ADANI POWER MAHARASHTRA LTD 5x660MW THERMAL POWER STATION UNIT PRE-SYNCHRONIZATION CHECK LIST

UNIT:1 2 GENERATOR TRANSFORMER Check whether all OLR are in reset position Take trials of Coolers R phase Y phase B phase ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok Remarks ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok ok ok ok ok ok ok / not ok / not ok / not ok / not ok / not ok / not ok / not ok DATE:Remarks ok / not ok ok / not ok

Cooler-1 Cooler-2 Cooler-3 Cooler-4 Cooler-5 Cooler-6 3

Confirm whether GT cooler bank is in CB mode after trials AUTOMATIC VOLTAGE GENERATOR Isolate the GT cooler bank ON signal Check voltage (DC) across X10:1-51 for EXC ON (ie 24Vdc) Check voltage (DC) across X11:7-57 for FCB ON (ie 24Vdc) Check voltage (DC) across U70 W15:3-3 & A03K03A1 for EXC ON (ie 240Vdc) Check voltage (DC) across U70 W15:2-4 & K10A1 for FCB ON (ie 240Vdc) Check voltage (DC) across K10:1-6 for FCB ON readiness (ie 240Vdc) Check voltage (DC) across A03K031-5 for field flashing readiness (ie 40-50Vdc) Close & open FCB in Local mode Close & open FCB in remote mode via simulation (short X11:7-57 for close &X11:8-58 for open) Remove loop after trials. Check cooling fan operation by picking up K16 Normalize K16 contactor Check Status of LEDs in U70 (In:11,13,14; Out:9,15) Check Status of LEDs in U71 (In:11) Normalize the GT cooler bank ON signal Check whether all relays are in reset condition GENERATOR CONTROL PANEL Check voltage across X2:71-72 (ie Main CB closing) With GT isolator (89G) Open condition-220Vdc With GT isolator (89G) Close condition-110Vdc Check voltage across X2:73-74 (ie Tie CB closing) With GT isolator (89G) Open condition-220Vdc With GT isolator (89G) Close condition-110Vdc Check voltage across X2:21-22 (ie GT voltage-0Vac) Check voltage across X2:23-24 (ie Bus-1 voltage -63.5Vac) Check voltage across X2:25-26 (ie Bus-2 voltage -63.5Vac) GENERATOR / GT / UT Check whether all relays in GPP-A/B are in reset condition Check whether all relays in GTRP are in reset condition Check whether all relays in UTRP are in reset condition

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

2 3 4 5

REMARKS ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok ok / not ok REMARKS ok / not ok ok / not ok ok / not ok

1 2 3

REMARKS

CHECKED BY

S.no 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Time 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 4.25 4.26 4.27 4.28 4.29 4.30 4.31 4.32 4.33 4.34 4.35 4.36 4.37 4.38 4.39 4.40 4.41 4.42 4.43 4.44 4.45

KWh

S.no 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Time 4.46 4.47 4.48 4.49 4.50 4.51 4.52 4.53 4.54 4.55 4.56 4.57 4.58 4.59 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15

KWh