You are on page 1of 14

SINCE 1952

GP PUT DD SARAJEVO

Adresa: Alipaina br. 22A 71000 Sarajevo Bosna i Hercegovina tel: +387 (0)33 277-140 fax: +387 (0)33 277-141 e-mail: uprava@put.ba

HISTORY
Company GP PUT was established in Sarajevo, Bosnia and Herzegovina, in 1952 as a state enterprise, in order to facilitate the growing demand for high standard roads. The establishment of the Company in the years immediately after World War II enabled the company to contribute enormously to restore the former Yugoslavia and to gain valuable experience needed for capital works. At home, in Bosnia & Herzegovina, Company has undertaken numerous projects that include roads, building, earth-fill dams, airport runways, as well as the production of the construction materials and pre-fabricated construction units, in building materials of crushed stone, bridge pre-stressed girder supports, concrete pipes, bricks, concrete building blocks and various other concrete ware for civil engineering. Gained experience and enormous potential, soon took GP PUT on the international market, namely: 1965. Libija - At the coastal area, Benghazi-Tripoli, the Company constructed more than 400 km of highways. 1969. Kenya - In Kenya Company is known as Put - Sarajevo General Engineering Company. The Company accomplished over 1,500 km of roads of all standards, and took place in several projects of reconstruction of airports in Kenya. Repairs and overly to runways, aprons, and the Administration Complex Building at Nairobi Jomo Keniata International Airport, upgrading of the existing airstrip to modern standards at Malindi and Naivasha Airports, are examples of the high quality workmanship that Company has produced.

ABOUT US
GP PUT D.D. SARAJEVO is a company which through building roads, highways, bridges, tunnels, airports and buildings, at the same time built herself position as one of the most respected and most famous construction companies in our region and broader. During the long term business GP PUT DD SARAJEVO has gained extensive experience in the construction of buildings for various purposes, and has profiled itself as a company which is characterized by professionalism, respect for contractual obligations, and adaptability to individual requirements of our investors and customers which ultimately results in high confidence in the implementation of projects. Today GP PUT D.D. SARAJEVO is recognizable company in the construction sector, mainly specialized in the field of road construction. And we began like this...

OUR PERSONAL INFO


1993. Pakistan - We established PUT Sarajevo branch office in Pakistan. It was built a modern system of highways between Lahore and Okara in Pakistan and were carried out projects in several other regions. 1998. Uganda - In early 1998 PUT-Sarajevo began with the construction and reconstruction of roads Sironko Kapchorwa (45 km). The project aimed to provide access to one of the most beautiful national parks - Mount Elgon and to open Kapchorwa District to the rest of East Africa. l GP PUT D.D. SARAJEVO l ALIPAINA 22 A, 71000 SARAJEVO,

SINCE 1952

BOSNIA AND HERZEGOVINA l ID: 4200529290008

At this point the GP PUT D.D. SARAJEVO is registered in Kenya, Pakistan, Libya and Uganda. Since its foundation in 1952 Company was engaged in the following activities: l Designing and construction of all kinds of roads and highways, l Designing and construction of all kinds of bridges, l Designing and construction of houses and buildings, l Designing and construction of railways l Designing and construction of concrete and asphalt airport runways, l Production of various building materials.

l VAT: 200529290008 l MBS: 65-01-0012-11 l TEL: 033/277-140

GP PUT DD SARAJEVO

l FAX: 033/277-141 l E-mail: uprava@put.ba

PROFFESIONAL STAFF AND EQUIPMENT


GP PUT D.D. SARAJEVO proudly points out that in our team are superb personnel composed primarily of graduate engineers of building, geodesy, mechanical engineering and transport and communications engineers. Continuous process of selection and training of personnel is a top priority and guarantee of stable and secure companys growth. Investing in our staff through a continuous process of education, upgrading existing skills and acquiring new knowledge, are the backbone of strategic development and long-term vision of the company GP PUT DD SARAJEVO EDUCATIONAL LEVEL QUALIFICATION STRUCTURE OF EMPLOYEES B. Sc. of Civile engineering B. Sc. Geodesy engineering B. Sc. of Mechanical engineering University degree graduate B. Sc. in Transport and Communications Graduated engineer of chemistry B. Sc. Economist Bachelor of Law Professor of Biology Professor of English University degree Construction engineer Economist Constraction supervisor Constraction Technician Geodesic Technician Mechanical Engineering Technician A traffic Technician Economic Technician Arboreal Technician Gymnasium Asphalt Paver Technician Others Rebar fixer Bricklayer Carpenter Mechanician Automobile electrician Locksmith Operator of construction machinery Driver Assistant of construction worker Other auxiliary workers TOTAL 14 3 3 1 1 8 2 1 1 4 2 13 2 5 5 2 2 1 4 8 2 2 10 10 2 5 24 19 18 19 193

GP PUT D.D. SARAJEVO owns a significant amount of equipment and machinery for the works according to the required standards as well as highly qualified and experienced staff for the construction and maintenance of equipment. Equipment includes equipment for the earthmoving, asphalt plants, equipment for the works on the road, crushers, trucks and equipment for concrete products. Success of GP PUT D.D. SARAJEVO at international tenders, through market competition and the performance of all listed contracts, has improved the professional standing of the Company especially in developing countries. It should be noted that GP PUT D.D. employs 644 workers abroad. TYPE OF VEHICLE / MACHINERY CAR, PICK-UP TRUCK WHEEL LOADER ROLLER, COMPACTOR ROAD RECLAIMER HYDRAULIC EXCAVATOR BULDOZER ASPHALT PAVER ASPHALT PLANT TRACTOR CONTAINER POWER GENERATOR MOBILE CRANE TOWER CRANE COMPRESSOR ASPHALT PLANER ASPHALT MIXER STONE CRUSHER PERVIBRATOR ASPHALT CUTTER BACKHOE LOADER VIBRO COMPACTOR FORKLIFTER VOGEL CONNECTION FOR AS.PAVER TRUCK CISTERN AND SPRAYER LORRY MIXER MINIBUS TRAILER QUANTITY 68 82 27 60 18 20 9 10 4 9 27 4 2 6 21 14 6 2 11 4 7 10 2 1 5 8 2 4 3

The company also has its own registered laboratory for material, well-equipped and with highly experienced staff. Laboratory performs quality control, which include chemical, physical and structural tests for the works carried out by Company. Laboratory also provides services to other businesses and the public.

10

11

CURRENT PROJECTS
In order to present you a realistic picture of the projects taken in country and abroad, at this moment, in the following attachment we bring you view of same.

BOSNIA AND HERZEGOVINA


THE Vc HIGHWAY, SUBSECTION DRIVUA-GORICA INVESTOR: JP AUTOCESTE FEDERACIJE BIH d.o.o. MOSTAR CONTRACT SIGNING DATE: 29.09.2010. CONTRACT VALUE (): 4.160.445,38 VALUE OF COMPLETED WORKS (): 2.742.953,39

QUALITY CONTROL SERVICE


The company also has its own, registered laboratory for material, well-equipped and led by very experienced staff. Laboratory exists for more than 50 years and is the first of its kind at some construction company. It all started turning out to foreign markets where it was evident how much is necessary a role of laboratories in the process of construction of an object. GP Put is registered by Decision of the Federal Ministry of Energy, Mining and Industry, for this field, and now we are in the process of Laboratory Accreditation in BAT-e. The laboratory is properly equipped with experienced staff and modern equipment in the field of its activities, which are:
ASPHALT BETON

Projektovanje i postavljanje receptura na bazama, za sve vrste asfalta, kao i kontrola proizvodnje i ispitivanje gotovog kolovoza.
GEOMECHANICS

The design and installation of the recipebases, for all types of asphalt, as well as control production and testing of the finished road.

MAIN CITY HIGHWAY PHASE I ZENICA INVESTOR: JP ZA PROSTORNO PLANIRANJE I UREENJE GRADA ZENICA d.o.o. ZENICA CONTRACT SIGNING DATE: 26.01.2012. CONTRACT VALUE (): 2.289.997,18 VALUE OF COMPLETED WORKS (): 598.170.11

CEMENT

Tests of materials, tests bearing capacity of static and dynamic plate, compaction of materials inroadway with all mechanicalmethods.

Testing received batches

BITUMEN

Testing received batches All equipment is always properly attested, and the tests are carried out in accordance with and to the extent applicable regulations and standards J.U.S and EN. Laboratory has performed a complete internal control on the three sections of Highway, as well as all the other jobs that GP PUT performed. Also according to the Agreement on business cooperation we perform tests for many companies throughout the whole country.

12

13

GASIFICATION OF SREDNJOBOSANSKI CANTON-BUILDING A GAS PIPELINE INVESTOR: BH GAS d.o.o SARAJEVO CONTRACT SIGNING DATE: 23.01.2012. CONTRACT VALUE (): 4.272.853,77 VALUE OF COMPLETED WORKS (): 1.683.561,97

ROAD RECONSTRUCTION DROZGOMETVA -SELIMOVII INVESTOR: DIREKCIJA ZA PUTEVE KANTON SARAJEVO CONTRACT SIGNING DATE: 02.08.2011. CONTRACT VALUE (): 533.373,57 VALUE OF COMPLETED WORKS (): 504.185,38

THE Vc HIGHWAY, SUBSECTION LEPENICA-SUHODOL INVESTOR: CENGIZ INSAAT SANAYI VE TICARET A.S. ISTANBUL,TURSKA CONTRACT SIGNING DATE: 15.03.2013. CONTRACT VALUE (): 462.149,99 VALUE OF COMPLETED WORKS (): WORK IN PROGRESS

THE Vc HIGHWAY, SUBSECTION LEPENICA-SUHODOL INVESTOR: EUROASFALT d.o.o SARAJEVO CONTRACT SIGNING DATE: 15.10.2012. CONTRACT VALUE (): 5.199.507,03 VALUE OF COMPLETED WORKS (): 68.788,04 THE Vc HIGHWAY,VLAKOVO-TARIN, SUBSECTION VLAKOVO-LEPENICA INVESTOR: EUROASFALT d.o.o SARAJEVO CONTRACT SIGNING DATE: 30.03.2013. CONTRACT VALUE (): 2.308.471,26 VALUE OF COMPLETED WORKS (): WORK IN PROGRESS

14

15

KENYA
In Kenya, the current projects are Homabay-Mbita Road Project, Homabay District, Kenya, Nairobi and Othaya Roads Project, Around Othaya town, Central Province Kenya Nairobi, whose ends are expected during this year.
HOMABAY-MBITA ROAD PROJECT INVESTOR: HOMABAY DISTRICT,KENYA,NAIROBI CONTRACT SIGNING DATE: 02.10.2009. VALUE OF COMPLETED WORKS () : 14.838.452,30

OTHAYA ROADS PROJECT, AROUND OTHAYA TOWN INVESTOR: CENTAR KENYA PROVINCE NAIROBI CONTRACT SIGNING DATE: 05.02.2010. VALUE OF COMPLETED WORKS () : 18.533.589,90

REVIEW OF FINANCIAL INCOMES OF GP PUT D.D. SARAJEVO DURING THE PAST PERIOD
YEAR 2007. 2008. 2009. 2010. 2011. 2012. INCOME (EUR) 27.186.266,50 27.575.441,43 19.214.556,01 11.953.006,65 17.742.655,68 27.235.866,61

16

17

REFERENCES
BOSNIA AND HERZEGOVINA

PROJECT NAME CHILDRENS VILLAGE SOS KINDERDORF SARAJEVO RECONSTRUCTION OF ROAD BOJNIKRELJEVO WITH ENTIRE INFRASTRUCTURE ROAD RECONSTRUCTION WITH EXPANSION OF ROADS:SECTION STRIEVO-DRAGA THROUGH BLAGAJ AND SECTION D.DRENICA-G.DRENICA RECONSTRUCTION OF FLATS IN GORADE RECONSTRUCTION OF ROAD BUTILE RELJEVO(RECONSTRUCTION OF ROAD WITH EXPANSION OF RAILWAYS AND CONSTRUCTION OF ACCOMPANYING INFRASTRUCTURE) RECONSTRUCTION OF MAJOR ROAD M-17:SECTION LAVA-ATII,SECTION KONJIC-JABLANICA RECONSTRUCTION OF MAJOR ROAD M-18: SECTION OLOVO-KLADANJ RECONSTRUCTION OF ROAD LAVAATII (DAMAGE ELIMINATION ON ROAD M-18 OLOVO-KLADANJ) INFRASTRUCTURE (ROADS,WATER SUPPLY SYSTEM,TELECOMMUNICATIONS ) IN MILLITARY CAMP BUTMIR, SARAJEVO RECONSTRUCTION OF DOBRINJA V SARAJEVO SETTLEMENT WEST ROADS TOWARD SARAJEVO RECONSTRUCTION OF BAEVO TANK AND PUMP STATION WASTE DEPOT (WORKS ON MUNICIPAL WASTE DEPOT) TARIN-PODORAAC SECTION, REPAIR AND ASPHALTING

TOTAL VALUE OF WORKS () 1.863.658,91 1.153.234,69

CONSTRUC. PERIOD 1996-1998 1997

INVESTITOR SOS KINDERDORF AUSTRIJA MINISTRY OF TRANSPORT AND COMMUNICATIONS OF SARAJEVO CANTON CITY OF MOSTAR RECONSTRUCTION AUTHORITY BOSNIA AND HERZEGOVINA PIU HOUSING, SARAJEVO MINISTRY OF TRAFFIC AND COMMUNICATIONS OF SARAJEVO KANTON FEDERAL ROAD AUTHORITY SARAJEVO, BIH FEDERAL ROAD AUTHORITY SARAJEVO, BIH FEDERAL AUTHORITY FOR TRAFFIC PROJECT IMPLEMENTATION IN BOSNIAN FEDERATION (PID) NATO, CORIMEC ITALIANA SPA,MILANO,ITALIA PIU HOUSING, SARAJEVO MINISTRY OF TRANSPORT AND COMMUNICATIONS OF SARAJEVO CANTON EUROPEAN COMMISSION IN SARAJEVO INSTITUTE FOR SARAJEVO CANTON CONSTRUCTION BOSNAPUTEVI D.D.

PROJECT NAME SARAJEVO-ZENICA HIGHWAY,SECTION JOANICA- PODLUGOVI ROAD KNOT JABLANICA (REPAIR AND RECONSTRUCTION OF M-17 ROAD) HIPERMARKET ROBOT EXTERNAL DECORATION SARAJEVO-KRIVAJEVII (RECONSTRUCTION OF ROADS, SECTION SARAJEVO-KRIVAJEVII) NORTH ROAD (RECONSTRUCTION OF ROAD FROM BUS STATION TO MERKATORMARKET) TVORNICA OPEKE SARAJEVO (INFRASTRUCTURE AND INTERNAL HALLS-FACTORY CONSTRUCTION) TITOVA STREET-SLAB LAYING BUSINESS CENTRE INTERMERKURSARAJEVO-ZENICA MOTORWAY, SECTION PODLUGOVI-VISOKO NORTH LONGITUDINAL, SECTION I-II TRANSVERSAL

TOTAL VALUE OF WORKS () 14.827.464,55 710.764,23 670.844,60 581.084,24

CONSTRUC. PERIOD 2003 2003 2004 2004

INVESTITOR ROAD MANAGAMENT OF FEDERATION OF BOSNIA AND HERZEGOVINA FEDERAL ROAD MANAGEMENT INSTITUTE FOR CANTON CONSTRUCTION IN SARAJEVO FEDERAL ROAD MANAGEMENT, BOSNAPUTEVI D.D. SARAJEVO CANTON,MINISTRY OF TRAFFIC AND COMMUNICATIONS, ROAD MANAGEMENT TVORNICA OPEKE SARAJEVO SARAJEVO CANTON-ROAD MANAGEMENT OF SARAJEVO CANTON INTERMERKUR ROAD MANAGAMENT OF FEDERATION OF BOSNIA AND HERZEGOVINA SARAJEVO CANTON,MINISTRY OF TRAFFIC,ROAD DEPT. FEDERAL MINISTRY OF TRAFFIC AND COMMUNICATION, ROAD DEPT. OF FEDERATION OF BOSNIA AND HERZEGOVINA DOO SARAJEVO CONSTRUCTION INSTITUTE, SARAJEVO CANTON ROAD DEPT. TUZLA

3.312.299,13 664.679,44

1997-1999 1997

1.153.234,69

1997

1.251.729,44

2005-2006

1.044.046,26 1.495.017,46

1998 1998

860.272,62

2005

516.166,54 799.668,17 14.316.172,67 1.871.286,87

2005 2005-2006 2005-2006 2007-2010

530.209,68

1998

1.482.746,45 946.656,92 2.976.714,74 511.291,88 1.559.449,95 625.587,60

1998 1999 1999 1999 2000 2001

SARAJEVO-ZENICA MOTORWAY, SECTION DOBRINJE-VISOKO

15.841.716,30

2007-2008

WATER TREATMENT SMILJEVII RECONSTRUCTION OF REGIONAL ROAD R 471 BANOVII-VIJENAC,SECTION TULOVII-TRETENICA

900.046,09 377.297,11

2006-2008 2006-2007

18

19

PROJECT NAME RECONSTRUCTION OF REGIONAL ROAD R 455a IVINICE-SVATOVAC,SECTION POLJICE-INTERSECTION MURGA BUSINESS CENTRE MEGAMIX, LAND WORKS BUSINESS CENTRE MEGAMIX, LAND WORKS EXTERNAL DECORATION NIZ I NIZ II,GORNJI POFALII CONSTRUCTION OF LATERAL TOLL HOUSE AT VISOKO REPAIR AND RECONSTRUCTION OF ROAD M-17. SECTION BRADINA-OSTROAC REPAIR OF MAIN ROAD M-18, SECTION SREDNJE-SEMIZOVAC REPAIR OF MAIN ROAD M-17, SECTION JABLANICA-ALEKSIN HAN INVESTMENT-TECHNICAL AND ROUTINE MAINTENANCE OF STREETS REPAIR OF MAIN ROAD M-18, BORDER CROSSING RS/FBIH BOGATII-TRNOVO REPAIR OF MAIN ROAD M-18,TUZLASARAJEVO,SECTION PODPAKLENIK-OLOVO REGULATION OF THE RIVER ON THE STRETCH BRIDGE 6 BRIDGE 5 REPAIR OF ROAD M5,SECTION EHEREHAJIN MOST-KORIJA CONSTRUCTION OF HIGHWAY ON CORRIDOR Vc, SECTION DRIVUAKAKANJ, SUBSECTION DRIVUA-GORICA CONSTRUCTION OF HIGHWAY ON SECTION DROZGOMETVA-SELIMOVII LOCAL ROAD RAKOVA NOGA-BJELOVII, MUNICIPALITY KREEVO REPAIR OF MAIN ROAD M-5 SECTION PRAA-HRENOVICA

TOTAL VALUE OF WORKS () 316.899,73 475.313,29 400.816,02 424.852,87

CONSTRUC. PERIOD 2006-2007 2008 2007-2008 2008-2009

INVESTITOR

KENYA

ROAD DEPT. TUZLA MEGAMIX D.O.O. CONSTRUCTION INSTITUTE, SARAJEVO CANTON SARAJEVO CANTON,FLAT CONSTRUCTION FUND FEDERAL OFFICE FOR HIGHWAY CONSTRUCTION, MANAGEMENT AND MAINTENANCE ROAD DEPT. OF FEDERATION OF BOSNIA AND HERZEGOVINA ROAD DEPT. OF FEDERATION OF BOSNIA AND HERZEGOVINA ROAD DEPT. OF FEDERATION OF BOSNIA AND HERZEGOVINA MUNICIPALITY CENTAR, SARAJEVO ROAD DEPT. OF FEDERATION OF BOSNIA AND HERZEGOVINA ROAD DEPT. OF FEDERATION OF BOSNIA AND HERZEGOVINA FEDERAL DEPT. FOR CONSTRUCTION, MANAGEMENT AND MAINTENANCE OF HIGHWAYS JROAD DEPT. OF FEDERATION OF BOSNIA AND HERZEGOVINA FEDERAL DEPT. FOR CONSTRUCTION, MANAGEMENT AND MAINTENANCE OF HIGHWAYS SARAJEVO CANTON,MINISTRY OF TRAFFIC,ROAD DEPT. ROAD DEPT. OF FEDERATION OF BOSNIA AND HERZEGOVINA ROAD DEPT. OF FEDERATION OF BOSNIA AND HERZEGOVINA TOTAL VALUE OF WORKS () 19.597.367,40 25.087.108,01 CONSTRUCTION PERIOD 1975

PROJECT NAME RECONSTRUCTION OF RUNWAY AT NAIROBI AIRPORT LODVAR-KAKUMA ROAD, KENYA-ROAD CONSTRUCTION 140 km LONG KALANGA CORNER LAGA HAMARIS, KENYA-ROAD CONSTRUCTION 126 km LONG MOI SOUTH LAKE ROAD-NAIVASHA, KENYA-ROAD CONSTRUCTION 15 km LONG CONSTRUCTION OF KALANGA CORNERLAGA HAMARIS SECTION, ADDING 48 km OF ROADS ON STANDARD BITUMEN ROAD,INCLUDING 10 BRIDGES 30-70m LONG MAI-MAHIU-NAIVASHA, KENYA,ROAD RECONSTRUCTION MWINGI-KALANGA CORNER, KENYA ROAD CONSTRUCTION 46km LONG OPEN POOL AND TENNIS COURTS IMPALA CLUB NAIROBI (CONSTRUCTION OF POOLS AND TENNIS COURTS) LONGONOT TURNOFFNAIVASHA,RECONSTRUCTION OF MAIN MOTORWAY ALONG 28 km ROAD RECONSTRUCTION OF STREETS IN NAIROBI, KENYA,INFRASTRUCTURE AND ASPHALT ROADS CONSTRUCTION OF KISII-CHEMOSIT (C21) KISII-CHEMOSIT CONSTRUCTION OF ROAD NYAMIRAKADONGO CONSTRUCTION OF ROAD NDORIOWIMBI

INVESTOR MINISTRY OF ROADS AND PUBLIC WORKS MINISTRY OF TRANSPORT AND COMMUNICATION MINISTRY OF TRANSPORT AND COMMUNICATION MINISTRY OF TRANSPORT AND COMMUNICATION

1987-1991

1.369.172,68

2008-2010

26.093.689,51

1989-1993

3.452.115,47 1.291.186,35 791.739,06 587.985,66 297.491,09 920.170,46

2008-2009 2008-2009 2009-2010 2009-2010 2009 2010

4.072.783,58

1990-1991

12.454.510,26

1994-1999

MINISTRY OF PUBLIC WORKS AND ROADS

2.129.307,00 18.195.896,24 2.710.027,10

1997-1998 1997-1999

MINISTRY OF PUBLIC WORKS AND ROADS MINISTRY OF PUBLIC WORKS AND ROADS MINISTRY OF PUBLIC WORKS AND ROADS MINISTRY OF PUBLIC WORKS AND ROADS MINISTRY OF PUBLIC WORKS AND ROADS MINISTRY OF PUBLIC WORKS AND ROADS MINISTRY OF PUBLIC WORKS AND ROADS MINISTRY OF PUBLIC WORKS AND ROADS MINISTRY OF PUBLIC WORKS AND ROADS

1998

292.952,86

2010

7.193.960,51

1999-2001

364.589,46

2010

5.176.898,66 8.904.374,76 19.557.917,15 3.485.371,90 8.392.404,18

1999

23.996.709,84

2011-i dalje u toku 2011-2012 2012 2012

2002-2004 2005-2008 2005-2008 2005-2007

458.098,02 591.103,80 581.439,29

20

21

PROJECT NAME CONSTRUCTION OF ROAD KABATIKARIUA-MAREIRA CONSTRUCTION OF ROAD OWIMBILUANDA-KOTIENO CONSTRUCTION OF ROAD OTHAYA DISTRICT ROADS RECONSTRUCTION HOMA BAY-MBITA ROAD

TOTAL VALUE OF WORKS () 11.552.439,80 11.716.887,34 33.162.764,22 35.593.661,63

CONSTRUCTION PERIOD 2006-2009 2006-2010 2009- still in progress 2009- still in progress

INVESTOR MINISTRY OF PUBLIC WORKS AND ROADS MINISTRY OF PUBLIC WORKS AND ROADS MINISTRY OF PUBLIC WORKS AND ROADS MINISTRY OF PUBLIC WORKS AND ROADS

PAKISTAN

PROJECT NAME CONSTRUCTION OF LAHORE-OKARA ROAD,PAKISTAN DARA GHAZI KHAN-BYPASS AND TANUSSA SECTION,PAKISTAN INDUS ROAD 37km LONG RECONSTRUCTION OF EXISTING ROAD (N5), SECTION LAHORE-OKARA 30km LONG RECONSTRUCTION OF CRUCIAL SECTION OF EXISTING APPROACH BETWEEN LAHORE AND SAHIWAL (40 km) LAHORE-OKARA, 144 km RECONSTRUCTION OF HIGHWAY NOWSHERA-PESHAWAR ROAD CONSTRUCTION KASUR GHANDA SINGH ROAD ROAD CONSTRUCTION PATTOKI OLD MULTAN ROAD VO-5 PESHAWAR

TOTAL VALUE OF WORKS () 27.680.991,09

CONSTRUCTION PERIOD 1994-1996

INVESTOR ROADS AUTHORITY OF MINISTRY OF COMMUNICATION ROADS AUTHORITY ROADS AUTHORITY ISLAMABAD ROADS AUTHORITY OF MINISTRY OF COMMUNICATION ROADS AUTHORITY OF MINISTRY OF COMMUNICATION ROADS AUTHORITY ISLAMABAD ROADS AUTHORITY LAHORE-PUNJAB ROADS AUTHORITY LAHORE-PUNJAB ROADS AUTHORITY ISLAMABAD

11.757.646,15

1997-2001

2.442.895,86

2001-2002

UGANDA

4.645.760,74

2003-2004

PROJECT NAME ROAD SIRONKOKAPCHORWA,CONSTRUCTION OF NEW ROAD 45 km LONG AND RECONSTRUCTION OF EXISTING SECTION ROAD SIRONKO-KAPCHORWA

TOTAL VALUE OF WORKS () 21.952.768,10

CONSTRUC. PERIOD 1998-2002

INVESTITOR MINISTRY OF LABOUR,TRANSPORT AND COMMUNICATIONS MINISTRY OF LABOUR,TRANSPORT AND COMMUNICATIONS

42.112.466,12 13.106.023,22 4.544.888,11 1.506.471,54 3.184.405,08

2004-2008 2006-2010 2008-2010 2009-2010 2012

32.381.726,67

2004-2008

22

23

FUTURE FROM OUR PERSPECTIVE


Our objective advantage is a 60 years of experience in civil engineering, infrastructure and construction projects, and the fact that our team have a professional, well-educated, experienced people who have worked on three continents. People are our greatest treasure, and when it comes to education and promotion of our staff, in these cases we always gives them priority over all other. All that investment in training our employees comes with investing in equipment and its modernization, as all together, makes us even more effective in the the execution of entrusted works. GP PUT D.D. SARAJEVO has a real chance of becoming one of the leading construction companies in the region and we are well on track to expand our business abroad. Our mission is to remain prominent and respectable construction company in the region and beyond , following previous results by pursuing a assigned work reliably and quality. We are aiming to become a company which will stand out with the quality of processes and relations, as well as product quality, and our greatest award will be confidence of the public community and our clients.

CONTACT
BOSNIA AND HERZEGOVINA GP PUT D.D. SARAJEVO ALIPAINA 22 A 71000 SARAJEVO, BOSNA I HERCEGOVINA Phone: 033 277-140; FAX: 033 277-141 E-mail: uprava@put.ba

UGANDA
C.E. PUT SARAJEVO P.O. BOX 24507 SPRING ROAD,PLOT 132 BUGOLOBI KAMPALA Phone: +256 41 223 683; FAX:+256 41 220 958 E-mail: putugmle@infocom.com.ug

KENYA
PUT SARAJEVO GEN. ENG. CO. P.O. BOX No. 48331 LENANA ROAD 52, NAIROBI Phone: +254 725 426; FAX: +254 710 203 E-mail: esed.becirevic@put.ba

PAKISTAN
PUT SARAJEVO GEN. ENG. CO. 3-CIVIC CENTER, NEW GARDEN TOWN, LAHORE Phone: + 92 42 358 53 912-14; FAX: + 92 42 358 81 638 E-mail: sead.buljina@put.ba

24

25

26

You might also like