SECTION 15854 FAN COIL UNITS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

PART 01 - GENERAL 1.01 Section Includes:A. Provide fan coil units as per the equipment schedule suitable for concealed or exposed duty as scheduled on the drawings. Provide horizontal or vertical unit configurations as scheduled on the drawings. Equip units with the following features: 1. Filters 2. Chilled water cooling coils with 2-way motorized valve package. 3. 1.02 Fan Section 3 speed low/medium/high.

DESCRIPTION

C.

DATE JOB/EWO

D.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

RELATED SECTIONS A. Section 15245 Vibration Isolation.

PROJECT ENGINEER
____________ DATE

1.03

SUBMITTALS A. Submit product data for approval.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

1.04

QUALITY ASSURANCE A. Equipment capacities to be ARI certified.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

PART 02 - PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. CARRIER


Date:

B. TRANE C. YORK D. ZAMIL


SECTION 15854

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

1 OF 3

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

E. or approved equal. 2.02 EQUIPMENT A. Fan coil units shall be ceiling suspended type basic unit with return air plenum, or exposed cabinet type as mentioned in the floor plans and equipment schedule. FCU shall be complete with the following: 1. 2. 3. 4. 5. Direct-drive forward curved centrifugal fan with flexible connections. Motor with integral thermal protection 3 speed operation Low/medium/high. Galvanized steel outside casing. Insulated galvanized steel drain pan. Cooling coil made of copper tubes mechanically bonded to aluminum Fins.

DESCRIPTION

ENGG

CERT

DATE JOB/EWO

B.

Insulate units internally with 1/2" thick fiberglass to prevent external condensation and heat loss/gain. Cabinets shall have removable bottom panels for access to all components. Manual Air Vent: Locate at highest point of chilled water coil header. Unit hanger suspension and accessories. Unit dimension shall suitable for the space available. Manufacturer shall inspect the site and certify that the proposed units suitable for the available space. Manufacturer to provide cooling controls for each fan coil unit consisting of: 1. Factory assembled 2 way-motorized valve package including isolating valves. Room thermostat/controller with 3-speed fan switch compatible for BAS hook-up. Refer to specification section 15985.

C. D. E. F.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

F.

CONSTRUCTION AGENCY
________________ DATE:

2.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

SECTION 15854

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

2 OF 3

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

PART 03 - EXECUTION 3.01 INSTALLATION A. Install fan coil units at locations designated on drawings in accordance with manufacturer's published instructions. Provide piping connections as per diagram on drawings. Floor mounted units to be located on neoprene isolation pads. Suspended units with vibration isolators as per section 15240. Ensure proper condensate drainage.

ENGG

CERT

B.
DESCRIPTION

C. D. E.

REV. NO.

DATE JOB/EWO

END OF SECTION

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

SECTION 15854

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

3 OF 3

00

You might also like