of new schools complex for ADNOC at Ruwais -Abudhabi-UAE. Infrastructure works at Al-Raha Beach -Abudhabi-UAE. ETA Gardens Residential Apartments,Magadi road ,Bangalore Vellore medical college,Vellore,Tamilnadu Road Over bridge-Vaniyambadi,Tamilnadu Patni computer systems (phase I & II), Sipcot IT park, Chennai.

Project Details
Company: GPM LOOMBA SA-JV ,New Delhi. April 2011 to till date. : : : : Constructions of Married Accommodation Project in hilly terrain including allied services for Army/Airforce/Navy (MAP Project) . Ministry Of Defence-Government Of India. BrichGunj Military station-Port Blair,South Andhamans. Rs 367.37 Crores within 28 months

PROJECT #1: Project Client Project Location Project Value Project Description :

It is the biggest site for MAP PhaseII project.area having approx.65 Acres.The site Location is heavily undulated and spread over on two ridges and one valley with big nala following in between. It has very steep slopes and in level difference within the site is almost 90 meters.The layout in the site is designed to accommodate 103 blocks in total consisting of 24 DUs of MAJORS ,93 Dus of JCOs and 775 Dus of ORs. Blocks were planned with different configuration to suit the lay of the ground as per survey and the Retaining walls of height between 3 to 10 meters. Infrastructure work including, Roads, Drainage, Retaining walls& stone pitching,Rain water Harvesting works,arboriculture works ans compound wall. Including other services like Internal water supply works,Internal Electrical works and Area drainage works.. The Length of Road has app.6Km with a slope of 1:8 to 1:12 .

Resposibilities : Project scheduling and monitoring as per CPM Chart and report to project manager. Utilise the man and materials. Preparing weekly, monthly programmes. Dealing with client,consultants and contractors. Closeout the all QA/QC ,Safety issues. EMIRATES CODE COMPANY -ABUDHABI, from Oct 2009JAN 2011 Constructions of new schools project for ADNOC . M/s ABUDHABI NATIONAL OIL CORPORATION. M/s DORCHE GROUPPE-ABUDHABI. M/s ENGINEERING CONSULTANTS GROUP -ABUDHABI ADNOC HOUSING COMPLEX - RUWAIS. 300MILLION DIRGAMS( 300 crores)

Company:

PROJECT #1: Project Client Consultant Project Location Project Value Project Description :

: : : : :

It has 3 schools(male,female&kindergarten schools) with G+1,Total build Area is 2,25,000sqm with connecting landscaping. Architect is German based architect. Building is gladded with Structural glazing Semi unitized panels and in combination with

composite panels. Infrastructure work including, Roads, Drainage, Service yard and compound wall. Including other services like Firefighting & Hydro-pneumatic system. Kindergarten school was construct with fully precast panels.

Responsibilities : Project scheduling and monitoring as per CPM Chart and report to project manager. Utilize the man and materials Preparing weekly, monthly programmes. Dealing with client, consultants and contractors. Closeout the all QA/QC ,Safety issues. ALDAR LAING O ROURKE ABUDHABI ,Sep2007-Sep 2009 : : : : : : ALRAHA BEACH PROJECT M/s Aldar properties-Abu Dhabi. M/s Consult mounsell Ltd-Abudhabi M/s Dornier consulting GmbH. Al-Raha Beach -Abudhabi $20billion

Company:

PROJECT #2: Project Client Structural Consultant Service Consultant Project Location Project Value

Project Description : AL RAHA BEACH DEVELOPMENT: Construction of canal road bridges, Soil investigation get done by geotechnical laboratory, providing them co-ordinate and site access, daily monitoring their activity,writtting daily records of their findings and daily report for their progress, AL RAHA BEACH DEVELOPMENT: Construction of Canal Road Bridges, Piling get done by Sub contractor (Bauer, Dutch Foundation), checking the piling data sheet, establishment of site, material take off, requesting for temporary work items, dealing with consultant, giving program and three week look ahead concrete requirement to the planning department, Cocoordinating with Concrete supplier and giving correct drawing to the foremen, drawing profile for dewatering system. Checking daily progress sheet and monitoring it against the planning schedule, ordering for plant and equipment required for the coming activity, constructing of coffer dam by sheet piling method and the secant piles (male female piles). AL RAHA BEACH DEVELOPMENT: Construction of Canal Road Bridges,liasoning with different trade of sub contractors, assisting in their activities, issuing work permits, writing method statements for different activities, Taking care of HSE of the works under my supervision(Domain) EAST COAST CONSTRUCTIONS AND INDUSTRIES LTD, from Aug 2004Sep2007. : : : : : ETA Gardens - bangalore. M/s ETA STAR India div. M/s Potencial Consultants P. Ltd M/s JDS Architects P.Ltd Magadi Road-Bangalore. INR 120 Crores.

Company:

PROJECT #3: Project Client Consultant Project Location Project Value

Project Description : It has 8 towers with G+2,19floors Residential Apartments with Club house, Swimming pools, open theatre, sports ground, childrens park, library, aerobics and meditation hall, bars and restaurant, car parks etc.., Architect is German based architect. It has connecting steel bridges at Every 6 Floors connecting with all Towers.

Armourcrete & STP water proofing system for raft slab & wall Each floor has a 4 Flats ,Each Flat have 3 Bed rooms2 attached,1 commen Toilets,varendah and Balcony with fully marble,Tiles Flooring. Interior features with Modular furniture, Alu trac ceiling, Gypsum & AMF panel for False ceiling, Joineries Fully Glazed Frameless Doors and Flooring Ceramic tile & Granite. Building is gladded with Structural glazing Semi unitized panels and in combination with composite panels. Infrastructure work including, Roads, Drainage, Service yard and compound wall. Including other services like Firefighting & Hydro-pneumatic system. : : : : : Vellore medical College-Vellore11 M/s TPWD-Tamilnadu. M/s PWD Design. Adukkamparai-Vellore INR 20 Crores.

PROJECT #4: Project Client Consultant Project Location Project Value Project Description :

It has 4 towers of G+3 building with Hexactonal plan. It has 3 curved domes in top. It was government hospital which is use medical college students. Infrastructure work including, Roads, Drainage, Service yard and compound wall. Including other services like Firefighting & Hydro-pneumatic system : : : : : Road over bridge-vaniyambadi M/s Southern Railways. M/s Southern railways. Jolarpet Junction-Vaniyampadi INR 18 Crores.

PROJECT #5: Project Client Consultant Project Location Project Value Project Description :

It has 3 Span ROB bridge, Each span have a 16 beams with22m at End span,32m in middle span All Beams are post tensioning precast Beams which has T1,T2 32nos of 15.2mmdia Tendons.

This bridge has completed within 6 months..

PROJECT #6: Project (working) Client Consultant Project Location Project Value

: : : : :

IT Park for PATNI Computer Systems Ltd. PhaseII M/s PATNI Computer Systems Ltd., M/s STUP Consultants P. Ltd SIPCOT IT Park, IT Highway, Siruseri, Chennai. INR 80 Crores.

Project Description : Main building area 2.90 Lac Sft. RCC Framed structure withBasement, Stilt and ground+3 floors. Well Point dewatering system. Mass Excavation more than 55000 cum. Armourcrete & STP water proofing system for raft slab & wall (10300 Sqm). GGBS cement concrete mix used for Sulphate & Chloride resistant. Interior features with Modular furniture, Alu trac ceiling, Gypsum & AMF panel for False ceiling, Joineries Fully Glazed Frameless Doors and Flooring Ceramic tile & Granite. Building is gladded with Structural glazing Semi unitized panels and in combination with composite panels. Infrastructure work including, Roads, Drainage, Service yard and compound wall. Including other services like Firefighting & Hydro-pneumatic system.

PROJECT #7: Project Client Consultant Project Location Project Value Project Description :

: : : : :

IT Park for PATNI Computer Systems Ltd. Phase - I. M/s PATNI Computer Systems Ltd., M/s STUP Consultants P. Ltd SIPCOT IT Park, IT Highway, Siruseri, Chennai. INR 50 Crores.

Main building area 1.35 Lac Sft. RCC Framed structure and siporex concrete floor with floor trunking. Interior features with Modular furniture, Alu trac ceiling, Gypsum & AMF panel for False ceiling, Joineries Fully Glazed Frameless Doors and Flooring Ceramic tile & Granite.

Building is gladded with Structural glazing Semi unitized panels and in combination with composite panels.

Job Expertise Personal Details Fathers Name Date of Birth Sex Nationality Marital Status Passport details passport number Date of issue & expiry Place of issue Languages Known To Read & Write To Speak Work Permit Temp. Address : : : : : : : : : : : k.mohammed ibrahim may14 , 1982. Male. Indian. Married G0964920. 02/12/2006 & 01/12/2016. Tiruchirapalli. English,Tamil English,Tamil& Hindi UAE, India GPM LOOMBA-SA JV C-55 EAST OF KAILASH NEW DELHI -110065 Project planning & Management. Design,Drawings co-ordination. Monitoring and Tracking activities. Progress reporting. Sub Contractor billing. Rising ITR,MVR,MAR & Co-ordinate with Client and Consultant. Finishing works ,precast panels. Post-tensioning Works. Pilling Works. Quality Assurance and Quality control.

I hereby declare that the particulars in the curriculum vitae are true and correct to the best of my knowledge and belief.

Place: Date:

(M.Rasikraja)

You might also like