You are on page 1of 4

Ryobi Kiso (S) Pte Ltd

Safe Work Practices (SWP) for Bored Piling Operation Procedures check for minimum requirements (Please tick):

SWP-24


#$

Permit-to-Work Procedure in place where applicable Logout Tag out S stem where applicable PP! requirements

!mergenc "esponse Plan(!"P) ______________________________________________________________ Prepare the lifting machine for hoisting of steel casing$ a$ b$ c$ d$ e$ %ppro&al for Permit to Work 'hecklist %ppro&al for Permit to (oist 'hecklist %ppro&al for (ot work Permit 'hecklist 'heck Limit switch for workabilit 'heck Lifting )ears for &alidit and workabilit

*$

Prepare the access for ser&ice crane and boring rig$ a$ b$ 'heck the ground conditions +f ground is not firm enough, la steel plates onto ground

-$ 1$

.irect traffic and unauthori/ed personnel awa from the installation area (at least 0m radius)$ Pre-boring for the steel casing installation$ a$ b$ c$ !nsure all personnel in&ol&ed to wear PP! 2oring "ig operator is to be shield-off from falling debris !nsure signalman 3 riggerman to be present

0$

(oisting and inserting the steel casing into the pre-bored hole$ a$ b$ c$ 4se shackles during lifting of steel casing !nsure adequate co&er for the lifting hole of steel casing i$e$ 05mm !nsure the casing is inserted at least -m into the ground before releasing the wire rope

6$

(oisting and mounting the &ibro-hammer onto the steel casing$ a$ b$ 'heck wire rope of &ibrator hammer for kinks 'heck the h draulic hose for leakage

Page 1 of 2

Ryobi Kiso (S) Pte Ltd


7$ Slowl insert the steel casing using &ibro-hammer$ a$ b$ 8$ !nsure all personnel clear at least 0m awa from the point of insertion !nsure signalman 3 riggerman to be present

SWP-24

.ismounting the &ibro-hammer$ a$ b$ !nsure all personnel clear at least 0m awa from the point of insertion !nsure signalman 3 riggerman to be present

9$

'ontinue boring to the required depth$ a$ b$ c$ !nsure all personnel in&ol&ed to wear PP! 2oring "ig operator is to be shield-off from falling debris !nsure signalman 3 riggerman to be present

Page 2 of 2

Ryobi Kiso (S) Pte Ltd


#5$ +nspection of bored hole depth$ a$ b$ c$

SWP-24

'onstruct a standing platform for personnel in&ol&ed in the inspection using steel plates !nsure that the height of steel casing is at least 5$6m abo&e platform +nstall prefabricated co&er made of steel rebar to pre&ent personnel from falling into the borehole while measuring the depth$

##$

Shift boring rig awa from the bored hole area to gi&e wa to concrete truck$ a$ !nsure signalman 3 riggerman to be present

#*$

(oist and lower the prefabricated steel cage into the bored hole$ a$ b$ 4se shackles instead of hooks 'heck lifting point of the steel cage i$e$ at least * links must be welded to all the main bars

#-$

:ill 2ored hole with concrete to the desired depth$ a$ b$ c$ !nsure signalman 3 riggerman to be present Proper signage and barricading to pre&ent unauthorised personnel to enter the work area Lifting crew to be present and conduct ph sical and &isual inspection prior an hoisting

#1$

:urther lower and release the steel cage$ a$ !nsure no workers put their hands on the steel cage

#0$

(oisting and mounting the &ibro-hammer onto the steel casing$ a$ b$ !nsure all personnel clear at least 0m awa from the point of e;traction !nsure signalman 3 riggerman to be present

#6$

!;tracting the steel casing using &ibro-hammer$ a$ b$ c$ !nsure all personnel clear at least 0m awa from the point of e;traction !nsure signalman 3 riggerman to be present Piling <peration signage to be displa ed to warn all personnel

#7$

.ismounting the &ibro-hammer$ a$ !nsure the casing is still at least -m inserted into the ground before releasing the wire rope

#8$

"emo&al of casing from the bored hole

Page 3 of 2

Ryobi Kiso (S) Pte Ltd


a$ b$ c$ d$ #9$ !nsure all personnel clear at least m awa from the point of remo&al !nsure signalman 3 riggerman to be present !nsure the casing is loose from soil friction !nsure the casing wire rope is of appropriate rating

SWP-24

2ackfill the hole to the ground le&el$ a$ b$ !nsure a firm backfill using the e;ca&ator to compact the backfill 'o&er the backfill using a steel plate

!;ca&ated Pile Pits a) c) Secured ladders will be pro&ided into pile pits$ 2arricades with warning signs will be pro&ided to the peripher of the pile pits$ Prepared 2 : =r .aiman .esignation: WS(< .ate: #9 @anuar *5## "e&iewed 2 : =r >g 'hoon (uat .esignation: Senior Pro?ect =anager .ate: #9 @anuar *5##

b) Pile pits will be cut in steps or timbering pro&ided to the sides to pre&ent collapse$

Prepared 2 : =r .aiman .esignation: WS(< .ate: #1 @une *5#5

"e&iewed 2 : =r >g 'hoon (uat .esignation: Senior Pro?ect =anager .ate: #1 @une *5#5