Professional Documents
Culture Documents
F.A.I. RTE. 57
SECTION 10-32HB-3,K
8-0" h h
7"
179-9 12 Elev. 699.87 Concrete Nails (Flat Hd. C.S.) P.G.L. of Roadway
4
1 1/2
cl.
3-9
7-0
3/4 Chamfers
8-5
SEC. 10-32HB-3,K
h 2 1 1/2 cl.
6
7 x 7-#6 h 2 bars
h 5
v h1 a 1
NAME PLATE
7-0
Earth Slope
11-5
6 Hollow bulb type nonmetallic water seal. (6 from top of wall to top of footing.)
9
3} Drains |8-0
7-8 6
2-0
Constr. Joint
12
a2
h 1
a2
3-0
v 1
-6
5/8
Elev. 689.06
"
BILL OF MATERIAL
Bar No. Size Length Shape
10 - #4 v 2 (E) bars at 9 cts. (Each Short Wing) 45 - #4 v 2 (E) bars at 9 cts. (Each Long Wing) 1x2-#4 h 6 (Bottom) Each Long Wing h6
36
HALF ELEVATION
1-9
CORNER DETAIL
a 1 720 93 #7 #4 10-6 8-10 a 2
5
4
-6
2-9
-1
5-3
10"
8-10"
10"
18
#4
4-6
2-8
1x2-#4 h 6
w
-0 .
"
8
-3
7"
h h 1
88 98 98 26 4 8 52
#7 #5 #6 #4 #6 #8 #4
in
BAR a 1
h
h 2 h 3
#5
ct
2-
-9
s.
7x
9"
BAR d
7-4
BAR z
3
h 4 h 5 h 6 or
at
#7 ch
80-0
Ea
ba
Lo
ng
11 g
43
rs
at in
|3
LOCAL TANGENT
"
34 -7
8"
8"
"
ct
s.
2x8 - #7 h bars at Top of
1-8
1-1 1-1 7x7-#5 h bars at 18 1/2 cts. 1 Top & Bottom of Bottom Slab Top Slab (Place as shown in Cross Section) 9x8-#7 h bars at 13 cts.
v v 1 v 2(E) *1 1/2
cl.
434 8 110 22 22 22 22 22
#4 #4 #4 #4 #4 #4 #4 #4
2-#6 h 4 bars in
(1-8 Min. Lap)
Min. Lap)
327-#7 a 1 bars at 6 cts. Bottom of Top Slab Sta. 31+31.92 327-#7 a 1 bars at 6 cts. Top of Bottom Slab 82-#4 a2 bars at |2-0 cts. Bottom of Bottom Slab
Top of Headwalls
Each Headwall
8-0
BAR s
BAR s 1
2-2
10
(2-9
12
h or h 6 3
cl.
w w1 z 8"
14 28 148
#5 #5 #7
9-5 17-10 7-11 Cu. Yd. Pound Pound 180 349 34,618
Flow
32-8
^
**33-#7 a 1 bars at 6 cts. Bott. of Top Slab **33-#7 a 1 bars at 6 cts. Top of Bott. Slab **9-#4 a 2 bars at |24 cts. Bott. of Bott. Slab 1-#4 h
3
4-10
Face
7-5
Back
12.8
|3
SECTION A-A
*v bars shall not be 3/4 Drip Notch placed more than 1 1/2 cl. from back face of wingwall.
at
79
#5 ct
w
8#7 5 z -0 s. ba E m ac in rs . h @ Sh or tW in g
h3
A
1-#4 h 3 Each Short Wing
SHOWING OUTLINES
58
3"
s.
^ 64.4 ew Sk
32
DESIGN STRESSES
0" -6 "
fy = 60,000 psi fc = 3,500 psi Max. Soil Pressure under footing = 2778 psf
-1
ct
11
M-42 or M-53, Grade 60. Bars indicated thus 12 x 4-#5 etc. indicates 12 lines of bars with 4 lengths per line. Reinforcement bars designated (E) shall be epoxy coated. All construction joints shall be bonded. Any excavation required for box culvert construction shall be included in the contract unit price for concrete, per Art. 502.15.
CULVERT DETAILS
VERT. SCALE: HORIZ. DATE 062205 CHECKED BY JDE DRAWN BY JDC
c:\projects\d505095\details5095.dgn
cl.
v 3
77 .2 ^
2 0 # 4 s ar 1 b s at 1 2 s. ct
2 0 # 4 s b ar s at 1 2 ct s.