Project: 194158381.xlsx.

ms_office Sheet: Basic Data

Page: 1 of 12 Print Date: 12/6/2013

WORK-UP SHEET BASIC DATA


Project: Location: Architect: Estimate No:

ASSIGNMENT 14 WELLAND, ONTARIO DINO MORABITO 14

Units: Date: By: Checked:

imperial
5-Dec-13 BRIAN SHEEHAN

Perimeters
L OWSP Foundation IWSP 1st Floor Wall Perimeter 1st Floor IWSP Brick Perimeter 0.333 2.00 90.000 Foundation Wall Perimeter W 83.333 R 18.333 0.833 THK 383.332 lf 380.000 lf 376.668 lf 383.332 lf 383.332 lf 382.000 lf

Sloped Trench
elevation: Trench Depth width: Trench Width Trench Perimeter
@ grade @ bottom rise: run

12.17 @ top 3.08

7.83 @ bottom 2.00

4: 1
@ grade

4.334 lf 2.542 lf

4'-0" or 1.20m

rise run

393.499 lf

Straight Trench
elevation: Trench Depth @ bottom Trench Width Trench Perimeter
@ grade @ bottom

@ bottom trench width

0.000 lf 0.000 lf 0.000 lf

Areas
Total Area Recess Recess Cutout Cutout Gross Area Wall (1.00) 380.000 0.833 Basement Floor Area Wall (1.00) 383.332 0.000 (1.00) (1.00) 23.333 19.333 22.667 16.667 1.00 (1.00) 90.000 18.333 83.333 30.000 7499.97 sf (549.99) sf 0.00 sf (528.89) sf (322.22) sf 6098.87 sf (316.54) sf 5782.33 sf 0.00 sf 6098.87 sf

Floor & Ceiling Area

\\vboxsrv\conversion_tmp\scratch_1\194158381.xlsx.ms_office

Project: 194158381.xlsx.ms_office Sheet: Cut & Fill

Page: 2 of 12 Print Date: 12/6/2013

ESTIMATE WORKSHEET CUT & FILL


Project: Location: Architect: Estimate No:

ASSIGNMENT 14 WELLAND, ONTARIO DINO MORABITO 14 DEPTHS APPLICABLE 1 2 3 4 AVERAGE DEPTH Grid Size: 0.00 sf Future Present Cut Fill

Units: Date: By: Checked:

imperial
14-Dec-13 BRIAN SHEEHAN

Location

AREA

UNITS

CUT VOLUME

UNITS

FILL VOLUME

UNITS

Cut

# of Grids Depth # of Cut/Fill 0.000 0 0.000 0 0.000 0 0.000 0


Avg Depth

0.00 0 0.000 0.00 sf 0 <- double check 0.00 cf "In Place"

Fill

# of Grids Depth # of Cut/Fill 0.000 0 0.000 0 0.000 0 0.000 0 0.00 0 0 <- double check

\\vboxsrv\conversion_tmp\scratch_1\194158381.xlsx.ms_office

Project: 194158381.xlsx.ms_office Sheet: Cut & Fill

Page: 3 of 12 Print Date: 12/6/2013

ESTIMATE WORKSHEET CUT & FILL


Project: Location: Architect: Estimate No:

ASSIGNMENT 14 WELLAND, ONTARIO DINO MORABITO 14 DEPTHS APPLICABLE 1 2 3 4


Avg Depth

Units:

imperial
14-Dec-13 BRIAN SHEEHAN

Future Present Cut Fill

Date: By: Checked:

Location

AVERAGE DEPTH 0.000

AREA 0.00 sf

UNITS

CUT VOLUME

UNITS

FILL VOLUME 0.00 cf "In Place"

UNITS

Transition Parcel

A1

2 corner cut/2 corner fill


0.00 0.00 sf 0.00 0.00 sf

Cut
0.000 0.000 0.000 0.000 Depth # of Cut/Fill 0.000 4
Avg Depth

0.00 4 0.000 0.00 sf 0.00 cf "In Place"

Fill
0.000 0.000 0.000 0.000 Depth # of Cut/Fill 0.000 4
Avg Depth

0.00 4 0.000 0.00 sf 0.00 cf "In Place"

\\vboxsrv\conversion_tmp\scratch_1\194158381.xlsx.ms_office

Project: 194158381.xlsx.ms_office Sheet: Cut & Fill

Page: 4 of 12 Print Date: 12/6/2013

ESTIMATE WORKSHEET CUT & FILL


Project: Location: Architect: Estimate No:

ASSIGNMENT 14 WELLAND, ONTARIO DINO MORABITO 14 DEPTHS APPLICABLE 1 2 3 4 AVERAGE DEPTH Future Present Cut Fill

Units: Date: By: Checked:

imperial
14-Dec-13 BRIAN SHEEHAN

Location

AREA

UNITS

CUT VOLUME

UNITS

FILL VOLUME

UNITS

Transition Parcel

A2

3 corner cut/1 corner fill


0.00 0.00 0.00 sf 0.00 sf

Cut
0.000 0.000 0.000 0.000 Depth # of Cut/Fill 0.000 4
Avg Depth

0.00 4 0.000 0.00 sf 0.00 cf "In Place"

Fill
0.000 0.000 0.000

Depth # of Cut/Fill

0.000 3
Avg Depth

0.00 3 0.000 0.00 sf 0.00 cf "In Place"

\\vboxsrv\conversion_tmp\scratch_1\194158381.xlsx.ms_office

Project: 194158381.xlsx.ms_office Sheet: Cut & Fill

Page: 5 of 12 Print Date: 12/6/2013

ESTIMATE WORKSHEET CUT & FILL


Project: Location: Architect: Estimate No:

ASSIGNMENT 14 WELLAND, ONTARIO DINO MORABITO 14 DEPTHS APPLICABLE 1 2 3 4 AVERAGE DEPTH Future Present Cut Fill

Units: Date: By: Checked:

imperial
14-Dec-13 BRIAN SHEEHAN

Location

AREA

UNITS

CUT VOLUME

UNITS

FILL VOLUME

UNITS

Transition Parcel

B1

3 corner fill/1 corner cut


0.00 0.00 0.00 sf 0.00 sf

Cut
0.000 0.000 0.000

Depth # of Cut/Fill

0.000 3
Avg Depth

0.00 3 0.000 0.00 sf 0.00 cf "In Place"

Fill
0.000 0.000 0.000 0.000 Depth # of Cut/Fill 0.000 4
Avg Depth

0.00 4 0.000 0.00 sf 0.00 cf "In Place" 0.00 cf "In Place" TOTAL CUT "In Place" Swell Factor TOTAL CUT "Loose" 0 cy TOTAL FILL "In Place" Compaction Factor TOTAL FILL "Compacted" Truckload size Truckloads cy 0 loads 0 cy cy 0 loads 0 cy 0 cy 0.00 cf "In Place"

\\vboxsrv\conversion_tmp\scratch_1\194158381.xlsx.ms_office

Project: 194158381.xlsx.ms_office Sheet: Cut & Fill

Page: 6 of 12 Print Date: 12/6/2013

ESTIMATE WORKSHEET CUT & FILL


Project: Location: Architect: Estimate No:

ASSIGNMENT 14 WELLAND, ONTARIO DINO MORABITO 14 DEPTHS APPLICABLE 1 2 3 4 AVERAGE DEPTH Future Present Cut Fill

Units: Date: By: Checked:

imperial
14-Dec-13 BRIAN SHEEHAN

Location

AREA

UNITS

CUT VOLUME

UNITS

FILL VOLUME

UNITS

Total truckloads of earthfill to import

0 loads

\\vboxsrv\conversion_tmp\scratch_1\194158381.xlsx.ms_office

Project: 194158381.xlsx.ms_office Sheet: Div 3

Page: 7 of 12 Print Date: 12/6/2013

ESTIMATE Division 03-Concrete


Project: Element/Trade: Element/UCI Reference:

ASSIGNMENT 14 CONCRETE

Project No: Measured: Extended: Dimensions

14 B.S.

Estimate No: Estimate Type: Priced:

14 TAKE OFF

Units: Date: Checked: Unit

imperial 5-Dec-13

Cost ($)

Description

No.

Extensions

Quantity

Unit

Price

03 30 00 - CAST-IN-PLACE CONCRETE
Footings
Concrete Strip Footing; 380 x 1.833' x 1; 20 Mpa Strip Footing 1.0 380.000 1.833 1.000 696.54 0.00 0.00 0.00 0.00 0.00 0.00 696.54 Forms to Strip Footing Strip Footing cf cf cf cf cf cf cf 25.8 cy

Steps Steps

2.0

380.000

1.000

760.00 0.00 0.00 0.00 0.00

sf sf sf sf sf sf sf sf sf 760.0 sf

Steps Steps Bulkheads Bulkheads

0.00 0.00 0.00 0.00 760.00

Keyway ### x ### 0.00 Concrete Spread Footing; 30" X 30" X 12"; 20 Mpa 6.0 2.500 2.500 0 lf

1.000

37.50 0.00 0.00 37.50

cf cf cf 1.4 cy

Forms to Spread Footing 6.0 2.500 2.500 1.000 60.00 0.00 0.00 60.00 sf sf sf 60.0 sf

\\vboxsrv\conversion_tmp\scratch_1\194158381.xlsx.ms_office

Project: 194158381.xlsx.ms_office Sheet: Div 3

Page: 8 of 12 Print Date: 12/6/2013

ESTIMATE Division 03-Concrete


Project: Element/Trade: Element/UCI Reference:

ASSIGNMENT 14 CONCRETE

Project No: Measured: Extended: Dimensions

14 B.S.

Estimate No: Estimate Type: Priced:

14 TAKE OFF

Units: Date: Checked: Unit

imperial 5-Dec-13

Cost ($)

Description

No.

Extensions

Quantity

Unit

Price

Foundation Wall
Foundation Wall; 380' x 10" x ; 25 Mpa 1.0 380.000

0.833

6.000

1899.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00

cf cf cf cf cf cf cf cf cf cf 65.8 cy

Brickshelf

(1.0)

382.000

0.333

1.000

0.00 (127.21) 1772.03

Forms to Foundation Wall 2.0 380.000 6.000 4560.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Bulkhead-Left Bulkhead-Right 0.00 0.00 0.00 4560.00
sf sf sf sf sf sf sf sf sf sf sf

4560.0 sf

" x 8" Anchor Bolts @ 7'-0" o.c.


o.c.

#DIV/0!
corners

pcs #DIV/0! pcs

Concrete Piers; ; Mpa 0.00 0.00 0.00 0.00 0.00 Forms to Concrete Piers cf cf cf cf 0.0 cy

\\vboxsrv\conversion_tmp\scratch_1\194158381.xlsx.ms_office

Project: 194158381.xlsx.ms_office Sheet: Div 3

Page: 9 of 12 Print Date: 12/6/2013

ESTIMATE Division 03-Concrete


Project: Element/Trade: Element/UCI Reference:

ASSIGNMENT 14 CONCRETE

Project No: Measured: Extended: Dimensions

14 B.S.

Estimate No: Estimate Type: Priced:

14 TAKE OFF

Units: Date: Checked: Unit

imperial 5-Dec-13

Cost ($)

Description

No.

Extensions

Quantity

Unit

Price

0.00 0.00 0.00 0.00 0.00 Extra for Brickshelf; 4" wide x 12" high 1.0 382.000 382.00

sf sf sf sf 0.0 sf

382 lf

Slab on Grade
Slab on Grade; 5782.33 x 5" ; 20 MPa 1.0 5,782.33

0.417

2411.23 0.00 0.00 0.00 0.00 2411.23

cf cf cf cf cf 89.4 cy

" Clear Stone; 6" thick 1.0 5,782.328 0.500 2891.16 0.00 0.00 0.00 0.00 2891.16 Expansion Joint Filler; 1/2" x 5" 1.0 cf cf cf cf cf 108.0 cy

376.668

376.67 0.00 376.67

lf lf 377 lf

Welded Wire Fabric; 6x6 W1.4/1.4 5,782.328 0.00 0.00 0.00


laps

sf sf sf 0 sf

0.00 Polyethylene Vapour Barrier below Slab 1.0 5,782.33


laps

5782.33 10%

\\vboxsrv\conversion_tmp\scratch_1\194158381.xlsx.ms_office

Project: 194158381.xlsx.ms_office Sheet: Div 3

Page: 10 of 12 Print Date: 12/6/2013

ESTIMATE Division 03-Concrete


Project: Element/Trade: Element/UCI Reference:

ASSIGNMENT 14 CONCRETE

Project No: Measured: Extended: Dimensions

14 B.S.

Estimate No: Estimate Type: Priced:

14 TAKE OFF

Units: Date: Checked: Unit

imperial 5-Dec-13

Cost ($)

Description

No.

Extensions

Quantity

Unit

Price

6360.56 Screeding, curing and trowel finish 1.0 Perimeter Drain 4" 1.0 393.499 393.50 0.00 393.50 " Clear Stone; 11" cover to Perimeter Drain 1.0 393.499 2.000 1.000 787.00 0.00 787.00

6361 sf

5,782.33

5782.33

5783 sf

lf lf 394 lf

cf cf 30.0 cy

\\vboxsrv\conversion_tmp\scratch_1\194158381.xlsx.ms_office

Project: 194158381.xlsx.ms_office Sheet: Div 31

Page: 11 of 12 Print Date: 12/6/2013

ESTIMATE Division 31-Earthwork


Project: Element/Trade: Element/UCI Reference: Dimensions Description No. L W H Extensions Quantity

ASSIGNMENT 14 Project No: EARTHWORK


Measured: Extended:

14 B.S.

Estimate No: Estimate Type: Priced:

14 TAKE OFF

Units: Date: Checked: Unit

imperial 3-Dec-13

Cost ($)

Unit

Price

EARTHWORK
31 14 00 - Strip Topsoil & Stockpile on site 1.0 180.000 100.000 0.500 9000.00 0.00 0.00 9000.00 cf cf cf 334.0 cy

31 23 00 - Sitework; Excavation & Fill 0.00 0.00 0.00 0.00 (9000.00) 0.00 0.00 (9000.00) cf cf cf cf cf cf cf (333.0) cy

Volume of Topsoil stocked on site Volume of Cut from "Cut & Fill" Volume of Fill from "Cut & Fill"

31 23 16 - Mass Excavation to Basement Bldg 1.0 6,098.87 Footing 1.0 380.000 2.833 Sloped Trench 1.0 393.499 2.542 Straight Trench

4.334 0.500 4.334

26432.49 538.27 4334.76 0.00 31305.53

cf cf cf cf 1160.0 cy

31 23 16 - Hand excavation to footings 6.0 3.500

3.500

0.500

36.75 0.00 0.00 0.00 36.75

cf cf cf cf 2.0 cy

31 23 33 - Backfill with Native Material Trench 1.0 Hand Excavation Perimeter Drain (1.0)

4,334.763 786.998

4334.76 0.00 (787.00) 3547.77

cf cf cf 132.0 cy

Native Material for Disposal Excavation 1.0 Backfill (1.0)

829.0 132.0

swell compaction

20% 15%
truck capacity

994.8 (151.8) 843.0 10.0

cy cy 843.0 cy 85 loads

\\vboxsrv\conversion_tmp\scratch_1\194158381.xlsx.ms_office

Project: 194158381.xlsx.ms_office Sheet: Div 31

Page: 12 of 12 Print Date: 12/6/2013

ESTIMATE Division 31-Earthwork


Project: Element/Trade: Element/UCI Reference: Dimensions Description No. L W H Extensions Quantity

ASSIGNMENT 14 Project No: EARTHWORK


Measured: Extended:

14 B.S.

Estimate No: Estimate Type: Priced:

14 TAKE OFF

Units: Date: Checked: Unit

imperial 3-Dec-13

Cost ($)

Unit

Price

Division 31-Earthwork

$0