This document containsT-Mobile proprietary information. No use or disclosure of the information contained herein is permitted without the prior written consent of T-Mobile.
-1-
Revision History Version 1 2 Date of Change 1/19/2013 10/17/2013 Person REH REH Notes, Comments, Reasons Initial Draft Updated Per Field
-2-
Table of Contents 1.0 OVERVIEW ............................................................................................................................................. 4 2.0 INSTALL VENDOR REQUIREMENTS ......................................................................................................... 4 2.1 2.2 2.3 VENDOR REQUIRED ON-SITE SUPPLIES .................................................................................................. 4 ARRIVAL CHECKLIST ........................................................................................................................... 4 STORE EQUIPMENT INSTALLATION PRIORITIES ......................................................................................... 4
3.0 APPENDIX A - POINT OF SALE REFRESH INSTALL GUIDE ........................................................................ 6 3.1 3.1.1 3.1.2 3.2 3.2.1 3.3 3.4 3.5 3.6 3.7 3.8 3.8.1 3.9 DISCONNECTING/INSTALLING MACHINES ............................................................................................... 6 OBTAINING MACHINE NAME WHEN NOT LOGGED ON ............................................................................. 6 OBTAINING MACHINE NAME WHEN LOGGED ON .................................................................................... 7 POWERING ON THE NEW SYSTEM ......................................................................................................... 7 VERIFYING BOOT ORDER....................................................................... ERROR! BOOKMARK NOT DEFINED. CHERRY TOOLS INSTALLATION ............................................................................................................ 10 MSR INSTALLATION (IF PRESENT) ....................................................................................................... 13 CHANGING THE COM PORT NUMBER ON POS WORKSTATION (CASH DRAWER) .......................................... 18 ADDING NETWORK PRINTERS IN WINDOWS 7 ....................................................................................... 20 ACQUIRING THE MAC ADDRESS ......................................................................................................... 22 TROUBLESHOOTING ......................................................................................................................... 24 INGENICO NOT BEING SEEN IN WATSON .............................................................................................. 24 TESTING ........................................................................................................................................ 26
-3-
1.0
Overview
The document covers all steps in the preparation, deployment and installation of new POS computer equipment at all new T-Mobile Retail Stores. The Install Vendor will work with an assigned TMO Project Manager who will coordinate dates for deployment and act as liaison for any issues. The TMO Project Manager will contact the awarded vendor with specific dates to perform the installation. This document was updated and approved for use in all 2013 POS PC Replacement Program. This document should only be distributed in its entirety.
2.0
2.1
2.2
Arrival Checklist
Upon arrival, Install Tech must verify the completion of the following items at the store. Any unsatisfactory findings must be reported back to the TMO PM immediately. Tech may be asked to complete some of these tasks if requested. New Equipment has arrived. Report any missing equipment to the TMO Bridge.
2.3
-4-
Print Test Page from every Printer (only once). Disconnect and de-install existing Point of Sale computer. Old PC should be put in box from new PC and prepped for pickup. NOTE: Cash till must be closed on computer before removal, Manager/Rep can close till. Install and re-connect new Point of Sale computer. Re-connect Cash Drawer using Belkin USB to Serial Adapter (adapter will be provided). Re-image Point of Sale computer with latest image (Thumb drive provided). Replace existing mouse with new USB optical mouse (comes with new PC). Re-install Cherry Keyboard / MSR on each new Point of Sale computer. Re-install all Printers on Sales Floor on each new Point of Sale computer. Validate all new Point of Sale peripherals are working properly through approved testing. RSM to provide final test and acceptance on each new Point of Sale system. RSM Acceptance and any other paper work to be faxed to T-Mobile Bridge Support. NOTE: When receiving equipment on-site, any issues contact TMO PM. Anything missing should be reported immediately to the TMO SOS PM.
-5-
3.0
3.1
Disconnecting/Installing Machines
Ensure POS till for workstation has been closed (store manager, store rep), before disconnecting the existing PC, the onsite tech needs to validate with the store manager before disconnecting the workstation.
3.1.1
Obtaining Machine Name When Not Logged on At the Welcome to Windows screen press CTRL-Alt-Delete. At the Warning screen click OK
At the LogOn to Windows screen click the drop down arrow on Log on to. You will see three options GSM1900, NATAPPS and an option with (this computer) the name to the left of that is the Computer Name
-6-
3.1.2
Obtaining Machine Name When Logged on Find icon labeled as My Computer. Properties. Right-click on the My Computer icon and select
On the properties tab, the computer name is listed next to Full computer name (note the gsm1900.org is not necessary)
Power off old workstation Disconnect peripherals and network Connect peripherals and network to new workstation
3.2
NOTE: THE USB KEY SHOULD NOT BE REMOVED UNTIL INSTRUCTED TO, LATER IN THIS SECTION.
-7-
Enter the Computer name. Select the correct Time Zone. The Computer Role will be Retail / POS.
-8-
OS will start installing and reboot several times. If the PC appears stalled, press and hold the power button on the comptuer until it shuts down. Then press the power button to restart it again. When installation completes you will be at the Windows 7 logon screen, press CTRL-ALTDEL. At the Warning window select OK NOTE: THE USB KEY MAY NOW BE REMOVED.
At the user login screen please log in with your provided username and password. RightClick on Time in lower right corner of screen and select Adjust Time/Date. Validate time zone is correct for your location.
-9-
3.3
Copy the Cherry Tools 5.7.zip from the Z drive: \\waprdfscos01\cos\ITA\Store_Buildout\Vendor\2013POSWin7Upgrade\Cherry Tools 5.7.zip\Cherry Tools 5.7 down to the C:\IT Resources folder on the C:\
- 10 -
- 11 -
Yes to UAC warning. Finish and then you will be prompted to reboot the system. After the machine is back up you will need to open the Cherry Tools- Designer from under All Programs.
Cancel out of the Designer wizard and select the Activate button at the top
- 12 -
Click on the filename search button to open the correct configuration file. The correct file should already be showing in the window.
Next, you will see a green checkmark and a window stating that the configuration has been successfully wrote to the keyboard. You will now need to open notepad and test the credit card swipe. When you test swipe a Credit card it will take the following format in Notepad.
3.4
- 13 -
Copy the Configuration Utility and the HPHIDKBConfig zip files from the HP MSR folder on \\aztemadkvault\g$\MSR to the C:\IT Resources folder on the local PC. Extract both of those files into the C:\IT Resources folder by right-clicking on the file and selecting Extract All.
Keep the default location for the destination and click Extract
Right click and Run the HPHIDKBConfig as Administrator. If the installer runs without error the MSR will beep and you will see a message stating the Configuration was successfully wrote to the MSR. If it fails you will see the following error.
- 14 -
NOTE: THE MANUAL CONFIGURATION ONLY NEEDS TO BE DONE IF THE NOTEPAD TEST FOR THE MSR DOES NOT WORK You will now need to use the Configuration Utility that was already copied to the C:\IT Resources folder in the earlier steps. Run the Setup.exe and accept the User Account control warning. Select Next.
- 15 -
Next Select Finish, then Launch the HP MagSwipe Configuration Utility from All Programs
Select Reader Interface, If the device is plugged in you will have a device populated in the window
- 16 -
Select the USB HID Keyboard Data Format and then Send to MSR at the bottom. The MSR device will beep once and you will see a message stating the settings have been wrote successfully. Select OK and Close the Utility on with the Close button on the lower right hand corner. Then Exit the Utility.
- 17 -
You will now need to test the MSR by opening Notepad and swiping a Credit Card. You can open notepad quickly by clicking on Windows and typing notepad in the explorer bar.
If the configuration was successful you will see data populated in Notepad.
The final step will be to remove the HP MagSwipe Configuration Utility from the UnInstall option in All Programs/ HP MagSwipe Configuration Utility.
3.5
- 18 -
Right-click on the adapter and choose properties. Select the Port Settings tab and press the Advanced button.
Select COM1 from the COM Port Number pull-down list and press OK.
Verify that the adapter is now set to COM1 in the device manager:
- 19 -
3.6
- 20 -
Type in the TCP/IP address of the printer to be installed and hit Next.
If it auto detects the printer and installs drivers it will look like this example of a CP3525 model: If there are no native drivers (for older models, like a 4350) it will look like this:
At this point, hit Windows Update button, be patient as it downloads the drivers from Microsoft. Once downloaded select HP as manufacturer and select the model, in this case, the 4350 PCL5:
Then hit next. Note: if the drivers are still not listed, click on Have disk and point the wizard to the drivers for that model printer. Also, DO not select drivers in POSTSCRIPT mode (PS), they will not work correctly in Retail.
- 21 -
Name the printer according to the store naming convention and hit next:
3.7
In the Window type: IPCONFIG /ALL, then press ENTER. Scroll up until you find the network adapter connected to gsm1900.org (circled in red)
- 22 -
Please call in the following information to the T-Mobile Bridge: Host name, Physical address (MAC Address) Items circled in red.
The T-Mobile Bridge will then add the machine physical address to the Watson POD configuration table.
- 23 -
3.8
Troubleshooting
3.8.1
Ingenico Not Being Seen in Watson If the store personnel cannot see the Ingenico device in the Watson App., its likely that the Ingenico is not attached. Go to Device Manager and update the device that is circled in red.
Then click on search automatically. This updates the driver for the Ingenico to work with Watson.
To re-boot the Ingenico iSC480, press the # key and Yellow key simultaneously and hold for 3 seconds, then release.
- 24 -
- 25 -
3.9
Testing
Restart all the machines to ensure all policies have been received. Log on with domain account. Open Internet Explorer and verify you can visit web pages. Verify Icons are similar to screen below, Notify PM if no Icons are present.
Verify previously installed printers are present. Every POS should print to every printer. Print a test page to each printer making sure each one printed correctly Verify the following items are in the Start Menu under Programs.
Verify cash drawer is not locked; key should be at the 12 oclock position Go to Z drive: \\waprdfscos01\cos\ITA\Store_Buildout\Vendor\2013POSWin7Upgrade
- 26 -
Click on $ symbol to pop drawer, You will get a Drawer should now be Open message and see the drawer pop if everything is correct If you hear a thump but the cash drawer remains closed the key is most likely turned to the closed position or there is an obstruction If the com port settings are incorrect you will see the following displayed
If COM port was incorrect change, restart and test again, reference COM Port section in OS setup. - Call your PM if you need assistance here If you did not receive an error and the cash drawer did not open revisit the APG Cash Drawer Setup section and verify the following: Open drawer, lift tray out, check for green blinking lights towards rear or cash drawer. If there are no lights check that power adapter is connected on both ends, power strip is on Tape cash drawer keys to front of drawer using blue painters tape,
- 27 -
If power checks out verify serial cable is connected to desktop with adapter properly seated. Remove cash drawer and gently turn over. Check connections for loose cables. Verify dip switch settings. Repeat testing procedure from beginning on each machine in this section as well as checklist. Contact PM to review post completion checklist.
Here are some cash drawer tips: First open the cash drawer and remove the money tray. Look in the drawer towards the back and see if you see a green blinking light. If you do not then this means the drawer does not have power to it. The power cord is either unplugged from the back of the drawer or the power strip. On the bottom of the drawer there are 3 rows of dip switches. See the diagram below to make sure the following switches are on.
- 28 -
If the store Reports that the Ingenico is not attached during testing, do the following. Once logged into Watson, you will see that the Ingenico is not attached. Go to device manager and update the device that is circled in red.
Then click on search automatically. This updates the driver for the Ingenico to work with Watson.
- 29 -
Hand Off to Production Post Install Checklist Fax to 813-353-6458 when Complete.
Machine Name: Machine Name: Machine Name: Machine Name: Machine Name: Machine Name: Machine Name: Machine Name: Machine Name: Machine Name: Machine Name: Machine Name:
Accepted By: Accepted By: Accepted By: Accepted By: Accepted By: Accepted By: Accepted By: Accepted By: Accepted By: Accepted By: Accepted By: Accepted By:
FOH - POS TESTING Verify all POS application icons have downloaded to each POS system. Verify that all printer drivers have been installed on each POS system and they can print to each printer. Verify each cash drawer pops when you run the Blingpop tool. Verify each scanner beeps on power up and has the red light that indicates the scanner is ready for use. Verify each MSR/Cherry Keyboard properly scans credit cards. If Manager is onsite at the time of install, they have verified access to all POS applications (i.e: Watson, CAM, Inter Active Coverage Map, etc.) CABLING/CLEAN UP & MISCELLANEOUS Verify all cabling at each POS has been neatly tucked out view of the customer. Verify all PCs have been labeled, one on the PC, one on the Monitor. All old PCs have been placed in the new PC boxes and placed in the back room for pickup. All packaging materials from the equipment been broken down and removed from the store.
- 30 -
Vendor Tech ____________________________ Vendor Company ________________________ Store Number ____________ Store Name ___________________________________________
Post Install Outstanding Issue/s Dead, Missing or Defective Equipment Describe dead/defective equipment and provide a detailed description of the problem
By signing this document, I certify that I have tested and accepted into Production each new POS PC.