FORMAT FOR DATA COLLECTION Name of Project : Name of Substation : 1 E!ectrica! S"stem Parameters #o!ta$e Data for !

ast one %1& "ear %A'ri! ())* to Marc+ ()),&


Month Maximum voltage (%) Minimum voltage (%)
Whether full range of data already obtained from SEMS

33 kV Bus

kV Bus

33 kV Bus

kV Bus

(verify obtained)

if

!"#$%& M!'$%& ()*$%& ()+$%& !),$%& SE"$%& -./$%& *-V$%& 0E.$%& (!*$%1 2% 5EB$%1 M!#$%1 Loa- Data for !ast one %1& "ear%A'ri! ())* to Marc+ ()),&
Month Maximum +oad 33 kV Bus kV Bus 6W 6V!r 6W 6V!r

342%

Minimum +oad 33 kV Bus kV Bus 6W 6V!r 6W 6V!r

Whether full range of data already obtained from SEMS

(verify obtained)

if

!"#$%& M!'$%& ()*$%& ()+$%& !),$%& SE"$%& -./$%& *-V$%& 37831 0E.$%& (!*$%1 37933 5EB$%1 M!#$%1 Fau!t Le.e! at Substation /us
Maximum (MV!)

7 &4 7448

418 38

98 3%

Minimum (MV!)

1 of 3

33 kV Bus

kV Bus

33 kV Bus

kV Bus

Whether full range of data already obtained from SEMS

(verify if obtained)

Para!!e! O'eration at 110# Whether "ra:tised #estri:tions (if any) for ;arallel o;eration !ny other relevant information from Site ;ersonnel

Dra1in$s of e2istin$ Substation T"'e of Dra1in$ P!an6 E!e.ation6 Section sc+ematic of S1it+"arP!an6 E!e.ation6 Section sc+ematic of Contro! Room One !ine E!ectrica! Dia$ram of t+e substation 3+et+er a.ai!ab!e %C+ec0 for corrections an-4or ratin$s to ma0e it u'5to5 -ate&

P+"sica! Detai!s of e2istin$ Substation A S1itc+"ar- Detai!s


!vailability of s;a:e near kV Bus<.able Su;;ort Stru:ture (incase of non availability of indoor space for breaker, both the Breaker & Capacitor Bank are to be installed outdoor) #e=uirement of :able tren:h (surfa:e or buried) in 'ard for :onne:tion of .a;a:itor Bank to kV Bus Whether extension grounding re=uired Whether of extension shielding re=uired Whether any of dismantling >ork re=uired

/ Contro! Room Detai!s !vailability of #e=uirement Whether s;a:e for of :able extension

Whether of dismantling

any .a;a:ity ? details of >ork existing !.<0. 2 of 3

installation of tren:h .ir:uit extension Breaker(along >ith ada;ter ;anel7 if re=uired)

:ontrol room re=uired re=uired (if re=uired then >hether load bearing >all to be en:ountered)

!uxiliary su;;ly

;o>er

Detai!s of e2istin$ Ca'acitor /an0 %if an"& Voltage +evel @ 6V!# @ /y;e @ .onne:tion @ Bank :onfiguration in:luding no2 of series ? ;arallel units @ Whether >orking or not @ Mode of S>it:hing (eg2 /hrystor S>it:hed .a;a:itor /S.) @ ,! dra>ing of Bank available or not @ /y;e of mounting ("linth<Stru:ture) @ 0etails of Bus >ork @ 0etails of #ea:tor @ (eg2 /hrystor S>it:hed #ea:tor TSR7 /hrystor .ontrolled #ea:tors TCR) 0etails of Aarmoni: filters (if any) @ Surge ;rote:tion of Bank @ Short time rating @ Ca'acitor contro!!in$ Circuit /rea0er /y;e @ #ating @ Bnterru;ting :a;a:ity .a;a:itor S>it:hing :a;a:ity @ 0etails of Bsolator< earth s>it:h @