cripple stud
finish floor cripple stud at 16 o.c. tread 11 riser king stud 6-0
header
sill plate
blocking
stringer
1-6
foundation
The exterior window framing carries the load of upper floors, ceiling, and roof down and around what will be a pane of glass later in construction. The load is distributed by a header, trimmers, and the sill plate.
2x6 rim joist 1/2 osb sheathing 2x10 sole plate peak brick veneer top chord 2x6 double top plate web panel point panel point top chord
top view
truss at 24 o.c.
4x8 panel of 1/2 osb sheathing 1/2 osb sheathing truss rafter
6d nail fastener
header 1/8 spacing between panels ceiling joists double top plate 4x8 panel of osb sheathing 2x6 Stud wall w/ insulation 1-0 soffit screened vent 3-0 rough opening for fireplace king stud jack stud sole plate 2-0
side view