You are on page 1of 3

Saudi Aramco 2616-ENG (3/99)

OPERNS.


SAUDI ARAMCO OIL COMPANY
SECTION 12692 FLOOR MATS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

PART 1 - GENERAL 1.01 SECTION INCLUDES Recessed mats with heavy devices textured polypropylene carpet inserts. 1.02 RELATED SECTIONS A. B. Section 08120 Section 08410 Section 09310 Aluminum doors and frames Aluminum Entrances. Tiles Work

DATE JOB/EWO

DESCRIPTION

C. 1.03

DELIVERY AND STORAGE Protect products from damage. Deliver in manufacturer's unopened containers or bundles fully identified with name, brand, type and grade. Store in a dry, ventilated space.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

1.04

SUBMITTALS A. B. Submit under provisions of Saudi Aramco Contract Documents. Manufacturer's Data: Submit to SAUDI ARAMCO manufacturer's specifications and installation instructions for materials and accessories to show compliance with the Specifications. Submit complete shop drawing with clear dimension and details for SAUDI ARAMCO approval.

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

C.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

SECTION 12692

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC K55 A

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

14-Sep-07

JOB/EWO#

1 OF 3

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

PART 2 - PRODUCTS 2.01 MANUFACTURERS A 1. C/S Group 17756 P.O.Box 380 USA Muncy, Pennsylvania Tel: 001 717 546 5941 Fax: 001 717 546 5169 Pawling Corporation Standard Products Division 157 Charles Colman Boulevard Pawling, New York 125641-118. Frontrunner & Front Runner Entrance Matting Supplier: Saudi Arabian Markets Ltd. Tel: 03 857 1757 Fax: 03 857 4556

DESCRIPTION

ENGG

CERT

2.

3.
DATE JOB/EWO

B. 2.02

Substitutions: Under provisions of Saudi Aramco Contract Documents.

REV. NO.

MATERIALS A. Description: Furnish and install C/S Pedigrid II aluminum recessed foot grilles in size and system mats. Quantities as indicated on drawings all as manufactured by Construction Specialties Inc or approved equal. Tread Surface: Carpet treads shall be 100% solutiondyed nylon color as per Saudi Aramco approvals. Carpet fiber shall be fusion bonded to a rigid backing. All carpet shall be free of splices. Pedigrid II shall be one of the multiple tread options which snap lock together to comprise the overall grid length. All materials shall be prforated between each tread for drainage, fnish to be clear enodize. Framing: DP Series, pedigrid II, 1602C-LB; extruded, aluminum alloy 1 deep. Recessed frames shall be supplied pre-cut with mitered corners shipped unassembled, together with all necessary anchor pins and corner pins.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

B.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

C.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

SECTION 12692

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC K55 A

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

14-Sep-07

JOB/EWO#

2 OF 3

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

PART 3 - EXECUTION 3.01 EXAMINATION A. 3.02 Verify that field measurements are as indicated on shop drawings.

ENGG

CERT

INSTALLATION A. Mat frames shall be assembled at the job site and installed so that upper edge shall be level with the finished floor surface. A cement base below floor surface shall be screeded inside the mat recess frame area, using the edge provided by the frame as a guide. The frame shall be anchored into cement with anchor pins a minimum of 24" on centers. Corner pins shall be installed at all corners. Large frames should be properly braced to prevent "bowing." To prevent tripping, recessed area should be filled with plywood prior to installation of mat. Field Measurements: After frames are installed field measurements shall be taken accurately by measuring overall width (left to right) and overall length (front to back) at three points. Diagonals shall be measured to determine squareness) before fabricating mats. Measurements shall be included on shop drawings. Cleaning: Recess shall be cleaned thoroughly by removing construction debris. Contractor shall check for uniform depth and install mat or grate per shop drawings. Trimming: For more exact fit, minor trimming may be done on all rubber or vinyl mats or mats with a vinyl edging.

DATE JOB/EWO

DESCRIPTION

B.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

C.

PROJECT ENGINEER
____________ DATE

D.

CERTIFIED _ __________
DATE: ________

3.03

SCHEDULES A. Refer to Architectural Drawings.

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

END OF SECTION

Date:

SECTION 12692

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC K55 A

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

14-Sep-07

JOB/EWO#

3 OF 3

00

You might also like