Bill of Stone work in Flooring, Staircase and Kitchen for different structures at L&T site BETWA No of towers = 3

Stone work measurement for Staircases Note: Two staircases were present in a tower covering the 12 floors of also basement is provided in each building and second Staircase 1 area 1 from ground floor(floor) to half landing area 2 from next half of landing to floor total area of staircase connecting each floor area of stone work for stair case for building or 15 floors area of stone work for stacking stair case for building or 15 floors total stone work(including stacking) For the whole project site (including stacking) cost @ Rs. 650/ sq.m (including stacking) total stone work (excluding stacking) for project site cost @ Rs. 650/ sq.m (including stacking) Staircase 2 area 1 from ground floor(floor) to half landing area 2 from next half of landing to floor total area of staircase connecting each floor area of stone work for stair case for building or 12 floors area of stone work for stacking of stair case for building or 15 floors total stone work For the whole project site cost @ Rs. 650/ sq.m total stone work (excluding stacking) for project site cost @ Rs. 650/ sq.m (including stacking) Flooring of Stone work in corridors area of stone work Corridors flooring area of corridor area under staircase area in free spaces total area Cost @ Rs 850/sq. m for on floor for one building for project site total cost 76 11.285 6.216 93.501 sq. m sq. m sq. m sq. m area of corridor+ area under staircase+ three corners behind lift Stacking 10.277232 sq. m 1.3716 sq. m 2.6838 sq. m 14.332632 sq. m 12182.7372 rupees 146192.8464 rupees 438578.5392 rupees

7.75 8.375 16.125 241.9 39 281 841.7538 547139.97 725.625 471656.25

8.25 7.65 15.9 190.80 33.162 224 671.88672 436726.37 572.4 372060

79475.85 rupees 953710.2 rupees 2861130.6 rupees 3299709.139 rupees

ROHINI two G+12 and one G+8 building

Stone work measurement for Staircases Note: Two staircases were present in a tower covering the 12 floors of also basement is provided in each building and second Staircase 1 area 1 from ground floor(floor) to half landing area 2 from next half of landing to floor total area of staircase connecting each floor area of stone work for stair case for building or 15 floors area of stone work for stacking stair case for building or 15 floors total stone work(including stacking) For the whole project site (including stacking) cost @ Rs. 650/ sq.m (including stacking) total stone work (excluding stacking) for project site cost @ Rs. 650/ sq.m (excluding stacking) Staircase 2 area 1 from ground floor(floor) to half landing area 2 from next half of landing to floor total area of staircase connecting each floor area of stone work for stair case for building or 12 floors area of stone work for stacking of stair case for building or 15 floors total stone work For the whole project site cost @ Rs. 650/ sq.m total stone work (excluding stacking) for project site cost @ Rs. 650/ sq.m (including stacking) Flooring of Stone work in corridors area of stone work Corridors flooring area of corridor 58 area under staircase 11.285 area in free spaces 13.1096 total area 82.3946 Cost @ Rs 850/sq. m 70035.41 for one floor for one building 840424.92 for project site 2241133.12 total cost 2680033 Note: one building of G+8 is present sq. m sq. m sq. m sq. m rupees rupees rupees rupees area of corridor+ area under staircase+ three corners behind lift Stacking 11.681344 sq. m 1.3716 sq. m 3.083064 sq. m 16.136008 sq. m 13715.6068 rupees 164587.2816 rupees 438899.4176 rupees

7.75 8.375 16.125 241.9 39 281 841.7538 547139.97 725.625 471656.25

8.25 7.65 15.9 190.80 33.162 224 671.88672 436726.37 572.4 372060

Rapti

Stone work measurement for Staircases Note: Two staircases were present in a tower covering the 12 floors of also basement is provided in each building and second Staircase 1 area 1 from ground floor(floor) to half landing area 2 from next half of landing to floor total area of staircase connecting each floor area of stone work for stair case for building or 15 floors area of stone work for stacking stair case for building or 15 floors total stone work(including stacking) For the whole project site (including stacking) cost @ Rs. 650/ sq.m (including stacking) total stone work (excluding stacking) for project site cost @ Rs. 650/ sq.m (excluding stacking) Staircase 2 area 1 from ground floor(floor) to half landing area 2 from next half of landing to floor total area of staircase connecting each floor area of stone work for stair case for building or 12 floors area of stone work for stacking of stair case for building or 15 floors total stone work For the whole project site cost @ Rs. 650/ sq.m total stone work (excluding stacking) for project site cost @ Rs. 650/ sq.m (including stacking)

7.75 8.375 16.125 241.9 39 281 841.7538 547139.97 725.625 471656.25

8.25 7.65 15.9 190.80 33.162 224 671.88672 436726.37 572.4 372060

&T site

basement is provided in each building and second staircase also covers the basement

sq.m sq.m sq.m sq.m sq.m sq.m sq.m sq. m

sq.m sq.m sq.m sq.m sq.m sq.m sq.m sq. m

area under staircase+ three corners behind lift

basement is provided in each building and second staircase also covers the basement

sq.m sq.m sq.m sq.m sq.m sq.m sq.m sq. m

sq.m sq.m sq.m sq.m sq.m sq.m sq.m sq. m

area under staircase+ three corners behind lift

basement is provided in each building and second staircase also covers the basement

sq.m sq.m sq.m sq.m sq.m sq.m sq.m sq. m

sq.m sq.m sq.m sq.m sq.m sq.m sq.m sq. m