JADUAL KADAR BAYAR PERKHIDMATAN UKUR TANAH BAGI TUJUAN KEJURUTERAAN Berikut ialah jadual bayaran perkhidmatan yang

dijalankan oleh Jurukur Tanah Berlesen yang berdaftar di bawah Akta Jurukur Tanah Berlesen 1958 (Akta 58! ("indaan 1991!# Jadual bayaran ini berdasarkan kepada kos sehari bagi satu pasukan ukur seperti berikut$% &emenanjung 'alaysia &abah( &arawak dan .ilayah "ersekutuan /abuan $ RM743.00 $ RM966 ()adar &emenanjung 'alaysia * +,-!

PART I GENERAL ENGINEERING SURVEY 1# GENERAL ITEMS "ara 1#1 to 1#1 pres0ribe work items and work rates appli0able in all types of sur1ey# They are to be in0luded as when ne0essary part and par0el of the rele1ant work items for any parti0ular sur1ey# 1#1 Classification of Terrain and Ground Condition The following 0lassifi0ation of terrain and ground 0ondition is to be adopted in determining the general ground 0ondition of the proje0t site# 2lassifi0ation of Terrain and 3round 2ondition 5lat and undulating area 6illy area &wampy area Built up area 4es0ription up to 1, degrees slope or differen0es in heights of not more than 7, metres e80eeding 1, degrees slope or differen0e in heights of more than 7, metres generally wetted at the time of sur1ey whether temporary or permanent in nature area with man made stru0ture su0h as building( road( fen0e( drain( hedge( 0utting( embankment and et0#

1#7 Preparatory Work .ork rate for preparatory work is 1 party%day# 1

1#+ Mobilization and Demobilization .ork rates for mobili9ation and demobili9ation per party are as follow$ 4istan0e between .orksite and 6ead:uarters 5, kilometres or less 'ore than 5, kilometres but not e80eeding 15, kilometres 'ore than 15, kilometres but not e80eeding +,, kilometres ;80eeding +,, kilometres 1#+#1 7 'obili9ation and 4emobili9ation 2ost <il 1 party%day party%days

+ party%days

'obili9ation of the sur1ey party by the following modes of transportation where ne0essary shall be reimbursable at 0ost#

1#+#1#1 6ire of heli0opter or air0raft and 0rew 1#+#1#7 6ire of boat and 0rew 1#+#1#+ 6ire of additional motor 1ehi0les and dri1ers under e80eptional 0ir0umstan0es# 1#+#1# Air fares 1# Point Positioning by Satellite This item pro1ides the fee for "oint "ositioning with the use of &atellite# The sur1ey rates 0hargeable under this item for ea0h job shall 0onsist of the following 0harges$% 1# #1 2harge for mobili9ation and demobili9ation of + 5ield parties shall be as follows$ 2harge for + 5ield "arties =' 7(>,, =' 5( ,, =' 8(1,, 7

4istan0e to .orksite from 6ead:uarters 'ore than 5, kilometres but not e80eeding 15, kilometres 'ore than 15, kilometres but not e80eeding +,, kilometres ;80eeding +,, kilometres

1# #7 1# #+ 1# # 1# #5 1# #@

Basi0 0harge ? =' (@@,#,, 2harge for positioning of ea0h point is ='1(9>,#,, 2harge for the 0onstru0tion of a monument similar to type A2B 'ark of &ur1ey 4epartment is =' +,,#,, 2harge for site 0learan0e for obser1ation shall be on reimbursable basis# 2harge of &ur1ey in &e0urity Areas shall be as per item 1#8#

1#5 Planimetric Control and Connection The a00ura0y for planimetri0 0ontrol and 0onne0tion shall not be less than 1 in ,,,# The planimetri0 0ontrol and 0onne0tion in0ludes$ i! ii! 1#5#1 2onne0tion to &ur1ey 4epartment datum( and Along the proposed or e8isting routes or alignment =ates for planimetri0 0ontrol and 0onne0tion are as follows$ "eninsular ='7#,, C metre ='7#5, C metre ='7#5, C metre ='7#5, C metre &abahC&arawak ='7#@, C metre ='+#75 C metre ='+#75 C metre ='+#75 C metre

2lassifi0ation of Terrain and 3round 2ondition 5lat and undulating area 6illy area &wampy area Built up area 1#@ Height Control and Connection

The height 0ontrol and 0onne0tion in0ludes$ i! ii! 1#@#1 2onne0tion to Ben0h 'arks( and Along the proposed or e8isting routes or alignment Height control shall be established on the following conditions: 1#@#1# The datum for height 0ontrol shall be established by at least two e8isting Ben0h 'arks# 1#@#1#5 The sur1eyor shall take the shortest pra0ti0al route# +

1#@#7

Work rates are as follow: .ork rate in kilometre per party%day 5lat and 6illy E &wampy Dndulating E Built up area 1#@ km C party%day ,#5 km C party%day 1#, km C party%day ,#+ km C party%day

2lass for 6eighting a# Frdinary b# "re0ise

A00ura0y (in metres! * ,#,7 G km * ,#,,+ G km .here k is the distan0e in kilometre

The sur1eyor may use any methods that he 0onsiders most suitable for the job to meet the a00ura0y re:uired# 1#> 'arks! These rates are appli0able if work item monumenting is done together with items 1#5 and 1#@# 1#>#1 Mon !enting The work rates for monumenting are as follows$% 'arks "er "arty%days 'onument Type A00essible a# .ith 0on0reting b# .ithout 0on0reting 5 Hna00essible 7 + Monumenting (2onstru0tion of Hnterse0tion "oints( Temporary Ben0h 'arks and =eferen0e

1#>#7

S"ecification for Standard Mon !ent The temporary ben0h marks (TB'! standard monument shall be 0onstru0ted out of a 1 metre length of , mm diameter gal1ani9ed iron pipe set in 0on0rete of dimension +,0m 8 +,0m 0 +,0m# The TB' standard monument number and the 1alue of the TB' must be written on the 0on0rete#

1#>#+

S"ecification for Standard Mon !ent witho t #oncreting The temporary ben0h marks (TB'! standard monument shall be 0onstru0ted out of a 1 metre length of , mm diameter gal1ani9ed iron pipe to be firmly embedded#

1#>#

Non Standard Mon !ent Hn the e1ent where the &ur1eyor is re:uired to 0onstru0t monuments a00ording to non%standard spe0ifi0ations the 0harge shall be at a0tual 0ost#

1#8

Sur ey in Security !reas 1#8#1 1#8#7 1#8#+ .here se0urity pass or permit has to be obtained from the authority( an additional 0harge of 75- of the total fees is appli0ableI or .here armed es0ort is re:uired and working hours are di0tated by rele1ant authority( and additional fee of 5,- of the total fees is appli0ableI and .hen there is a waiting time after mobili9ation an additional 0harge at ='9,,#,, per party%day shall be appli0able#

.here re:uired( the pro1ision of armed es0ort shall be at no 0ost to the /i0ensed /and &ur1eyors# 1#9 Sur ey in "naccessible !reas .here the sur1ey worksite is away from motorable road( the following 0harges are appli0able$ 4istan0e to .orksite from 'otorable =oad a# , kilometre to 7 kilometres b# 'ore than 7 kilometres 1#1, #eimbursable 1#1,#1 Rei!b rse!ents for o t of "ocket e$"endit re inc rred are as follows: 1#1,#1#1A0tual e8penses in0urred in pur0hase of rele1ant do0uments( plans( maps( re0ord and et0# 1#1,#1#7A0tual e8penses in0urred for telegrams( fa8 tele8( telephone 0alls and et0# 1#1,#1#+6iring 0harge of spe0ial e:uipments and software pa0kages as agreed with the 0lient# 5 Additional 2harges <o additional 0harge 7,- of the total fees

1#1,#1# ;8penses in0urred in tra1eling( a00ommodation and subsisten0e allowan0e shall be as follows$% i! ii! iii! Tra1elling Air 5are 'ilage 6otel &ubsisten0e Allowan0e A0tual 5, 0ents per km 'a8imum =' 18,#,,** per day ='85#,, per day

1#1,#1#5;8penses in0urred in the use of spe0ial transportation e#g# heli0opter( boat et0# as agreed with the 0lient# 1#11 Preparation of $and !c%uisition Plans "reparatory work as per item 1#7# All 0ertified plans and 0adastral sheets pur0hased for the 0ompilation C preparation of the land a0:uisition plans shall be 0harged as per item 1#1,#+#1 The time in1ol1ed for sear0h at the /and Fffi0e and other 3o1ernment 4epartment will be 0harged at ='1,#,, per hour plus tra1eling e8penses 0hargeable as per item 1#1,#+# # 2harge for 0omputation and plan drawing shall be ='7,#,, per lot subje0t to a minimum 0harge of =' ,,#,, per A1 si9e sheet#

1#11#1 1#11#7

1#11#+

1#11#

2onditions$ /and a0:uisition plans shall be 0omplied from the &ur1ey 4epartment 0adastral sheet( and on the same s0ale# This drawing shall show$ (i! (ii! (iii! (i1! 1#17 lot boundaries with bearings and distan0es within the sur1eyed 0orridor lot numbers lot areas any other information normally shown on &ur1ey 4epartment 0adastral sur1ey sheets#

Processing& Con ersion and Translation of Digital Data together 'ith (uality !ssurance .here the sur1ey result is re:uired to be submitted in a designated format( a 0harge of 7,- of the total sur1ey fees is appli0able# @

1#1+

Transformation of Co)ordinates The 0harge shall be ='7,#,, per point subje0t to a minimum 0harge of =' ,,#,, per job#

1#1

Supply of Plans and Documents 1#1 #1 "lans and do0uments to be supplied to the 0lient without 0harge shall be as follows$ 1#1 #1#1Fne (1! set of plan on tra0ing paper of weight 1,5C11, gms C s:#m# 1#1 #1#7Two (7! sets of paper prints 1#1 #1#+4igital data in 4.3 format 1#1 #1# All rele1ant data( field book( drawing( 0al0ulation sheet( et0# prepared in the e8e0ution of the 0ontra0t# 2ondition$ ;80ept 1#1 #1#1 all other do0uments shall bear the signature of the /i0ensed /and &ur1eyor# 1#1 #7 The 0ost of replotting any drawing on a different s0ale on A1 si9e is ='78, per sheet# 1#1 #+ Additional sets of transparen0ies or paper prints shall be supplied at the following 0ost$ Type of &i9e of "lan 2harge per 0opy ='5,#,, ='+,#,, ='75#,, ='1,#,,

5ilm transparen0y of A1 si9e Tra0ing paper transparen0y of A1 si9e Tra0ing paper transparen0y of A7 si9e or smaller "aper print of A1 si9e or smaller

7#

S"T* S+#,*7#1 Classification of Sites &ur1ey sites may in0lude$%

>

7#1#1 7#1#7 7#1#+ 7#1#

Building sites 4am sites &ites for traffi0 inter0hanges and road jun0tion Any site for de1elopment and 0onstru0tion#

5ees for &ite &ur1ey are as follows$% 7#7 Preparatory Work .ork rate for preparatory work is 1 party%day# 7#+ Mobilization and Demobilization =ates for mobili9ation and demobili9ation shall be as per item 1#+# 7# Demarcation of .oundaries& Planimetric Control and Connection =ates for demar0ation of boundaries( planimetri0 0ontrol and 0onne0tion shall be as per item 1#5# 7#5 Height Control and Connection .ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@# 7#@ Monumenting .ork rates for monumenting shall be as per item 1#># These rates are appli0able if work item monumenting is done together with item 7#7( 7#+( 7# and 7#5# 7#> Sur ey in Security !reas .ork rates for sur1ey in se0urity areas shall be as per item 1#8# 7#8 Sur ey in "naccessible !reas .ork rates for sur1ey ina00essible areas shall be as per item 1#9# 7#9 #eimbursable The 0harge for reimbursable shall be as per item 1#1,# 7#1, Topographical Sur ey These rates are appli0able if work item topographi0al sur1ey is done together with items 7#7( 7#+( 7# ( 7#5 and 7#@#

7#1,#1 #onto r and %etail .ork rates per party%days in he0tare are as follows$% 2lassifi0ation of Terrain And 3round 2ondition 5lat E Dndulating area 6illy area &wampy area Built up area 7#1,#7 Grid Heighting .ork rates per kilometer in party%days are as follows$% 3rid Hnter1al (.ith detail! 1, m 4e1eloped area Built up area Dnde1eloped area &wampy area 7#11 Minimum /ee The minimum fee shall be 7 party%days whi0h is in0lusi1e of 1 party%day for preparation works# 7#17 Preparation of $and !c%uisition Plans The 0harge for preparation of land a0:uisition plans shall be as per item 1#11# 5#,, @#,, #,, 5#5, 7, m 7#5, +#,, 7#,, 7#>5 3rid Hnter1al (.ithout detail! 1, m 7#5, +#,, 7#,, 7#>5 7, m 1#75 1#5, 1#,, 1# , 2ontour Hnter1als 1 metre 7 metres + metres 1#75 % 1#,, 1#,, 1#5, ,#>5 1#75 1#75 1#>5 1#,, 1#5, 1#5,

2lassifi0ation of Terrain And 3round 2ondition

7#1+

Processing& Con ersion and Translation of Digital Data together 'ith (uality !ssurance .here the sur1ey result is re:uired to be submitted in a designated format the 0harge shall be as per item 1#17#

7#1

Transformation of Co)ordinates The 0harge for 0on1ersion and transformation of 0oordinates shall be as per item 1#1+#

7#15

Supply of Plans and Documents The 0harge for supply of plans and do0uments shall be as per item 1#1 #

+#

C#0SS)S*CT"01"1G W"TH S0+1D"1G /0# .#"DG* S"T*S /ees for Cross)Sectioning 'ith sounding for bridge sites sur ey are as follo's2)

+#1

Preparatory Work .ork rate for preparatory work is 1 party%day#

+#7

Mobilization and Demobilization =ates for mobili9ation and demobili9ation shall be as per item 1#+#

+#+

Planimetric Control and Connection =ates for planimetri0 0ontrol and 0onne0tion shall be as per item 1#5#

+#

Height Control and Connection .ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@#

+#5

Monumenting .ork rates for monumenting shall be as per item 1#># These rates are appli0able if work item monumenting is done together with item +#1( +#7( +#+ and +# #

+#@

Sur ey in Security !reas .ork rates for sur1ey in se0urity areas shall be as per item 1#8#

+#>

Sur ey in "naccessible !reas .ork rates for sur1ey ina00essible areas shall be as per item 1#9# 1,

+#8

#eimbursable The 0harge for reimbursable shall be as per item 1#1,#

+#9

Sur ey of .ridge Sites The work rates for the sur1ey of bridge site shall be 5#5, party%day C per he0tare( e80luding the generally wetted area# These rates are appli0able if work item sur1ey of bridge sites is done together with items +#1( +#7( +#+( +# and +#5#

+#1,Cross)Sectioning 'ith Sounding These rates are appli0able if work item topographi0al sur1ey is done together with items +#1( +#7( +#+( +# and +#5# +#1,#1 %e"th of water less than & !etre .here the depth of water is less than 1 metre( the work rate shall be 8 party days per kilometer of 0ross%se0tioning with spot le1el taken at 1, metres inter1als# Hf the inter1al is less than 1, metres the fees shall be in0reased proportionately# +#1,#7 %e"th of water greater than & !etre .here the depth of water is greater than 1 metre( the 0harges are as follows$ +#1,#7#1 +#1,#7#7 +#1,#7#+ 'obili9ation and demobili9ation of boat is ='@,,#,, per boat Boat rental ='+,,#,, per boat per day .ork rate for 0ross%se0tioning shall be 8 party%day per kilometer of 0ross%se0tioning with spot le1el taken at 1, metres inter1als# Hf the inter1al is less than 1, metres the fees shall be in0reased proportionately#

+#11

Preparation of $and !c%uisition Plans The 0harges for preparation of land a0:uisition plans shall be as per item 1#11# These rates are appli0able of work item preparation of land a0:uisition plans is done together with item +#1#

+#17

Processing& Con ersion and Translation of Digital Data together 'ith (uality !ssurance .here the sur1ey result is re:uired to be submitted in a designated format( the 0harge shall be as per item 1#17# 11

+#1+

Transformation of Co)ordinates The 0harge for 0on1ersion and transformation of 0oordinates shall be as per item 1#1+#

+#1

Supply of Plans and Documents The 0harge for supply of plans and do0uments shall be as per item 1#1 #

#0!D !1D #!"$W!- S+#,*5ees for =oad and =ailway &ur1ey are as follows$%

#1

Preparatory Work .ork rate for preparatory work is 1 party%day#

#7

Mobilization and Demobilization =ates for mobili9ation and demobili9ation shall be as per item 1#+#

#+

Planimetric Control and Connection =ates for planimetri0 0ontrol and 0onne0tion shall be as per item 1#5#

Height Control and Connection .ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@#

#5

Monumenting .ork rates for monumenting shall be as per item 1#># These rates are appli0able if work item monumenting is done together with item #1( #7( #+ and # #

#@

Sur ey in Security !reas .ork rates for sur1ey in se0urity areas shall be as per item 1#8#

#>

Sur ey in "naccessible !reas .ork rates for sur1ey ina00essible areas shall be as per item 1#9#

#8

#eimbursable The 0harge for reimbursable shall be as per item 1#1,#

17

#9

Sur ey of Strip 'ith Spot $e el and Detail These rates are appli0able if work item sur1ey of strip with spot le1el at 7, metres inter1al is done together with items #1( #7( #+( # ( #5 and #11# The work rates per party%day in he0tares are as follows$ 2lassifi0ation of Terrain And 3round 2ondition 4e1eloped area C flat E undulating area Built up area Dnde1eloped area C hilly area &wampy area =ate 7#, ha C party%day 1#5 ha C party%day 1#5 ha C party%day 1#, ha C party%day

#1,Setting 0ut of Centre $ine of #oad and #ail'ay These rates are appli0able if work item setting out of 0enter line of road and railway is done together with items #1( #7 and #+# #1,#1 &etting out of 0enter line of road and railway from H" to H" with 0hainage pegs at 7, metres inter1als# The work rates in party%days per kilometer are as follows$ 2lassifi0ation of Terrain And 3round 2ondition 5lat E Dndulating area 6illy area &wampy area Built up area #1,#7 =ate 7#>5 party%days C km #>5 party%days C km #75 party%days C km #75 party%days C km

&etting out of 0enter line of road and railway from H" to H" with 7, metres inter1als 0hainage pegs and 0ur1e settings# .ork rates in party%days per kilometer are as follows$%

2lassifi0ation of Terrain And 3round 2ondition 5lat E Dndulating area 6illy area &wampy area Built up area #ondition 1+

=ate +#>5 party%days C km 5#5, party%days C km 5#5, party%days C km 5#5, party%days C km

.here the 0hainage inter1al is less than 7, metres then the fees shall be in0reased proportionately# #11Connection to #eference Markers These rates are appli0able if work item 0onne0tion to referen0e markers is done together with items #1( #7( #+ and # # =ates for 0onne0tion to referen0e markers shall be as follow$ #11#1 'lani!etric #onnection =ates for planimetri0 0onne0tion shall be as per item 1#5# #11#7 Height #onnection .ork rates for height 0onne0tion shall be as per item 1#@ #17 $ongitudinal Profiling !long *stablished Chainage Pegs /ongitudinal "rofiling is the determination of le1els at the pegs established and is done together with item #1,# The work rate in party%days per kilometer are as follows$% 2lassifi0ation of Terrain And 3round 2ondition 5lat E Dndulating area 6illy area &wampy area Built up area #ondition (i! (ii! /e1els to be taken at e1ery 7, metres and at any points to indi0ate signifi0ant 0hange in slope# .here the 0hainage inter1al is less than 7, metres then the fees shall be in0reased proportionately# =ate 1#>5 party%days C km +#,, party%days C km +#,, party%days C km +#,, party%days C km

#1+

Cross)sectioning 1

2ross%se0tioning shall be 0arried out at the 0hainage pegs established and is done together with item #1, and #17# The work rates in se0tions per party%days are as follows$ 2lassifi0ation of Terrain And 3round 2ondition 5lat E Dndulating area 6illy area &wampy area Built up area #ondition (i! 3453 .here the total width is more than >, metres then the fees shall be in0reased proportionately# =ate > se0tions C party%day se0tions C party%day se0tions C party%day se0tions C party%day

Setting 0ut of #eser e .oundaries These rates are appli0able if work item setting out of reser1e boundaries is done together with items #1,# The work rates in party%days per kilometer are as follows$% 2lassifi0ation of Terrain And 3round 2ondition 5lat E Dndulating area 6illy area &wampy area Built up area #onditions (i! The abo1e rates are only appli0able when the setting out of the reser1e boundary is 0arried out together with the setting out of the 0enter line# Ftherwise the normal rates for planimetri0 0ontrol and 0onne0tion as per item 1#5 shall apply# 6ard wood pegs to be planted at turning points and jungle roller pegs at intermediate points on the reser1e at about 1,, metres > inter1als# 5or reser1e width of @, metres or less( fees shall be 0harged a00ording to the distan0e measured along the 0enter%line of the reser1e# 15 =ate 7#5 party%days C km +#, party%days C km +#, party%days C km +#, party%days C km

(ii! (iii!

(i1!

5or reser1e width of more than @, metres( or where the setting out has to be 0arried out along both sides of the reser1e( fees shall be 0harged a00ording to planimetri0 0ontrol and 0onne0tion rates as per item 1#5 measured along both sides of the reser1e#

#15

Preparation of $and !c%uisition Plans The 0harges for preparation of /and A0:uisition "lans shall be as per item 1#11# These rates are appli0able if work item preparation of land a0:uisition plans is done together with item #1#

#1@

Processing& Con ersion and Translation of Digital Data together 'ith (uality !ssurance .here the sur1ey result is re:uired to be submitted in a designated format( the 0harge shall be as per item 1#17#

#1>

Transformation of Co)ordinates The 0harge for 0on1ersion and transformation of 0oordinates shall be as per item 1#1+#

#18

Supply of Plans and Documents The 0harges for supply of plans and do0uments shall be as per item 1#1 # #18#1 Types of "lans to be &upplied The types of plans to be supplied to the 0lientBs department are as follows$% #18#1#1 /o0ation plan of the sur1ey area at a suitable s0ale su0h that the area under study 0an be shown in a single standard si9e sheet# The 0hainages of the alignment shall be indi0ated for ease of 0ross referen0ing with the detail plans# #18#1#7 /ongitudinal profile and plan shall show details of ground le1els( 0hainages and all features as re:uired the sur1ey stations along the 0enter%line of the road( H"s( lo0ations of the 0ross%se0tions taken( referen0e points and ben0h marks# All items shall be 0learly indi0ated and referen0ed# The longitudinal profile shall be at a s0ale of$ 1 $ 1,,, (hori9ontal! 1 $ 1,, (1erti0al!

1@

#18#1#+ 4rawing of all the 0ross%se0tions taken along( the 0entre line of the proposed road( plotted in 0onse0uti1e order( to a s0ale of 1 $ 1,, both hori9ontal and 1erti0al# The drawings shall show details of ground le1els and distan0es from the 0entre line of pa1ement( shoulders( et0# #18#1# 5# All formats of plans submitted shall 0onform to a00epted pra0ti0e# All drawings shall be on A1 si9e unless otherwise agreed#

P"P*$"1* S+#,*5ees for "ipeline &ur1ey are as follows$%

5#1

Preparatory Work .ork rate for preparatory work is 1 party%day#

5#7

Mobilization and Demobilization =ates for mobili9ation and demobili9ation shall be as per item 1#+#

5#+

Planimetric Control and Connection =ates for planimetri0 0ontrol and 0onne0tion shall be as per item 1#5#

5#

Height Control and Connection .ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@#

5#5

Monumenting .ork rates for monumenting shall be as per item 1#># These rates are appli0able if work item monumenting is done together with item 5#1( 5#7( 5#+ and 5# #

5#@

Sur ey in Security !reas .ork rates for sur1ey in se0urity areas shall be as per item 1#8#

5#>

Sur ey in "naccessible !reas .ork rates for sur1ey ina00essible areas shall be as per item 1#9#

5#8

#eimbursable The 0harge for reimbursable shall be as per item 1#1,#

5#9

Setting 0ut of Pipeline 1>

&etting out of "ipeline from H" to H" with 0hainage pegs at 7, metres inter1als# These rates are appli0able if work item setting of pipeline is done together with items 5#1( 5#7( 5#+( 5# and 5#5# The work rates in party%days per kilometer are as follows$% 2lassifi0ation of Terrain and 3round 2ondition 5lat and undulating area 6illy area &wampy area Built up area 5#1, $ongitudinal Profiling /ongitudinal "rofiling is the determination of le1els at the pegs established and is done together with 5#9# The work rates in party%days per kilometer are as follows$% 2lassifi0ation of Terrain and 3round 2ondition 5lat and undulating area 6illy area &wampy area Built up area 2onditions (i! (ii! /e1els along 0enter%line of the pipeline route to be taken at 7, metre inter1als and at points ne0essary to show any signifi0ant 0hanges in slope# /ongitudinal se0tions along the pipeline route shall be drawn to a s0ale of $ 1 1 (iii! $ $ 1,,, (hori9ontal! 1,, (1erti0al! Along ;8isting =oad 1#75 party%days C km 7#,, party%days C km 7#,, party%days C km 7#,, party%days C km Fther areas 1#5 party%days C km 7#5 party%days C km 7#5 party%days C km 7#5 party%days C km Along ;8isting =oad +#,, party%days C km +#>5 party%days C km +#>5 party%days C km +#>5 party%days C km Fther areas +#>5 party%days C km 5#,, party%days C km 5#,, party%days C km 5#,, party%days C km

At all streams( bridge and 0ul1ert 0rossings the following information shall be obtained$ 18

(a! (b! (0! 6455

&e0tion of streams along the pipeline 0enter%line gi1ing le1els at inter1als suffi0iently 0lose to show the bed le1els# The soffit le1el of the longitudinal beam of the bridges( together with their spans and the lo0ations of the 0olumns# The in1ert le1els and the 0rown le1els of all 0ul1erts#

Sur ey of Site 'ith 746 metre Contour and Detail These rates are appli0able if work item sur1ey of site with spot le1el at 7,m inter1al and detail is done together with items 5#1( 5#7( 5#+( 5# and 5#5# 5#11#1 5#11#7 ,#5 metre 0ontour and detail sur1ey ,#>5 haCparty%days

The 0harge for minimum fees shall be as per item 7#11#

5#17

Cross)Sectioning The 0harges for 0ross%se0tioning shall be as per item #1+#

5#1+

Sur ey of Strip 'ith Spot $e el and Detail The 0harges for sur1ey of strip with 7 metre 0ontour inter1al and detail shall be as per item #9#

6453

Setting out of #eser e .oundaries The fees for setting out of reser1e boundaries shall be as per item #1 #

6456

Preparation of $and !c%uisition Plans The 0harges for preparation of land a0:uisition plans shall be as per item 1#11# These rates are appli0able if work item preparation of land a0:uisition plans is done together with items 5#1

5#1@

Processing& Con ersion and Translation of Digital Data together 'ith (uality !ssurance .here the sur1ey result is re:uired to be submitted in a designated format( the 0harge shall be as per item 1#17#

5#1>

Transformation of Co)ordinates 19

The 0harges for 0on1ersion and transformation of 0oordinates shall be as per item 1#1+# 5#18 Supply of Plans and Documents The 0harge for supply of plans and do0uments shall be as per item 1#1 # PART II ENGINEERING SURVEY FOR DRAINAGE AND IRRIGATION @# C$!SS"/"C!T"01 0/ T*##!"1 !1D G#0+1D C01D"T"01 The following 0lassifi0ation of terrain shall be applied $ @#1 @#7 @#+ @# @#5 ># 4e1eloped area refers to an area 0urrently planted with padi## Built%up area refers to an area with man%made stru0tures su0h as building( road( fen0e( drain( hedge( 0utting( embankment et0# Dnde1eloped area refers to any area other than that referred to in @#1 and @#7 abo1e# &wampy area refers to generally wetted area at the time of sur1ey whether temporary or permanent in nature# Tidal area refers to an area subje0ted to inundation by tides# S"T* S+#,*5ees for &ite &ur1ey are as follow $% >#1 >#7 >#+ ># Preparatory 'ork for Site Sur ey .ork rate for preparatory work is 1 party%day# Mobilization and Demobilization .ork rates for mobili9ation and demobili9ation shall be as per item 1#+ # Planimetric Control and Connection =ates for planimetri0 0ontrol and 0onne0tion shall be as per item 1#5 # Height Control and Connection .ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@ # >#5 Monumenting 7,

.ork rates for monumenting shall be as per item 1#> # These rates are appli0able if work item monumenting is done together with items >#1( >#7( >#+ and ># # >#@ >#> >#8 >#9 Sur ey is Security !reas .ork rates for sur1ey in &e0urity areas shall be as per item 1#8 # Sur ey in inaccessible !reas .ork rates for sur1ey in ina00essible areas shall be as per item 1#9 # #eimbursable The 0harge for reimbursable shall be as per item 1#1, # Topographical Sur ey These rates are appli0able if work item topographi0al sur1ey is done together with items >#7( >#+( ># ( >#5 and >#@ >#9#1 #onto r and %etail .ork rates per party%days in he0tares are as follows $ 2lassifi0ation of Terrain and 3round 2ondition 5lat and Dndulating area C de1elop 6illy area C unde1eloped &wamp area Built up area >#9#7 Grid S r(e) 2ost in party%day per kilometre 3rid line with &pot /e1els at Base /ine inter1als of 2lassifi0ation of Terrain and 6eight and 3round 2ondition 75 metre 5, metre 1,, metre 2ontrol and abo1e 4e1eloped area 7#5, 7#,, 1#>5 1#5, Built up area +#,, +#,, 7#>5 7#5, Dnde1eloped area +#75 7#5, 7#75 7#,, &wampy area #,, +#5, +#75 +#,, Tidal area #5, #,, +#>5 +#5, 2ontour Hnter1al 1 metre 7 metre + metre 1#75 1#5, 1#>5 % 1#,, 1#,, ,#>5 1#75 1#75 1#,, 1#5, 1#5,

>#1,

Minimum /ee for Site Sur ey 71

The minimum fees shall be 7 party%days whi0h is in0lusi1e of 1 party%day for preparatory work# The method of sur1ey shall be left to the professional dis0retion of the /i0ensed /and &ur1eyor# >#11 Preparation of $and !c%uisition Plans The 0harge for preparation of land a0:uisition plans shall be as per item 1#11 # >#17 Processing& Con ersion& and Translation of Digital Data together 'ith (uality !ssurance .here the sur1ey results is re:uired to be submitted in designated format( the 0harge shall be as per item 1#17 # >#1+ Transformation of Co)ordinates The 0harges for 0on1ersion and transformation of 0o%ordinates shall be as per item 1#1+ >#1 Supply of Plans and Documents The 0harge for supply of plans and do0uments shall be as per item 1#1 # 8# W!T*#W!- S+#,*5ees for &ur1ey .aterways (in0lusi1e of /akes( "onds and =eser1oir! are as follows $% 8#1 8#7 8#+ 8# 8#5 Preparatory 'ork .ork rate for preparatory work is 1 party%day# Mobilization and Demobilization .ork rates for mobili9ation and demobili9ation shall be as per item 1#+# Planimetric Control and Connection =ates for planimetri0 0ontrol and 0onne0tion of the site shall be as per item 1#5# Height Control and Connection .ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@# Monumenting =ates for monumenting shall be as per item 1#># These rates are appli0able if work item monumenting is done together with items 8#1( 8#7( 8#+ and 8# #

77

8#@

Sur ey in Security !reas .ork rates for sur1ey in se0urity areas shall be as per item 1#8#

8#>

Sur ey in "naccessible !reas .ork rates for sur1ey in ina00essible areas shall be as per item 1#9#

8#8

#eimbursable The 0harge for reimbursable shall be as per item 1#1,#

8#9

Sur ey of Strip 'ith Detail These rates are appli0able if work item sur1ey of strip with detail is done together with items 8#1( 8#7( 8#+( 8# and 8#5# .ork rates per party%days in he0tare are as follows$ 2lassifi0ation of Terrain and 3round 2ondition 4e1eloped area C flat E undulating area Built up area Dnde1eloped area C hilly area &wampy area Tidal area =ate 7#,, ha C party%days 1#5, ha C party%days 1#5, ha C party%days 1#,, ha C party%days ,#>5 ha C party%days

8#1,

Setting 0ut of Centre $ine of Proposed #oute& Water'ays& Canals and Drains These rates are appli0able if work item setting out of 0entre line( longitudinal se0tioning and 0ross se0tioning for the proposed route( waterways( 0anals and drains is done together with items 8#1( 8#7( 8#+( 8# ( 8#5 and 8#9# 2ost in party%day per kilometer

2lassifi0ation of &etting /ongitudinal Terrain and Fut &e0tion .ith &pot 3round 2ondition /e1els at inter1al of 5,m 1,,m 4e1eloped area 7#>5 1#75 1#,, Dnde1eloped area #75 1#>5 1#,, Built up #75 7#,, 1#>5 &wampy area #75 7#75 7#,, Tidal area #>5 7#5, 7#75 8#11

2ross se0tion at 5,m inter1als for sur1eyed width of 5,m 1#>5 7#,, 7#,, 7#>5 +#,, >5m 7#,, 7#5, 7#5, +#75 +#5, 1,,m 7#75 +#,, +#,, +#>5 #,,

Sur ey of *8isting route& Water'ays& Canals and Drains 7+

These rates are appli0able if work item setting out of 0entre line( longitudinal se0tioning and 0ross se0tioning of e8isting route( waterways( 0anals and drains is done together with items 8#1( 8#7( 8#+( 8# ( 8#5 and 8#9# 2lassifi0ation of Terrain and 3round 2ondition 4e1eloped area Dnde1eloped area Built up &wampy area Tidal area &pe0ifi0ations $ (i! &etting out of 0enter line from H" to H" of proposed or e8isting where appli0able of route( waterways( 0anals and drains shall be 0arried out at 5, metres inter1al# where the inter1al of setting out is less or more than 5, metre then the fees shall be in0reased or de0reased proportionetely# Fnly 8 and y 0oordinates of the setting our makers are to be supplied# /ongitudinal se0tion sur1ey of e8isting route( waterways( 0anals and drains in0lude taking of le1els of the right and left banks# /e1els shall be taken along alignment at e1ery 5, metre inter1al and at points ne0essary to show signifi0ant 0hange in slope# 2ross se0tion sur1ey shall be 0arried out at inter1als of 5, metres and a0ross 0orridor width of 5, metre# .here the width of 0orridor and inter1als is more of less than 5, metres then the fees shall be in0reased or de0reased proportionately# Alignment &ur1ey /ongitudinal &e0tion .ith &pot /e1els at inter1al of 5,m 1,,m 1#>5 1#5, 7#75 7#,, 7#5, 7#75 7#>5 7#5, +#,, 7#>5 2ross se0tion at 5,m inter1als for sur1eyed width of 5,m 7#75 7#5, 7#5, +#75 +#5, >5m 7#5, +#,, +#,, +#>5 #,, 1,,m 7#>5 +#5, +#5, #75 #5,

+#,, +#5, +#5, +#5, #75

(ii! (iii! (i1! (1! (1i! (1ii!

(1iii! Hf the depth of the route( waterways( drains and 0anals at the time of sur1ey is more than 1 metre the 0harge shall be as per item +#1,#7 of "art 1#

8#17

Site Sur ey 2ost in party%day per site 2lassifi0ation of Terrain and 3round 2ondition 4e1eloped area Dnde1eloped area Built up area &wampy area Tidal area 2onditions $ (i! (ii! (iii! 2ross%se0tion sur1ey shall be 0arried out at inter1als of 5, metre and a0ross 0orridor width of 5, metre# .here the width of 0orridor and inter1als is more than 5, metres then the fees shall be in0reased proportionately# Hf the depth of the waterways at the time of sur1ey is more than 1 metre the 0harge shall be as per item +#1,#7 # =ate for &ite of 15,m 8 15,m 7#5 party%day C site +#5 party%day C site +#5 party%day C site +#5 party%day C site +#5 party%day C site

8#1+

Setting)out of Water'ays #eser e These rates are appli0able if work item setting out of waterways reser1e is done together with items 8#1( 8#7( 8#+ and 8#1, # .ork rates in party%days per kilometre are as follows $ 2lassifi0ation of Terrain and 3round 2ondition 4e1eloped area Built up area Dnde1eloped area &wampy area Tidal area 2onditions $ (i! The abo1e rates are only appli0able when the setting our of the reser1e boundary is 0arried out together with the setting out of the 0entre line# Ftherwise the normal rates for planimetri0 0ontrol and 0onne0tion as per item 1#5 shall apply# =ate 7#5 party%days C km +#, party%days C km +#, party%days C km +#, party%days C km +#5 party%days C km

75

(ii!

6ard wood pegs to be planted at turning points and jungle roller pegs at intermediate points on the reser1e at about 1,, metre inter1als and where the inter1als is less than 1,, metres the fees shall be in0reased proportionately# 5or reser1e width of @, metres or less( fees shall be 0harged a00ording to the distan0e measured along the 0entre%line of the reser1e# 5or reser1e width of more than @, metres( or where the setting out has to be 0arried out along both sides of the reser1e( fees shall be 0harged a00ording to planimetri0 0ontrol and 0onne0tion rates as per item 1#5 measured along both sides of the reser1e#

(iii! (i1!

8#1

Preparation of $and !c%uisition Plans The 0harge for preparation of land a0:uisition plans shall be as per item 1#11 #

8#15

Processing& Con ersion and Translation of Digital Data together 'ith (uality !ssurance .here the sur1ey result is re:uired to be submitted in designated format( the 0harge shall be as per item 1#17 #

8#1@

Transformation of Co)ordinates The 0harges for 0on1ersion and transformation of 0o%ordinates shall be as per item 1#1+ #

8#1>

Supply of Plans and Documents The 0harge for supply of plans and do0uments shall be as per item 1#1 # PART III ENGINEERING SURVEY FOR TRANSMISSION LINE

9#

C$!SS"/"C!T"01 0/ T*##!"1 !1D G#0+1D C01D"T"01 The following 0lassifi0ation of terrain shall be applied $

9#1 9#7 9#+

5lat and undulating area refers to an area with terrain of up to 1, slope# 6illy area refers to an area with terrain e80eeding 1, slope# &wampy area refers to generally wetted area at the time of sur1ey whether temporary or permanent in nature# 7@

9# 1,#

Built%up area refers to an area with man%made stru0tures su0h as buildings( road( fen0e drain( hedge( 0utting( embankment et0# T#!1SM"SS"01 $"1* S+#,*5ees for Transmission /ine &ur1ey are as follow $

1,#1 1,#7 1,#+ 1,#

Preparatory 'ork .ork rate for preparatory work is 1 party%day per job# Mobilization and Demobilization .ork rates for mobili9ation and demobili9ation shall be as per item 1#5 # Planimetric Control and Connection =ates for planimetri0 0ontrol and 0onne0tion shall be as per item 1#5 # Height Control and Connection .ork rates and 0ondition for height 0ontrol and 0onne0tion shall be as per item 1#@ #

1,#5

Monumenting .ork rates for monumenting shall be as per item 1#> # These rates are appli0able if work item monumenting is done together with items 1,#1( 1,#7( 1,#+ and 1,# #

1,#@

Sur ey in Security !reas .ork rates for sur1ey in se0urity areas shall be as per item 1#8 #

1,#>

Sur ey in "naccessible !reas .ork rates for sur1ey in ina00essible areas shall be as per item 1#9 #

1,#8

Sur ey of Strip 'ith Spot $e el and Detail These rates are appli0able if work item sur1ey of strip with spot le1el at 7,m inter1al is done together with items 1,#1( 1,#7( 1,#+( 1,# and 1,#5 # The work rates per party%days in he0tare are as follows$ 2lassifi0ation of Terrain And 3round 2ondition 5lat E undulating area 6illy area &wampy area Built up area =ate 7#, ha C party%day 1#5 ha C party%day 1#, ha C party%day 1#5 ha C party%day

7>

1,#9

Setting)out of Centre $ie of Transmission $ine These rates are appli0able if work item setting%out of 0entre line of transmission line is done together with item 1,#8# .ork rates in party%days per kilometer are as follows$ 2lassifi0ation of Terrain And 3round 2ondition 5lat E undulating area 6illy area &wampy area Built up area 2onditions$ (i! (ii! The setting%out of 0entre line of transmission line shall be 0arried out at 7,, metres inter1als# Angle positions shall be indi0ated by empla0ement of gal1ani9ed iron pipes 1 meter in length and , mm in diameter# The pipe shall be buried in the ground to a depth of ,#>5 meter and remaining e8posed portion to be painted red# .here the inter1al is less than 7,, metres then the fees shall be in0reased proportionately# =ate 7#>5 party%days C km #75 party%days C km #75 party%days C km #75 party%days C km

(iii!

1,#1, $ongitudinal Profiling These rates are appli0able if work item longitudinal profiling is done together with item 1,#9# .ork rates in party%day per kilometer are as follow$% 2lassifi0ation of Terrain And 3round 2ondition 5lat E undulating area 6illy area &wampy area Built up area 2onditions$ (i! (ii! /e1els shall be taken at e1ery 5, metres inter1als and points ne0essary to indi0ate signifi0ant 0hanges in slope# .here the inter1al is less than 5, metres then the fees shall be in0reased proportionately# =ate 1#5, party%days C km 7#>5 party%days C km 7#>5 party%days C km 7#>5 party%days C km

1,#11 Cross)Sectioning 78

These rates are appli0able if work item 0ross se0tioning is done together with item 1,#8 and 1,#1,# .ork rates in party%day per se0tion are as follows$% 2lassifi0ation of Terrain And 3round 2ondition 5lat E undulating area 6illy area &wampy area Built up area 2onditions$% (i! (ii! The total width of ea0h se0tion shall be 1, meters# .here the width is more than 1, meters then the fees shall be in0reased proportionately# =ate 1 se0tions C party%day 1, se0tions C party%day 1, se0tions C party%day 1, se0tions C party%day

1,#17 Setting 0ut of To'er9Pylon Positions These rates are appli0able if work item setting out of towerC pylon positions is done together with items 1,#1( 1,#7 and 1,#+# The work rates in towerC pylon per party%day are as follows$% 2lassifi0ation of Terrain And 3round 2ondition 5lat E undulating area 6illy area &wampy area 1,#1+ Site Sur ey for To'er9Pylon Positions These rates appli0able if work item site sur1ey for sur1ey for towerC pylon positions is done together with items 1,#1( 1,#7( 1,#+( 1,# and 1,#5# .ork rates in sites per party%day are as follows$% 2lassifi0ation of Terrain And 3round 2ondition 5lat E undulating area 6illy area &wampy area =ate + sites per party%day 7 sites per party%day 7 sites per party%day =ate + towersC pylon per party%day 7 towersC pylon per party%day 7 towersC pylon per party%day

79

2onditions$% (i! (ii! (iii! (i1! 1,#1 The ma8imum area per site shall be 1,, s:uare meters# &pot le1els shall be taken at 7 meters inter1als# .here the inter1al is less than 7 meters then the fees shall be in0reased proportionately# .here the area is more than 1,, s:uare meters the fees shall be in0reased proportionately#

Setting 0ut #eser e .oundaries These rates are appli0able if work item setting out reser1e boundaries is done together with item 1,#9# .ork rates in party%days per kilometer are as follows$% 2lassifi0ation of Terrain And 3round 2ondition 5lat E undulating area 6illy area &wampy area Built up area 2ondition$% (i! &etting%out shall be 0arried out by off%setting from the 0entre line 7,, meters markers# 2ontour Hnter1al @,m ,m 7,m 7#5 party%day 7#75 7#, +#, party%day 7#>5 7#5 +#, party%day 7#>5 7#5 +#, party%day 7#>5 7#5

1,#15 Marking of Trees 'ithin the #eser e .oundaries These rates are appli0able if work item marking of trees within the reser1e boundaries is done together with item 1,#1 # .ork rates in party%days per kilometer are as follows$% 2lassifi0ation of Terrain And 3round 2ondition 5lat E undulating area 6illy area &wampy area Built up area 2onditions$% The trees to be marked shall be +, 0entimeters or more in diameter measured at appro8imately 1 meter abo1e ground le1el# 1,#1@ #eimbursable +, 7,m ,#5, party%day ,#>5 party%day ,#>5 party%day ,#5, party%day 2ontour Hnter1al ,m ,#>5 party%day 1#,, party%day 1#,, party%day ,#>5 party%day @,m 1#,, party%day 1#75 party%day 1#75 party%day 1#,, party%day

The 0harge for reimbursable shall be as per item 1#1, # 1,#1> Preparation of $and !c%uisition Plans =ates and 0onditions for preparation of /and A0:uisition "lans shall be as per item 1#11 of "art 1# These rates are appli0able if work item preparation of land a0:uisition plans is done together with items 1,#1 # 1,#18 Processing& Con ersion and Translation of Digital Data together 'ith (uality !ssurance .here the sur1ey results if re:uired to be submitted in designated format( the 0harge shall be as per item 1#17 # 1,#19 Transformation of Co)ordinates The 0harges for 0on1ersion and transformation of 0o%ordinates shall be as per item 1#1+ # 1,#7, Supply of Plans and Documents 2ost of plans and do0uments to be supplied shall be as per item 1#1 # PART IV ENGINEERING SURVEY FOR AERIAL MAPPING 11# 11#1 !erial Mapping !erial Mapping #ate 2ompilation &0ale &maller than or e:ual to 1 $ 1,,,, /arger than 1$1,,,, but smaller than or e:ual to 1 $ ,,, /arger than 1 $ ,,, but smaller than or e:ual to 1$1,,, /arger than 1$1,,, .here A is the area in 6e0tare# +1 3round 2ontrol 5ee =',#5(28(4*6!! ='(28(4*6!! ='1#5(28(4*6!! ='7#,(28(4*6!! 2ompilation 5ee ='(7 #,,8A!8,#5 ='(7 #,,8A! ='(7 #,,8A!81#5 ='(7 #,,8A!87#,

2 is the distan0e in metre J 5A 8 1,(,,, 4 is the rate for tra1ersing as pro1ided in terms 1#5 of "art H 6 is the rate for heighting as pro1ided in para 1#@ of "art H 11#7 Deli erables (i! (ii! The 0ompiled hard 0opy plans# 4igital data in 4.3 format#

.here the sur1ey result is re:uired to be submitted in a designated format an additional 0harge of 7,- of the total sur1ey fees is appli0able# 17 !erial Photography Aerial photography will be 0harged on a0tual 0ost plus 75- management fee# =eimbursable items are $ 17#1 17#7 17#+ 17# 1+# 2ost of 0hartering of air0raft# 2ost of rental of e:uipment su0h as 0amera and na1igation e:uipment# 2ost of photographi0 material su0h as aerial film( paper( diapositi1e( 0hemi0al and pro0essing# 2ost of se0urity super1ision# #eimbursable The 0harge for reimbursable shall be as per item 1#1, # PART V HYDROGRAPHI SURVEY FOR TERRITORIAL !ATERS 1 # General The s0hedule of rates for 2oastal 6ydrographi0 &ur1eys in support of $% the management of 0oastal 9ones the hydrographi0 sur1ey of deltai0 regions and ri1er mouths up to two kilometers upstream of the ri1er mouth the de1elopment of 0oastal engineering( property( infrastru0ture proje0ts and a0ti1ities the management and de1elopment of jetties( ports( harbours and asso0iated maritime fa0ilities the management and de1elopment along inland waterways and inland water body +7

The 3eneral Htems in "art H shall be appli0able here# 6ydrographi0 &ur1ey are as follows $ 1 #1 Mobilization and Demobilization

5ees for 2oastal

.ork rates for mobili9ation and demobili9ation shall be as per item 1#+ of "art H 1 #7 Planimetric Control and Connection .ork rates for planimetri0 0ontrol and 0onne0tion of the site shall be as per item 1#5 of "art H# 1 #+ Height Control and Connection .ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@ of "art H# 1 # Monumenting .ork rate for monumenting shall be as per item 1#> of "art H# These rates are appli0able if work item monumenting is done together with items 1 #1( 1 #7 and 1 #+# 1 #5 1 #@ 1 #> 1 #8 Sur ey in Security !reas .ork rates for sur1ey in se0urity areas shall be as per item 1#8 of "art H# Sur ey in "naccessible !reas .ork rates for sur1ey in ina00essible areas shall be as per item 1#9 of "art H# #eimbursable The 0harge for reimbursable shall be as per item 1#1, Sur ey of Strip With Detail These rates are appli0able if work item sur1ey of strip with detail is done together with items 1 #1( 1 #7( 1 #+ and 1 # # .ork rates per party days in he0tare are as follows $ 1 #8#1 1 #8#7 1 #8#+ 1 #8# 4e1eloped area C flat and undulating Built up area Dnde1eloped area C hilly area &wampy area 7#, ha C party day 1#5 ha C party days 1#5 ha C party days 1#, ha C party days ,#>5 ha C party days

1 #8#5 Tidal area

++

1 #9

Shoreline Profiling 1 #9#1 Topographical :0nshore; Profiling

These rates are appli0able if work item of topographi0al (Fnshore! profiling is done together with items 1 #1( 1 #7( 1 #+( 1 # and 1 #8 2ost in party day per km &pe0ifi0ations 4e1eloped area Dnde1eloped area Built up area &wampy Tidal area &pe0ifi0ation $ &pot le1els shall not be more than 1, metres apart along the profiling line and shall e8tend as far into the sea as is possible# 1 #9#7 .athymetric :0ffshore; Profiling Base /ine and 6eight 2ontrol 7#5, +#,, +#75 #5, #5, "rofiles at inter1al of 75m 5,m 1,,m and abo1e 7#,, 7#5, +#,, #,, #,, 1#>5 7#75 7#>5 +#>5 +#>5 1#5, 7#,, 7#5, +#5, +#5,

These rates are appli0able if work item of bathymetri0 profiling is done together with items 1 #1( 1 #7( 1 #+( 1 # ( 1 #8 and 1 #9#1 2ost in party day per km "rofiles at inter1al of (m! 75 5, >5 1,, or more &ubje0t to a minimum of =' +(,,,#,, per job# &pe0ifi0ation (i! The e0ho sounder shall be 0alibrated at the start and at the end of ea0h dayBs sounding using the bar 0he0k method# "arty 4ay C km ,#+, ,# , ,# , ,#5,

(ii! (iii! (i1!

2ontinuous e0ho sounding shall be 0arried out with the sounding re0orded at not more than 1, metres inter1al along the profiling line# &ounding is to be e8tended as 0lose as possible to the shoreline# &ounding must be redu0ed to the adopted height datum from obser1ed tides#

1 #1, Tidal 0bser ation These rates are appli0ation if work item of tidal obser1ation is done together with items 1 #1( 1 #7( 1 #+ and 1 # 1 #1,#1 !utomatic Water $e el #ecording "eriod 1 days or less +, days Hnstallation ='+(@,, ='+(@,, 'easurement and 4ata "ro0essing =' 5(,,, ='17(7,,

.here the duration is less than +, days but more than 1 days( the fees shall be 0omputed proportionately# .here the duration is more than +, days( then the fees shall be in0reased proportionately# &pe0ifi0ation (i! .ater le1el measurement with self%re0ording (automati0! water le1el re0order with the measurement re0orded at not more than 15 minutes inter1al 0ontinuously for measurement period# The re0orded data shall be down loaded at the end of the measurement period and pro0ess to produ0e tabulation of re0orded water le1el in A&2HH or '& ;K2;/ format# 5or the purposes of harmoni0 analysis of tidal data( a minimum of +, days re0orded data is re0ommended#

(ii!

(iii!

1 #1,#7 Direct #eading The 0ost in party day and lump sum# Hnstallation of Tide "ole Tidal Fbser1ation =' 9,,#,, =' 7,#,, C hour subje0t to a minimum of 1 party day per job

+5

&pe0ifi0ation (i! .ater le1el measurement by method of dire0t obser1ation of a tide pole establish in the 1i0inity of the sur1ey area with the tidal obser1ations 0arried out at no more that 15 minutes inter1al# The obser1ed data should be pro0essed to produ0e tabulation of obser1ed tidal le1els in A&2HH or '& ;K2;/ format#

(ii!

1 #11 Current Measurement These rates are appli0able if work item 0urrent measurement is done together with items 1 #1( 1 #7( 1 #+ and 1 # # 1 #11#1 Self #ecording Current Measurement The 2ost in /ump &um per lo0ation per instrument# "eriod 1 days or less +, days Hnstallation =' >(,,, =' >(,,, 'easurement and 4ata "ro0essing =' 19(@,, =' +9(5,,

.here the duration is less than +, days but more than 1 days( the fees shall be 0omputed proportionately# .here the duration is more than +, days( then the fees shall be in0reased proportionately# &pe0ifi0ation (i! (ii! A self%re0ording 0urrent meter shall be deployed at a designated lo0ation with a suitable mooring and re0o1ery system (e#g# D%shape mooring! 'easurement of 0urrent speed and dire0tion using the self re0ording 0urrent meter the measurement of 0urrent speed and dire0tion at not more than +, minutes inter1al 0ontinuously for the measurement period# The self%re0ording 0urrent meter must not be subje0t to bifouling during the measurement period# The re0orded data shall be down loaded at the end of the measurement period and pro0ess to produ0e tabulation of re0orded 0urrent speed and dire0tion in A&2HH or '& ;K2;/ format#

(iii! (i1!

+@

1 #11#7 Direct #eading The 0ost per lo0ation# "reparation and set up 4ire0t obser1ation of 2urrent &peed and 4ire0tion &pe0ifi0ation (i! Hn%situ obser1ation of the 0urrent speed and dire0tion using a dire0t reading 0urrent meter at three depths within the water 0olumn (one meter below surfa0e( mid depth( and one meter abo1e the seabed! at the designated lo0ation# The 0urrent speed and dire0tion will be obser1ed at no more than +, minutes inter1al# The measurement is normally 0arried out during spring and neap tidal 0ondition and the measurement period shall not be less than 1+ hours to suffi0iently 0o1er the basi0 tidal 0y0le# The obser1ed data should be pro0essed to produ0e tabulation of obser1ed 0urrent speed and dire0tion in A&2HH or '& ;K2;/ format# ='1(8,, =' +,, C hour subje0t to a minimum of ='+(9,, per job#

(ii!

(iii!

1 #17 Sea'aterTemperature and Salinity Measurement These rates are appli0able if work item &eawater Temperature and &alinity 'easurement is done together with items 1 #1( 1 #7( 1 #+ and 1 # The 0ost per lo0ation# Hnstallation =' 1(8,,

Hn%situ (dire0t! obser1ation of &eawater Temperature and &alinity =' +,, C hour subje0t to a minimum of ='+(9,, per job# &pe0ifi0ation (i! Hn%situ obser1ation of sea water temperature and salinity using dire0t reading temperature and salinity bridge at three depths within the water 0olumn (one metre below surfa0e( mid depth( and one metre abo1e the seabed#! at one designated lo0ation# The temperature and salinity will be obser1ed at no more that +, minutes inter1al# +>

(ii!

The measurement is normally 0arried out during spring and neap tidal 0ondition and the measurement perild shall not be less than 1+ hours to suffi0iently 0o1er the basi0 tidal 0y0le# The obser1ed data shall be pro0essed to produ0e tabulation in A&2HH or '& ;K2;/ format#

(iii!

1 #1+ Seabed :Grab; Soil Sampling These rate is appli0able if work item grab sampling is done together with item 1 #1( 1 #7( 1 #+ and 1 # 2ost in /ump &um per sample =' 75, per sample subje0t to a minimum 0harge of ='1(75, &pe0ifi0ation (i! (ii! 1 #1 &eabed (3rab! soil sampling shall be 0arried out at designated lo0ation using appropriate frab sampler e#g# Lan 4er Leen type The seabed soil samples shall be sent to appro1ed laboratory for parti0le si9e distribution (sie1e analysis!

Sea'ater Sampling These rates is appli0able if work item sea water sampling is done together with item #1( 1 #7( 1 #+ and 1 # # 2ost in /ump &um per sample =' 75, per sample subje0t to a minimum 0harge of ='1(75, &pe0ifi0ation (i! (ii! &eawater sample shall be 0olle0ted using an appropriate water sampler at different depths within the water lo0aion at ea0h designated lo0ation# .ater sample shall be sent to an appro1al laboratory for total suspended solids analysis#

1 #15 Processing& con ersion and Transformation to Designated /ormat With (uality !ssurance As per item 1#17 of "art 1#

+8

1 #1@ Preparation of #eport and Submission 2ost in "er0entage of Total &ur1ey 5ees 0hargeable# 5- of the total &ur1ey 5ees 0hargeable A minimum fee is =' 7(5,, per job# 1 #1@#1 (i! (ii! (iii! (i1! (1! (1i! 1 #1@#7 Sur ey #eport should include& as a minimum& the follo'ing &0ope of .ork "ersonnel and ;:uipment 'ethodology &ignifi0ant ;1ents 4ata 2olle0ted =esult of laboratory analysis (if appli0able! Supply of Plans and Documents

&upply of "lans and 4o0uments as per item 1#1 of "art 1

+9