For
Engineering, Procurement, Construction
Projects
Index
A.
Overall .................................................................................................................. 4
B.
Engineering .......................................................................................................... 4
1.
Disciplines ....................................................................................................................... 4
2.
3.
4.
C.
Procurement ........................................................................................................ 5
1.
Disciplines ....................................................................................................................... 5
2.
Tender ............................................................................................................................. 5
D.
Construction ........................................................................................................ 5
1.
Disciplines ....................................................................................................................... 5
2.
Civil ................................................................................................................................. 5
I.
II.
Roads .......................................................................................................................... 5
III.
IV.
V.
VI.
Foundation ............................................................................................................... 6
VII.
Steel Structure.......................................................................................................... 6
VIII.
IX.
X.
Pavement .................................................................................................................... 7
3.
Mechanical ...................................................................................................................... 7
I.
II.
III.
Columns / Vessels.................................................................................................... 7
IV.
V.
VI.
VII.
VIII.
Heaters .................................................................................................................... 8
IX.
X.
4.
Electrical.......................................................................................................................... 9
I.
II.
III.
IV.
5.
Instrumentation................................................................................................................ 9
I.
6.
Insulation ......................................................................................................................... 9
7.
Painting ..........................................................................................................................10
8.
Refractory.......................................................................................................................10
Page 3 of 10
A. Overall
a.
b.
c.
d.
Engineering
Procurement
Construction
Commissioning
10%
40%
45%
5%
10%
20%
15%
30%
10%
15%
20%
50%
60%
75%
90%
100%
20%
90%
100%
40%
60%
70%
90%
100%
B. Engineering
1. Disciplines
a.
b.
c.
d.
e.
f.
Process
Civil and Structural
Piping
Mechanical
Electrical
Instrumentation
Start Of Activity
Submit For Approval
Comments From Client
Incorporate Comments
Final Submission
Issued For Design / Construction
Page 4 of 10
C. Procurement
1. Disciplines
a.
b.
c.
d.
e.
f.
Civil
Structural
Piping
Mechanical
Electrical
Instrumentation
10%
10%
25%
35%
10%
10%
10%
20%
30%
90%
95%
100%
15%
10%
25%
30%
10%
10%
5%
100%
20%
50%
70%
100%
2. Tender
a.
b.
c.
d.
e.
f.
Issue Of Enquiry
Issue Of Technical Bid Analysis (TBA)
Issue Of PO
Manufacturing
Dispatch
Receipt at Site
D. Construction
1. Disciplines
a.
b.
c.
d.
e.
f.
Civil
Structural
Piping
Mechanical
Electrical
Instrumentation
2. Civil
I.
Site Grading
a. Clear Site
b. Cutting and Filling
II.
a.
b.
c.
d.
Roads
Leveling
Soling
B.M.
Premix
Page 5 of 10
III.
a.
b.
c.
d.
IV.
a.
b.
c.
d.
V.
a.
b.
c.
d.
e.
f.
VI.
a.
b.
c.
d.
e.
VII.
RCC Structure
Excavation/PCC
Raft Concrete
Super Structure Wall
Slab and Back Filling
a.
b.
c.
d.
e.
10%
25%
65%
100%
10%
60%
80%
100%
15%
50%
65%
75%
80%
100%
10%
35%
75%
95%
100%
50%
80%
95%
100%
20%
40%
65%
90%
100%
Foundation
Excavation
Reinforcement
Shuttering
Concreting
Back Filling
Steel Structure
a. Fabrication
(Including Surface Preparation and
Primer Coating)
b. Erection
c. Alignment & Grouting
d. Final Painting
VIII.
Page 6 of 10
IX.
a.
b.
c.
d.
e.
X.
5%
60%
80%
90%
100%
5%
10%
100%
25%
40%
85%
90%
100%
15%
50%
60%
85%
90%
100%
50%
60%
95%
100%
50%
60%
100%
Pavement
a. Leveling
b. PCC
c. Paving
3. Mechanical
I.
a.
b.
c.
d.
e.
Excavation
Manholes
Laying & Joining
Testing
Back Filling
II.
a.
b.
c.
d.
e.
f.
III.
a.
b.
c.
d.
IV.
Columns / Vessels
Positioning
Aligning & Grouting
Fixing Internal
Inspection
Heat Exchangers
a. Positioning
b. Aligning & Grouting
c. Testing
Page 7 of 10
V.
a.
b.
c.
d.
e.
f.
VI.
a.
b.
c.
d.
e.
VII.
a.
b.
c.
d.
e.
VIII.
a.
b.
c.
d.
e.
f.
IX.
a.
b.
c.
d.
X.
a.
b.
c.
d.
e.
10%
55%
85%
90%
95%
100%
10%
50%
80%
85%
100%
10%
50%
80%
85%
100%
30%
50%
60%
75%
85%
100%
20%
65%
85%
100%
30%
70%
80%
90%
100%
Horton Spheres
Column Erection
Patel Aligning
Welding and Radiography
Hydro Testing
Finishing
Horton Spheres
Column Erection
Patel Aligning
Welding and Radiography
Hydro Testing
Finishing
Heaters
Structure Fabrication
Structure Erection
Refractory Lining
Coil Erection
Stack Erection
Miscellaneous Work
Erection Of Machinery
Positioning
Alignment & Grouting
Cleaning and Flushing
Final Aligning
Page 8 of 10
4. Electrical
I.
II.
Transportation to Site
Fix Base Frame
Aligning and Grouting
Cable Connection
Testing
10%
45%
70%
90%
100%
10%
40%
80%
90%
100%
50%
40%
100%
10%
25%
50%
70%
90%
100%
20%
50%
85%
100%
15%
50%
100%
Electrical Cabling
a.
b.
c.
d.
e.
III.
Transportation to Site
Tray Erection
Cable Laying
Cable Connection
Testing
Electrical Fittings
a. Installation
b. Cable Connection
c. Testing
IV.
Control panel
a.
b.
c.
d.
e.
f.
Transportation to Site
Welding and Installation
Aligning and Grouting
Mounting Instruments
Cabling
Testing
5. Instrumentation
I.
Field Instruments
a.
b.
c.
d.
Support Erection
Mounting
Cabling
Loop Checking
6. Insulation
a. Surface Preparation
b. Lagging
c. Cladding
Page 9 of 10
7. Painting
a. Surface Preparation
b. Primer Application
c. Final Coating
15%
50%
100%
25%
90%
100%
8. Refractory
a. Lining Preparation
b. Castable
c. Cure & Dry
Page 10 of 10