You are on page 1of 8

Free Program provided by www.freeconstructionhelp.

com (Free Construction Help, LLC) Note: Verify All your Entries, we are not responsible for any errors or omissions. This is a Free Estim Some Values have been entered to demonstrate the method of calculating. We hope you enjoy using The program is not locked-Protected, simply go to Tools and unprotect if you wish to modify it. Always enter a value in the Units Column and the Amount in the How Much Column. The Type Cost so that you can keep track of the Type of Cost as indicated under the Definitions at the Left. DO NOT Change or Enter Values in the Amount Column, it Computes the Amounts entered in Units a Definitions PH = Per Hour PD = Per Day PW = Per Week PM = Per Month LF = Lineal Feet BF = Board Feet SF = Square Feet CF = Cubic Feet SY = Square Yard CY = Cubic Yard UC = Unit Cost FC = Fix Cost CONTRACTOR: Phone # Engineer: Phone # Architect: Phone # Units SUB-TOTAL PRE-CONSTRUCTION COSTS 100 Design Review Fees 101 Plan Check Fees 102 Permits - City 103 Permits - County 104 Utility Connection Fees 105 School Taxes 106 Park Taxes 107 Misc. Taxes 108 Project Bonds 109 Impact Fee 110 Other Costs 1 111 Other Costs 2 112 Other Costs 3 SUB-TOTAL PRE-CONSTRUCTION COSTS SITE CONSTRUCTION COSTS 200 Temporary Electricity 201 Temporary Water 202 Temporary Toilets 203 Temporary Storage Trailer 204 Other Costs 1 205 Other Costs 2 206 Other Costs 3 207 Other Costs 4 300 301 302 303 304 305 306 307 Special Inspections Concrete Testing Soil Testing-Geo-tech Special Structural Other Costs 1 Other Costs 2 Other Costs 3 Other Costs 4 Type Cost

1 1 1 1 1 1 1 1 1

FC FC FC FC FC FC FC FC FC

6 PM 6 PM 6 PM

20 PH 1 FC

400 Project Security

6 PM

401 402 403 404 500 501 502 503

Equipment Rental Tools Equipment Rental Earth Moving Other Costs 1 Other Costs 2 Project Management Project Supervision Other Costs 1 Other Costs 2 6 PM 1 FC

600 General Contractor's overhead 601 General Contractor's profit 602 State Sales Tax (where applicable) 603 Builder Contingency 604 Other Costs 1 605 Other Costs 2 SUB-TOTAL GENERAL REQUIREMENTS SITE PREPARATION COSTS 700 Demolition 701 Site Clearing 702 Building Stakeout 703 Rough Grading 704 Shoring 705 Excavation 706 Fll 707 Site retaining walls 708 Waterproofing 709 Backfill 710 Site drainage 711 Private septic system 712 Domestic water well 713 Pump house 714 Pressure water system 715 Environmental 716 Off-site Improvements 717 Other Costs 1 718 Other Costs 2 SUB-TOTAL SITE PREPARATION FOUNDATION COMPLETE W/FOUNDATION ENDORSEMENT 800 Embedded Hardware 801 Ground Plumbing 802 Ground Mechanical 803 Ground Electrical 804 Underground Water 805 Underground Sewer 806 Underground Electric 807 Underground Gas 808 Foundation & Building retaining walls poured 809 Concrete slab poured-Building 810 Concrete slab poured-Walks

1 FC

20 CY

1 FC

811 Concrete slab poured-Drive 812 Other Costs 1 813 Other Costs 2 SUB-TOTAL FOUNDATION COMPLETE BUILDING ROUGH-IN COMPLETION 900 Structural Masonry 901 Rough Framing Materials 902 Structural Steel 903 Modular or Sectional Mfg. Home 904 Package/Kit Home 905 Mfg. Trusses/components 906 Rough framing labor 907 Lightweight concrete interior floors 908 Plumbing Top-out 909 Rough heating, ventilation, air conditioning 910 Rough electrical 911 Fire protection sprinklers 912 Fireplaces incl. Flues 913 Security & Communications pre-wiring 914 Other Costs 1 915 Other Costs 2 SUB-TOTAL BUILDING ROUGH-IN COMPLETION EXTERIOR WEATHERTIGHT 1000 Waterproofing decks, shower pans, etc. 1001 Gutters, Downspouts, Sheet Metal 1002 Roof covering 1003 Roof Plywood 1004 Windows 1005 Exterior Doors 1006 Skylights 1007 Glazing 1008 Exterior Siding (specify) 1009 Exterior Trim 1010 Stucco 1011 Masonry Veneer 1012 Ornamental Iron 1013 Garage Doors & openers 1014 Exterior Painting 1015 Other Costs 1 1016 Other Costs 2 SUB-TOTAL EXTERIOR WEATHERTIGHT DRYWALL / FINISH CARPENTRY 1100 Insulation 1101 Drywall 1102 Plaster 1103 Interior stairways 1104 Cabinetry 1105 Finish Materials/Millwork 1106 Interior Doors

1 FC

1 FC

13 FC

1107 Finish Hardware 1108 Finish Carpentry Labor 1109 Other Costs 1 1110 Other Costs 2 SUB-TOTAL DRYWALL / FINISH CARPENTRY BUILDING COMPLETION / FINAL INSPECTION / N.O.C. FILED 1200 Countertops 1201 Tub/shower enclosures 1202 Interior Painting/Wall coverings 1203 Hard surface finish flooring 1204 Carpeting 1205 Built-in appliances 1206 Special Equipment (specify) 1207 Security System 1208 Intercom 1209 Built-in vacuum cleaner 1210 Finish Plumbing 1211 Plumbing Fixtures 1212 Finish Electrical 1213 Electrical Fixtures 1214 Finish Heating, ventilation, air conditioning 1215 Solar Backup 1216 Bath accessories 1217 Tub and shower doors/mirrors 1218 Finish Grading 1219 Pool/Spa 1220 Hardscape -- Driveway, walkways, steps 1221 Landscaping 1222 Irrigation System 1223 Fencing including gates 1224 Touch-up/Final cleaning 1225 Other Costs 1 1226 Other Costs 2 SUB-TOTAL BUILDING COMPLETION

1 FC

TOTAL PROJECT COSTS

ee Construction Help, LLC) ssions. This is a Free Estimating Program. g. We hope you enjoy using it. you wish to modify it. ch Column. The Type Cost is provided initions at the Left. e Amounts entered in Units and How Much Columns.

How Much

Amount ($)

$ $ $ $ $ $ $

3,500.00 500.00 850.00 635.00 178.00 -

$ 3,500.00 $ 500.00 $ 850.00 $ 635.00 $ 178.00 $ $ $ $ $ $ $ $ $ 5,663.00

$ $ $

45.00 25.00 30.00

$ $ $ $ $ $ $ $

270.00 150.00 180.00 -

$ $

55.00 350.00

$ 1,100.00 $ $ 350.00 $ $ $ $ $ $ 900.00

150.00

$ $ $ $ $ $ $ $ $ 5,500.00 $ 35,000.00

$ 33,000.00 $ 35,000.00 $ $ $ $ $ 70,950.00

865.00

45.00

$ $ 865.00 $ $ $ $ $ 900.00 $ $ $ $ $ $ $ $ $ $ $ $ $ 1,765.00

350.00

$ $ $ $ $ $ $ $ $ $ $

350.00 -

$ $ $ $

350.00

3,670.00

$ $ $ $ $ $ $ $ $ $ $ 3,670.00 $ $ $ $ $ $ 3,670.00

2,350.00

$ $ $ $ $ $ $ $ $ $ $ $ $ 2,350.00 $ $ $ $ $ 2,350.00

42.75

$ $ $ $ $ $ $

555.75

$ $ $ $ $

555.75

870.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

870.00 870.00

TOTAL PROJECT COSTS

$ 86,173.75