Safe Work Practices (SWP) for Bored Piling Operation Procedures check for minimum requirements (Please tick):
SWP-24
#$
Permit-to-Work Procedure in place where applicable Logout Tag out S stem where applicable PP! requirements
!mergenc "esponse Plan(!"P) ______________________________________________________________ Prepare the lifting machine for hoisting of steel casing$ a$ b$ c$ d$ e$ %ppro&al for Permit to Work 'hecklist %ppro&al for Permit to (oist 'hecklist %ppro&al for (ot work Permit 'hecklist 'heck Limit switch for workabilit 'heck Lifting )ears for &alidit and workabilit
*$
Prepare the access for ser&ice crane and boring rig$ a$ b$ 'heck the ground conditions +f ground is not firm enough, la steel plates onto ground
-$ 1$
.irect traffic and unauthori/ed personnel awa from the installation area (at least 0m radius)$ Pre-boring for the steel casing installation$ a$ b$ c$ !nsure all personnel in&ol&ed to wear PP! 2oring "ig operator is to be shield-off from falling debris !nsure signalman 3 riggerman to be present
0$
(oisting and inserting the steel casing into the pre-bored hole$ a$ b$ c$ 4se shackles during lifting of steel casing !nsure adequate co&er for the lifting hole of steel casing i$e$ 05mm !nsure the casing is inserted at least -m into the ground before releasing the wire rope
6$
(oisting and mounting the &ibro-hammer onto the steel casing$ a$ b$ 'heck wire rope of &ibrator hammer for kinks 'heck the h draulic hose for leakage
Page 1 of 2
SWP-24
.ismounting the &ibro-hammer$ a$ b$ !nsure all personnel clear at least 0m awa from the point of insertion !nsure signalman 3 riggerman to be present
9$
'ontinue boring to the required depth$ a$ b$ c$ !nsure all personnel in&ol&ed to wear PP! 2oring "ig operator is to be shield-off from falling debris !nsure signalman 3 riggerman to be present
Page 2 of 2
SWP-24
'onstruct a standing platform for personnel in&ol&ed in the inspection using steel plates !nsure that the height of steel casing is at least 5$6m abo&e platform +nstall prefabricated co&er made of steel rebar to pre&ent personnel from falling into the borehole while measuring the depth$
##$
Shift boring rig awa from the bored hole area to gi&e wa to concrete truck$ a$ !nsure signalman 3 riggerman to be present
#*$
(oist and lower the prefabricated steel cage into the bored hole$ a$ b$ 4se shackles instead of hooks 'heck lifting point of the steel cage i$e$ at least * links must be welded to all the main bars
#-$
:ill 2ored hole with concrete to the desired depth$ a$ b$ c$ !nsure signalman 3 riggerman to be present Proper signage and barricading to pre&ent unauthorised personnel to enter the work area Lifting crew to be present and conduct ph sical and &isual inspection prior an hoisting
#1$
:urther lower and release the steel cage$ a$ !nsure no workers put their hands on the steel cage
#0$
(oisting and mounting the &ibro-hammer onto the steel casing$ a$ b$ !nsure all personnel clear at least 0m awa from the point of e;traction !nsure signalman 3 riggerman to be present
#6$
!;tracting the steel casing using &ibro-hammer$ a$ b$ c$ !nsure all personnel clear at least 0m awa from the point of e;traction !nsure signalman 3 riggerman to be present Piling <peration signage to be displa ed to warn all personnel
#7$
.ismounting the &ibro-hammer$ a$ !nsure the casing is still at least -m inserted into the ground before releasing the wire rope
#8$
Page 3 of 2
SWP-24
2ackfill the hole to the ground le&el$ a$ b$ !nsure a firm backfill using the e;ca&ator to compact the backfill 'o&er the backfill using a steel plate
!;ca&ated Pile Pits a) c) Secured ladders will be pro&ided into pile pits$ 2arricades with warning signs will be pro&ided to the peripher of the pile pits$ Prepared 2 : =r .aiman .esignation: WS(< .ate: #9 @anuar *5## "e&iewed 2 : =r >g 'hoon (uat .esignation: Senior Pro?ect =anager .ate: #9 @anuar *5##
b) Pile pits will be cut in steps or timbering pro&ided to the sides to pre&ent collapse$
"e&iewed 2 : =r >g 'hoon (uat .esignation: Senior Pro?ect =anager .ate: #1 @une *5#5