You are on page 1of 10

TRAINING SUPPORT PACKAGE (TSP)

TSP Number TSP Title Task Number(s) / Title(s) Effective Date Supersedes TSP(s) TSP Users Proponent Comments / Recommendations

77W12H01 Overview Of The 300,000-GPD Barge ROWPU

01 Oct 1999 None MOS 77W10 Water Treatment Specialist The proponent for this document is Quartermaster Center and School. Send comments and recommendations directly to: DEPARTMENT OF THE ARMY TRAINING DIRECTORATE ATTN: ATCL-AT 401 First Street Suite 227 Ft. Lee, VA 23801-1511 This product has been reviewed by the product developers in coordination with the U.S. Army Combined Arms Support Command foreign disclosure authority. This product is releasable to military students from foreign countries on a case-by-case basis.

Foreign Disclosure Restrictions

PREFACE
Purpose

This Training Support Package provides the instructor with a standardized lesson plan for presenting instruction for:

This TSP Contains

TABLE OF CONTENTS PAGE Preface ............................................................................................................................................. 2 Lesson Section I Administrative Data ..................................................................................... 4 Section II Introduction.................................................................................................. 6 Terminal Learning Objective - Acquire knowledge on the 300,000-GPD Barge Mounted ROWPU. .............................................. 6 Section III Presentation ................................................................................................ 8 Section IV Summary..................................................................................................... 9 Section V Student Evaluation .................................................................................... 10

77W12H01 version TATS / Overview Of The 300,000-GPD Barge ROWPU 01 Oct 1999
SECTION I. All Courses Including This Lesson Task(s) Taught(*) or Supported Reinforced Task(s) Academic Hours

ADMINISTRATIVE DATA
Course Number Course Title

720-77W10
Task Number

77W10, WATER TREATMENT SPECIALIST, AIT COURSE


Task Title

Task Number

Task Title

The academic hours required to teach this TSP are as follows:


ADT Hours/Methods

Test Test Review Total Hours:


Prerequisite Lesson(s) Clearance Access References
Number Lesson Number

.5 / Programmed Instruction .0 .0 .5
Lesson Title

None

Security Level: Unclassified Requirements: There are no clearance or access requirements for the lesson.
Title Date Additional Information

Student Study Assignments Instructor Requirements Additional Support Personnel Requirements Equipment Required for Instruction Materials Required

None

One primary instructor and one alternate per class if conference

None

Name

Quantity

Expendable

None INSTRUCTOR MATERIALS:

Training Support Package VGT (1-2) Lite Pro Projector (P16312) Projector Video Data (P18230) Viewing Screen

STUDENT MATERIALS:

Notepad Pen/Pencil
Classroom, Training Area, and Range Requirements Ammunition Requirements Instructional Guidance GENERAL INSTRUCTION BUILDING

Name

Student Qty

Misc Qty

None NOTE: Before presenting this lesson, instructors must thoroughly prepare by studying this lesson and identified reference material.

Ensure facilities and materials are ready prior to class time.

Proponent Lesson Plan Approvals

Name

Rank

Position

Date

Mr. Harold A. Williams James Keener

GS-13 Major

Chief, QM-PWD, TD Chief, WTD

SECTION II.

INTRODUCTION Method of Instruction: Conference / Discussion Instructor to Student Ratio is: 1:18 Time of Instruction: 0 hrs Media: Group-paced Instruction

Motivator

An understanding of the operation of the 300,000-GPD ROWPU barge is important for the water treatment specialist in the production of potable water. NOTE: Show VGT 01.

Terminal Learning Objective

NOTE: Inform the students of the following Terminal Learning Objective requirements.
At the completion of this lesson, you [the student] will: Action: Acquire knowledge on the 300,000-GPD Barge Mounted ROWPU. Conditions: Given a video. Standards:

In accordance with the information provided on the videotape.

Safety Requirements

1. No smoking in the classroom. 2. Keep aisles clear for hasty exits. 3. Identify and point out primary and alternate fire exits. 4. Observe all safety precautions.

Risk Assessment Level Environmental Considerations

Low

Army Regulation 200-1 delineates TRADOC responsibilities to integrate environmental requirements across DTLOMS and ensure all training procedures, materials, and doctrine include sound environmental practices and considerations. The Army's environmental vision is to be a national leader in environmental and natural resource stewardship for present and future generations as an integral part of all Army missions. This Training Support Package meets this standard.

Evaluation Instructional Lead-In

Refer students to the Student Evaluation Plan. This video will provide you with an overview of the 300,000-GPD Barge Mounted ROWPU.

Lead-In

SECTION III.

PRESENTATION

1.

Learning Step / Activity 1. The students will acquire knowldege on the 300,000-GPD BargeMounted ROWPU. Method of Instruction: Instructor to Student Ratio: Time of Instruction: Media: Programmed Instruction 1:18 25 mins Group-paced Instruction

NOTE: Students will watch the 300,000-GPH ROWPU video. NOTE: Conduct a check on learning and summarize the learning activity.

SECTION IV.

SUMMARY Method of Instruction: Conference / Discussion Instructor to Student Ratio is: 1:18 Time of Instruction: 0 hrs Media: Group-paced Instruction

Review / Summarize Lesson

NOTE: Show VGT 02. The following key points were discussed within the lesson unit: a. Overview Of The 300,000-GPD ROWPU

Check on Learning

Ask students the following questions. As you review the items individually, ask students if they have any additional questions. 1. What deployment assistance is necessary for the ROWPU? (It is not self-propelled and requires assistance from the military sea lift command.) 2. How much does the ROWPU weigh when fully equipped? (550 tons.) 3. How many anchors are generally used and what kind of weather conditions is it secured for? (Four anchors are generally used, and they will secure the ROWPU up to sea state 3.)

SECTION V.

STUDENT EVALUATION NOTE: Describe how the student must demonstrate accomplishment of the TLO standard. Refer student to the Student Evaluation Plan.

Testing Requirements

The student must achieve a score of 70% on the End of Annex Exam. The written examination will be administered following a block of instruction and is located in the Instructor Test Package. Refer to the Course Management Plan/Program of Instruction (CMP/POI) for guidance on administering the test. NOTE: Rapid, immediate feedback is essential to effective learning. Schedule and provide feedback on the evaluation and any information to help answer students' questions about the test. Provide remedial training as needed.

Feedback Requirement

10

You might also like