All India Renewable Energy Regulatory And Policy Data Base (All India RE-RAP Data Base)

January 2013

Template flow for RE Regulatory Data Base

Step-1

A. Summary worksheet for RE Regulatory and Policy parameters provide broad summary of var technology-wise FIT, RPO, OA etc.) across state and centre. This sheet has linkages to respec

Step-2

Separate summary worksheets developed on the following topics and each such individual work States and UTs. a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. FIT Wind FIT Solar Thermal FIT Solar PV FIT Biomass FIT Bagasse Cogen FIT MSW FIT SHP FIT Biomass Gassifier FIT Biogas FIT other Technologies ... RPO Summary REC Grid Connectivity Open Access

k. l. m. n. o.

... RPO Summary REC Grid Connectivity Open Access

Step-3

Unique Code for each Reference Documents built based on following sub-codes which are scalab

Step-4

Entire Reference document across States/Technologies/type of notifications, etc., listed in a sing the actual document as in the following manner:

Entire Reference document across States/Technologies/type of notifications, etc., listed in a sing the actual document as in the following manner:

Step-5

The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusiv For example all reference docs for Karnataka could be filtered as shown below.

Step-6

Folder Structure for maintaining base documents All files/ base documents maintained in single folder (Advantage: One point access of all re File named using the unique code name. (Advantage: Linking file name to the Unique Code Each file serial numbered, which is in line with List of documents in excel sheet. (Advantag will help in monthly updation)

RE Regulatory Data Base

provide broad summary of various renewable energy specific parameters (viz. his sheet has linkages to respective detailed sheets of each specific parameter.

Hyperlinks direct to detail sheets which give key sub parameters for central and state level.

and each such individual worksheet cover identified details of central, all

wing sub-codes which are scalable

otifications, etc., listed in a single worksheet along with hyperlinks linking to

otifications, etc., listed in a single worksheet along with hyperlinks linking to

eference docs or to get exclusive list of technology-wise reference documents. shown below.

ntage: One point access of all reference document) ng file name to the Unique Code makes search easy) ments in excel sheet. (Advantage: easy search; easy to identify latest added files

Summary Sheet

Wind STATE / CENTRE Tariff (Rs/kWh) Control period Tariff (Rs/kWh)

Solar PV

Solar Thermal

Biomass

Bagasse based cogeneration

Control period

Tariff (Rs/kWh)

Control period

Tariff (Rs/kWh)

Control period

Tariff (Rs/kWh)

Control period

CERC

Wind power density Tariff(Rs /kWh) <200 = 5.96, 5.36(with A.D) 200-250 = 5.42, 4.87(with A.D) 250-300 = 4.77, 4.29(with A.D) 300-400 = 3.97, 3.57(with A.D) >400 = 3.73 , 3.35(with A.D) For first 10 years-3.5 For next 10 years-determined thereafter N.A

FY 2012-13

Lev - 10.39 AD - 1.04 After AD - 9.35

FY 2012-13

Lev - 12.46 AD - 1.24 After AD - 11.22

FY 2012-13

***given below in separate table

FY 2012-13

***given below in separate table

FY 2012-13

Andhra Pradesh Arunachal Pradesh Assam

For WPP having entered into PPA btw May 1, 2009 to March 31, 2014 From 2012-13 to 2016-17 (5 yr) April 1, 2012 to March 31, 2015 (3 years) N.A From April 1, 2012 to 2016-17 (5 yrs) N.A

17.91 (Without AD) 14.95 (With AD)

2010-11 and 2011-12

15.31 (Without AD) (With AD)

12.85

2010-11 and 2012-13

NA

2009-10 to 2014-15

2009-10 to 2014-15

April 2012 to March 2017

NA

5 Years( 2012-13 to 2017-18)

No tariff Order

5 Years( 2012-13 to 2017-18)

N.A

Jan 2012 to Mar 2014 10.9 (Without AD) 09.85 (With AD) 13.11 (Without AD) (With AD) 11.87

Jan 2012 to Mar 2014

NA

3 years(till March 2014)

NA

3 years(till March 2014)

Bihar

N.A

Upto March 31, 2015 commissioning

Upto March 31, 2015 commissioning

NA

NA

NA

NA

Chhattisgarh

N.A

April 2012 to March 2017

April 2012 to March 2017

NA

5 Years(2011-12-2016-17)

NA

5 Years(2011-12-2016-17)

Delhi

N.A Gross Tariff - Rs 4.23/kWh Depreciation- Rs 0.38/kWh Net Tariff-Rs 4.23/kWh Wind power density Tariff(Rs /kWh) 200-250 = 6.14 N.A

3 years starting from FY 2012-13 For MW Scale Plants: Jan 2012March 2013: 10.37 (Without AD), 09.28 (With AD), FY 2013-14: 9.64 9.18 (SPV Crystalline) 8.90 (SPV Thin film) 12.91 (Without AD) (With AD) 12.17 11.55

NA 4.49 (with AD) 4.54(w/o AD) Jan 29, 2012 to March 31, 2015 5.59 (for watercooled) 5.88 (for aircooled condenser) NA

No tariff Order

No tariff Order

No tariff Order three years from 1st June, 2010 to 31st May, 2013. 3 years(till FY 13-FY15)

Gujarat

August 11, 2012 to March 31, 2016

Jan 29, 2012 to March 31, 2015

1.06.2010 to 31.03.2013.

4.65 (with AD) 4.71(w/o AD)

Haryana Himachal Pradesh Jammu and Kashmir Jharkhand

Commissioned during FY 2012-13 According to the generic tariff Order (Duration to be fixed as find appropriate by the Commission) FY 2012-13 to FY 2016-17 (5 years)

3 years(till FY 13-FY15)

3 years(till FY 13-FY15)

3 years(till FY 13-FY15)

3.83

NA

No tariff Order

NA

2012-17 (5 years from the date of commencement) June 2010 to June 2013 14.5 (Including rooftop and small solar PV plants) 15.18 (including incentives) 10.44 (capacity >2 MW), 10.70 (Capacity upto 2 MW) Lev -11.16 (11.66 - RT & SSPGP) AD -1.65 (1.65) after AD -9.51 (10.01)

2012-17 (5 years from the date of commencement) June 2010 to June 2013

NA

5 years(2012-13 to 2017-18)

NA 5 years(2012-13 to 2017-18)

N.A Average tariff for first 10 years from signing of PPA= Rs 3.70/kWh 3.64

June 23, 2010 to March 31, 2013 1. All new RE projects, which are entering into PPA on or after Janu1, 2010 for a period of 10 years Applicable to project proposals submitted after Nov 22, 2010 May 2010 to March 31, 2013 Tariff(Rs FY 2012-13
5.67

NA

Till March 31, 2015

NA

Till March 31, 2015

Karnataka

Upto March 31, 2013 commissioning For projects commissioned before dec 31, 2009 Aug 2012 to March 2014 FY 2010-14(5 years from the date of commencement )

11.35

Upto March 31, 2013 commissioning

NA

NA

NA

NA

Kerala

NA

No tariff Order

2.55 1.91(FT)+1.99(VT)= 3.90(for FY 2012-13 2.26(F.C)+ 2.53(V.C)= 4.79 (for FY 2012-13) NA

NA

Madhya Pradesh

4.35 Wind power density /kWh)


200-250

12.65 Lev - 13.44 AD - 1.97 After AD - 11.47

Aug 2012 to March 2014

No tariff Order

March 2012 to end of FY 2013-14

till 31.3.2013

Maharashtra

FY 2010-14(5 years from the date of commencement )

5.41

FY2013-14 and FY2014-15

2010-11 to 2014-15

Manipur FY 2010-11 to FY 2014-15 Mizoram FY 2010-14(5 years from date of notification) FY 2010-14(5 years from date of notification)

NA

2010-11 to 2014-15

2010-11 to 2014-15

NA

2010-11 to 2014-15

NA

2010-11 to 2014-16

Meghalaya

NA

FY 2013-15 (3 years)

NA

FY 2013-15 (3 years)

NA

FY 2013-15 (3 years)

NA

FY 2013-15 (3 years)

NA

FY 2013-15 (3 years)

Nagaland Rs 5.31/kWh (Without AD) & Rs 4.48/kWh (With AD) Provisions akin to CERC, 5.96 (without AD) 5.36 (with AD) 5.18 (without AD) 4.90 (with AD)-for projects in aisalmer, Jodhpur and Barmer districts

FY 2012-14 (3 years) Lev- 17.80 AD -3.03 After AD -14.77 Lev - 10.39 AD - 1.04 After AD - 9.35 9.63 (Plant comissioned by 31 Mar 2014) with AD - 10.45 9.63 (Roof top and SSPG comissioned by 31 mar 2014) NA Lev - 18.45 AD- 4.11 After AD - 14.34 FY 2009-12 (3 years from notification of these regulations) Lev - 17.70 AD - 1.65 after AD - 16.05

FY- 2012-14 (3 years) Plant comissioned in FY (2012-13) onwards FY 2012-16 (5 years from the notification of order) Lve - 14.73 AD - 2.41 After AD-12.32 Lev - 12.46 AD - 1.24 After AD - 11.22 11.95 (Without AD) With AD - 10.45 11.95 (Small Solar thermal power gen comissioned by 31 Mar 2015 NA Lev - 15.51 AD - 3.35 After AD - 12.16 FY 2009-12 (3 years from notification of these regulations) Lev - 12.95 AD - 1.15 after AD - 11.80

FY- 2012-14 (3 years) Plant comissioned in FY (2012-13) onwards FY 2012-16

FY2010-11 to FY2014-15

NA Rs 4.4/kWh (Without AD) & Rs 4.12/kWh (With AD) Rs 5.32/kWh (Without AD) & Rs 5.2/kWh (With AD) Parameters and tariffs to be determined through suo-motu petition or on case-to-case basis No Tariff Order/Regulations available

2011-12 to 2014-15

Orissa

2010-11 to 2012-13 Provisions akin to CERC (April 2012 to March 2017)

4.09

From FY2010-11 to FY2012-13

2010-11 to 2012-13

Punjab

5.83

From FY2010-11 to FY2012-13

2012-13

Rajasthan

April 1, 2009 to March 31, 2014

FY 2012-13

FY 2012-13 Revised Tariff-4.96 for water cooled / 5.42 for Air cooled

FY2009-10 to FY 2013-14

2009-10 to 2014-15

Sikkim

NA

NA

NA

NA

No Tariff Order/Regulations available

Tamil Nadu

3.51 Rs/kWh FY 2009-12 (3 years from notification of these regulations) Zone-1 (5.15 Rs/kWh without AD, 4.75 with AD) Zone-2 ((4.35 Rs/kWh without AD,

August 31, 2012 to March 31, 2014

FY 2010-11 (till 31/05/12) NA

FY 2010-11 (till 31/05/12)

4.694

August1, 2012 to July 31, 2014

NA

01/08/2012 to 31/07/2014

Tripura

NA

NA FY 2009-12 (3 years from the commensment of these regulations)

NA

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Uttarakhand

FY 2010-11 upto March 31, 2013

FY 2009-12 (3 years from the commensment of these regulations)

FY2009-10 to FY2013

NA

NA

Prepared by ABPS Infra

Page10/123

Summary Sheet

Uttarakhand STATE / CENTRE

Wind Zone-1 (5.15 Rs/kWh without AD, 4.75 with AD) FY 2010-11 upto March 31, 2013 Zone-2 ((4.35 Rs/kWh without AD, Rs.3.21/Kwh with an escalation of 5.72% p.a. Tariff cap of 5.70 for 10 years from effectiveness of Regulations Oct 1, 2009 to Mar 31, 2014

Lev - 17.70 AD - 1.65 after AD - 16.05

Solar PV FY 2009-12 (3 years from the commensment of these regulations) FY 2010-14 (5 years)

Lev - 12.95 AD - 1.15 after AD - 11.80

Solar Thermal FY 2009-12 (3 years from the commensment of these regulations) 5.02 FY 2010-14 (5 years)

Biomass FY2009-10 to FY2013 NA

Bagasse based cogeneration NA

Uttar Pradesh West Bengal and so on for all the states Goa

15 (comissioned by Dec 2011,not covered under GOI incentive scheme) 10 (Capacity ranging 100 KW to 2 MW availing GBI) 10 (Grid connected plant not eligible No tariff Order

13 (comissioned by Dec 2011,not covered under GOI incentive scheme) NA

October 1, 2009 to March 31, 2014

refer worksheet 'Additional Data', Table 1 3.3

2010-11 to 2013-14

10 years for wind

FY 2013-17 (5 Years)

NA

5.00

NA

10/08/2012 to 10/08/2015

No RE Order/Regulations

No RE Order/Regulations

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Union Territories

Andaman Nicobar

No RE Order/Regulations

No RE Order/Regulations

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Chandigargh

No RE Order/Regulations

No RE Order/Regulations

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Dadra and Nagar Haveli

No RE Order/Regulations

No RE Order/Regulations

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Daman & Diu

No RE Order/Regulations

No RE Order/Regulations

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Lakshadweep

No RE Order/Regulations

No RE Order/Regulations

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Pondicherry

No RE Order/Regulations

No RE Order/Regulations

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No Tariff Order/Regulations available

No Tariff Order/Regulations available

CERC Tariff for Biomass for FY 2012-13 State Andhra Pradesh Haryana Maharashtra Punjab Rajasthan Tamil Nadu Uttar Pradesh Others Lev. FC 2.06 2.10 2.11 2.12 2.06 2.06 2.07 2.08 Lev. VC 3.12 3.55 3.63 3.71 3.10 3.07 3.17 3.33 Tariff (With AD) (FY 2012 13) 5.18 5.65 5.74 5.83 5.16 5.12 5.24 5.42 AD Benefit 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 Net Levellised (without AD) 5.05 5.52 5.61 5.70 5.03 4.99 5.11 5.29

CERC Tariff for Bagasse Co-gen for FY 2012-13 State Andhra Pradesh Haryana Maharashtra Punjab Tamil Nadu Uttar Pradesh Others Lev. FC 2.77 2.48 2.22 2.44 2.15 2.8 2.43 Lev. VC 2.29 3.25 3.2 2.86 2.46 2.55 2.77 Tariff (With AD) (FY 2012 13) 5.06 5.73 5.42 5.3 4.61 5.35 5.2 AD Benefit 0.21 0.18 0.16 0.18 0.16 0.21 0.18 Net Levellised (without AD) 4.85 5.55 5.26 5.12 4.45 5.14 5.02

Table 1: Tariffs of SHP in Madhya Pradesh Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Tariff without considering GoMP free power policy (Rs./kWh) 5.4 5.22 5.04 4.86 4.68 4.5 4.33 4.16 3.98 3.81 2.3 2.34 2.38 2.42 2.46 2.51 2.56 2.6 2.65 Run of the River Projects Tariff considering GoMP free power policy (Rs./kWh) 5-10 MW 5.4 5.22 5.48 5.28 5.09 4.9 4.71 4.52 4.33 4.14 2.5 2.54 2.59 2.63 2.68 2.73 2.78 2.83 2.88 Tariff without considering GoMP free power policy (Rs./kWh) 5.4 5.22 5.04 4.86 4.68 4.5 4.33 4.16 3.98 3.81 2.3 2.34 2.38 2.42 2.46 2.51 2.56 2.6 2.65

Cana 10 - 25 MW 5.4 5.8 5.6 5.4 5.2 5.01 4.81 4.62 4.43 4.23 2.56 2.6 2.64 2.69 2.74 2.79 2.84 2.89 2.95

<5 MW 5.4 5.22 5.04 5.12 4.93 4.74 4.56 4.37 4.19 4.01 2.42 2.46 2.51 2.55 2.59 2.64 2.69 2.74 2.79

Prepared by ABPS Infra

Page11/123

Summary Sheet

Wind STATE / CENTRE

Solar PV 20 21 22 23 24 25 26 27 28 29 30

Solar Thermal 2.71 2.76 2.82 2.88 2.94 3 3.07 3.14 3.21 3.28 3.36 2.85 2.91 2.96 3.03 3.09 3.16 3.23 3.3 3.38 3.45 3.54

Biomass 2.94 3 3.06 3.13 3.19 3.26 3.33 3.41 3.49 3.57 3.65 3.01 3.07 3.13 3.19 3.26 3.33 3.41 3.48 3.56 3.65 3.73

Bagasse based cogeneration 2.71 2.76 2.82 2.88 2.94 3 3.07 3.14 3.21 3.28 3.36

Prepared by ABPS Infra

Page12/123

Municipal solid Waste

Small Hydro

Tariff (Rs/kWh)

Control period

Tariff (Rs/kWh) HP, Uttarakhand and NE States (Below 5MW) - 4.14(without AD), 3.82 (with AD) (5MW-25MW)3.54(without AD), 3.25 (with AD) Other States (Below 5MW) - 4.88(without AD),

Control period

NA

NA

FY 2012-13

4.04 in 2009-10 and 5% escalation thereafter till 2013-14 Project Specific Tariff Determination

NA

No Tariff/Parameters Defined

No Tariff/Parameters Defined

NA

NA

9/4/2012 to 8/4/2017

Project Specific Tariff Determination

NA

NA

31/3/2012 to 31/3/2015

NA

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Project Specific Tariff Determination Rs 2.49/kWh for the first year and Rs 2.833/kWh from the second year onwards 6.8

NA

NA

5 Years(2011-12-2016-17)

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Project Specific Tariff Determination

NA

Case to Case basis

3 years(till FY 13)

Project Specific Tariff Determination

NA

NA

18/12/2012 to 31/3/2017

Project Specific Tariff Determination

NA

NA

2012-13 to 2016-17

NA

NA

NA Rs 3.40/kWh for the first 10 years after signing the PPA Rs 2.94/kWh

NA

Rs 4.15/kWh

NA

NA

NA

NA

NA

NA

NA

Refer Table 1 below

30/06/2010 to 31/03/2013

Rs 4.88/kWh

NA

NA

2010-11 to 2014-15

Project Specific Tariff Determination

NA

NA

2010-11 to 2014-15

Project Specific Tariff Determination

NA

NA

2010-11 to 2014-16

No Tariff Order/Regulations available

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Project Specific Tariff Determination

NA

NA Rs 3.91/kWh (<=5 MW) & Rs 3.64/kWh (5-25 MW) w/o AD and Rs 3.31/kWh & Rs 3.09/kWh respectively Rs 4.88/kWh (<=5 MW) & Rs 4.16/kWh (5-25 MW) w/o AD and Rs 4.5/kWh & Rs 3.82/kWh respectively Parameters and tariffs to be determined through suo-motu petition or on case-to-case basis No Tariff Order/Regulations available Parameters are defined on case to case basis No Tariff Order/Regulations available

2011-12 to 2014-15

Project Specific Tariff Determination

NA

2010-11 to 2012-13

Project Specific Tariff Determination

NA

2012-13

Project Specific Tariff Determination

NA

2009-10 to 2014-15

No Tariff Order/Regulations available

NA

No Tariff Order/Regulations available Parameters are defined on case to case basis No Tariff Order/Regulations available

No Tariff Order/Regulations available

NA

No Tariff Order/Regulations available

NA

Project Specific Tariff Determination

NA

NA

Prepared by ABPS Infra

Page13/123

Municipal solid Waste Project Specific Tariff Determination Rs 2.89/kWh for existing projects and Rs 3.21 for new Projects under the head 'Other NCE Projects' Capped at Rs 5.1/kWh upto August 10, 2022 NA

Small Hydro NA UPERC specifies 'year of operation' based fixed cost and financial year based tariff. It does not specify the 4.4

NA

2010-11 to 2013-14

NA

10/08/2012 to 10/08/2015

NA

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

NA

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

NA

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

NA

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

NA

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

NA

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

NA

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

<5 MW 5.4 5.22 5.04 5.12 4.93 4.74 4.56 4.37 4.19 4.01 2.42 2.46 2.51 2.55 2.59 2.64 2.69 2.74 2.79

Canal Based Projects Tariff considering GoMP free power policy (Rs./kWh) 5-10 MW 5.4 5.22 5.48 5.28 5.09 4.9 4.71 4.52 4.33 4.14 2.5 2.54 2.59 2.63 2.68 2.73 2.78 2.83 2.88

11 - 25 MW 5.4 5.8 5.6 5.4 5.2 5.01 4.81 4.62 4.43 4.23 2.56 2.6 2.64 2.69 2.74 2.79 2.84 2.89 2.95

Prepared by ABPS Infra

Page14/123

Municipal solid Waste 2.85 2.91 2.96 3.03 3.09 3.16 3.23 3.3 3.38 3.45 3.54 2.94 3 3.06 3.13 3.19 3.26 3.33 3.41 3.49 3.57 3.65 3.01 3.07 3.13 3.19 3.26 3.33 3.41 3.48 3.56 3.65 3.73

Small Hydro

Prepared by ABPS Infra

Page15/123

FIT:WIND

ANNEXURE-1A
STATE-WISE FEED-IN-TARIFF FOR WIND
Financial Parameters STATE / CENTRE Tariff Regulations / or Order or Draft (Ref. no. dt) Control period Tariff (Rs/kWh) Capital Cost (lakh/MW) Capacity Utilisation Factor (%) Wind power density CUF <200 = 20% 200-250 = 22% 250-300 = 25% 300-400 = 30% >400 = 32% Useful life (yrs) Normative Parameters Subsidy and incentive by Taxes and Duties Central /State Govt

CERC (FY12-13)

CERC Generic RE Tariff Order for FY 2012-13; CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

FY 2012-16 (3 yrs)

Wind power density Tariff(Rs /kWh) <200 = 5.96, 5.36(with A.D) 200-250 = 5.42, 4.87(with A.D) 250-300 = 4.77, 4.29(with A.D) 300-400 = 3.97, 3.57(with A.D) >400 = 3.73 , 3.35(with A.D)

575 (FY 2012-13)

25

Shall be factored in the tariff on per unit benefit derived on levellised basis

Tariff exclusive of taxes and duties, pass through allowed on actual basis

CERC (FY13-14)

Draft CERC Generic RE Tariff Order for FY 2013-14; CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

FY 2012-16 (3 yrs)

Wind power density Tariff(Rs /kWh) <200 = 6.27, 5.78(with A.D) 200-250 = 5.70, 5.25(with A.D) 250-300 = 5.02, 4.63(with A.D) 300-400 = 4.18, 3.85(with A.D) >400 = 3.92 , 3.61(with A.D)

595.99 (FY 2013-14)

Wind power density CUF <200 = 20% 200-250 = 22% 250-300 = 25% 300-400 = 30% >400 = 32%

25

Shall be factored in the tariff on per unit benefit derived on levellised basis

Tariff exclusive of taxes and duties, pass through allowed on actual basis

Andhra Pradesh

Wind Tariff Order in respect of "New Wind Based Power Projects ( O.P No. 6/7 of 2009)

For WPP having entered into PPA btw May 1, 2009 to March 31, 2014

For first 10 years-3.5 For next 10 years-determined thereafter

470

24.50%

20

N.A

N.A

Arunachal Pradesh

RE Tariff Regulations, 2012 (April 9, 2012)

From 2012-13 to 2016-17 (5 yr)

N.A

N.A

N.A

N.A

Shall be taken into consideration while determining tariff

Pass through on actual incurred basis

Assam

Draft RE Tariff Regulations, 2012 (January 13, 2012)

April 1, 2012 to March 31, 2015 (3 years)

N.A

492 (FY 2011-12), indexation mechanism as per CERC RE Tariff Regulation

Wind power density CUF 200-250 = 20% 250-300 = 23% 300-400 = 27% >400 = 30%

25

Shall be taken into consideration while determining tariff

Pass through on actual incurred basis

Bihar

N.A

N.A

N.A

N.A

N.A

N.A

N.A

N.A

Chhattisgarh

Draft RE Tariff Regulations, 2012 (April 2, 2012)

From April 1, 2012 to 201617 (5 yrs)

N.A

575 (FY 2012-13) subject to indexation mechanism as per CERC RE Tariff Regulation

Wind power density CUF upto 200 = 20% 201-250 =22% 251-300 =25% 301-400 =30% >400 =32%

25

Shall be taken into consideration while determining tariff

Pass through on actual incurred basis

Delhi

N.A

N.A

N.A Gross Tariff - Rs 4.23/kWh Depreciation- Rs 0.38/kWh Net Tariff-Rs 4.23/kWh Wind power density Tariff(Rs /kWh) 200-250 = 6.14 250-300 = 4.91 300-400 = 4.09 >400 = 3.84

N.A Excluding evacuation-Rs 568 lakh/MW Evacuation cost=Rs 38 lakh/MW

N.A

N.A

N.A Takes into account benefit of depreciation. Shall take a view on GBI once MNRE announces the scheme

N.A

Gujarat

Wind Tariff Order (Order No.2 of 2012, Aug 8, 2012)

August 11, 2012 to March 31, 2016

24%

25

N.A

Haryana

Suo Moto Petition for Determination of Levellised Tariff for RE Projects dated Sept 2012

Commissioned during FY 2012-13

575

Wind power density CUF 200-250 = 20% 250-300 = 25% 300-400 = 30% >400 =32%

25

Shall be taken into consideration while determining tariff

Pass through on actual incurred basis

Himachal Pradesh

HPERC( Promotion of Generation from According to the generic Renewable Energy sources and Terms tariff Order (Duration to be and conditions of Tariff) Regulations, fixed as find appropriate by 2012 the Commission) (Dec 17, 2012)

N.A

N.A

N.A

25

1. Shall be taken into consideration while Tariff determined determining tariff. shall be inclusive 2. 90% of the capital of all taxes and subsidy available to project duties as per applicable scheme of MNRE/State Govt shall be considered

Jammu and Kashmir

Draft RE Tariff Regulations, 2012

FY 2012-13 to FY 2016-17 (5 years)

575 for FY 2012-13 subject to indexation

Wind power density CUF upto 200 =20% 201-250 = 22% 251-300 = 25% 301-400 =30% >400 =32%

25

Shall be taken into consideration while determining tariff

Tariff determined shall be inclusive of all taxes and duties

Jharkhand

Regulations for Determination of Tariff for procurement of power from wind June 23, 2010 to March 31, generators 2013 (June 23, 2010) 1. All new RE projects, Order for determination of tariff for RE which are entering into PPA sources on or after Janu1, 2010 for (Dec, 11,2009) a period of 10 years 2. Also applicable to

N.A

515 for first year subject to indexation

20%

25

Shall be taken into consideration iGBI incentive while determining tariff Shall not take into consideration incentives allowed by Govt for tariff determination Shall be taken into consideration while determining tariff. Generating company shall disclose the details of such subsidy/incentive if availed along with application of fixation of tariff and get the rate adjusted appropriately

N.A

Karnataka

Average tariff for first 10 years from signing of PPA= Rs 3.70/kWh

470

26.50%

25

Pass through on actual incurred basis

Kerala

(Power Procurement from RE sources ) second amendment Regulation, 2010 (Nov 22, 2010)

Applicable to project proposals submitted after Nov 22, 2010

3.64

456

22%

20

Tariff determined shall be inclusive of all taxes and duties

Madhya Pradesh

Wind Tariff Order (May, 14, 2010)

May 2010 to March 31, 2013

4.35

500

20%

25

N.A

Tariff determined shall be inclusive of all taxes and duties

Prepared by ABPS Infra

Page16/123

FIT:WIND

ANNEXURE-1A
STATE-WISE FEED-IN-TARIFF FOR WIND
Financial Parameters STATE / CENTRE Tariff Regulations / or Order or Draft (Ref. no. dt) Control period Tariff (Rs/kWh) Capital Cost (lakh/MW) Capacity Utilisation Factor (%) Wind power density CUF Wind power density <200 = 20% CUF 200-250 = 22% 200-250= =20% 250-300 25% 250-300 300-400 =23% = 30% 300-400 >400 = =27% 32% >400 =30% Useful life (yrs) Normative Parameters Subsidy and incentive by Taxes and Duties Central /State Govt

CERC (FY12-13) Maharashtra

CERC Generic RE Tariff Order for FY 2012-13; CERC (Terms and Conditions for Tariff determination from Generic Tariff Order Renewable Energy Sources) ( March 30, 2012) Regulations, 2012

FY 2012-16 (3 yrs) FY 2012-13

Wind power power density density Tariff(Rs Tariff(Rs Wind /kWh) /kWh) <200 = 5.96, 5.36(with A.D) 200-250 5.67 200-250 = 5.42, 4.87(with (including AD of 0.81/kWh) A.D) 250-300 4.93 250-300 = 4.77, 4.29(with A.D) (including AD of 0.70/kWh) 300-400 = 3.97, 3.57(with A.D) 300-400 4.20 >400 = 3.73 , 3.35(with A.D) (including AD of 0.60/kWh)
>400 (including AD of 0.54/kWh) 3.78

575 (FY 2012-13) 516.94 for FY 2012-13 subject to indexation

25 25

Shall into be factored the Takes account in benefit tariff on per unit benefit of depreciation. However derived on levellised basis shall not take into account GBI benefit into tariff determinattion

Tariff exclusive of taxes and duties, pass through Pass through on allowed on actual actual incurred basis

Manipur

Mizoram

Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and FY 2010-11 to FY 2014-15 Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010.

600 Lakhs/MW (FY 2010-11)

200-250 - 20% 250-250 - 23% 300-400 - 27% >400 - 30%

25

Shall be considered in Tariff Tariff exclusive of taxes and duties. computation as when Taxes and duties availed allowed allowed as pass through on actual incurred basis Tariff exclusive of taxes and duties, pass through allowed on actual basis

Meghalaya

Draft Meghalaya State Electricity Regulatory Commission (Terms and Conditions for determination of Tariff for Generation from Renewable Energy Sources) Regulations, 2012. Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011 Tariff Order (Dated 14/09/2010)

FY 2013-15 (3 years)

NA

Rs. 575 Lakh / MW (FY 2012-13)

Nagaland

FY 2012-14 (3 years) Rs 5.31/kWh (Without AD) & Rs 4.48/kWh (With AD)

Rs. 467 Lakh / MW (FY 2010-11)

Wind power density CUF Upto 200 = 20% 201-250 =22% 251-300 =25% 301-400 =30% >400 =32% 200-250 - 20% 250-250 - 23% 300-400 - 27% >400 - 30%

25

Shall be factored in the tariff on per unit benefit derived on levellised basis

25

Orissa

2010-11 to 2012-13

467.13 Lakhs/MW

19%

25

Tariff exclusive of Shall be considered in Tariff taxes and duties. computation as when Taxes and duties availed Incentive or subsidy offered allowed Tariff exclusive allowed of as by Central/State Govt. shall Tax; ROE be considered while computed on predetermining tariff tax basis

Punjab

Order on adoption of CERC RE Tariff Regulation and determination of generic RE Tariff for FY 2012-13

Provisions akin to CERC (April 2012 to March 2017)

Provisions akin to CERC, 5.96 (without AD) 5.36 (with AD)

Provisions akin to CERC (575 lakh/MW)

RERC (Terms and Conditions of Tariff) Regulations, 2009, Rajasthan Draft Tariff Order on Wind Projects for Sikkim

April 1, 2009 to March 31, 2014

5.18 (without AD) 4.90 (with AD)-for projects in aisalmer, Jodhpur and Barmer districts 5.44 (without AD) 5.14 (with AD)-for

530 Lakh/MW for FY 13

Incentive or subsidy availed to be computed on case to Provisions akin to case basis by Punjab State CERC (Tariff Provisions akin to wind zone 1 (upto 20%) Corporation ltd and the exclusive of Tax; CERC (25) same to be reduced from ROE computed on the tariff to that extent for pre-tax basis) a period of 12 years. Any Policy support by way 21%- Jaisalmer, Jodhpur Tax is not a pass of capital subsidy /Capital and Barmer districts through; ROE 25 Finance Assistance (CFA), 20%- Other comupted on prehigher depreciation benefit districts tax basis or GBI, which becomes

Tamil Nadu

Comprehensive Tariff Order on Wind Energy (Order No. 6 of 2012) dated July 31, 2012 TERC (Cogeneration and Generation of Electricity from renewable source of Energy) regulation 2009 Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010

August 31, 2012 to March 31, 2014

3.51 Rs/kWh

Rs. 575 Lakh /MW. Capital cost is apportioned among plant machinery, civil works & land at 85%, 10% and 5% respectively.

27.15%

20

Tripura

NA

FY 2009-12 (3 years from notification of these regulations) Zone-1 (5.15 Rs/kWh without AD, 4.75 with AD) Zone-2 ((4.35 Rs/kWh without AD, 4.00 with AD) Zone-3 (3.65 Rs/kWh without AD, 3.35 with AD) Zone-4 ((3.20 Rs/kWh without AD, 2.90 with AD) Rs.3.21/Kwh with an escalation of 5.72% p.a. Tariff cap of 5.70 for 10 years from effectiveness of Regulations No RE Order/Regulations Direct Taxes included in the Tariff. Taxes and duties levied by the appropriate Government other than direct taxes shall be allowed as pass through on actual Not specified separately Price cap excludes taxes No RE Order/Regulations

Uttarakhand

FY 2010-11 upto March 31, 2013

515

200-250 - 20% 250-250 - 23% 300-400 - 27% >400 - 30%

25

Only 75% of the capital subsidy for the financial year of commissioning as per applicable scheme of MNRE shall be considered for tariff determination.

Uttar Pradesh

UPERC - CNCE Regulations, 2009 Draft WBERC(Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012 No RE Order/Regulations

Oct 1, 2009 to Mar 31, 2014

Not specified separately

Not specified separately

Not specified separately Not specified separately

Not specified separately

West Bengal

10 years for wind

Not specified separately

Not specified separately

Not specified separately

Goa

No RE Order/Regulations

No RE Order/Regulations

No RE No RE Order/Regulations Order/Regulation s

No RE Order/Regulations

Union Territories No RE No RE Order/Regulations Order/Regulation s No RE No RE Order/Regulations Order/Regulation s No RE No RE Order/Regulations Order/Regulation s No RE No RE Order/Regulations Order/Regulation s No RE No RE Order/Regulations Order/Regulation s No RE No RE Order/Regulations Order/Regulation s No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations

Andaman Nicobar

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

Chandigargh Dadra and Nagar Haveli Daman & Diu

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

Lakshadweep

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

Pondicherry

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

Prepared by ABPS Infra

Page17/123

FIT:WIND

Normative Parameters Late Payment surcharge Reference CE98R01060212, 1.25% per month if payment delayed beyond 60 days CE98O01270312 CE98R01060212, 1.25% per month if payment delayed beyond 60 days CE98B01251012 Archives

N.A

AP01O01010509

N.A

AR98R01090412

1.25% per month if payment delayed beyond 60 days

AS98A01130112

N.A

N.A

1.25% per month if payment delayed beyond 60 days

CG98A01020412

N.A

N.A

N.A

GJ01O01080812

1.25% per month if payment delayed beyond 60 days

HR98O01030912

HR98O01250112

1.25% per month if payment delayed beyond 60 days

HP98R01171212

HP08A01250712

1.25% per month if payment delayed beyond 60 days

JK98A01000012

1.25% per month if payment delayed beyond 30days

JH01R01230610

N.A

KA98O01111209

N.A

KL98R01221110

2% over and above short term SBI PLR p.a. if payment delayed beyond 30days

MP01O01140510

Prepared by ABPS Infra

Page18/123

FIT:WIND

Normative Parameters Late Payment surcharge Reference Archives

1.25% per month if payment 1.25% per delayed month if beyond 60 days payment delayed beyond 60 days

MH98O01300312

1.25% per month for payments delayed beyond 60 days from billing date

MN98R01150410

1.25% per month if payment delayed beyond 60 days

ML98A01050912

1.25% per month for payments delayed beyond 60 days from 1.25% per billing month for payments delayed beyond 60 days from billing 1.25% per month for payments delayed beyond a period of 60 days from the date of billing 1.25% per month on daily basis for delay beyond a period of 1.5 month from the

NL98R01300811

OR98O01140910

PB98O01190712

RJ98R01230109

RJ01B01080612

Penalty of 1% per month shall be levied for delayed payment by the licensee

TN01O01310712

TR98R01230309

1.25% per month for delays beyond a period of 60 days from the date of billing

UA98R01060710

1.25% p.m. beyond 2 months Not specified

UP98R01220310

WB98A01100812

No RE Order/Regulations

No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations

Prepared by ABPS Infra

Page19/123

FIT: SOLAR

ANNEXURE-1B
STATE-WISE FEED-IN-TARIFF FOR SOLAR PV
Financial Parameters STATE Tariff Regulations / or Order or Draft (Ref. no. dt) Control period Tariff (Rs/kWh) Capital Cost (lakh/MW) Capacity Utilisation Factor (%) Auxiliary Consumption (%) Normative Parameters Useful life (yrs)

CERC (FY12-13)

CERC Generic RE Tariff Order for FY 2012-13; CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

FY 2012-16 (3 yrs)

Lev - 10.39 AD - 1.04 After AD - 9.35

1000 (FY 201213)

19%

25

CERC (FY13-14)

Draft CERC Generic RE Tariff Order for FY 2013-14; CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

FY 2012-16 (3 yrs)

Lev - 8.75 AD - 0.88 After AD - 7.87

800 (FY 2013-14)

19%

25

Andhra Pradesh IA No 17 of 2010, dated July 14, 2010 Arunachal Pradesh APSERC RE Tariff Regulations, 2012 dated April 9, 2012 RE Tariff Regulation (Draft) dated Jan 13, 2012 BERC Order on Petition 12/2012, dated May 29, 2012, Solar Tariff Regulations dated Aug 2, 2010 RE Tariff Regulation dated Apr 02, 2012

2010-11 and 2011-12

17.91 (Without AD) 14.95 (With AD) 1000 19%

25

April 2012 to March 2017

25

Assam

Jan 2012 to Mar 2014 Upto March 31, 2015 commissioning April 2012 to March 2017 3 years starting from FY 201213 10.9 (Without AD) 09.85 (With AD)

1442

19%

25

Bihar

1000

19%

25

Chhattisgarh

1000

19%

25

Delhi

Solar PV Tariff Regulations 2012

1000

19% 18% with 1% annual degradation 19%

25

Gujarat

GERC Order 1 of 2012 dated Jan 27, 2012

For MW Scale Plants: Jan 20121000 (MW scale Plants), 1200 Jan 29, 2012 to March 31, 2015 March 2013: 10.37 (Without AD), (kW scale plants) 09.28 (With AD), FY 2013-14: 9.18 (SPV Crystalline) 8.90 (SPV Thin film) N.A 894( SPV-C) 863 (SPV-TF) N.A

0.25%

25

Haryana

Himachal Pradesh

Jammu and Kashmir

Jharkhand

Karnataka

Kerala

Madhya Pradesh

Suo Moto Petition for Determination of Levellised Tariff for RE Projects dated Sept 3 years(till FY 13-FY15) 2012 HPERC( Promotion of Generation from According to the generic tariff Renewable Energy sources and Terms Order (Duration to be fixed as and conditions of Tariff) Regulations, find appropriate by the 2012 Commission) JKSERC (Terms and Conditions for Tariff 2012-17 (5 years from the date determination from RE Sources) Regulations of commencement) (Draft), 2012 (Determination of Tariff for Procurement of Power from Solar PV and Solar June 2010 to June 2013 Thermal Power Projects) REGULATIONS, 2010 dated June 23, KERC Order on Solar Power Tariff Upto March 31, 2013 Determination dated July 13, 2010 commissioning Power procurement from Solar Plants by Distribution For projects commissioned Licensee - Regulation 2008 dated Jan 1, before dec 31, 2009 2009 Tariff Order for Solar Based Power Aug 2012 to March 2014 Generation dated Aug 01, 2012 MERC RE tariff regulayions,2010 ,Case No 10 of 2012 (Mar 30, 2012) FY 2010-14(5 years from the date of commencement )

0%

25

N.A

N.A

25

1000

19%

25

1700 14.5 (Including rooftop and small solar PV plants) 15.18 (including incentives) 10.44 (capacity >2 MW), 10.70 (Capacity upto 2 MW) Lev -11.16 (11.66 - RT & SSPGP) AD -1.65 (1.65) after AD -9.51 (10.01)

19%

25

1550

19%

25

2250 1025 (capacity >2 MW), 1050 (capacity upto 2 MW)

21% 19% with 1% annual deration from 3rd yr onwards 19%

20

0.25%

25

Maharashtra

1000 (FY 2012-13)

NA

25

Manipur JERC of Manipur & Mizorum (RE Tariff regulation) 2010 dated 15 Apr,2010 &Mizoram FY 2010-14(5 years from date of notification) 1900 (FY 2010-11) 19% NA 25

Meghalaya

Draft Meghalaya State Electricity Regulatory Commission (Terms and Conditions for determination of Tariff for Generation from Renewable Energy Sources) Regulations, 2012. NERC (terms and condition for determination of generation tariff for renewable energy) regulation 2011

FY 2013-15 (3 years)

NA

1000 (FY 2012-13)

19%

NA

25

Nagaland

FY- 2012-14 (3 years) Lev- 17.80 AD -3.03 After AD -14.77 Lev - 10.39 AD - 1.04 After AD - 9.35 9.63 (Plant comissioned by 31 Mar 2014) with AD - 10.45 9.63 (Roof top and SSPG comissioned by 31 mar 2014) NA

1690

19-21%

NA

25

Orissa

Punjab

Rajasthan

OERC redetermination of generic tariff Plant comissioned in FY (2012for solar PV and Solar thermal,Case No 13) onwards 1 of 2012 Adoption of CERC RE tariff regulation FY 2012-16 (5 years from the 2012,Petetion no 35 of 2012,dated 19 notification of order) July 2012 RERC (Determination of benchmark capital cost for solar PV and Solar thermal power projects) dated 13 may 2012

1690

19%

NA

25

1000

19% 20% with deration of 0.5% PA after 2nd year

NA

25

940

0.25%

25

Sikkim

Tariff order or Regulation not found

NA

NA

NA

NA

NA

Tamil Nadu

TNERC (tariff order for projects covered under JNNSM) dated 27/05/10

FY 2010-11 (till 31/05/12)

Lev - 18.45 AD- 4.11 After AD - 14.34

17.15

19% with a deration of 1% every year after ten years.

2%

25

Prepared by ABPS Infra

Page20/123

FIT: SOLAR

ANNEXURE-1B
STATE-WISE FEED-IN-TARIFF FOR SOLAR PV
Financial Parameters STATE Tamil Nadu Tariff Regulations / or Order or Draft TNERC (tariff order for projects covered (Ref. no. dt) under JNNSM) dated 27/05/10 CERC Generic RE Tariff Order for FY TERC (Cogeneration and Generation of 2012-13; Electricity from renewable source of CERC (Terms and Conditions for Tariff Energy) regulation 2009 determination from Renewable Energy Sources) Regulations, 2012 UPERC (Captive and Non-conventional Energy generating plants )regulation 2009 Draft WBERC (Cogeneration & generation of electricity from renewable energy source), regulation 2012 Control period FY 2010-11 (till 31/05/12) Lev (Rs/kWh) - 18.45 Tariff AD- 4.11 After AD - 14.34 Capital Cost (lakh/MW) 17.15 Capacity Utilisation 19% with a deration Factor (%) of 1% every year after ten years. Auxiliary Consumption (%) 2% Normative Parameters Useful life (yrs) 25

NA FY 2012-16 (3 yrs) FY 2009-12 (3 years from the commensment of these regulations) FY 2010-14 (5 years)

Tripura CERC (FY12-13) Uttarakhand

Uttar Pradesh

West Bengal

FY 2013-17 (5 Years)

FY 2009-12 (3 years from - 10.39 notificationLev of these regulations) AD - 1.04 1000 (FY 201213) After LevAD - 17.70 - 9.35 1700 (Projects comissioned on AD - 1.65 or after 1/04/09) after AD - 16.05 15 (comissioned by Dec 2011,not covered under GOI incentive scheme) 10 (Capacity ranging 100 KW to 2 MW availing GBI) 10 (Grid connected plant not eligible for any incentive and

19% 19% NA

25 25

Prepared by ABPS Infra

Page21/123

FIT: SOLAR

Normative Parameters Subsidy and incentive by Central /State Govt Taxes and Duties Late Payment surcharge

Shall be factored in the tariff Tariff exclusive of taxes and 1.25% per month beyond on per unit benefit derived duties, pass through allowed a delay of 60 days on levellised basis on actual basis

Shall be factored in the tariff Tariff exclusive of taxes and 1.25% per month beyond on per unit benefit derived duties, pass through allowed a delay of 60 days on levellised basis on actual basis

Shall be factored in the tariff on per unit benefit derived on levellised basis Shall be considered (including AD) and per unit benefit shall be derived on levellised basis Shall be factored in the tariff on per unit benefit derived on levellised basis Shall be factored in the tariff on per unit benefit derived on levellised basis

Tariff exclusive of taxes and duties, pass through allowed 1.25% per month beyond on actual basis a delay of 60 days Tariff exclusive of taxes and duties, pass through allowed 1.25% per month beyond on actual basis a delay of 60 days Tariff exclusive of taxes and duties, pass through allowed 1.25% per month beyond on actual basis a delay of 60 days Tariff exclusive of taxes and duties, pass through allowed 1.25% per month beyond on actual basis a delay of 60 days

Shall be factored in the tariff Tariff exclusive of taxes and on per unit benefit derived duties, pass through allowed 1.25% per month beyond on levellised basis on actual basis a delay of 60 days

1. Shall be taken into Tariff determined shall be 1.25% per month if consideration while inclusive of all taxes and payment delayed beyond determining tariff. duties 60 days 2. 90% of the capital Shall be factored in the tariff Tariff exclusive of taxes and on per unit benefit derived duties, pass through allowed 1.25% per month beyond on levellised basis on actual basis a delay of 60 days Shall be factored in the tariff on per unit benefit derived 1.25% per month beyond on levellised basis a delay of 30 days

1.25% per month beyond a delay of 30 days Shall be factored in the tariff Tariff exclusive of taxes and on per unit benefit derived duties, pass through allowed 1.25% per month beyond on levellised basis on actual basis a delay of 60 days Shall be factored in the tariff Tariff exclusive of taxes and 1.25% per month beyond on per unit benefit derived duties, pass through allowed a delay of 60 days on levellised basis on actual basis

Shall be factored in the tariff Tariff exclusive of taxes and 1.25% per month beyond on per unit benefit derived duties, pass through allowed a delay of 60 days on levellised basis on actual basis

Shall be factored in the tariff on per unit benefit derived on levellised basis Shall be factored in the tariff on per unit benefit derived on levellised basis Subsidy shall be workout and tariff shall be reduced for a period of 12 years GBI

RE developers shall be exempted from all types of taxes and duties RE developers shall be exempted from all types of taxes and duties RE developers shall be exempted from all types of taxes and duties

1.25% per month beyond a delay of 60 days 1.25% per month beyond a delay of 60 days 1.25% per month beyond a delay of 60 days

NA

NA

NA

AD benefit shall be factored in the tariff

1% per month for payment after 30 days of billing

Prepared by ABPS Infra

Page22/123

FIT: SOLAR

Normative Parameters Subsidy and incentive by AD benefit shall beGovt factored Central /State in the tariff Taxes and Duties per month for Late1% Payment surcharge payment after 30 days of billing

Shall be factored in the tariff Tariff exclusive of taxes and 1.25% per month beyond on per unit benefit derived duties, pass through allowed a delay of 60 days 75% of capital subsidy for Including Direct Tax but on levellised basis on actual basis the financial year of Exclusive other tax and 1.25% per month beyond comissioning as per duties a delay of 60 days from Income tax applicable scheme of MNRE Exempt 10% tax rate for 0-10 and all other taxes and duties & other levies 1.25% per month beyond imposed by State/central a delay of 60 days

Prepared by ABPS Infra

Page23/123

STATE-WISE FEED-IN-TARIFF FOR SOLAR (Thermal)

STATE

Tariff Regulations / or Order or Draft (Ref. no. dt)

CERC (FY 12-13)

CERC Generic RE Tariff Order for FY 2012-13; CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

CERC (FY13-14)

Draft CERC Generic RE Tariff Order for FY 2013-14; CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

Andhra Pradesh IA No 17 of 2010, dated July 14, 2010 Arunachal Pradesh RE Tariff Regulation (Draft) dated Jan 13, 2012 Order on Petition 12/2012, dated May 29, 2012, Solar Tariff Regulations dated Aug 2, 2010 RE Tariff Regulation dated Apr 02, 2012

Assam

Bihar

Chhattisgarh

Delhi

Gujarat

GERC Order 1 of 2012 dated Jan 27, 2012

Haryana

Himachal Pradesh

Jammu and Kashmir

Jharkhand

Suo Moto Petition for Determination of Levellised Tariff for RE Projects dated Sept 2012 HPERC( Promotion of Generation from Renewable Energy sources and Terms and conditions of Tariff) Regulations, 2012 JKSERC (Terms and Conditions for Tariff determination from RE Sources) Regulations (Draft), 2012 (Determination of Tariff for Procurement of Power from Solar PV and Solar Thermal Power Projects) REGULATIONS, 2010 dated June 23, KERC Order on Solar Power Tariff Determination dated July 13, 2010

Karnataka

Kerala Tariff Order for Solar Based Power Generation dated Aug 01, 2012 MERC RE tariff regulayions,2010 ,Case No 10 of 2012 (Mar 30, 2012)

Madhya Pradesh

Maharashtra

Manipur JERC of Manipur & Mizorum (RE Tariff regulation) 2010 dated 15 Apr,2010 &Mizoram

Meghalaya

Draft Meghalaya State Electricity Regulatory Commission (Terms and Conditions for determination of Tariff for Generation from Renewable Energy Sources) Regulations, 2012. NERC (terms and condition for determination of generation tariff for renewable energy) regulation 2011 OERC redetermination of generic tariff for solar PV and Solar thermal,Case No 1 of 2012 Adoption of CERC RE tariff regulation 2012,Petetion no 35 of 2012,dated 19 July 2012

Nagaland

Orissa

Punjab

Rajasthan

RERC (Determination of benchmark capital cost for solar PV and Solar thermal power projects) dated 13 may 2012 Tariff order or Regulation not found TNERC (Tariff order for Solar thermal projects covered by JNNSM) dated 08/07/2010 TERC (Cogeneration and Generation of Electricity from renewable source of Energy) regulation 2009 UERC (Tariff and other terms for supply of electricity from renewable enrgy sources and non fossil fuel based cogeneration) regulation 2010 UPERC (Captive and Non-conventional Energy generating plants )regulation 2009 NA

Sikkim

Tamil Nadu

Tripura

Uttarakhand

Uttar Pradesh

West Bengal

Goa

No tariff Order

Union Territories

Andaman Nicobar

No tariff Order

Chandigargh

No tariff Order

Dadra and Nagar Haveli

No tariff Order

Daman & Diu

No tariff Order

Lakshadweep

No tariff Order

Pondicherry

No tariff Order

ANNEXURE-1B

N-TARIFF FOR SOLAR (Thermal)


Financial Parameters Control period Tariff (Rs/kWh) Capital Cost (lakh/MW)

FY 2012-16 (3 yrs)

Lev - 12.46 AD - 1.24 After AD - 11.22

1300 (FY 201213)

FY 2012-16 (3 yrs)

Lev - 11.90 AD - 1.21 After AD - 10.69

1200 (FY 201314)

2010-11 and 2012-13

15.31 (Without AD) 12.85 (With AD)

Jan 2012 to Mar 2014 Upto March 31, 2015 commissioning April 2012 to March 2017 13.11 (Without AD) 11.87 (With AD)

1500

1300

1300

Jan 29, 2012 to March 31, 2015

12.91 (Without AD) 11.55 (With AD)

1400

3 years(till FY 13-FY15) According to the generic tariff Order (Duration to be fixed as find appropriate by the Commission) 2012-17 (5 years from the date of commencement) June 2010 to June 2013 Upto March 31, 2013 commissioning

12.17

1300

N.A

N.A

1300

1300

11.35

1300

Aug 2012 to March 2014

12.65 Lev - 13.44 AD - 1.97 After AD - 11.47

1325

FY 2010-14(5 years from the date of commencement )

1300

FY 2010-14(5 years from date of notification)

1500 (FY2010-11)

FY 2013-15 (3 years)

NA

1300 (FY2012-13)

FY- 2012-14 (3 years) Lve - 14.73 AD - 2.41 After AD-12.32 Lev - 12.46 AD - 1.24 After AD - 11.22

1530

Plant comissioned in FY (201213) onwards

1530

FY 2012-16

1300

FY 2012-13

11.95 (Without AD) With AD - 10.45 11.95 (Small Solar thermal NA Lev - 15.51 AD - 3.35 After AD - 12.16 FY 2009-12 (3 years from notification of these regulations) Lev - 12.95 AD - 1.15 after AD - 11.80 13 (comissioned by Dec 2011,not covered under GOI incentive scheme) NA

1275

NA

NA

FY 2010-11 (till 31/05/12)

1556 (FY 2010-11)

NA FY 2009-12 (3 years from the commensment of these regulations) FY 2010-14 (5 years)

1300 (Projects comissioned on or after 1/04/09)

NA

NA

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

Normative Parameters Capacity Utilisation Factor (%) Auxiliary Consumption (%) Useful life (yrs) Subsidy and incentive by Central /State Govt

23%

10%

25

Shall be factored in the tariff on per unit benefit derived on levellised basis

23%

10%

25

Shall be factored in the tariff on per unit benefit derived on levellised basis

25

23%

10%

25

23%

10%

25

Shall be considered (including AD) and per unit benefit shall be derived on levellised basis Shall be factored in the tariff on per unit benefit derived on levellised basis Shall be factored in the tariff on per unit benefit derived on levellised basis

23%

10%

25

23% with 0.25% annual degradation

10.00%

25

23%

10%

25 1. Shall be taken into consideration while determining tariff. 2. 90% of the capital Shall be factored in the tariff on per unit benefit derived on levellised basis Shall be factored in the tariff on per unit benefit derived on levellised basis

N.A

N.A

25

23%

10%

25

23%

10

25

23%

8%

25

23% with 0.5% annual deration from 3rd yr onwards

10%

25 Shall be factored in the tariff on per unit benefit derived on levellised basis Shall be factored in the tariff on per unit benefit derived on levellised basis

23%

10%

25

23%

10%

25

23%

10%

25

Shall be factored in the tariff on per unit benefit derived on levellised basis

23%

10%

25

Shall be factored in the tariff on per unit benefit derived on levellised basis Shall be factored in the tariff on per unit benefit derived on levellised basis Subsidy shall be workout and tariff shall be reduced for a period of 12 years

24%

10%

25

23%

10%

25

23% with a deration of 0.25% every year after fourth year. NA 23% with a deration of 1% every year after ten years.

6.50%

25

NA

NA

NA AD benefit shall be factored in the tariff

10%

25

23%

10%

25

75% of capital subsidy for the financial year of comissioning as per applicable scheme of MNRE

NA

NA

NA

NA

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

Taxes and Duties

Late Payment surcharge

Reference CE98R01060212

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60 days CE98O01270312 CE98R01060212

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60 days CE98B01251012

AP02O01140610

Tariff exclusive of taxes and duties, pass through allowed on actual basis Tariff exclusive of taxes and duties, pass through allowed on actual basis Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60 days 1.25% per month beyond a delay of 60 days 1.25% per month beyond a delay of 60 days

AS98A01130112 BR02O01290512 BR02R01020810

CG98R01020412

GJ02O01270112

HR98O01030912 Tariff determined shall be inclusive of all taxes and duties Tariff exclusive of taxes and duties, pass through allowed on actual basis 1.25% per month if payment delayed beyond 60 days 1.25% per month beyond a delay of 60 days 1.25% per month beyond a delay of 30 days

HP98R01171212

JK98A01000012

JH02R01230610

KA02O01130710

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 30 days 1.25% per month beyond a delay of 60 days

MP02O01010812

MH98O01300312 MN98R01150410

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60 days

MZ98R01150410

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60 days

ML98A01050912

RE developers shall be exempted from all types of taxes and duties RE developers shall be exempted from all types of taxes and duties RE developers shall be exempted from all types of taxes and duties

1.25% per month beyond a delay of 60 days 1.25% per month beyond a delay of 60 days 1.25% per month beyond a delay of 60 days

NL98R01300811

OR02O01010212

PB98O01190712

RJ02O01300512

NA

NA 1% per month for payment after 30 days of billing

TN02O01080710

TR98R01230309 Including Direct Tax but Exclusive other tax and duties 10% tax rate for 0-10 Exempt from Income tax and all other taxes and duties & other levies imposed by State/central NA 1.25% per month beyond a delay of 60 days 1.25% per month beyond a delay of 60 days NA

UA98R01060710

UP98R01220310

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

Archives

HR02Z01000612

FIT:BIOMASS

ANNEXURE-1C
STATE-WISE FEED-IN-TARIFF FOR BIOMASS
Financial Parameters STATE Tariff Regulations / or Order or Draft (Ref. no. dt) Control period Tariff (Rs/kWh) Capital Cost (lakh/MW) Specific heat rate (kcal/kWh) Auxiliary Consumption (%) Calorific Value (kCal/kg)

Norm

CERC (FY 12-13)

CERC Generic RE Tariff Order for FY 2012-13; CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

FY 2012-16 (3 yrs)

***given below in separate table

445 (FY 12-13)

4000

10%

3300

CERC (FY13-14)

Draft CERC Generic RE Tariff Order for FY 2013-14; CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

FY 2012-16 (3 yrs)

***given below in separate table

462 (FY 13-14)

4000

10%

3300

Andhra Pradesh

Tariff Order (Dated 31/03/2009) &

2009-10 to 2014-15 5 Years( 2012-13 to 2016-17) 3 years(till March 2014)

NA

400

3,800

9%.

3275

Arunachal Pradesh

Tariff Notification Dated April 9, 2012 Notification (Draft) Dated Guwahati the 13th January, 2012

NA

445

4000

10%

3300

Assam

NA FC - 2.08/kWh VC - 3.34/kWh with 5% annual escalation in fuel cost NA

426

3800

10%

3467

Bihar

Order on Tariff Determination for Biomass Plants to be commissioned in 2012-13 to 2016-17

5 Years( 2012-13 to 2016-17)

445

4000

10%

3300

Chhattisgarh

Draft RE Tariff Regulation_April 2012

5 Years(2011-122016-17) No tariff Order 1.06.2010 to 31.03.2013.

445

4000

10%

3300

Delhi

No tariff Order

NA 4.49 (with AD) 4.54(w/o AD) 5.59 (for watercooled) 5.88 (for aircooled condenser) N.A

NA

NA

NA

NA

Gujarat

Bagass Tariff Order - Order No. 5 of 2010-May 17, 2010

454

3800

10%

3300

Haryana

Haryana RE (Biomass) Tariff Order 03092012

3 years(till FY 13FY15)

445 (aircooled condenser) 475 (water cooled condenser)

3800

10%

3458

Himachal Pradesh

Jammu and Kashmir

HPERC( Promotion of Generation from According to the Renewable Energy sources and Terms generic tariff Order and conditions of Tariff) Regulations, (Duration to be fixed 2012 as find appropriate 5 years(2012-13 to Draft RE Tariff Regulations_July 2012 2017-18) Biomass and NFFcogen Tariff Regulations_27012010 RE Tariff Order(111209) Till March 31, 2015

N.A

N.A

N.A

N.A

NA

445

4000

10%

3300

Jharkhand

NA

450

3800

10%

3467

Karnataka

NA

NA

487

9%

Kerala

No tariff Order

No tariff Order March 2012 to end of FY 2013-14 FY2013-14 and FY2014-15

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

Madhya Pradesh

Biomass Tariff Order_ March 2, 2012

450

3800

10%

3612

Maharashtra

MERC suo motu Tariff Order dated

5.41

402.54

3800

10%

3611

Manipur

Joint Electricity Regulatory Commission for 2010-11 to 2014-15 Manipur & Mizoram (Terms and Conditions for Tariff determination from Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Draft Meghalaya State Electricity Regulatory Commission (Terms and Conditions for determination of Tariff for Generation from Renewable Energy Sources) Regulations, 2012. Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011 OERC Suo Moto Tariff Order dated September 14, 2010 in Petition No 37/2008 2010-11 to 2014-15

NA

520

3800

10%

3467

&Mizoram

NA

520

3800

10%

3467

Meghalaya

FY 2013-15 (3 years)

NA

550

3800

10%

3467

Nagaland

FY2010-11 to FY2014-15 From FY2010-11 to FY2012-13 4.09

403

3800

10%

3467

Orissa

450

3800

10%

3522

Punjab

PSERC Suo Motu Order on RE Tariff by From FY2010-11 to adopting CERC Tariff FY2012-13

5.83

445

4000

10%

3300

Rajasthan

RERC Tariff Regulation 2009 dated January 23, 2009, Tariff Order dated Dec 21, 2012

FY2009-10 to FY 2013-14

Prepared by ABPS Infra

FY 2012-13 Revised Tariff4.96 for water cooled / 5.42 for Air cooled Page39/123

521.24/564.68

4300 during 10.5 % during s and stabilisation and 4200 10% after tabilization / after stabilization / 4540 12.5 % during s and before stabilization and 12% after tabilization 4440 after stabilization

3400

FIT:BIOMASS

ANNEXURE-1C
STATE-WISE FEED-IN-TARIFF FOR BIOMASS
Financial Parameters STATE Tariff Regulations / or Order or Draft (Ref. no. dt) Control period Tariff (Rs/kWh) FY 2012-13 Revised Tariff4.96 for water cooled / 5.42 for Air cooled ***given below in separate table NA Capital Cost (lakh/MW) Specific heat rate (kcal/kWh) Auxiliary Consumption (%) Calorific Value (kCal/kg)

Norm

Rajasthan CERC (FY 12-13)

Sikkim

RERC Tariff Regulation 2009 dated January 2009, CERC Generic RE23, Tariff Order for FY Tariff Order2012-13; dated Dec 21, 2012 CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 NA

FY2009-10 to FY 2013-14 FY 2012-16 (3 yrs)

521.24/564.68 445 (FY 12-13)

4300 during 10.5 % during s and stabilisation and 4200 10% after tabilization / after stabilization / 4540 12.5 % during s and before stabilization and 12% after tabilization 4440 after stabilization 4000 10%

3400 3300

NA

NA

NA

NA

NA

Tamil Nadu

Comprehensive Tariff Order for Biomass Power Plants, Order No 8 of 2012 dated July 31 ,2012

August1, 2012 to July 31, 2014

4.694

445

3840

10%

3200

Tripura

NA

NA

NA

NA

NA

NA

NA

Uttarakhand

Uttar Pradesh

UERC (Tariff and Other Terms for Supply of Electricity from Renewable FY2009-10 to Energy Sources and non-fossil fuel FY2013 based Co-generating UPERC (Captive and Non-Stations) Conventional Energy Generating Plants) Regulations, October 1, 2009 to 2009 March 31, 2014 (hereinafter referred to asRegulatory CNCE Draft West Bengal Electricity Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) No tariff Order NA

450

4200

10%

3371

5.02

NA WBERC does not specify the project parameters for determination of tariff. It only specifies a cap for the tariff. No tariff Order

NA

NA

NA

West Bengal

5.00

WBERC does not WBERC does not WBERC does not specify the project specify the project specify the project parameters for parameters for parameters for determination of tariff. It determination of tariff. It determination of tariff. It No tariff Order No tariff Order No tariff Order

Goa

No tariff Order

No tariff Order

Union Territories

Andaman Nicobar

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

Chandigargh

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

Dadra and Nagar Haveli

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

Daman & Diu

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

Lakshadweep

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

Pondicherry

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

CERC Tariff for Biomass for FY 2012-13 State Andhra Pradesh Haryana Maharashtra Punjab Rajasthan Tamil Nadu Uttar Pradesh Others Lev. FC 2.06 2.10 2.11 2.12 2.06 2.06 2.07 2.08 Lev. VC 3.12 3.55 3.63 3.71 3.10 3.07 3.17 3.33 Tariff (With AD) (FY 2012 13) 5.18 5.65 5.74 5.83 5.16 5.12 5.24 5.42 AD Benefit 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 Net Levellised (without AD) 5.05 5.52 5.61 5.70 5.03 4.99 5.11 5.29

CERC Proposed Tariff for Biomass for FY 2013-14 State Andhra Pradesh Haryana Maharashtra Punjab Rajasthan Tamil Nadu Uttar Pradesh Others Lev. FC 2.21 2.25 2.26 2.27 2.20 2.20 2.21 2.23 Lev. VC 3.37 3.84 3.92 4.01 3.35 3.31 3.43 3.60 Tariff (With AD) (FY 2012 13) 5.58 6.09 6.18 6.28 5.55 5.51 5.64 5.83 AD Benefit 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 Net Levellised (without AD) 5.44 5.95 6.04 6.14 5.41 5.37 5.50 5.69

Prepared by ABPS Infra

Page40/123

FIT:BIOMASS

1921.5

Normative Parameters Plant Load Factor (%) Fuel Cost (Rs/ MT) Useful life (yrs) Subsidy and incentive by Central /State Govt Taxes and Duties Late Payment surcharge Reference Archives

60% during stabilisation period , 70% for remaining stabilisation period of 1st year and then 80% from 2nd year onward

Andhra Pradesh-2315 Haryana-2635 Maharashtra-2695 Punjab-2756 Rajasthan-2300 Tamil Nadu-2277 Uttar Pradesh-2355 Other States-2476

20

Shall be factored in the tariff on per unit benefit derived on levellised basis

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60 days

CE98R01060212, CE98O01270312

60% during stabilisation period , 70% for remaining stabilisation period of 1st year and then 80% from 2nd year onward

Andhra Pradesh-2502.01 Haryana-2847.86 Maharashtra-2912.71 Punjab-2978.63 Rajasthan-2485.80 Tamil Nadu-2460.94 Uttar Pradesh-2545.24 Other States-2676.01

CE98R01060212 Tariff exclusive of taxes and Shall be factored in the tariff duties, pass on per unit benefit derived through on levellised basis allowed on actual basis

20

1.25% per month beyond a delay of 60 days CE98B01251012

80%.

1300 for base year 200910 (5%esc) 2283 for FY2012-13 (5%esc) 2018 for FY 2012-13 (5% esc)

20

Passed on to utility/consumer

70%

20

70% First six months of COD: 60% ii. Next six months upto one year of COD: 70% iii. From 2nd Year of COD onwards: 80 % First six months of COD: 60% ii. Next six months upto one year of COD: 70% NA 70% for 1st year & 80% from 2nd year onwards. 70% for 1st year & 80% from 2nd year onwards.

20

Normative capital cost, Accelerated Depreciation , on actual Corporate income tax rate, incurred basis Capitalisation of RE projects subject to Normative capital cost, pass through Accelerated Depreciation , on actual Corporate income tax rate, incurred basis Capitalisation of RE projects subject to

over and above the determined tariffs, to be reimbursed by pass through

NA 1.25% per month, beyond 60 days 1.25% per month, beyond 60 days

AP98O0120911

AR98R0190412

AS98A01130112

2476 for FY 2012-13 (5% escalation)

20

NA

NA

NA

BR04O01301112

BR04C01010712

2476 for FY 2012-13 (linked with indexation) NA

20

Normative capital cost, pass through Accelerated Depreciation , on actual Corporate income tax rate, incurred basis Capitalisation of RE projects subject to NA Normative capital cost, Accelerated Depreciation , Corporate income tax rate, Capitalisation of RE projects Normative capital cost, Accelerated Depreciation , Corporate income tax rate, Capitalisation of RE projects during second half of the Tariff determined shall be inclusive of all taxes and duties Normative capital cost, Accelerated Depreciation , Corporate income tax rate, Capitalisation of RE projects NA NA pass through on actual incurred basis subject to pass through on actual incurred basis subject to production of pass through on actual incurred basis subject to pass through on actual incurred basis subject to NA

1.25% per month, beyond 60 days NA 1.25% per month, beyond 60 days

CG98A01020412

NA

NA

1600 (5% esc)

20

GJ04O01170510

2556 - FY 2012-13(5% esc)

20

1.25% per month, beyond 60 days 1.25% per month if payment delayed beyond 60 days 1.25% per month, beyond 60 days NA

HR98O01030912

HR98O01250112/ HR98R0130211

N.A

N.A

20

HP98R01171212

HP98A01240712

During stabilisation : 60 % (ii)During the 2500(indexation or 5% esc) remaining period of the first year of operation of 1797- FY2010-11 (5% 70% esc) 75% 1280 FY 2009-10 ( 5% esc) No tariff Order

20

JK98A01010712

20

JH04R01270110

20

NA

NA

NA

KA98O01111209

No tariff Order During stabilisation : 60 % (ii)During the remaining period of the first year of operation of 60% before stabilisation period , 70% for remaining stabilisation period of 1st year and 60% before stabilisation period , 70% for remaining stabilisation period of 1st year and 60% before stabilisation period , 70% for remaining stabilisation period of 1st year and

No tariff Order

No tariff Order

No tariff Order

No tariff Order

KL07R02191108

2100

20

NA Passed on to utility/consumer Passed on to utility/consumer Passed on to utility/consumer

NA excluded from the tariff excluded from the tariff excluded from the tariff Tariff exclusive of taxes and duties, pass through allowed on actual basis excluded from the tariff excluded from the tariff excluded from the tariff

NA

MP04O0120312 MH98R01070610 / MH98O01300312 MN98R01150410

2605 2084 for FY010 -11 ( with 5% esc) 2084 for FY010 -11 ( with 5% esc)

20

NA

20

NA

20

NA

MZ98R01150410

85%

2018 for FY2012 -13 ( with 5% esc)

20

Shall be factored in the tariff on per unit benefit derived on levellised basis

1.25% per month beyond a delay of 60 days

ML98A01050912

Prepared by ABPS Infra

60% before stabilisation period , 70% for 1855 for FY010 -11 ( with remaining stabilisation 5% esc) period of 1st year and 60% before stabilisation period , 70% for 1968 remaining stabilisation period of 1st year and 60% before stabilisation period , 70% for 2756 remaining stabilisation period of 1st year and 60% before stabilisation period , 70% for remaining stabilisation 1921.5 for FY012-13 ( with period of 1st year and 5% esc) then75% from 2nd year onward

20

Passed on to utility/consumer Passed on to utility/consumer Passed on to utility/consumer

NA

NL98R01300811

20

NA

OR98O01140910

20

NA

PB98O01190712

20

Passed on to utility/consumer

excluded from the tariff

NA

RJ04O01211212

RJ98R01230109 / RJ04O01091211

Page41/123

FIT:BIOMASS

1921.5

Normative Parameters Plant Load Factor (%) Fuel Cost (Rs/ MT) Useful life (yrs) Subsidy and incentive by Central /State Govt Taxes and Duties Late Payment surcharge Reference Archives

60% before stabilisation period , 70% for 60% during stabilisation Andhra remaining stabilisation 1921.5 forPradesh-2315 FY012-13 ( with period , Haryana-2635 period of 1st year and 5% esc) Maharashtra-2695 then75% from 2nd year 70% for remaining Punjab-2756 onward stabilisation period of 1st Rajasthan-2300 year and then Tamil Nadu-2277 Uttar Pradesh-2355 NA NA 80% from 2nd year Other States-2476 onward

20 20

NA

Passed on to excluded from Tariff exclusive utility/consumer the tariff of taxes and Shall be factored in the tariff duties, pass on per unit benefit derived through on levellised basis allowed on actual basis NA NA

NA 1.25% per month beyond a delay of 60 days NA

RJ04O01211212 CE98R01060212, CE98O01270312

RJ98R01230109 / RJ04O01091211

NA

80%

2277

20

Passed on to utility/consumer

NA

interest of 1% per Month

TN04O01310712

NA 60% before stabilisation period , 70% for remaining stabilisation period of 1st year and NA

NA 1518 for FY009-10 ( with 5% esc) NA

NA

NA 75% passed onto utility/consumer passed on to utility/consumer

NA

NA 1.25% p.m. beyond 60 days 1.25% p.m. beyond 2 months WBERC does not specify the project parameters for determination of No tariff Order

NA

20

NA

UA98R01060710

NA

NA

UP98R01220310

WBERC does not WBERC does not specify WBERC does not WBERC does not specify WBERC does specify the project the project parameters for specify the project the project parameters for not specify the parameters for determination of tariff. It parameters for determination of tariff. It only project determination of tariff. It only specifies a cap for the determination of specifies a cap for the tariff. parameters for No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

WB98A01100812

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

Prepared by ABPS Infra

Page42/123

FIT:BAGASSE_COGEN

ANNEXURE-1D
STATE-WISE FEED-IN-TARIFF FOR BAGASSE_COGEN
Financial Parameters STATE Tariff Regulations / or Order or Draft (Ref. no. dt) Control period Tariff (Rs/kWh) Capital Cost (lakh/MW) Station heat rate (kcal/kWh) Auxiliary Consumption (%) Calorific Value (kCal/kg) Normative Parameters Fuel Cost (Rs/ MT) Andhra Pradesh-1307 Haryana-1859 Maharashtra-1832 Punjab-1636 Tamil Nadu-1408 Uttar Pradesh-1458 Other States-1583 Andhra Pradesh-1412.58 Haryana-2009.17 Maharashtra-1979.99 Punjab-1768.16 Tamil Nadu-1521.74 Uttar Pradesh-1575.78 Other States-1710.88 Useful life (yrs) Subsidy and incentive by Central /State Govt Taxes and Duties Late Payment surcharge

Plant Load Factor (%)

CERC (FY 12-13)

CERC Generic RE Tariff Order for FY 2012-13; CERC (Terms and Conditions for Tariff ***given below in separate FY 2012-16 (3 yrs) determination from table Renewable Energy Sources) Regulations, 2012

420

3600

8.50%

2250

UP&AP - 45% TN & Maha - 60% Other States - 53%

20

Shall be factored in the tariff on per unit benefit derived on levellised basis

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60 days

CERC (FY13-14)

Draft CERC Generic RE Tariff Order for FY 2013-14; CERC (Terms and Conditions for Tariff ***given below in separate FY 2012-16 (3 yrs) determination from table Renewable Energy Sources) Regulations, 2012

436.36 (For FY 13-14)

3600

8.50%

2250

UP&AP - 45% TN & Maha - 60% Other States - 53%

20

Shall be factored in the tariff on per unit benefit derived on levellised basis

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60 days

Andhra Pradesh

Tariff Order (Dated 31/03/2009)

2009-10 to 201415 5 Years( 2012-13 to 2016-17) 3 years(till March 2014) 5 Years( 2012-13 to 2016-17) 5 Years(2011-122016-17) No tariff Order No tariff Order

325

3700

9.0%

2300

55%

950

20

Passed on to utility/consumer

over and above the determined

1.25% per month, beyond 60 days 1.25% per month, beyond 60 days

Arunachal Pradesh

Tariff Notification Dated April 9, 2012 Notification (Draft) Dated Guwahati the 13th January, 2012 Order on Tariff Determination for Bagasse based Co-generation Plants to be commissioned in 2012-13 to 2016-17 Draft RE Tariff Regulation_April 2012(NFF Cogen) No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

20

Assam

NA FC - 2.29/kWh VC - 2.77/kWh with 5% annual escalation in fuel cost NA

421

3600

8.50%

2250

53%

1306(5% esc)

20

Normative capital cost, pass through Accelerated Depreciation , on actual Corporate income tax rate, incurred basis Normative capital cost, pass through Accelerated Depreciation , on actual Corporate income tax rate, incurred basis

Bihar

420

3650

8.50%

2275

53%

1583(5% esc)

20 Normative capital cost, pass through Accelerated Depreciation , on actual Corporate income tax rate, incurred basis No tariff Order No tariff Order

Chhattisgarh

420

3600

8.50%

2250

53%

1583 ( for first year, after through indexation) No tariff Order

20

1.25% per month, beyond 60 days No tariff Order

Delhi

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

No tariff Order

Gujarat

three years from Bagass Tariff Order - Order No. 4 of 2010-May 31, 2010 1st June, 2010 to 31st May, Haryana Biomass Tariff Order -03092012 3 years(till FY 13FY15)

4.65 (with AD) 4.71(w/o AD)

415

3600

8.50%

2250

60%

1200(5% esc)

20

Haryana

3.83

421.3

3600

8.50%

2250

53%

662(with 5% esc)

20

Himachal Pradesh

HPERC( Promotion of Generation from According to the Renewable Energy sources and Terms generic tariff Order and conditions of Tariff) Regulations, (Duration to be Draft RE Tariff Regulations_July 2012 Biomass and NFFcogen Tariff Regulations_27012010 RE Tariff Order(111209) 5 years(2012-13 to 2017-18) Till March 31, 2015

N.A

N.A

N.A

N.A

N.A

N.A

N.A 1600 (indexation or 5% esc) 1163(5% esc)

20

Normative capital cost, pass through 1.25% per month, Accelerated Depreciation , on actual beyond 60 days Corporate income tax rate, incurred basis Normative capital cost, pass through 1.25% per month, Accelerated Depreciation , on actual beyond 60 days Corporate income tax rate, incurred basis Tariff determined shall be pass through 1.25% per month if inclusive of all taxes and on actual payment delayed duties incurred basis beyond 60 days Normative capital cost, pass through Accelerated Depreciation , on actual Corporate income tax rate, incurred basis 1.25% per month, beyond 60 days

Jammu and Kashmir

NA

420

3600

8.50%

2250

53%

20 20

Jharkhand

NA

400

3600

8.5%

2250

53%

Karnataka

NA

NA

365

3600

8%

2250

60%

1025(with 5% esc)

20

Kerala

Power Procurement Regulations 2008 Tariff Order on Bagass based Cogen_03092008 Tariff Regulations (Dated 07/06/2010) & RE Tariff Order March 31, 2012 Tariff Regulations (Dated 15/04/2010)

NA

2.55 1.91(FT)+1.99(VT)= 3.90(for FY 2012-13 2.26(F.C)+ 2.53(V.C)= 4.79 (for FY 2012-13) NA

350

55%

12

Madhya Pradesh

till 31.3.2013 2010-11 to 201415 2010-11 to 201415 2010-11 to 201416

275

3700

8%

2300

55%

775

20 passed on to utility/consumer passed on to utility/consumer passed on to utility/consumer passed on to 1.25% p.m. beyond utility/consum 60 days er passed on to 1.25% p.m. beyond utility/consum 60 days er passed on to 1.25% p.m. beyond utility/consum 60 days er 1.25% per month beyond a delay of 60 days

Maharashtra

398.07

3600

8.50%

2250

60%

1832

20

Manipur

516

3600

8.50%

2250

53%

1350

20

&Mizoram

Tariff Regulations (Dated 15/04/2010) Draft Meghalaya State Electricity Regulatory Commission (Terms and Conditions for determination of Tariff for Generation from Renewable Energy Sources) Regulations, 2012. Tariff Regulations (Dated 08/2011)

NA

516

3600

8.50%

2250

53%

1350

20

Meghalaya

FY 2013-15 (3 years)

NA

420

3600

8.50%

3467

45% for 120 days of operation 60% for 240 days of operation

1583

Nagaland

2011-12 to 201415 2010-11 to 201213 2012-13 2009-10 to 201415 No Tariff Order/Regulations available 01/08/2012 to 31/07/2014 No Tariff Order/Regulations available NA 2010-11 to 201314 10/08/2012 to 10/08/2015 No Tariff Order/Regulations available

NA Rs 4.4/kWh (Without AD) & Rs 4.12/kWh (With AD) Rs 5.32/kWh (Without AD) & Rs 5.2/kWh (With AD)

398

3600

8.50%

2250

53%

1221

Orissa

Tariff Order (Dated 14/09/2010)

398.07

3600

8.50%

2250

53%

1221

Punjab

Tariff Order (Dated 19/07/2012)

420

3600

8.50% Parameters and tariffs to be determined through suo-motu No Tariff Order/Regulations available

2250 Parameters and tariffs to be determined through suo-motu No Tariff Order/Regulations available

80% Parameters and tariffs to be determined through suo-motu petition or on No Tariff Order/Regulations available

2357 Parameters and tariffs to be determined through suo-motu petition or on No Tariff Order/Regulations available

Rajasthan

Tariff Regulations (Dated 23/01/2009)

Parameters and tariffs to be Parameters and tariffs to be Parameters and tariffs determined through suodetermined through suo-motu to be determined motu petition or on case-topetition or on case-to-case through suo-motu No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available

Tariff exclusive of taxes and Shall be factored in the duties, pass 20 tariff on per unit benefit through derived on levellised basis allowed on actual basis passed on to passed on to 20 utility/consum utility/consumer er passed on to passed on to 20 utility/consum utility/consumer er passed on to passed on to 20 utility/consum utility/consumer er Parameters and Parameters and tariffs to be Parameters tariffs to be determined through suoand tariffs to determined motu petition or on case-to- be determined

1.25% p.m. beyond 60 days 1.25% p.m. beyond 60 days 1.25% p.m. beyond 60 days Parameters and tariffs to be determined through

Sikkim

No Tariff Order/Regulations available

No Tariff No Tariff No Tariff No Tariff Order/Regulations Order/Regulation Order/Regulati Order/Regulations available s available ons available available 1% p.m. beyond 30 days No Tariff Order/Regulations available 1.25% p.m. beyond 60 days 1.25% p.m. beyond 2 months NA No Tariff Order/Regulations available

Tamil Nadu

Tariff Order (Dated 31/07/2012)

NA

420

3700

9%

2300

55%

1050

20

NA

NA

Tripura

No Tariff Order/Regulations available

No Tariff Order/Regulations available NA refer worksheet 'Additional Data', Table 1 3.3 No Tariff Order/Regulations available

Uttarakhand

Tariff Regulations (Dated 06/07/2010)

Uttar Pradesh

Tariff Regulations (Dated 22/03/2010) Draft Tariff Regulations (Dated 10/08/2012) No Tariff Order/Regulations available

West Bengal

Goa

No Tariff No Tariff No Tariff Order/Regulations No Tariff Order/Regulations Order/Regulation Order/Regulati available available s available ons available passed on to 75% passed onto 445 3600 8.50% 2250 45% 1013 20 utility/consum utility/consumer er UPERC specifies 'year of UPERC specifies 'year UPERC specifies 'year UPERC specifies 'year UPERC specifies 'year of UPERC specifies 'year of UPERC specifies passed on to operation' based fixed cost of operation' based of operation' based of operation' based operation' based fixed operation' based fixed 'year of NA utility/consum and financial year based fixed cost and financial fixed cost and financial fixed cost and financial cost and financial year cost and financial year operation' based er WBERC does not specify the WBERC does not WBERC does not WBERC does not WBERC does not specify WBERC does not specify WBERC does project parameters for specify the project specify the project specify the project the project parameters for the project parameters for not specify the NA NA determination of tariff. It only parameters for parameters for parameters for determination of tariff. It determination of tariff. It project No Tariff No Tariff No Tariff No Tariff No Tariff No Tariff No Tariff No Tariff Order/Regulations No Tariff Order/Regulations Order/Regulations Order/Regulations Order/Regulations Order/Regulations Order/Regulations Order/Regulation Order/Regulati available available available available available available available s available ons available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Union Territories No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulation s available No Tariff Order/Regulation s available No Tariff Order/Regulation s available No Tariff Order/Regulation s available No Tariff Order/Regulation s available No Tariff Order/Regulation s available No Tariff No Tariff Order/Regulations Order/Regulati available ons available No Tariff No Tariff Order/Regulations Order/Regulati available ons available No Tariff No Tariff Order/Regulations Order/Regulati available ons available No Tariff No Tariff Order/Regulations Order/Regulati available ons available No Tariff No Tariff Order/Regulations Order/Regulati available ons available No Tariff No Tariff Order/Regulations Order/Regulati available ons available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available

Andaman Nicobar

No Tariff Order/Regulations available

Chandigargh Dadra and Nagar Haveli Daman & Diu

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Lakshadweep

No Tariff Order/Regulations available

Pondicherry

No Tariff Order/Regulations available

CERC Tariff for Bagasse Co-gen for FY 2012-13 State Andhra Pradesh Haryana Maharashtra Punjab Tamil Nadu Uttar Pradesh Others Lev. FC 2.77 2.48 2.22 2.44 2.15 2.8 2.43 Lev. VC 2.29 3.25 3.2 2.86 2.46 2.55 2.77 Tariff (With AD) (FY 2012 13) 5.06 5.73 5.42 5.3 4.61 5.35 5.2 AD Benefit 0.21 0.18 0.16 0.18 0.16 0.21 0.18 Net Levellised (without AD) 4.85 5.55 5.26 5.12 4.45 5.14 5.02

CERC Proposed Tariff for Bagasse Co-gen for FY 2013-14 State Andhra Pradesh Haryana Maharashtra Punjab Tamil Nadu Uttar Pradesh Others Lev. FC 2.95 2.64 2.37 2.60 2.29 2.98 2.59 Lev. VC 2.47 3.51 3.46 3.09 2.66 2.76 2.99 Tariff (With AD) (FY 2012 13) 5.42 6.16 5.83 5.69 4.95 5.73 5.58 AD Benefit 0.23 0.20 0.18 0.20 0.18 0.23 0.20 Net Levellised (without AD) 5.19 5.96 5.66 5.49 4.78 5.50 5.38

Prepared by ABPS Infra

Page43/123

FIT:BAGASSE_COGEN

Reference

Archives

CE98R01060212

CE98O01270312 CE98R01060212

CE98B01251012

AP98O01310309 AP98O0120911 AS98A01130112

AR98R0190412

BR07O01301112

BR07C01000712

CG98R01120412

GJ07O01310510 HR98O01250112/ HR0O01270511/ HR98R0130211 HP98A01240712

HR98O01030912

HP98R01171212

JK98A01000712

JH07R01270110

KA98O01111209

KL07R02191108

MP07O0130908 MH98R01070610 / MH98O01300312 MN98R01150410

MZ98R01150411

ML98A01050912

NL98R01300811

OR98O01140910

PB98O01190712

RJ98R01230109 No Tariff Order/Regulations available

TN07O01310712

No Tariff Order/Regulations available UA98R01060710

UP98R01220310

WB98A01100812

Prepared by ABPS Infra

Page44/123

FIT:SMALL HYDRO

ANNEXURE-1F
STATE-WISE FEED-IN-TARIFF FOR SMALL HYDRO
Financial Parameters STATE Tariff Regulations / or Order or Draft (Ref. no. dt) Control period Tariff (Rs/kWh) Capital Cost (lakh/MW) Capacity Utilisation Factor (%) Auxiliary Consumption (%) Normative Parameters Useful life (yrs) Subsidy and incentive by Central /State Govt Taxes and Duties Late Payment surcharge

CERC (FY 12-13)

CERC Generic RE Tariff Order for FY 2012-13; CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

HP, Uttarakhand and NE States (Below 5MW) - 4.14(without AD), 3.82 (with AD) (5MW-25MW)3.54(without AD), 3.25 (with AD) FY 2012-16 (3 yrs) Other States (Below 5MW) - 4.88(without AD), 4.50 (with AD) (5MW-25MW)4.16(without AD), 3.82 (with AD)

HP, Uttarakhand and NE States (Below 5MW) - 770 (5MW-25MW)- 700 Other States (Below 5MW) - 600 (5MW-25MW)- 550

HP, Uttarakhand and NE States - 45% 1% Other States- 30% 35

Shall be factored in the tariff on per unit benefit derived on levellised basis

Tariff exclusive of taxes and 1.25% per month duties, pass beyond a delay of 60 through days allowed on actual basis

CERC (FY13-14)

Draft CERC Generic RE Tariff Order for FY 2013-14; CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

HP, Uttarakhand and NE States (Below 5MW) - 4.37(without AD), 4.02 (with AD) (5MW-25MW)3.74(without AD), 3.42 (with AD) FY 2012-16 (3 yrs) Other States (Below 5MW) - 5.15(without AD), 4.74 (with AD) (5MW-25MW)4.39(without AD), 4.01 (with AD)

HP, Uttarakhand and NE States (Below 5MW) - 798.11 (5MW-25MW)- 725.55 Other States (Below 5MW) - 621.90 (5MW-25MW)- 570.08

HP, Uttarakhand and NE States - 45% 1% Other States- 30% 35

Shall be factored in the tariff on per unit benefit derived on levellised basis

Tariff exclusive of taxes and 1.25% per month duties, pass beyond a delay of 60 through days allowed on actual basis

Andhra Pradesh

No Tariff/Parameters Defined

No Tariff/Parameters Defined 9/4/2012 to 8/4/2017

No Tariff/Parameters Defined NA

No Tariff/Parameters Defined 700 (<=5 MW) & 630 (5-25 MW) 669 (<=5 MW) & 602 (5-25 MW) No Tariff Order/Regulations available 600 (<=5 MW) & 550 (5-25 MW) No Tariff Order/Regulations available No Tariff Order/Regulations available Case to Case basis

No Tariff/Parameters Defined 45%

No Tariff/Parameters Defined 1%

No Tariff/Parameters Defined 35

No Tariff/Parameters Defined passed on to utility/consumer passed on to utility/consumer No Tariff Order/Regulations available passed on to utility/consumer No Tariff Order/Regulations available No Tariff Order/Regulations available passed on to utility/consumer

No Tariff/Paramet ers Defined passed on to utility/consume r passed on to utility/consume r No Tariff Order/Regulatio ns available water charges/statuto ry charges as No Tariff Order/Regulatio ns available No Tariff Order/Regulatio ns available passed on to utility/consume r

No Tariff/Parameters Defined 1.25% p.m. beyond 60 days 1.25% p.m. beyond 60 days No Tariff Order/Regulations available 1.25% p.m. beyond 60 days No Tariff Order/Regulations available No Tariff Order/Regulations available 1.25% p.m. beyond 60 days

Arunachal Pradesh

Tariff Regulations (Dated 9/4/2012) Draft Tariff Regulations (Dated 13/01/2012) No Tariff Order/Regulations available Draft RE Tariff Regulation_April 2012(NFF Cogen) No Tariff Order/Regulations available

Assam

31/3/2012 to 31/3/2015 No Tariff Order/Regulations available 5 Years(2011-12-2016-17) No Tariff Order/Regulations available No Tariff Order/Regulations available 3 years(till FY 13)

NA No Tariff Order/Regulations available NA No Tariff Order/Regulations available No Tariff Order/Regulations available Case to Case basis

45% No Tariff Order/Regulations available 30% No Tariff Order/Regulations available No Tariff Order/Regulations available Case to Case basis

1% No Tariff Order/Regulations available 1% No Tariff Order/Regulations available No Tariff Order/Regulations available Case to Case basis

35 No Tariff Order/Regulations available 35 No Tariff Order/Regulations available No Tariff Order/Regulations available 35

Bihar

Chhattisgarh

Delhi

Gujarat

No Tariff Order/Regulations available

Haryana

RE Tariff Regulations (Dated 03/02/2011) HPERC( Promotion of Generation from Renewable Energy sources and Terms and conditions of Tariff) Regulations, 2012 (Dec 17, 2012) Draft RE Tariff Regulations

Himachal Pradesh

18/12/2012 to 31/3/2017

NA

780 (100kW - 2MW), 750 (2-5 MW) & 700 (5-25 MW)

1.00%

40

passed on to utility/consumer

passed on to 1.25% p.m. beyond utility/consume 60 days r 1.25% p.m. beyond 60 days NA passed on to utility/consume r not included NA NA

Jammu and Kashmir

2012-13 to 2016-17

NA

770 (<=5 MW) & 700 (5-25 MW) NA

45%

1%

35

passed on to utility/consumer NA

Jharkhand

Tariff Regulations (Dated 03/07/2007)

NA

NA Rs 3.40/kWh for the first 10 years after signing the PPA Rs 2.94/kWh

NA

0.50%

20

Karnataka

RE Tariff Order (Dated 11/12/2009) Tariff amendment Regulations (Dated 22/11/2010) SHP Tariff Regulations (Dated 30/06/2010) Tariff Regulations (Dated 07/06/2010)

NA

475

30%

1%

NA

NA

NA

Kerala

NA

520 700 for Run of the river, 600 for canal based generation 498.88 (<=5 MW) & 453.53 (525 MW) 812 (<=5 MW) & 730 (5-25 MW) 812 (<=5 MW) & 730 (5-25 MW)

30% 35% for Run of the river, 30% for canal based generation 30%

0.50%

25

NA

NA

Madhya Pradesh

30/06/2010 to 31/03/2013

Refer Table 1 below

1%

30

NA passed on to utility/consumer passed on to utility/consumer passed on to utility/consumer

NA

NA

Maharashtra

2010-11 to 2014-15

NA

1%

35

Manipur

Tariff Regulations (Dated 15/04/2010)

2010-11 to 2014-15

NA

40%

101%

35

&Mizoram

Tariff Regulations (Dated 15/04/2010)

2010-11 to 2014-16

NA

40%

201%

35

passed on to 1.25% p.m. beyond utility/consume 60 days r passed on to 1.25% p.m. beyond utility/consume 60 days r passed on to 1.25% p.m. beyond utility/consume 60 days r Tariff exclusive of taxes and 1.25% per month duties, pass beyond a delay of 60 through days allowed on actual basis 1.25% p.m. beyond 60 days 1.25% p.m. beyond 60 days 1.25% p.m. beyond 60 days Parameters and tariffs to be determined through No Tariff Order/Regulations available Parameters are defined on case to case basis

Meghalaya

Draft Meghalaya State Electricity Regulatory Commission (Terms and Conditions for determination of Tariff for Generation from Renewable Energy Sources) Regulations, 2012.

FY 2013-15 (3 years)

NA

770 (<=5 MW) & 700 (5-25 MW) (for 2012-13)

45%

1%

35

Shall be factored in the tariff on per unit benefit derived on levellised basis

Nagaland

Tariff Regulations (Dated 08/2011)

2011-12 to 2014-15

NA Rs 3.91/kWh (<=5 MW) & Rs 3.64/kWh (5-25 MW) w/o AD and Rs 3.31/kWh & Rs 4.88/kWh (<=5 MW) & Rs 4.16/kWh (5-25 MW) w/o AD and Rs 4.5/kWh & Parameters and tariffs to be determined through suomotu petition or on case-toNo Tariff Order/Regulations available

Orissa

Tariff Order (Dated 14/09/2010)

2010-11 to 2012-13

Punjab

Tariff Order (Dated 19/07/2012)

2012-13

Rajasthan

Tariff Regulations (Dated 23/01/2009)

2009-10 to 2014-15 No Tariff Order/Regulations available

Sikkim

No Tariff Order/Regulations available

passed on to utility/consume r passed on to 600 (<=5 MW) & 550 (5-25 passed on to 35% 1% 35 utility/consume MW) utility/consumer r passed on to 600 (<=5 MW) & 550 (5-25 passed on to 30% 1% 35 utility/consume MW) utility/consumer r Parameters and tariffs to be Parameters and tariffs to Parameters and tariffs to Parameters and Parameters and tariffs to be Parameters determined through suo-motu be determined through suo- be determined through suotariffs to be determined through suoand tariffs to petition or on case-to-case motu petition or on case-to- motu petition or on case-todetermined motu petition or on case-to- be determined No Tariff No Tariff No Tariff Order/Regulations No Tariff No Tariff No Tariff Order/Regulations Order/Regulations Order/Regulati available Order/Regulations available Order/Regulations available available available ons available 635 (<=5 MW) & 571 (5-25 MW) 30% 1% 35 passed on to utility/consumer Parameters are Parameters are defined on Parameters are defined on Parameters are defined on defined on case to case to case basis case to case basis case to case basis case basis Parameters are defined on case to case basis

Tamil Nadu

Parameters are defined on case to case basis

Parameters are defined on case to case basis

Parameters are defined on case to case basis

Parameters are defined on case to case basis

Tripura

No Tariff Order/Regulations available

No Tariff Order/Regulations available NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available 700 For 0-5 MW, 685 For 5-10 MW, 670 For 10-15 MW, 650 For 15-20 MW & 630 For 20UPERC specifies 'year of operation' based fixed cost and financial year based tariff. It WBERC does not specify the project parameters for determination of tariff. It only No Tariff Order/Regulations available

Uttarakhand

Tariff Regulations (Dated 06/07/2010)

Uttar Pradesh

Tariff Regulations (Dated 22/03/2010) Draft Tariff Regulations (Dated 10/08/2012) No Tariff Order/Regulations available

2010-11 to 2013-14

UPERC specifies 'year of operation' based fixed cost and financial year based 4.4 No Tariff Order/Regulations available

West Bengal

10/08/2012 to 10/08/2015 No Tariff Order/Regulations available

Goa

No Tariff No Tariff No Tariff No Tariff No Tariff No Tariff Order/Regulations Order/Regulations Order/Regulati Order/Regulations Order/Regulations available Order/Regulations available available available ons available available passed on to 75% passed onto 1.25% p.m. beyond 45% 1% 35 utility/consume utility/consumer 60 days r UPERC specifies 'year of UPERC specifies 'year of UPERC specifies passed on to 1.25% p.m. beyond operation' based fixed cost operation' based fixed cost 'year of operation' NA utility/consume 2 months and financial year based and financial year based based fixed cost r WBERC does not specify WBERC does not specify WBERC does not the project parameters for the project parameters for specify the project NA NA NA determination of tariff. It determination of tariff. It parameters for No Tariff No Tariff No Tariff No Tariff Order/Regulations No Tariff Order/Regulations No Tariff Order/Regulations Order/Regulations Order/Regulatio Order/Regulations available available available available ns available available

Prepared by ABPS Infra

Page45/123

FIT:SMALL HYDRO

ANNEXURE-1F
STATE-WISE FEED-IN-TARIFF FOR SMALL HYDRO
Financial Parameters STATE Goa Tariff Regulations / or Order or Draft (Ref. no. dt) No Tariff Order/Regulations available Control period No Tariff Order/Regulations available Tariff (Rs/kWh) No Tariff Order/Regulations available HP, Uttarakhand and NE States (Below 5MW) - 4.14(without AD), 3.82 (with AD) (5MW-25MW)No Tariff Order/Regulations 3.54(without AD), 3.25 (with available AD) No Tariff Order/Regulations Other States available (Below 5MW) - 4.88(without (with AD) No AD), Tariff 4.50 Order/Regulations (5MW-25MW)available 4.16(without AD), 3.82 (with AD) No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available Capital Cost (lakh/MW) No Tariff Order/Regulations available Capacity Utilisation Factor (%) No Tariff Order/Regulations available Auxiliary Consumption (%) No Tariff Order/Regulations available Normative Parameters Useful life (yrs) No Tariff Order/Regulations available Subsidy and incentive by Taxes and Central /State Govt Duties No Tariff No Tariff Order/Regulations Order/Regulatio available ns available Late Payment surcharge No Tariff Order/Regulations available

Union Territories No Tariff Order/Regulations available FY 2012-16 (3 yrs) No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available

HP, Uttarakhand and NE States No Tariff Order/Regulations (Below 5MW) - 770 available (5MW-25MW)- 700 No Tariff Order/Regulations Other States available (Below 5MW) - 600 550 No (5MW-25MW)Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations HP, Uttarakhand available and NE States - 45% No Tariff Order/Regulations Other States- 30% available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available 1% No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff No Tariff Order/Regulations Order/Regulations available available Shall be factored in the tariff No 35 Tariff on unit benefit derived No per Tariff Order/Regulations Order/Regulations on levellised availablebasis available No Tariff No Tariff Order/Regulations Order/Regulations available available No Tariff No Tariff Order/Regulations Order/Regulations available available No Tariff No Tariff Order/Regulations Order/Regulations available available No Tariff No Tariff Order/Regulations Order/Regulations available available No Tariff No Tariff Tariff exclusive Order/Regulations Order/Regulatio of and nstaxes available available 1.25% per month duties, pass No Tariff No beyond a Tariff delay of 60 through Order/Regulatio Order/Regulations days allowed on ns available available actual basis No Tariff No Tariff Order/Regulatio Order/Regulations ns available available No Tariff No Tariff Order/Regulatio Order/Regulations ns available available No Tariff No Tariff Order/Regulatio Order/Regulations ns available available No Tariff No Tariff Order/Regulatio Order/Regulations ns available available

Andaman Nicobar CERC (FY 12-13) Chandigargh

CERC Generic RE Tariff Order for FY No Tariff Order/Regulations available 2012-13; CERC (Terms and Conditions for Tariff fromavailable No Tariffdetermination Order/Regulations Renewable Energy Sources) Regulations, 2012 No Tariff Order/Regulations available

Dadra and Nagar Haveli

Daman & Diu

No Tariff Order/Regulations available

Lakshadweep

No Tariff Order/Regulations available

Pondicherry

No Tariff Order/Regulations available

Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Tariff without considering GoMP free power policy (Rs./kWh) 5.4 5.22 5.04 4.86 4.68 4.5 4.33 4.16 3.98 3.81 2.3 2.34 2.38 2.42 2.46 2.51 2.56 2.6 2.65 2.71 2.76 2.82 2.88 2.94 3 3.07 3.14 3.21 3.28 3.36

Table 1: Tariffs of SHP in Madhya Pradesh Run of the River Projects Tariff considering GoMP free power policy (Rs./kWh) <5 MW 5-10 MW 10 - 25 MW 5.4 5.4 5.4 5.22 5.22 5.8 5.04 5.48 5.6 5.12 5.28 5.4 4.93 5.09 5.2 4.74 4.9 5.01 4.56 4.71 4.81 4.37 4.52 4.62 4.19 4.33 4.43 4.01 4.14 4.23 2.42 2.5 2.56 2.46 2.54 2.6 2.51 2.59 2.64 2.55 2.63 2.69 2.59 2.68 2.74 2.64 2.73 2.79 2.69 2.78 2.84 2.74 2.83 2.89 2.79 2.88 2.95 2.85 2.94 3.01 2.91 3 3.07 2.96 3.06 3.13 3.03 3.13 3.19 3.09 3.19 3.26 3.16 3.26 3.33 3.23 3.33 3.41 3.3 3.41 3.48 3.38 3.49 3.56 3.45 3.57 3.65 3.54 3.65 3.73

Tariff without considering GoMP free 5.4 5.22 5.04 4.86 4.68 4.5 4.33 4.16 3.98 3.81 2.3 2.34 2.38 2.42 2.46 2.51 2.56 2.6 2.65 2.71 2.76 2.82 2.88 2.94 3 3.07 3.14 3.21 3.28 3.36

Canal Based Projects Tariff considering GoMP free power policy (Rs./kWh) <5 MW 5-10 MW 11 - 25 MW 5.4 5.4 5.4 5.22 5.22 5.8 5.04 5.48 5.6 5.12 5.28 5.4 4.93 5.09 5.2 4.74 4.9 5.01 4.56 4.71 4.81 4.37 4.52 4.62 4.19 4.33 4.43 4.01 4.14 4.23 2.42 2.5 2.56 2.46 2.54 2.6 2.51 2.59 2.64 2.55 2.63 2.69 2.59 2.68 2.74 2.64 2.73 2.79 2.69 2.78 2.84 2.74 2.83 2.89 2.79 2.88 2.95 2.85 2.94 3.01 2.91 3 3.07 2.96 3.06 3.13 3.03 3.13 3.19 3.09 3.19 3.26 3.16 3.26 3.33 3.23 3.33 3.41 3.3 3.41 3.48 3.38 3.49 3.56 3.45 3.57 3.65 3.54 3.65 3.73

Prepared by ABPS Infra

Page46/123

FIT:SMALL HYDRO

Reference

CE98R01060212, CE98O01270312

CE98R01060212

CE98B01251012

AP98O01310309

AR98R01090412

AS98A01130112 No Tariff Order/Regulations available CG98A01020412 No Tariff Order/Regulations available No Tariff Order/Regulations available HR98O01250112/ HR0O01270511/ HR98R0130211

HP98R01171212

JK98A01000712

JH08R01030707

KA98O01111209

KL98R01221110

MP08R01300608

MH98R01070610

MN98R01150410

MZ98R01150411

ML98A01050912

NL98R01300811

OR98O01140910

PB98O01190712

RJ98R01230109 No Tariff Order/Regulations available

TN08Z01000310

No Tariff Order/Regulations available UA98R01060710

UP98R01220310

WB98A01100812 No Tariff Order/Regulations available

Prepared by ABPS Infra

Page47/123

FIT:SMALL HYDRO

Reference No Tariff Order/Regulations available

No Tariff Order/Regulations available CE98R01060212, CE98O01270312 No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available

Prepared by ABPS Infra

Page48/123

STATE

Projects name)

Technology (Project (Incineration/ Biomethanation/ Gasification)

CERC

Andhra Pradesh

NA

Arunachal Pradesh

Assam

Bihar

NA

NA

Chhattisgarh

NA

NA

Delhi

Timarpur Okhla Waste Management Co. Ltd. (16 MW)

Incineration & Biomethanation

Gujarat

Hanjer Green Power Pvt. Ltd. (15 MW)

Incineration

Haryana

Himachal Pradesh

Jammu and Kashmir

NA

NA

Jharkhand

NA Srinivasa Gayathri Resource Recovery Ltd. (8 MW) NA

NA

Karnataka

Incineration

Kerala

NA

Madhya Pradesh

NA Solapur Bioenergy Systems Pvt. Ltd. (2.83 MW) NA

NA

Maharashtra

Biomethanation

Manipur

&Mizoram

NA

Meghalaya

NA

Nagaland

NA

Orissa

NA

Punjab

NA

Rajasthan

NA

Sikkim

NA

Sikkim

NA

Tamil Nadu

NA

Tripura

NA

Uttarakhand

NA

Uttar Pradesh

NA

West Bengal

NA

Goa

NA

NA

Union Territories

Andaman Nicobar

NA

NA

Chandigargh

NA

NA

Dadra and Nagar Haveli

NA

NA

Daman & Diu

NA

NA

Lakshadweep

NA

NA

Pondicherry

NA

NA

ANNEXURE-1E

STATE-WISE FEED-IN-TARIFF FOR MSW


Financial Parameters Tariff Order (Ref. no. dt) Tariff (Rs/kWh) Capital Cost (lakh/MW)

NA

NA

NA

Tariff Order (dt 31/03/2009)

4.04 in 2009-10 and Project Parameters not specified 5% escalation in the order thereafter till 2013-14

Tariff Regulations (dt 09/04/2012) Draft Tariff Regulations (Dated January 13, 2012)

Project Specific Tariff Determination Project Specific Tariff Determination

Project Specific Tariff Determination Project Specific Tariff Determination

NA

NA

NA

Draft RE Tariff Regulation_April 2012(NFF Cogen)

Project Specific Tariff Determination Rs 2.49/kWh for the first year and Rs 2.833/kWh from the second year onwards

Project Specific Tariff Determination

Order dt 20/01/2011

Project awarded through tariff based competitive bidding. (Auxilliary Consumption of 22%)

Tariff order (dt 30/07/2011)

6.8

690.7

Tariff Regulations (Dated February 03, 2011)

Project Specific Tariff Determination

Project Specific Tariff Determination

Draft Tariff Regulations (Dated July 24, 2012)

Project Specific Tariff Determination Project Specific Tariff Determination

Project Specific Tariff Determination Project Specific Tariff Determination

Draft RE Tariff Regulations_July 2012

NA

NA

NA

Tariff Order (dt 28/02/2012)

Rs 4.15/kWh

1111.125

NA

NA

NA

NA

NA

NA

Tariff Order (dt 03/09/2010)

Rs 4.88/kWh

1277

Tariff Regulations (Dated 15/04/2010)

Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available

Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available

Tariff Regulations (Dated 15/04/2010)

No Tariff Order/Regulations available

Tariff Regulations (Dated 08/2011)

Tariff Order (Dated 14/09/2010)

Tariff Order (Dated 19/07/2012)

Tariff Regulations (Dated 23/01/2009)

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available

No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available

Tariff Regulations (Dated 06/07/2010)

Tariff Regulations (Dated 22/03/2010) Draft Tariff Regulations (Dated 10/08/2012) NA

Project Specific Tariff Project Specific Tariff Determination Determination Rs 2.89/kWh for The regulations have the existing projects and provision of determining the Rs 3.21 for new tariffs of new projects on case-toProjects under the case basis Capped at Rs 5.1/kWh No parameters specified upto August 10, 2022 NA NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Normative Parameters Station heat rate (kcal/kWh) Auxiliary Consumption (%) NA Calorific Value Range Plant Load Factor (%) (kCal/kg)

NA

NA

NA

Project Parameters not Project Parameters not Project Parameters not specified in the order specified in the order specified in the order

Project Parameters not specified in the order

Project Specific Tariff Determination Project Specific Tariff Determination

Project Specific Tariff Determination Project Specific Tariff Determination

Project Specific Tariff Determination Project Specific Tariff Determination

Project Specific Tariff Determination Project Specific Tariff Determination

NA

NA

NA

NA

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination Project awarded through tariff based competitive bidding. (Auxilliary Consumption of 22%) 60% for the first year and 80% from the second year onwards Project Specific Tariff Determination

Project awarded Project awarded Project awarded through tariff based through tariff based through tariff based competitive bidding. competitive bidding. competitive bidding. (Auxilliary Consumption (Auxilliary Consumption (Auxilliary Consumption of 22%) of 22%) of 22%) 4100 11.5% 2250

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination Project Specific Tariff Determination

Project Specific Tariff Determination Project Specific Tariff Determination

Project Specific Tariff Determination Project Specific Tariff Determination

Project Specific Tariff Determination Project Specific Tariff Determination

NA

NA

NA

NA

4300

15%

2200

73%

NA

NA

NA

NA

NA

NA

NA

NA

12.72%

4800

78.90%

Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available

Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available

Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available

Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available

No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available

No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available

No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available

No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available Project Specific Tariff Determination The regulations have the provision of determining the tariffs of new projects on case-to-case basis No parameters specified

Project Specific Tariff Project Specific Tariff Project Specific Tariff Determination Determination Determination The regulations have The regulations have The regulations have the provision of the provision of the provision of determining the tariffs determining the tariffs determining the tariffs of new projects on case- of new projects on case- of new projects on caseNo parameters No parameters No parameters specified specified specified NA NA NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Fuel Cost (Rs/ MT)

Useful life (yrs)

Reference

NA

NA

Project Parameters not specified in the order

Project Parameters not specified in the order Project Specific Tariff Determination Project Specific Tariff Determination NA Project Specific Tariff Determination

AP98O01310309

Project Specific Tariff Determination Project Specific Tariff Determination

AR98R01090412

AS98A01130112

NA

NA

Project Specific Tariff Determination Project awarded through tariff based competitive bidding. (Auxilliary Consumption of 22%)

CG98A01020412

20

DL09O01200111

1320

20 Project Specific Tariff Determination

GJ09O01300711

Project Specific Tariff Determination

HR98R01030211

Project Specific Tariff Determination Project Specific Tariff Determination

Project Specific Tariff Determination Project Specific Tariff Determination NA

HP98A01240712

JK98A01000712

NA

NA

NA

20

KA09O01280212

NA

NA

NA

NA

NA

NA

20 Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available

MH09O01030910

Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination Project Specific Tariff Determination No Tariff Order/Regulations available

MN98R01150410

MZ98R01150411

No Tariff Order/Regulations available

NL98R01300811

OR98O01140910

PB98O01190712

RJ98R01230109 No Tariff Order/Regulations available

No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available Project Specific Project Specific Tariff Tariff Determination Determination The regulations have the The regulations provision of determining have the provision the tariffs of new projects of determining the on case-to-case basis tariffs of new No parameters No parameters specified specified NA NA

No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available

No Tariff Order/Regulations available No Tariff Order/Regulations available No Tariff Order/Regulations available UA98R01060710

UP98R01220310

WB98A01100812

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Incineration Biomethanation Gasification

RPO

ANNEXURE-II
STATE-WISE SUMMARY of RPO REGULATIONS

STATE

RPO/REC Regulations / or Order or Draft (Ref. no. dt) Order 16 of 2008 (March 31, 2009), Order 10 of 2010 (July 6, 2010), Regulation No 1 of 2012 (FY 13 to FY 17) Regulation: Notification No. APSERC/notification/8/2012 Notification-(AERC/21/2010)- November 2, 2010 RPO Regulation Notification Nov 2010, Solar RPO amended vide Order on Case 12 of 2012 dated May 29, 2012 Regulation (No. 36/CSERC/2011) March 04, 2011

Applicability to Captive / Open Access (Y / N) & Capacity

RPO Regulation No. Order 16 of 2008 (Para 1) Order 10 of 2010 (Page no:-7) Regulation 3, Page No:- 3 Regulation 4(b), Page no:- 3

RE Technology Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total (Discoms only) Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total

2011-12 4.75% 0.25% 5.00%

2012-13 4.75% 0.25% 5.00% 4.10% 0.10% 4.20% 4.05% 0.15% 4.20% 3.75% 0.25% 4.00% 5.25% 0.50% 5.75% 3.25% 0.15% 3.40% 2.60% 0.40% 3.00% 6.00% 1.00% 7.00% 2.00% 0.05% 2.05% 10.00% 0.25% 10.25% 4.75% 0.25% 5.00% 3.00% 1.00% 4.00%

2013-14 4.75% 0.25% 5.00% 5.45% 0.15% 5.60% 5.40% 0.20% 5.60% 4.00% 0.50% 4.50%

2014-15 4.75% 0.25% 5.00% 6.80% 0.20% 7.00% 6.75% 0.25% 7.00% 4.25% 0.75% 5.00%

2015-16 4.75% 0.25% 5.00%

2016-17 4.75% 0.25% 5.00%

2017-18

2018-19

2019-20

2020-21

Andhra Pradesh

Y (Captive- 1 MW and Above) & OA

Arunachal Pradesh

Y (Captive- 1 MW and Above) & OA

Assam

Regulation 4.1, Page no:- 2663 Regulation 4.1, Page no:- 3, Page 7 of 17 of Order 12 of 2012 Regulation 4.3, Page no:- 7 of 19

Bihar

Y (Captive- 5 MW and Above) & OA

Chhattisgarh

Y- Captive and OA (1 MW and above) Captive:- 1 MW and above, OA:- Contract Demand exceeding 1 MW NA (Obligated Entities are Discoms only)

Delhi

Notification (Final RPO REC Regulation dated 01/10/12 )

Regulation 4.1, Page no:- 13

JERC (Goa & UT)

NOTIFICATION (No.: JERC-14/2010) November 30, 2010 Notification No. 3 of 2010, April, 17, 2010 Regulation (No: HERC/23/2011 2nd Amendment) November 25, 2011 Notification (No. HPERC/438 Amendment) October 3, 2011

Regulation 1.1, Page no:- 3

Gujarat

Captive (5 MW and Above) & OA

Regulation 4.1, Page no:- 7

Haryana

Captive (5 MW and Above) & OA

Reg 64 Chapter 10, page no. 26

Himachal Pradesh

Y Captive 1 MW and Above & OA OA and Captive( Contract Demand 1 MVA/MW and Above) OA and Captive( Contract Demand 1 MVA/ 5 MW and Above)

Regulation 4.1, Page no:- 3

Jammu and Kashmir

Notification (No: JKSERC/10) March 11, 2011 Notification (No. 28 --) July 21, 2010

Regulation 7.1, Page no:- 8

Jharkhand

Regulation 5.2 Page no:- 5

Karnataka

Notification (No. S/03/1) March 16, 2011

OA and Captive( Contract Demand 5 MVA/ 5 Regulation 4(i)Page no:- 3 for Discoms and Regulation 4(ii), (iii) for captive MW and Above) 5% RPO for Captive and OA and OA consumers Y Regulation 3.1 Page no:- 2

Kerala

Madhya Pradesh

Notification (No. 1517/CT/2010/KSERC) November 23, 2010 Notification (No. 3042/MPERC-2010.) November 9, 2010

Y OA ( Contract Demand 1 MVA and Above) and Captive( Installed Capacity 1 MW and Above)

Regulation 4.1 Page no:- 3

Maharashtra

Notification (No.MERC/Legal/2010/483) June 7, 2010

Regulation 7.1, Page no:- 5

Manipur Notification (No. H. 13011/5/09-JERC) May 5, 2010. &Mizoram Notification (NO.MSERC/05/61) December, 21 2010 Notification (No.NERC/REGN/2011) August 29, 2011 Notification (No. OERC-Engg-02/2010) September 30, 2010 Notification (No.PSERC/Secy./Reg./55) June 3, 2011 Notification (No.RERC/Secy./Regulation - 85) MAY 24, 2011 Not Issued Y--- OA, Phase 1 -(till April 1, 2012):- 2 MVA Notification No. (TNERC / RPO / 19 / 2,) July 29, and above, Phase 2- ( April1, 2012 to April 2011 1, 2013):- 1 MVA and Above. Phase 3 - (after April 1, 2013:- all OA Consumers Notification (No. F.25/TERC/2009/415) September 16, 2010. UERC (Tariff and other terms for supply of electricity from RE sources and non-fossil fuel based Co-generating stations), dated July 6, 2010 Notification (No. UPERC/Secy/Regulation/10 787) August 17 , 2010 Draft WBERC (Cogeneration and Generation of electricity from RE), 2012, dated August 10, 2012 OA ( cosumption 1 MW and Above) and Captive( consumption 1 MW and Above) Regulation 2.1, Page no-5

Meghalaya

Y OA ( consumption 1 MW and Above) and Captive( consumption 1 MW and Above) Y Captive(5MW and Above) & OA (No explicit mentioning about who are Obligated Entities) Y- Captive and OA (1 MW and above)

Regulation 4 (2), Page No- 3

Nagaland

Regulation 2.1, Page No-5

Orissa

Regulation 3(1), page No-2

Punjab

Regulation 3(1), page No-3

Rajasthan Sikkim

Regulation 4(2), Page No-4

2.70% 0.10% 2.80% 2.25% 0.25% 2.50% 5.00% 0.25% 5.25% 1.90% 0.10% 2.00% 1.70% 0.30% 2.00% 5.50% 0.50% 6.00% 1.50% 0.00% 1.50% 10.00% 0.01% 10.01% 2.90% 0.10% 3.00% 2.50% 0.50% 3.00% 10% and 7% 0.25% 10.25% & 7.25% 3.35% 0.25% 3.60% 2.10% 0.40% 2.50% 6.75% 0.25% 7.00% 2.75% 0.25% 3.00% 5.75% 0.25% 6.00% 0.45% 0.30% 0.75% 6.75% 0.25% 7.00% 4.90% 0.10% 5.00% 2.37% 0.03% 2.40% 5.50% 0.50% 6.00%

1.00%

1.25%

1.50%

1.75%

2.00%

2.50%

4.60% 0.20% 4.80%

5.95% 0.25% 6.20%

7.30% 0.30% 7.60%

8.65% 0.35% 9.00%

3.00% 0.10% 3.10% 10.00% 0.25% 10.25%

10.00% 0.25% 10.25%

11.00% 0.25% 11.25%

12.00% 0.25% 12.25%

13.00% 0.50% 13.50%

14.00% 0.75% 14.75%

15.00% 1.00% 16%

15.50% 2.00% 17.50%

3.65% 0.25% 3.90% 3.40% 0.60% 4.00% 7.75% 0.25% 8.00% 4.75% 0.25% 5.00% 6.75% 0.25% 7.00% 0.60% 0.40% 1.00% 7.75% 0.25% 8.00% 5.35% 0.15% 5.50% 2.83% 0.07% 2.90% 6.35% 0.75% 7.10%

3.95% 0.25% 4.20% 4.70% 0.80% 5.50% 8.50% 0.50% 9.00%

4.25% 0.25% 4.50% 6.00% 1.00% 7.00% 8.50% 0.50% 9.00%

4.55% 0.25% 4.80%

4.85% 0.25% 5.10%

5.15% 0.25% 5.40%

5.45% 0.25% 5.70%

5.75% 0.25% 6.00%

6.05% 0.25% 6.30%

8.50% 0.50% 9.00%

5.80% 0.20% 6.00% 3.37% 0.13% 3.50% 7.00% 1.00% 8.20%

6.25% 0.25% 6.50% 3.81% 0.19% 4.00%

6.70% 0.30% 7.00%

Non-Solar Amendment to Regulation 3, Page 2 Solar Total Regulation 4.1, Page 4 Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total Non-Solar Solar Total

8.95% 0.05% 9.00% 0.90% 0.10% 1.00% 4.50% 0.03% 4.53% 4.50% 0.50% 5.00% 1.90% 0.10% 2.00% 5.00% 0.05% 5.05% 5.00% 1.00% 6.00% 3.75% 0.25% 4.00% 4.70% 0.30% 5.00% 5.60% 0.40% 6.00% 6.50% 0.50% 7.00% 7.40% 0.60% 8.00%

Tamil Nadu

Tripura

Y Captive(5MW and Above) and OA

Uttarakhand

Regulation9(1) Page no:- 13 of 48

Uttar Pradesh

Y Captive (1 MW and Above) & OA

Regulation 4.1 Page no:- 4

West Bengal

Regulation 3.1 Page no:- 4 of 19

3.00%

4.00%

Prepared by ABPS Infra

Page62/123

RPO

2021-22

3.00%

16.00% 3.00% 19.00%

6.35% 0.25% 6.60%

Prepared by ABPS Infra

Page63/123

REC

ANNEXURE-III
STATE-WISE REC PROVISIONS

STATE

REC Regulations (Y/N)

Nodal Agency

Average Power Purchase Cost (Rs/kWh)

Applicability

Reference (REC Regulation)

Reference (SNA)

Reference (APPC)

Archives

Andhra Pradesh

State Load Dispatch Centre

2.00

March 2012 to May 31, 2012

AP98R02210312

AP98R03210312

AP98R03210312

Arunachal Pradesh

Assam

Assam Energy Development Agency

AS98R02011210

AS98Z03041110

Bihar

Bihar Renewable Energy Development Agency CSPDCL: 2.11 BSP-TEED: 4.66 JSPL: 3.00

BR98R02161110

BR98Z03241110

Chhattisgarh

Chhattisgarh Renewable Energy Development Agency Energy Efficiency and Renewable Energy Management Centre

2012-13

CG98R02040311

CG98O03091110

CG98O03220611

Delhi

Y (Draft)

DL98R02011012

DL98O03181111

JERC (Goa & UT)

Gujarat

Gujarat Energy Development Agency

GJ98R02170410

GJ98Z03160710

Haryana

Haryana Renewable Energy Development Agency

HR98R02030211

HR98Z03061010

Himachal Pradesh

Directorate of Energy Jammu & Kashmir State Power Development Corporation (for SHP >2MW), Jammu & Kashmir Energy Development Agency (for all RE other than >2MW SHP), Ladakh Jharkhand Renewable Energy Development Agency

2.20

2012-13

HP98R02260510

HP98Z03190610

HP98O03160712

Jammu and Kashmir

JK98R02110311

JK98Z03030111

Jharkhand

JH98R02210710

JH98Z03210810

Karnataka

State Load Dispatch Center Agency for Nonconventional Energy and Rural Technology MP Urja Vikas Nigam Ltd.

2.60

2012-13

KA98R02160311

KA98Z03010411

KA98O03270612

Kerala

KL98R02231110

KL98O03031210

Madhya Pradesh

MP98R02191110

MP98O03070211

Maharashtra

Maharashtra Energy Development Agency

MH98R02070610

MH98O03010710

Manipur

Manipur Renewable Energy Development Agency

MN98R02050510

MN98Z03070910

&Mizoram

Imphal & Zoram Energy Development Agency Meghalaya Non- Conventional & Rural Energy Development Agency

MZ98R02050510

MZ98Z03070910

Meghalaya

ML98R02211210

ML98Z03201211

Nagaland

NL98R02290811

Orissa

Orissa Renewable Energy Development Agency

OR98R02300910

OR98Z03030211

Punjab

Punjab Energy Development Agency

PJ98R02030611

PJ98Z03301110

Rajasthan

Rajasthan Renewable Energy Corporation

2.57

2011-12

RJ98R02301210

RJ98Z03160610

RJ98O03131011

Sikkim

Tamil Nadu

State Load Dispatch Centre

2.54

2012-13

TN98R02071210

TN98O03071210

TN98O03030912

Tripura

Tripura Renewable Energy Development Agency

TR98R02160910

TR98Z03080910

Uttarakhand

Uttrakhand Renewable Energy Development Agency Uttar Pradesh New and Renewable Energy Development agency

2.68

2012-13

UK98R02031110

UK98O03020512

UK98O03290512

Uttar Pradesh

UP98O02170810

UP98O03040211

West Bengal

Y (Draft)

Prepared by ABPS Infra

Page64/123

OPEN ACCESS

ANNEXURE-V
STATE-WISE OPEN ACCESS PROVISIONS

STATE

Intra-State Open Access Regulations (Y/N) a) For Long term open access-STU b) For Short term open access-SLDC

Nodal agency a) Long term-Rs 10000 b) Short term-Rs 1000

Application fee (Rs)

Andhra Pradesh

1. Open Access Customer connected to Distribution system a) Short term -Both within same DISCOM- Concerned DISCOM -Injection point in the intra-state transmission system within state-SLDC -In different states-RLDC of the region of consumer b) Medium term and -Both within same DISCOM- Concerned DISCOM -Injection point in the intra-state transmission system within gujarat-STU -In different states-CTU c) Long term -Both within same DISCOM- concerned DISCOM -Injection point in the intra-state transmission system within state-STU -In diff states- CTU 2. Open Access Customer connected to Intra-State Trans system a) Short term -Both within state (in intra-state transmission system)- SLDC -Injection point in the distribution system within state-SLDC -In different states-RLDC of the region of consumer b) Medium term -Both within state- STU -Injection point in the distribution system within state-STU -In different states-CTU c) Long term -Both within Gujarat- STU -Injection point in the distribution system within state-STU -In different states-CTU

1. Open Access Customer connected to Distribution system a) Short term -Both within same DISCOM- Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW -Injection point in the intra-state transmission system within Arunachal-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW -In different states-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW b) Medium term -Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW -Injection point in the intra-state transmission system within Arunachal-Rs 50000 and Rs 1 lac respectively -In different states-Rs 1 lacs c) Long term -Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW -Injection point in the intra-state transmission system within Arunachal-Rs 50000 and Rs 1 lac respectively -In different states-Rs 1 lacs 2. Open Access Customer connected to Intra-State Trans sysem a) Short term -Both within Arunachal (in intra-state transmission system)- Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW -Injection point in the distribution system within Arunachal-Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW -In different states-Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW b) Medium term -Both within Arunachal- Rs 100000 (for capacity >5MW) ; Rs 50000 ( for capacity < 5MW) -Injection point in the distribution system within Arunachal -Rs 100000 (for capacity > 5MW) ; Rs 50000 ( for capacity <5 MW) -In different states-Rs 1 lacs c) Long term -Both within Arunachal- Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW) -Injection point in the distribution system within Arunachal-Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW) -In different states-Rs 2 lacs

Arunachal Pradesh

Draft Regulation

1. For LONG TERM a) STU for transactions where the point of drawal or point of injection is located on the intra-state transmission system. b) Otherwise the Distribution licensee of the area where point of drawl is located. Assam Y 2. For SHORT TERM Nodal agency is SLDC

a) Long term= Rs 100000 b) Short term= Rs 5000

a) For Long term open access-STU b) For Short term open access-SLDC Bihar Y

a) Long term-Rs 50000 b) Short term-Rs 5000

a) For transactions where the point of drawal or point of injection is located on the network of STU- STU for a) For transactions where the point of drawal or point of injection is located on the network of STU- Rs 2 lakh for LT, Rs 1 lakh for MT and LT and MT, SLDC for ST Rs 2500 for ST b) For transactions where the point of drawal or point of injection is located on the network of intra-state b) For transactions where the point of drawal or point of injection is located on the network of intra-state transmission licensee and there is transmission licensee and there is no involvement of STU network for conveyance of electricity- Concerned no involvement of STU network for conveyance of electricity- Rs 2 lakh for LT, Rs 1 lakh for MT and Rs 2500 for ST Transmission licensee for LT, MT and ST c) For transactions where the point of drawal or point of injection is located at STU and intra-state transmission licensee- Rs 4 lakh for LT, c) For transactions where the point of drawal or point of injection is located at STU and intra-state Rs 2 lakh for MT, Rs 5000 for ST transmission licensee-STU for LT and MT, SLDC for ST d) For transactions where the point of drawal or point of injection is located on intra-state transmission system and distribution licensees- Rs d) For transactions where the point of drawal or point of injection is located on intra-state transmission 4 lakh for LT, Rs 2 lakh for MT, Rs 5000 for ST system and distribution licensees- STU for LT and MT, SLDC for ST e) Both on same DISCOM network and no invovement of transmission ntw - Rs 2 lakh for LT, Rs 1 lakh for MT and Rs 2500 for ST e) Both on same DISCOM network and no invovement of transmission ntw -Concerned DISCOM for LT, MT and ST f) Both on same DISCOM network but invovement of transmission ntw - Rs 4 lakh for LT, Rs 2 lakh for MT, Rs 5000 for ST f) Both on same DISCOM network but invovement of transmission ntw - STU for LT and MT, SLDC for ST g) Both within same state but different DISCOMs- Rs 4 lakh for LT, Rs 2 lakh for MT, Rs 5000 for ST g) Both within same state but different DISCOMs- STU for LT and MT, SLDC for ST.

Chhattisgarh

1. Transmission Open Access a) For Long term open access-STU b) For Short term open access-SLDC 2. Distribution Open Access-SLDC

1. Transmission Open Access a) Long term- Rs 1 lakh b) Short term- Rs 10000 2. Distribution Open Access a) Long term-Rs 25000 b) Short term-Rs 2500

Delhi

Gujarat

1. Open Access Customer connected to Distribution system a) Short term -Both within same DISCOM- SLDC -Both within gujarat but different DISCOM -SLDC -Injection point in the intra-state transmission system within gujarat -SLDC -In different states-RLDC of the region of consumer b) Medium term and -Both within same DISCOM- SLDC -Both within gujarat but different DISCOM- STU -Injection point in the intra-state transmission system within gujarat- STU -In different states-CTU c) Long term -Both within same DISCOM- SLDC -Both within gujarat but different DISCOM- STU -Injection point in the intra-state transmission system within gujarat- STU 2. Open Access Customer connected to Intra-State Trans system a) Short term -Both within Gujarat (in intra-state transmission system)- SLDC -Injection point in the distribution system within gujarat-SLDC -In different states-RLDC of the region of consumer b) Medium term -Both within Gujarat- STU -Injection point in the distribution system within gujarat-STU -In different states-CTU

1. Open Access Customer connected to Distribution system a) Short term -Both within same DISCOM- Rs 2000 -Both within gujarat but different DISCOM-Rs 5000 -Injection point in the intra-state transmission system within Gujarat-Rs 5000 -In different states-As per CERC Regulation b) Medium term -Both within same DISCOM- Rs 25000 -Both within gujarat but different DISCOM-Rs 50000 -Injection point in the intra-state transmission system within gujarat-Rs 50000 -In different states-As per CERC Regulation c) Long term -Both within same DISCOM- Rs 25000 -Both within gujarat but different DISCOM-Rs 50000 -Injection point in the intra-state transmission system within gujarat-Rs 50000 2. Open Access Customer connected to Intra-State Trans sysem a) Short term -Both within Gujarat (in intra-state transmission system)- Rs 5000 -Injection point in the distribution system within gujarat-Rs 5000 -In different states-As per CERC Regulation b) Medium term -Both within Gujarat- Rs 25000 (for capacity < 100 MW) ; Rs 50000 ( for capacity >100 MW) -Injection point in the distribution system within gujarat-Rs 25000 (for capacity < 100 MW) ; Rs 50000 ( for capacity >100 MW) -In different states-As per CERC Regulation

Prepared by ABPS Infra

Page65/123

OPEN ACCESS

ANNEXURE-V
STATE-WISE OPEN ACCESS PROVISIONS

STATE

Intra-State Open Access Regulations (Y/N)

Andhra Pradesh Gujarat

Y Y

Nodal agency 1. Open Access Customer connected to Distribution system a) Short term a) Forwithin Long term open access-STU -Both same DISCOM - SLDC b) Forwithin Short gujarat term open -Both but access-SLDC different DISCOM -SLDC -Injection point in the intra-state transmission system within gujarat -SLDC -In different states-RLDC of the region of consumer b) Medium term and -Both within same DISCOM- SLDC -Both within gujarat but different DISCOM- STU -Injection point in the intra-state transmission system within gujarat- STU -In different states-CTU c) Long term -Both within same DISCOM- SLDC -Both within gujarat but different DISCOM- STU -Injection point in the intra-state transmission system within gujarat- STU 2. Open Access Customer connected to Intra-State Trans system a) Short term -Both within Gujarat (in intra-state transmission system)- SLDC -Injection point in the distribution system within gujarat-SLDC -In different states-RLDC of the region of consumer b) Medium term -Both within Gujarat- STU -Injection point in the distribution system within gujarat-STU -In different states-CTU c) Long term -Both within Gujarat- STU -Injection point in the distribution system within gujarat-STU -In different states-CTU 1. Intra-State Open Access- STU 2. Inter-State Open Access- CTU except RLDC for short term

Application fee 1. Open Access Customer connected to Distribution system (Rs) a) Short term a) Long term-Rs 10000 -Both within same DISCOM- Rs 2000 b) Short term-Rs 1000 -Both within gujarat but different DISCOM-Rs 5000 -Injection point in the intra-state transmission system within Gujarat-Rs 5000 -In different states-As per CERC Regulation b) Medium term -Both within same DISCOM- Rs 25000 -Both within gujarat but different DISCOM-Rs 50000 -Injection point in the intra-state transmission system within gujarat-Rs 50000 -In different states-As per CERC Regulation c) Long term -Both within same DISCOM- Rs 25000 -Both within gujarat but different DISCOM-Rs 50000 -Injection point in the intra-state transmission system within gujarat-Rs 50000 2. Open Access Customer connected to Intra-State Trans sysem a) Short term -Both within Gujarat (in intra-state transmission system)- Rs 5000 -Injection point in the distribution system within gujarat-Rs 5000 -In different states-As per CERC Regulation b) Medium term -Both within Gujarat- Rs 25000 (for capacity < 100 MW) ; Rs 50000 ( for capacity >100 MW) -Injection point in the distribution system within gujarat-Rs 25000 (for capacity < 100 MW) ; Rs 50000 ( for capacity >100 MW) -In different states-As per CERC Regulation c) Long term -Both within Gujarat- Rs 50000 (for capacity < 100 MW) ; Rs 100000 ( for capacity >100 MW) -Injection point in the distribution system within gujarat-Rs 50000 (for capacity < 100 MW) ; Rs 100000 ( for capacity >100 MW) -In different states-As per CERC Regulations

a) Short term- Rs 5000 b) Medium term- Rs 100000 c) Long term- Rs 200000

Haryana

Himachal Pradesh

For LT and MT OA a) At intra-state transmission system -STU b) At distribution system-SLDC. For Short term a) OA to intra-state transmission-SLDC b) OA in distribution system-concerned DISCOM

a) Short term- 5000 b) Medium term- Rs 1 lac upto 5MW and Rs 2 lac for 5 to 10 MW and Rs 6 lac above 10 MW c) Long term- Rs 2 lac upto 5MW and Rs 4 lac for 5 to 10 MW and Rs 6 lac above 10 MW

a)Long term OA-SLDC b) Short term-STU Jammu and Kashmir Y

Long Term :Rs 50000 for both open access in transmission and distribution Short Term: Rs 5000

Jharkhand

(i) The nodal agency for arranging the long term transmission/ distribution access shall be the State Transmission Utility or the Transmission Licensee or the Distribution Licensee whose system is used or is to be used for such long term access. (ii) The nodal agency for the short-term access shall be the State Load Despatch Centre.

Long term OA in transmission-Rs 25000 Long term OA in distribution-Rs 10000 Short term OA-Rs 5000

The nodal agency for arranging the long-term open access shall be the state transmission utility if its system is used; otherwise the nodal agency shall be the respective distribution licensee, within whose area the point of drawal is situated. Karnataka Y (2) For short term open access the nodal agency shall be the state load dispatch center.

Long term-Rs 5000 Short term-Rs 1000

A generating company or a licensee requiring open access shall apply to the respective licensee, whose transmission system/distribution system is intended to be used or immediately connected.

N.A

Kerala

Madhya Pradesh

Long term-STU Short term-SLDC Transmission Open Access-STU Distribution open access-Concerned Discom

Long term-Rs 50000 Short term-Rs 5000 Transmission OA-Rs 10000

Maharashtra

Manipur Y &Mizoram

For all Medium-Term and Long-Term Open Access : (a) STU for transactions for where the point of drawal or point of injection is located on the intra-state transmission network; (b) Otherwise the Distribution Licensee of the area where the point of drawal is located. For Short-Term Open Access transactions,: SLDC. 1. Open Access Customer connected to Distribution system a) Short term -Both within same DISCOM- Concerned DISCOM -Both within same state but different DISCOM-SLDC -Injection point in the intra-state transmission system within state-SLDC -In different states-RLDC of the region of consumer b) Medium term and Long term -Both within same DISCOM- Concerned DISCOM -Both within state but different DISCOM-STU -Injection point in the intra-state transmission system within state-STU -In different states-CTU

Short term-Rs 5000 Long term/Medium term-Rs 1 lakhs

Meghalaya

2. Open Access Customer connected to Intra-State Trans system a) Short term -Both within state(in intra-state transmission system)- SLDC -Injection point in the distribution system within state-SLDC -In different states-RLDC of the region of consumer b) Medium term and Long term -Both within state- STU -Injection point in the distribution system within state-STU -In different states-CTU

1. Open Access Customer connected to Distribution system a) Short term -Both within same DISCOM- Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW -Injection point in the intra-state transmission system within state-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW -In different states-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW b) Medium term -Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW -Different DISCOM-Rs 50000 upto 5MW and Rs 1 lakhs above 5MW Injection point in the intra-state transmission system within state-Rs 50000 and Rs 1 lac respectively -In different states-Rs 1 lacs c) Long term -Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW -Injection point in the intra-state transmission system within Arunachal-Rs 50000 and Rs 1 lac respectively -In different states-Rs 1 lacs 2. Open Access Customer connected to Intra-State Trans sysem a) Short term -Both within state (in intra-state transmission system)- Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW -Injection point in the distribution system within state-Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW -In different states-Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW b) Medium term -Both within state- Rs 100000 (for capacity >5MW) ; Rs 50000 ( for capacity < 5MW) -Injection point in the distribution system within state -Rs 100000 (for capacity > 5MW) ; Rs 50000 ( for capacity <5 MW) -In different states-Rs 1 lacs c) Long term -Both within state- Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW) -Injection point in the distribution system within state-Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW) -In different states-Rs 2 lacs

Prepared by ABPS Infra

Page66/123

1. Open Access Customer connected to Distribution system a) Short term -Both within same DISCOM- Concerned DISCOM -Both within same state but different DISCOM-SLDC -Injection point in the intra-state transmission system within state-SLDC -In different states-RLDC of the region of consumer b) Medium term and Long term -Both within same DISCOM- Concerned DISCOM -Both within state but different DISCOM-STU -Injection point in the intra-state transmission system within state-STU -In different states-CTU

OPEN ACCESS

STATE-WISE OPEN ACCESS PROVISIONS

Meghalaya STATE

Y Intra-State Open Access Regulations (Y/N)

2. Open Access Customer connected to Intra-State Trans system a) Short term -Both within state(in intra-state transmission system)- SLDC agency -Injection point in the distribution system withinNodal state-SLDC -In different states-RLDC of the region of consumer b) For Medium and Long term a) Long term term open access-STU -Both STU access-SLDC b) Forwithin Short stateterm open -Injection point in the distribution system within state-STU -In different states-CTU

1. Open Access Customer connected to Distribution system a) Short term -Both within same DISCOM- Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW -Injection point in the intra-state transmission system within state-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW -In different states-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW b) Medium term -Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW -Different DISCOM-Rs 50000 upto 5MW and Rs 1 lakhs above 5MW Injection point in the intra-state transmission system within state-Rs 50000 and Rs 1 lac respectively -In different states-Rs 1 lacs c) Long term -Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW -Injection point in the intra-state transmission system within Arunachal-Rs 50000 and Rs 1 lac respectively -In different states-Rs 1 lacs

ANNEXURE-V

2. Open Access Customer connected to Intra-State TransApplication sysem fee a) Short term (Rs) -Both within state (in intra-state transmission system)- Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW -Injection point in10000 the distribution system within state-Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW a) Long term-Rs -InShort different states-Rs b) term-Rs 100010000 and Rs 5000 resp for upto 5 MW and above 5MW b) Medium term -Both within state- Rs 100000 (for capacity >5MW) ; Rs 50000 ( for capacity < 5MW) -Injection point in the distribution system within state -Rs 100000 (for capacity > 5MW) ; Rs 50000 ( for capacity <5 MW) -In different states-Rs 1 lacs c) Long term -Both within state- Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW) -Injection point in the distribution system within state-Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW) -In different states-Rs 2 lacs

Andhra Pradesh

For all Medium-Term and Long-Term Open Access : (a) STU for transactions for where the point of drawal or point of injection is located on the intra-state transmission network; (b) Otherwise the Distribution Licensee of the area where the point of drawal is located. For Short-Term Open Access transactions,: SLDC.

Long term-Rs 10000 Short term-Rs 1000

Nagaland

The nodal agency for arranging long-term open access shall be the STU if the transmission system is Long term transmission OA-Rs 1 lakhs used; otherwise the nodal agency shall be the respective distribution licensee within whose area the Long term distribution OA-Rs 50000 point of drawl is situated. Short term OA-Rs 5000 For short-term open access transactions, the nodal agency for receiving and processing applications shall be the State Load Despatch Centre (SLDC). Orissa Y

1. Open Access Customer connected to Distribution system a) Short term -Both within same DISCOM- Concerned DISCOM -Both within same state but different DISCOM-SLDC -Injection point in the intra-state transmission system within state-SLDC -In different states-RLDC of the region of consumer b) Medium term and Long term -Both within same DISCOM- Concerned DISCOM -Both within state but different DISCOM-STU -Injection point in the intra-state transmission system within state-STU -In different states-CTU Punjab Y

1. Open Access Customer connected to Distribution system a) Short term -Both within same DISCOM- Rs 2000 -Injection point in the intra-state transmission system within state-Rs 5000 -In different states-As per CERC Regulations b) Medium term and Long term -Both within same DISCOM- Rs 50000 Injection point in the intra-state transmission system within state-Rs 1 lakhs -In different states-As per CERC Regulations

2. Open Access Customer connected to Intra-State Trans system a) Short term -Both within state(in intra-state transmission system)- SLDC -Injection point in the distribution system within state-SLDC -In different states-RLDC of the region of consumer b) Medium term and Long term -Both within state- STU -Injection point in the distribution system within state-STU -In different states-CTU

2. Open Access Customer connected to Intra-State Trans sysem a) Short term -Both within state (in intra-state transmission system)- Rs 5000 -Injection point in the distribution system within state-Rs 5000 -In different states-As per CERC Regulations b) Medium term -Both within state- Rs 1 lakh -Injection point in the distribution system within state -Rs 1 lakh -In different states-As per CERC Regulations c) Long term -Both within state- Rs 2 lakh -Injection point in the distribution system within state-Rs 2 lakh -In different states-As per CERC Regulations

Long term/Short term-STU

Long term- Rs50000 Short term-Rs 5000

Rajasthan

N.A Sikkim N.A Long term-STU Short term-SLDC

N.A

Long Term OA a) For conventional generators-Rs 5000 b) for non-conventional generators- Rs 200/MW subject to maximum of Rs 5000 Short term OA= Rs 1000

Tamil Nadu

Tripura

Uttarakhand

The Nodal Agency for arranging long-term open access shall be the state transmission utility if its system is used; otherwise the Nodal agency shall be the respective distribution licensee, within whose area the point of drawal is 1. Open Access Customer connected to 66kV or below a) Short term -Both within same DISCOM- Concerned DISCOM -Both within same state but different DISCOM-SLDC -Injection point in the intra-state transmission system within state-SLDC -In different states-RLDC of the region of consumer b) Medium term and Long term -Both within same DISCOM- Concerned DISCOM -Both within state but different DISCOM-STU -Injection point in the intra-state transmission system within state-STU -In different states-CTU

Long term OA-Rs 5000 Short Term OA-Rs 1000

1. Open Access Customer connected to 66kV or below a) Short term Both within same DISCOM- Rs 2000 -Both within same state but different DISCOM-Rs 5000 -Injection point in the intra-state transmission system within state-Rs 5000 -In different states-Rs 5000 b) Medium term and Long term -Both within same DISCOM- Rs 50000 -Both within state but different DISCOM-Rs 1 lakh -Injection point in the intra-state transmission system within state-Rs 1 lakh -In different states-Rs 1 lakh 2. Open Access Customer connected to 132 kV or above a) Short term -Both within state(in intra-state transmission system)- Rs 5000 -Injection point in the distribution system within state-Rs 5000 -In different states-Rs 5000 b) Medium term -Both within state- Rs 1 lakh -Injection point in the distribution system within state-Rs 1 lakh Short term-Rs 5000 Long term/Medium term-Rs 50000-1 lakhs

2. Open Access Customer connected to 132 kV or above a) Short term -Both within state(in intra-state transmission system)- SLDC -Injection point in the distribution system within state-SLDC -In different states-RLDC of the region of consumer b) Medium term and Long term -Both within state- STU -Injection point in the distribution system within state-STU Long term-STU Short term-SLDC

Prepared by ABPS Infra Uttar Pradesh

Page67/123

OPEN ACCESS

ANNEXURE-V
STATE-WISE OPEN ACCESS PROVISIONS

STATE

Intra-State Open Access Regulations (Y/N)

Long term-STU Short term-SLDC a) For Long term open access-STU b) For Short term open access-SLDC

Nodal agency

Short term-Rs 5000 Long term/Medium term-Rs 50000-1 lakhs a) Long term-Rs 10000 b) Short term-Rs 1000

Application fee (Rs)

Uttar Pradesh

Andhra Pradesh

West Bengal

The Nodal Agency for arranging the Long Term Open Access within the State shall be the STU if its system 1. Both source and drawl within WB is used. Otherwise, the Nodal Agency shall be the Transmission or the Distribution Licensee in whose a) Cogeneration and Renewable system the point of drawal of electricity is located; i) Long term-Rs 50000 ii) Short Term-Rs 5000 The Nodal Agency for Short Term Open Access and open access for emergency requirement and trial run 2. Both source and Drawl outside WB within the state shall be the SLDC. a) Cogeneration and renewable i) Long term-Rs 50000 ii) Short term-Rs 5000

Goa

Long term-STU Short term-SLDC Long term-STU Short term-SLDC Long term-STU Short term-SLDC Long term-STU Short term-SLDC Long term-STU Short term-SLDC Long term-STU Short term-SLDC Long term-STU Short term-SLDC Long term-STU Short term-SLDC

Long term-Rs 50000 Short term-Rs 5000 Long term-Rs 50000 Short term-Rs 5000 Long term-Rs 50000 Short term-Rs 5000 Long term-Rs 50000 Short term-Rs 5000 Long term-Rs 50000 Short term-Rs 5000 Long term-Rs 50000 Short term-Rs 5000 Long term-Rs 50000 Short term-Rs 5000 Long term-Rs 50000 Short term-Rs 5000

Union Territories

Andaman Nicobar

Chandigargh

Dadra and Nagar Haveli

Daman & Diu

Lakshadweep

Pondicherry

Prepared by ABPS Infra

Page68/123

OPEN ACCESS

Applicable Charges and losses

Transmission charges and losses

Cross-subsidy surcharge The CSS surcharge for HT Industrial Tariff for various DISCOMs are: 1. At 11 kVa) CPDCL-Rs 1.88 /unit b) EPDCL- Rs 2.18/unit c) NPDCL-Rs 1.71/unit d) SPDCL-Rs 1.58/unit 2. At 33 kV a) CPDCL-Rs 1.72 /unit b) EPDCL- Rs 2..00/unit c) NPDCL-Rs 1.78/unit d) SPDCL-Rs 1.69/unit 3. At 132 kV and above a) CPDCL-Rs 1.43 /unit b) EPDCL- Rs 2..26/unit c) NPDCL-Rs 1.70/unit d) SPDCL-Rs 2.28/unit (Detailed list of charges for various consumers are summarised under Page 20 of the Reference Order

Wheeling charges SOLAR : (Extract of Solar Policy):There will be no wheeling and transmission charges for wheeling of powergenerated from the Solar Power Projects , to the desired location/s for captive use/third party sale within the state through 33 KV system subject to industries maintaining their demand within its contracted demand. However, wheeling and transmission charges for wheeling of power generated from the Solar Power Projects for sale outside the state will be as per APERC regulations

Banking provisions The Wind Power Projects are not eligible for Banking of Energy. The Energy generated by captive generating plants, if not consumed during the billing month, would be deemed to have been sold to respective DISCOM and the DISCOM may pay for such unutilized energy at the rate of 85% of the tariff as amended

a) For FY 2012-13- Rs 65.50/kW/month Transmission losses (in kind)= 4.06% b) For FY 2013-14- Rs 61.03/kW/month Losses-4.02%

N.A

N.A

N.A

Banking of Power shall not be allowed without prior permission of the State Government.

To be determined on case to case basis Transmission losses=4.25% for FY 2012-13 Long term Transmission charges for FY 2010-11=70 paisa/unit Short Term Transmission charges=Rs 8736.65/ MW/day (charges shall be applicable till next Order by the Commission)

The following information, Voltage wise Distribution cost 33 kV, 11 kV, LT 3-Phase and LT 1-Phase Voltage wise Losses at distribution voltages Energy input and energy sales at different voltages 33 kV, 11 kV, LT-3 Phase & 1-Phase is required to compute the wheeling charges, which the APDCL should submit at the earliest. The Commission will determine the wheeling charges after receiving the above data from APDCL.

Developers can avail of the facility of banking of energy within fixed period spans of 6 months. All terms and conditions of the banking shall be incorporated in banking agreement to be drawn with the IPPs/Users society. This shall be approved, as may be required, by the regulator.

Long Term charges=53310/MW/month Short Term Charges: Rs 438.16/MW/day Transmission losses=4% in kind

For 132 kV consumers = 60 Ps./kWh. For 33 kV consumers (other than HTSS) = 54 Ps./kWh. For 11 kV consumers (other than HTSS) = 52 Ps./kWh For HTSS consumers 33 kV = 0 Ps./kWh For open access consumers procuring power from renewable energy based power generating plant, the cross subsidy surcharge payable shall be 50% of the cross subsidy surcharge determined for that year. a) For EHT consumers Rs 0.654 per unit (which is 50% of the computed value of Rs 1.309 per unit). b) For HT consumers Rs 0.379 per unit (which is 50% of the computed value of Rs 0.758 per unit).

At 33 kV:10.81 paisa/unit, losses of 6% in kind At 11 kV:12.64 pasia/unit; losses of 8% in kind

N.A

The charges related to transmission and wheeling shall be 6 % of the energy input into the system for the consumer using State grid for procuring power from renewable energy based power generating stations located in the State. Other than these charges, they shall not be required to pay any transmission charges or wheeling charges either in cash or kind.

The charges related to transmission and wheeling shall be 6 No banking facility for supply of Renewable energy sources through Open Access % of the energy input into the system for the consumer using State grid for procuring power from renewable energy based power generating stations located in the State. Other than these charges, they shall not be required to pay any transmission charges or wheeling charges either in cash or kind.

No cross-subsidy for renewable energy projects

Wheeling charges for FY 2012-13 for various DISCOMS are: A. At LT level 1) BRPL-88.88 paisa/unit 2) BYPL-97.99 paisa/unit 3) TPDDL-78.72 paisa/unit B. At 11 kV 1) BRPL-10.15 paisa/unit 2) BYPL-12.06 paisa/unit 3) TPDDL-50.96paisa/unit C. At 33/66 kV 1) BRPL-0.43 paisa/unit 2) BYPL-2.36 paisa/unit 3) TPDDL-15.01 paisa/unit D. Above 66 kV level Zero wheeling charges

However, no banking facility shall be provided for supply of electricity from renewable energy sources through open access.

Transmission chargers for FY 2012-13=2720 MW/day Transmission losses=3.85%

No Cross Subsidy for Solar. 1. SOLAR PROJECTS: No banking shall be allowed in case of third party sale. The energy wheeled is required to be consumed in No Cross subsidy for wind not availing REC benefit, and CSS would A) Wheeling at consumption site at 66 kV and above: Normal the same time block. Any unutilized energy is to be considered as sale to the utility and for the same the be applicable in case of REC benefit distribution licensee should pay 85% of the tariff determined by the Commission. transmission charges and losses( B) At consumption site below 66 kV: ( normal charges plus transmission and wheeling loss @ 7%. C) Wheeling at 11kV and above and below 66 kV - within same DISCOM: distribution loss of 3% in kind -different DISCOM: normal transmission charges and T&D loss of 10% of energy fed. D) Wheeling at 415 V or below:No wheeling charges 2. WIND PROJECTS A) Wheeling at consumption site at 66 kV and above: Normal transmission charges and losses( B) At consumption site below 66 kV: -( normal charges plus transmission and wheeling loss @ 10%. -For small investors, with only one WEG in the state: normal charges plus transmission and wheeling loss @ 7%. c)

Prepared by ABPS Infra

Page69/123

OPEN ACCESS

Applicable Charges and losses

Transmission charges and losses Transmission chargers for FY 2012-13=2720 MW/day Transmission losses=3.85% a) For FY 2012-13- Rs 65.50/kW/month Transmission losses (in kind)= 4.06% b) For FY 2013-14- Rs 61.03/kW/month Losses-4.02%

Cross-subsidy surcharge No Cross Subsidy for Solar. No Cross subsidy for wind not availing REC benefit, and CSS would The CSS surcharge Industrial be applicable in casefor of HT REC benefit Tariff for various DISCOMs are: 1. At 11 kVa) CPDCL-Rs 1.88 /unit b) EPDCL- Rs 2.18/unit c) NPDCL-Rs 1.71/unit d) SPDCL-Rs 1.58/unit 2. At 33 kV a) CPDCL-Rs 1.72 /unit b) EPDCL- Rs 2..00/unit c) NPDCL-Rs 1.78/unit d) SPDCL-Rs 1.69/unit 3. At 132 kV and above a) CPDCL-Rs 1.43 /unit b) EPDCL- Rs 2..26/unit c) NPDCL-Rs 1.70/unit d) SPDCL-Rs 2.28/unit (Detailed list of charges for various consumers are summarised under Page 20 of the Reference Order

Wheeling charges 1. SOLAR PROJECTS: A) Wheeling at consumption site at 66 kV and above: Normal SOLAR : transmission charges and losses( (Extract of Solar Policy):There will be no (wheeling and B) At consumption site below 66 kV: normal charges plus charges for wheeling of powergenerated from the transmission and wheeling loss @ 7%. Solar Power Projects to the desired location/s for captive C) Wheeling at 11kV, and above and below 66 kV use/third partyDISCOM: sale within the state through 33 KV system subject within same distribution loss of 3% in kind to industries maintaining their demand within its contracted -different DISCOM: normal transmission charges and T&D loss of demand. 10% of energy fed. However, wheeling and transmission charges for wheeling of D) Wheeling at 415 V or below:No wheeling charges power generated from the Solar Power Projects for sale outside the state will be as per APERC regulations 2. WIND PROJECTS A) Wheeling at consumption site at 66 kV and above: Normal transmission charges and losses( B) At consumption site below 66 kV: -( normal charges plus transmission and wheeling loss @ 10%. -For small investors, with only one WEG in the state: normal charges plus transmission and wheeling loss @ 7%. c)

Banking provisions No banking shall be allowed in case of third party sale. The energy wheeled is required to be consumed in the same time block. Any unutilized energy is to be considered as sale to the utility and for the same the The Wind Power Projects are not eligible for Banking of Energy. The Energy generated by captive distribution licensee should pay 85% of the tariff determined by the Commission. generating plants, if not consumed during the billing month, would be deemed to have been sold to respective DISCOM and the DISCOM may pay for such unutilized energy at the rate of 85% of the tariff as amended

Transmission Tariff for short term: 21 paisa/kWh Transmission loss:2.5%

1. For HT industry: 92 paisa/unit 2. For NDS HT: 80 paisa/unit 3. Bulk Supply other than domestic: 92 paisa/unit 4. Railways: 78 paisa/unit (CSS not applicable to captive generators and seeking open access for self consumption)

Wheeling Charges for FY 2012-13: 51 paisa/unit

The banking facility shall be allowed for a period of one year by the Licensee/ Utilities free of cost. However, withdrawal of banked power should be allowed only during non-peak hours. If the banked energy is not utilized within a period of twelve months from the date of power banked with the concerned power utilities/ licensee, it will automatically lapse and no charges shall be paid in lieu of such power.

Short term transmission charges=2.15 paisa/kWh Long Term/Medium Term transmission charges=Rs 11157/MW/month

EHT level (>66 kV): 47 paisa/unit HT level (>11kV): 110 paisa/unit LT level (<11 kV): 231 paisa/unit ( As per Hydro policy: Wheeling for captive use within the State shall be allowed by HPSEB at a fee of 2% (including system losses). For sale/captive use of power outside the State the HPSEB shall levy wheeling charges @ 10% (including system losses) of the energy received (excluding royalty) at the interconnection point for wheeling/transfer of power up to the mutually agreed inter-state point.) Nil For distribution (Wheeling) Rs.1396.00/day. Distribution Loses (HV) 5%

As per hydro policy, Banking of energy will also be allowed by the HPSEB as per prevailing rules and regulations. Further, Third party sale of power within the State shall not be allowed

ST rate for FY 2012-13: Charges Rs.496.00/day. Transmission Losses (EHV) 5%

The Wind Power Generators are eligible for one month banking for the electricity generated during the month. However, they are eligible to utilize the same during the month in proportion to the energy generated during peak and normal hours period. No banking facility for third party open access Jharkhand does not have a Renewable Policy as yet to deal with this issue. But it is recommended that facility for 100% banking of generated power is allowed on the condition that banked power will not be returned by more than a fixed quantity at one time. Utilities should facilitate banking though proper arrangement so that power banked during off-peak period is not drawn during peak season.

Renewable energy based power generation projects in Jharkhand are exempted from open access charges as per Government of Jharkhand notified the Industrial Policy in the year 2001, slient features of which is reproduced in the Wind Regulations. However wind Regulations allows only a 50% discount on wheeling charges and other surcharge on wheeling charges applicable to conventional form of generation shall be applicable for wind generation projects in Jharkhand.

Nil

66 kV and above: a) HT-2a: 43 paisa/unit b) HT-2b- 205 paisa/unit HT level-11kV/33kV: a) HT-2a: 11 paisa/unit b) HT-2b: 173 paisa/unit

Total wheeling charges through distribution/tranmission network= 5% in kind. No charges for solar

2% Banking charges for wind and small hydro. No charges for Solar

Transmission charge: 22 paisa/unit Transmission loss at EHT level:3%

EHT-66 kV: 11 paisa/kWh EHT-110kV: 0.00 paisa/kWh Railways: 24 paisa/kWh HT I Industrial: Rs 0.00/kWh HT II Non-Industrial: 49 paisa/kWh HT-IV Commercial: Rs 2.55/kWh

Wheeling charge: 26 paisa/unit

In case of captive generating plants with seasonal generation or infirm generation such as small hydel projects or wind, the distribution licensee may provide adequate facilities for banking of surplus power, provided such captive generating plants agree to pay banking charges. Provided that such banking shall not be allowed if such plants sell energy to other persons. Provided further that it shall not be the obligation of the distribution licensee to allow banking in cases where control over the fuel supply is possible or in cases where scheduling and dispatch is possible. (Banking charges shall be 5% of the energy banked and banking period shall be of 8 months starting from 1st of June every year. Withdrawal of banked energy shall be done on slot to slot basis within monthly billing cycle as follows. (a) Peak hour generation with peak hour consumption (b) Off peak hour generation with off peak hour consumption (c) Normal hour generation with normal hour consumption.

N.A(These charges shall be determined by the Commission as and when the situation arises, in light of relevant Long term or medium term= 213.39 Rs/kW/month Short/collective/renewable = 0.29 Rs/kWh Transmission loss =4.24%

Railways-Rs 1.14 /unit (However, in case (e.g. Public Water Works, Other than Irrigation, Bulk Residential Users, Bulk Supply to Exemptees etc., CSS is zero) 25% of the applicable CSS for open access consumer purchasing power from renewable sources of energy.

The Distribution Company in whose area the energy is consumed (irrespective of the point of injection) shall deduct 2% of the Banking of 100% allowed subject to following conditions: energy injected towards wheeling charges in terms of units.The Wheeling Charges Banking available for self use and third party wheeling for period of 1 year LT Network RInfra-D 0.88 Rs/kWh MSEDCL - 0.36 Rs/kWh TPC-D - 0.38 Rs/kWh HT Network RInfra-D - 0.46 Rs/kWh MSEDCL (11 kV) - 0.21 Rs/kWh MSEDCL (33 kV) - 0.04 Rs/kWh TPC-D - 0.19 Rs/kWh Regulatory Process underway for determination of such charges as mentioned in the Retail Tariff Order for FY 2012-13 No Provisions specified

Retail Tariff Order for FY 2012-13 mentions that the Regulatory Process is underway for determination of such charges

Retail Tariff Order for FY 2012-13 mentions that the Regulatory Process is underway for determination of such charges

Rs 7768/MW/day which shall be equivalent to paise 32.40 per Kwh.

The cross subsidy surcharge for IEHT is @ paise 41 per Kwh. The Cross subsidy surcharge for IHT consumers is @ paise 68 per Kwh.

Rs 23008/MW/Day.

No Provisions specified yet

Prepared by ABPS Infra

Page70/123

Rs 7768/MW/day which shall be equivalent to paise 32.40 per Kwh.

The cross subsidy surcharge for IEHT is @ paise 41 per Kwh. The Cross subsidy surcharge for IHT consumers is @ paise 68 per Kwh.

Rs 23008/MW/Day. OPEN ACCESS

No Provisions specified yet

Applicable Charges and losses

Transmission charges and losses

Cross-subsidy surcharge The CSS surcharge for HT Industrial Tariff for various DISCOMs are: 1. At 11 kVa) CPDCL-Rs 1.88 /unit b) EPDCL- Rs 2.18/unit c) NPDCL-Rs 1.71/unit d) SPDCL-Rs 1.58/unit 2. At 33 kV a) CPDCL-Rs 1.72 /unit b) EPDCL- Rs 2..00/unit c) NPDCL-Rs 1.78/unit d) SPDCL-Rs 1.69/unit 3. At 132 kV and above Not specified a) CPDCL-Rs 1.43 /unit b) EPDCL- Rs 2..26/unit c) NPDCL-Rs 1.70/unit d) SPDCL-Rs 2.28/unit (Detailed list of charges for various consumers are summarised under Page 20 of the Reference Order

Wheeling charges SOLAR : (Extract of Solar Policy):There will be no wheeling and transmission charges for wheeling of powergenerated from the Solar Power Projects , to the desired location/s for captive use/third party sale within the state through 33 KV system subject to industries maintaining their demand within its contracted demand. However, wheeling and transmission charges for wheeling of power generated from the Solar Power Projects for sale outside the state will be as per APERC regulations

Banking provisions The Wind Power Projects are not eligible for Banking of Energy. The Energy generated by captive generating plants, if not consumed during the billing month, would be deemed to have been sold to respective DISCOM and the DISCOM may pay for such unutilized energy at the rate of 85% of the tariff as amended

a) For FY 2012-13- Rs 65.50/kW/month Transmission losses (in kind)= 4.06% b) For FY 2013-14- Rs 61.03/kW/month Losses-4.02%

Provision as in RE Regulations A person, who has established the RE based Generating Stations or Co-generating Stations, shall have right to nondiscriminatory open access to the State Transmission System for carrying electricity from his plant by using transmission lines and associated facilities subject to payment of transmission charges and adjustment of average Transmission Losses in kind as determined by the Commission. (Transmission Charges and losses yet to be determined)

Not specified

Banking has been defined in the RE Regulations. No specic period specified

CESU/NESCO/WESCO/SOUTHCO- Rs 1500/MW/day or Rs 62.5 MWh Losses-3.8%

For HT consumers: CESU-101 paisa/unit NESCO-55 paisa/unit WESCO-76 paisa/unit SOUTHCO-165 paisa/unit For EHT concumers: CESU-197 paisa/unit NESCO-157 paisa/unit WESCO-158 paisa/unit SOUTHCO-276 paisa/unit (No cross-subsidy surcharge for purchase from Renewable sources) Large supply - 88 paisa/unit Domestic supply - 85 paisa/unit Non-Residential supply - 107 paisa/unit Bulk supply - 63 paisa/unit Railway traction - 107 paisa/unit

Wheeling charges: CESU-78.09paisa/unit NESCO-81.29paisa/unit WESCO-61.3 paisa/unit SOUTHCO-99.94 paisa/unit Wheeling losses:8%

No specific Provision as per RE Regulations

Transmission and Wheeling charges: In case of wheeling of power generated from NRSE project, transmission and wheeling charges shall be levied @ 2% of the energy injected into the State Grid, irrespective of the distance i.e. additional 2% of the total energy shall be injected at injection point(s). 10% of the average revenue realized by distribution licensee from such additional injection shall be passed on to the STU/Transmission licensee for compensating on account of transmission charges. Transmisssion losses: at 132/220 kV-2.5% at 66/33 kV-2.5% at 11 kV-2.5%

Wheeling charges: In case of wheeling of power generated from No specific Provision as per RE Regulations NRSE project, transmission and wheeling charges shall be levied @ 2% of the energy injected into the State Grid, irrespective of the distance i.e. additional 2% of the total energy shall be injected at injection point(s). 10% of the average revenue realized by distribution licensee from such additional injection shall be passed on to the STU/Transmission licensee for compensating on account of transmission charges. Distribution losses: at 132/220 kV-Nil at 66/33 kV-2.39% at 11 kV-6.36%

Note: As per draft amendment proposed as published on November 12, 2012 the above provision of wheeling charges are applicable to RE sale within the State. For RE sale outside the State, full wheeling and transmission charges shall apply Transmission Charges: Long Term Charges: 146.61 Rs/kW/month Short term charges: 32.07 paise/kWh Transmission Loss: 4.20%

Note: As per draft amendment proposed as published on November 12, 2012 the above provision of wheeling charges are applicable to RE sale within the State. For RE sale outside the State, full wheeling and transmission charges shall apply

Renewable Energy transactions exempted from payment of Cross Subsidy Surcharge (as per RERC Tariff Regulations)

Wheeling Charge & loss: EHV- 0.01 Rs/kWh & 0% loss 33 kV - 0.11 Rs/kWH & 3.80% loss 11 kV - 0.32 Rs/kWh & 0.32% loss

(As per RERC Tariff Regulations) (2) Period of banking; (a) In respect of third party sale and/or captive use of non firm energy, the banking and drawal shall be on six monthly basis i.e. April to September and October to March. However, during the months of December, January & February utilisation of the banked energy shall not be permitted. (b) For firm energy from biomass power plants banking and drawal be accounted for in the same month.

N.A

N.A

N.A

N.A

(Wind Tariff Order) The Commission has decided to fix 40% (Wind TO) Cross-subsidy surcharge for RE power shall be 50% as of the that applicable for the conventional power source transmission charges and 40% of the wheeling charges as applicable to the conventional power to the Wind power. Apart from these charges, the WEGs shall have to bear the actual line losses in kind as specified in the respective orders of the Commission and amended from time to time. (Biomass Tariff Order) The Commission has decided to fix 50% of the transmission charges and 50% of the wheeling charges as applicable to the conventional power to other nonconventional sources of poewr. Apart from these charges, the generators shall have to bear the actual line losses in kind as specified in the respective orders of the Commission and amended from time to time.

(Wind Tariff Order) The Commission has decided to fix 40% of the transmission charges and 40% of the wheeling charges as applicable to the conventional power to the Wind power. Apart from these charges, the WEGs shall have to bear the actual line losses in kind as specified in the respective orders of the Commission and amended from time to time. (Biomass Tariff Order) The Commission has decided to fix 50% of the transmission charges and 50% of the wheeling charges as applicable to the conventional power to other non-conventional sources of poewr. Apart from these charges, the generators shall have to bear the actual line losses in kind as specified in the respective orders of the Commission and amended from time to time.

(wind TO) Banking Period: April1st to March 31st of the following year. Banking charge: Rs. 0.94 Rs/kWh for FY 2012-13 = Difference of Average cost of purchase from trader for past two financial years as published by CERC (Rs 4.45 per kWh) and the maximum preferential tariff (Rs 3.51 per kWh)- applicable till 31st March 2013. From 1st April 2013, banking charges to be computed and published by TANGEDCO on the same principle. Treatment of excess unutilised banked energy: Considered as sale to Discom @ 75% of the retail tariff. For REC based projects, such excess energy left unutilised at end of banking period get lapsed

As per Tariff Order

Third Party Sale from renewable energy sources shall be exempted from the crosssubsidy surcharge determined by the Commission from time to time. Unless determined otherwise by the Commission in the respective years tariff order, no cross subsidy surcharge or additional surcharge shall be payable by the consumers seeking open access to transmission and/or distribution system.

No generator shall be allowed the facility of banking the electricity generated by them, nor will such facility be extended to any open access customers. As per Tariff Order Banking provisions stipulated in the RE Regulations for the State. (1) Applicable only in case of Captive generating plants (2) Banking allowed only during the period 17 hrs to 22 hrs; Withdrawl allowed only during the period other than the period 17 hrs to 22 hrs. (3) A Generating Station shall be allowed to withdraw power that was banked during a particular financial year in the same year or during the following financial year. (4) Banking charges shall be 12.5% of the energy banked (5) The banked power remaining unutilized on the expiry of the following financial year would be treated as sale and the financial settlement shall be made at the generic tariff for the year during which the power was banked. No banking charges shall be deducted from such unutilized banked energy. (6) Banking charges shall be 12.5% of the energy banked

NIL as per retail Tariff Orders Transmission Charges Long term: At 132 kV level : 0.176 Rs/kWh above 132 kV level: 0.132 Rs/kWh Short Term: At 132 kV level : 0.05 Rs/kWh above 132 kV level: 0.04 Rs/kWh Loss : 3.63% (FY 2012-13) Prepared byTransmission ABPS Infra

Common for all DISCOMs Connected at 11 kV: Long term - Rs. 0.527 / kWh Short term - Rs 0.132 /kWh Connected above 11 kV: Long term - Rs. 0.329 / kWh Short term - Rs 0.082 /kWh Page71/123

a) Banking of energy upto 100%, as agreed between the plant and the distribution licensee, shall be allowed during the the period 17:00 hrs. to 22:00 Hrs . (specified as peak hours for this purpose). b. Withdrawal of power shall be allowed only during the period other than 17:00 hrs. to 22:00 Hrs. c. The plants shall provide ABT compliant Special Energy Meters and the monthly settlement of energy sales shall be done based on: i. Power supplied during the peak hours as per SEM meter readings ii. Power banked as per daily schedules given for banking of power during the month. The lower of the two shall be considered as banked power and monthly settlement shall be done for the balance energy supplied by the plant at the rate specified for supply of electricity to distribution licensee. Provided that till implementation of intra-state ABT in the state of Uttar Pradesh, lower of the Power supplied during the peak hours as per SEM meter readings and the power banked as per the declaration given by the generating plant shall be considered as banked power. d. Upon introduction of intra-state ABT in the state of Uttar Pradesh, the banking as well as withdrawal of banked energy shall be subject to day ahead scheduling.

OPEN ACCESS

Applicable Charges and losses

Transmission charges and losses Transmission Charges Long term: a) Rs Rs/kWh 65.50/kW/month At For 132 FY kV 2012-13level : 0.176 Transmission (in kind)= 4.06% above 132 kV losses level: 0.132 Rs/kWh b) For FY 2013-14- Rs 61.03/kW/month Losses-4.02% Short Term: At 132 kV level : 0.05 Rs/kWh above 132 kV level: 0.04 Rs/kWh Transmission Loss : 3.63% (FY 2012-13)

Cross-subsidy surcharge NIL as per retail Tariff Orders The CSS surcharge for HT Industrial Tariff for various DISCOMs are: 1. At 11 kVa) CPDCL-Rs 1.88 /unit b) EPDCL- Rs 2.18/unit c) NPDCL-Rs 1.71/unit d) SPDCL-Rs 1.58/unit 2. At 33 kV a) CPDCL-Rs 1.72 /unit b) EPDCL- Rs 2..00/unit c) NPDCL-Rs 1.78/unit d) SPDCL-Rs 1.69/unit 3. At 132 kV and above a) CPDCL-Rs 1.43 /unit b) EPDCL- Rs 2..26/unit c) NPDCL-Rs 1.70/unit d) SPDCL-Rs 2.28/unit (Detailed list of charges for various consumers are summarised under Page 20 of the Reference Order

Wheeling charges Common for all DISCOMs SOLAR : at 11 kV: Connected (Extract of Solar Policy):There Long term Rs. 0.527 / kWh will be no wheeling and transmission charges wheeling of powergenerated from the Short term - Rs 0.132 for /kWh Solar Power Projects , to the desired location/s for captive use/third party sale 11 within Connected above kV:the state through 33 KV system subject to industries maintaining their demand within its contracted Long term - Rs. 0.329 / kWh demand. Short term - Rs 0.082 /kWh However, wheeling and transmission charges for wheeling of power generated from the Solar Power Projects for sale outside the state will be as per APERC regulations

Banking provisions a) Banking of energy upto 100%, as agreed between the plant and the distribution licensee, shall be allowed during the the period 17:00 hrs. to 22:00 Hrs . (specified as peak hours for this purpose). The Wind Power Projects are not eligible for Banking of period Energy. Thethan Energy generated by captive b. Withdrawal of power shall be allowed only during the other generating plants, if Hrs. not consumed during the billing month, would be deemed to have been sold to 17:00 hrs. to 22:00 respective DISCOM and the DISCOM may pay forEnergy such unutilized energy at the rate of 85% of tariff as c. The plants shall provide ABT compliant Special Meters and the monthly settlement of the energy amended sales shall be done based on: i. Power supplied during the peak hours as per SEM meter readings ii. Power banked as per daily schedules given for banking of power during the month. The lower of the two shall be considered as banked power and monthly settlement shall be done for the balance energy supplied by the plant at the rate specified for supply of electricity to distribution licensee. Provided that till implementation of intra-state ABT in the state of Uttar Pradesh, lower of the Power supplied during the peak hours as per SEM meter readings and the power banked as per the declaration given by the generating plant shall be considered as banked power. d. Upon introduction of intra-state ABT in the state of Uttar Pradesh, the banking as well as withdrawal of banked energy shall be subject to day ahead scheduling. e. The power withdrawn by the plant as ascertained by SEM readings, which could not be considered as withdrawal from banked power, shall be considered as power purchased by the plant. A Generating Plant shall be allowed to withdraw power that was banked during a particular financial year in the same year or during the following financial year.

(RE Regulations, 2010) Transmission charges payable for open access availed by cogeneration and renewable energy sources shall be two-third of the rate of such charges applicable for open access customers for long term and short term open access as determined in relevant tariff order

Wheeling charges applicable for use of distribution system or associated facilities of a licensee by open access customers for conveyance of electricity from cogeneration and renewable energy sources shall be either onethird of the wheeling charges calculated as per tariff order under Tariff Regulations or cost of 7.5% of the energy fed to the grid irrespective of the distance of wheeling, whichever is higher

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Yet to be specified

Prepared by ABPS Infra

Page72/123

OPEN ACCESS

Reference Open Access Regulation AP98R05080605

Reference for Open Access Charges AP98O05261012 AP03Z05260912 AP98O05200309

Reference for Banking provisions AP01Z05110408

AR98A05170812

AR08Z99240108

AS98R05010805

AS98O05160511 AS98O05160511

AS08Z05000312

BR98R05200506

BR98O05300312

CG98R05040311

CG98O05280412

CG98R05040311

DL98R05030111

DL98R05011012 DL98O05130712

DL98R05011012

GJ98R05010611

GJ98O05070412 GJ01O05080812 GJ03O05270112

GJ01O05080812 GJ03O05270112

Prepared by ABPS Infra

Page73/123

OPEN ACCESS

Reference Open Access Regulation GJ98R05010611 AP98R05080605

Reference for Open Access Charges GJ98O05070412 GJ01O05080812 AP98O05261012 GJ03O05270112 AP03Z05260912 AP98O05200309

Reference for Banking provisions GJ01O05080812 GJ03O05270112 AP01Z05110408

HR98R05110112

HR98O05290312 HR98O05310312

HR98Z05290310

HP98R05020510

HP98O05260612

HP08Z05000006

JK98R05250106

JK98Z05110712

JK01A05200810

JH98R05270605

JH01R05230610 JH03R05230610

JH01R05230610 JH03R05230610

KA98R05121104

KA98O05300412 KA98O05031012 KA98O05300412 KA98O05300412 KA98O05300412 KA98O05300412 KA98O05300412

KL98R05021105

KL98O05250712

KL99R05060807

MP03O05060710

MP98R05160605

MH99R05210405

MP03O05060710 MP01O05140510 MP98O05170412 MH98O05210512

MP01O05140510

MH01O05241103

MH99R05210605

MH98O05090911

MN98R05020710

MN99O05250712

ML98R05270412

ML99O05050912

Prepared by ABPS Infra

Page74/123

OPEN ACCESS

Reference Open Access Regulation AP98R05080605

Reference for Open Access Charges AP98O05261012 AP03Z05260912 AP98O05200309

Reference for Banking provisions AP01Z05110408

NL98R05000112

NL98R01300811

OR98R05060605

OR99O05130712

PB98R05010711

PB98R05010711

PB98R05121112

RJ98R05260504

RJ99O05270312

RJ99O05310310

RJ99O05080812

RJ98R01230109

RJ99Z05010210

N.A

TN98R05130411

TN01O05310712

TN01O05310712

TN04O05310712

TR98R05290410

TR98R05160910

UA99R05281010

UA98R05060710

UP98R05070605

UP99O05191012 UP99O05191012

UP01R01220310

Prepared by ABPS Infra

Page75/123

OPEN ACCESS

Reference Open Access Regulation AP98R05080605

Reference for Open Access Charges AP98O05261012 AP03Z05260912 AP98O05200309

Reference for Banking provisions AP01Z05110408

WB99R05120407

WB98R05100810

Prepared by ABPS Infra

Page76/123

Notification No./ Case No. Order No.2 of Power 2012 8/8/2012 Determination of Tariff for Procurement by the Distribution Licensees and Others from

State/Central

RE Technology

Type of Notification

List of Centre/States/UTs and respective Codes Central Code Body CE CERC ME MNRE PM Ministry of Power FR FOR CA CEA Code State AP Andhra Pradesh AR Arunachal Pradesh AS Assam BR Bihar CG Chattisgarh DL Delhi GJ Gujarat HR Haryana HP Himachal Pradesh JK Jammu & Kashmir JH Jharkhand KA Karnataka KL Kerala MP Madhya Pradesh MH Maharashtra

RE Technology Code 01 02 03 04 05 06 07 08 09 10 11 12 13 14 .. .. .. 97 98 99

MN Manipur MZ Mizoram ML Meghalaya NL Nagaland OR Orissa PB Punjab RJ Rajasthan SK Sikkim TN Tamil Nadu TR Tripura UA Uttarakhand UP Uttar Pradesh WB West Bengal GA Goa Union Territories Code UT AN Andaman & Nicobar CH Chandigarh DN Dadra and Nagar Haveli DD Daman & Diu LD Lakshadweep PY Pondicherry GT Goa and UTs combined

Data of Issuance/ Notification (DD/MM/YY)

Matter of notification

Denotation of each Parameters listed below of

RE Technology Technology Wind Solar Thermal Solar PV Biomass-Rankine Cycle Biomass-Gassifier Biogas Bagasse Co-gen SHP MSW Geothermal Wind Offshore Wind Repowering Solar Hybrid Tidal Code R O A B C Z

Type of Notification Notification Regulation Order Draft Regulations Draft Order Discussion Paper Others

Off-Grid RE All RE combined Other

Matter of the Notification Code 01 02 03 04 05 06 07 99 Matter Tariff RPO-REC APPC-State Agency Grid Connectivity Open Access Grid Code Competitive Bidding

Other

Sl.No.

State/ Centre

Tech

Tech Code based on Technology covered in the document

1 2 3 4

Andhra Pradesh Arunachal Pradesh Assam Chattisgarh

Wind Wind Wind Wind

01 98 98 01

5 6

Gujarat Haryana

Wind Wind

01 98

Himachal Pradesh

Wind

08

8 9 10 11 12 13 14

Jammu & Kashmir Jharkhand Karnataka Kerala Madhya Pradesh Maharashtra Manipur

Wind Wind Wind Wind Wind Wind Wind

98 01 98 98 01 98 98

15

Nagaland

Wind

98

16

Orissa

Wind

98

17 18 19 20 21 22

Punjab Rajasthan Rajasthan Tamil Nadu Tripura Uttarakhand

Wind Wind Wind Wind Wind Wind

98 98 01 01 98 98

23 24

Uttar Pradesh West Bengal

Wind Wind

98 98

25 26 27

Andhra Pradesh Assam Bihar

Solar PV Solar PV Solar PV

02 98 02

28 29

Bihar Chattisgarh

Solar PV Solar PV

02 98

30 31

Gujarat Haryana

Solar PV Solar PV

02 98

32 33

Jammu & Kashmir Jharkhand

Solar PV Solar PV

98 02

34

Karnataka

Solar PV

02

35 36 37

Madhya Pradesh Maharashtra Manipur

Solar PV Solar PV Solar PV

02 98 98

38

Mizoram

Solar PV

98

39

Nagaland

Solar PV

98

40 41

Orissa Punjab

Solar PV Solar PV

03 98

43

Rajasthan

Solar PV

03

44 45 46

Tamil Nadu Tripura Uttarakhand

Solar PV Solar PV Solar PV

03 03 98

47

Uttar Pradesh

Solar PV

98

48

West Bengal

Solar PV

98

49

Andhra Pradesh

Solar Thermal

02

50 51

Assam Bihar

Solar Thermal Solar Thermal

98 02

52 53

Bihar Chattisgarh

Solar Thermal Solar Thermal

02 98

54 55

Gujarat Haryana

Solar Thermal Solar Thermal

02 98

56 57

Jammu & Kashmir Jharkhand

Solar Thermal Solar Thermal

98 02

58

Karnataka

Solar Thermal

02

59 60

Madhya Pradesh Maharashtra

Solar Thermal Solar Thermal

02 98

61

Manipur

Solar Thermal

98

62

Mizoram

Solar Thermal

98

63

Nagaland

Solar Thermal

98

64 65

Orissa Punjab

Solar Thermal Solar Thermal

02 98

66

Rajasthan

Solar Thermal

02

67 68 69

Tamil Nadu Tripura Uttarakhand

Solar Thermal Solar Thermal Solar Thermal

02 02 98

70

Uttar Pradesh

Solar Thermal

98

71

Andhra Pradesh

Bagasse Co-gen

98

72 73

Andhra Pradesh Assam

Bagasse Co-gen Bagasse Co-gen

98 98

74 75

Arunachal Pradesh Bihar

Bagasse Co-gen Bagasse Co-gen

98 07

76

Chattisgarh

Bagasse Co-gen

98

77

Gujarat

Bagasse Co-gen

07

78

Haryana

Bagasse Co-gen

98

79

Himachal Pradesh

Bagasse Co-gen

98

80

Jammu & Kashmir

Bagasse Co-gen

98

81

Jharkhand

Bagasse Co-gen

07

82 83

Karnataka Kerala

Bagasse Co-gen Bagasse Co-gen

98 07

84 85

Madhya Pradesh Maharashtra

Bagasse Co-gen Bagasse Co-gen

07 98

86 87

Maharashtra Manipur

Bagasse Co-gen Bagasse Co-gen

98 98

88

Mizoram

Bagasse Co-gen

98

89

Nagaland

Bagasse Co-gen

98

90

Orissa

Bagasse Co-gen

98

91

Punjab

Bagasse Co-gen

98

92

Rajasthan

Bagasse Co-gen

98

93

Tamil Nadu

Bagasse Co-gen

07

94

Uttarakhand

Bagasse Co-gen

98

95

Uttar Pradesh

Bagasse Co-gen

98

96

West Bengal

Bagasse Co-gen

98

97

Andhra Pradesh

SHP

98

98 99

Arunachal Pradesh Assam

SHP SHP

98 98

100

Chattisgarh

SHP

98

101

Haryana

SHP

98

102

Himachal Pradesh

SHP

98

103 104 105 106 107

Jammu & Kashmir Karnataka Kerala Madhya Pradesh Maharashtra

SHP SHP SHP SHP SHP

98 98 08 08 98

108

Manipur

SHP

98

109

Mizoram

SHP

98

110

Nagaland

SHP

98

111

Orissa

SHP

98

112

Punjab

SHP

98

113

Rajasthan

SHP

98

114

Tamil Nadu

SHP

08

115

Uttarakhand

SHP

98

116

Uttar Pradesh

SHP

98

117

West Bengal

SHP

98

118

Andhra Pradesh

MSW

98

119 120

Arunachal Pradesh Assam

MSW MSW

98 98

121

Chattisgarh

MSW

98

122

Delhi

MSW

09

123

Gujarat

MSW

09

124

Haryana

MSW

98

125

Himachal Pradesh

MSW

98

126 127 128

Jammu & Kashmir Karnataka Maharashtra

MSW MSW MSW

98 09 98

129

Manipur

MSW

98

130

Mizoram

MSW

98

131

Nagaland

MSW

98

132

Orissa

MSW

98

133

Punjab

MSW

98

134

Rajasthan

MSW

98

135

Uttarakhand

MSW

98

136

Uttar Pradesh

MSW

98

137

West Bengal

MSW

98

138 139 140 141

Andhra Pradesh Arunachal Pradesh Assam Bihar

Biomass-Rankine Cycle Biomass-Rankine Cycle Biomass-Rankine Cycle Biomass-Rankine Cycle

98 98 98 4

142

Chattisgarh

Biomass-Rankine Cycle 98

143

Gujarat

Biomass-Rankine Cycle 04

144

Haryana

Biomass-Rankine Cycle 98

145

Haryana

Biomass-Rankine Cycle 98

146

Himachal Pradesh

Biomass-Rankine Cycle 98

147 148

Jammu & Kashmir Jharkhand

Biomass-Rankine Cycle Biomass-Rankine Cycle

98 04

149 150 151 152 153 154

Karnataka Kerala Madhya Pradesh Maharashtra Maharashtra Manipur

Biomass-Rankine Cycle Biomass-Rankine Cycle Biomass-Rankine Cycle Biomass-Rankine Cycle Biomass-Rankine Cycle Biomass-Rankine Cycle

98 07 04 98 98 98

155

Mizoram

Biomass-Rankine Cycle 98

156

Nagaland

Biomass-Rankine Cycle 98

157

Orissa

Biomass-Rankine Cycle 98

158 159 160

Punjab Rajasthan Rajasthan

Biomass-Rankine Cycle Biomass-Rankine Cycle Biomass-Rankine Cycle

98 98 04

161 162

Tamil Nadu Uttarakhand

Biomass-Rankine Cycle Biomass-Rankine Cycle

4 98

163

Uttar Pradesh

Biomass-Rankine Cycle 98

164

West Bengal

Biomass-Rankine Cycle 98

165 166 167 168

CERC CERC Jharkhand Andhra Pradesh SHP All RE

All RE All RE

98 98 08 98

169 170 171 172 173

Andhra Pradesh Andhra Pradesh Assam Bihar Bihar

All RE Solar PV All RE All RE Solar PV

98 02 98 98 02

174 175

Chattisgarh Delhi

All RE All RE

98 98

176

Goa and Union Territories Gujarat Haryana

All RE

98

177 178

All RE All RE

98 98

179 180 181

Himachal Pradesh Himachal Pradesh Jammu & Kashmir

All RE All RE All RE

98 98 98

182

Jharkhand

All RE

98

183

Karnataka

All RE

98

184 185

Kerala Madhya Pradesh

All RE All RE

98 98

186

Maharashtra

All RE

98

187

Manipur

All RE

98

188

Mizoram

All RE

98

189

Meghalaya

All RE

98

190 191 192 193

Nagaland Orissa Punjab Rajasthan

All RE All RE All RE All RE

98 98 98 98

194

Tamil Nadu

All RE

98

195 196

Tripura Uttarakhand

All RE All RE

98 98

197

Uttar Pradesh

All RE

98

198

West Bengal

All RE

98

199

Andhra Pradesh

All RE

98

200 201

Assam Bihar

All RE All RE

98 98

202

Chattisgarh

All RE

98

203

Delhi

All RE

98

204 205

Gujarat Haryana

All RE All RE

98 98

206 207

Himachal Pradesh Jammu & Kashmir

All RE All RE

98 98

208

Jharkhand

All RE

98

209

Karnataka

All RE

98

210 211

Kerala Madhya Pradesh

All RE All RE

98 98

212

Maharashtra

All RE

98

213

Manipur

All RE

98

214

Mizoram

All RE

98

215

Meghalaya

All RE

98

216 217 218 219

Nagaland Orissa Punjab Rajasthan

All RE All RE All RE All RE

98 98 98 98

220

Tamil Nadu

All RE

98

221 222

Tripura Uttarakhand

All RE All RE

98 98

223

Uttar Pradesh

All RE

98

224

Andhra Pradesh

All RE

98

225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255

Assam Bihar Chattisgarh Delhi Gujarat Haryana Himachal Pradesh Jammu & Kashmir Jharkhand Karnataka Kerala Madhya Pradesh Maharashtra Manipur Mizoram Meghalaya Orissa Punjab Rajasthan Tamil Nadu Tripura Uttarakhand Uttar Pradesh Andhra Pradesh Chattisgarh Himachal Pradesh Karnataka Rajasthan Tamil Nadu Uttarakhand Haryana

All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE Biomass-Rankine Cycle

98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98

256

Haryana

Bagasse Co-gen

98

257

Haryana

Solar PV

98

258

Haryana

Solar Thermal

98

259

Haryana

Wind

98

260 261 262 263 264

Andhra Pradesh Andhra Pradesh Andhra Pradesh Andhra Pradesh Andhra Pradesh

All RE All RE Solar PV All RE Wind

98 98 03 98 01

265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316

Arunachal Pradesh Arunachal Pradesh Assam Assam Assam Assam Bihar Bihar Chattisgarh Chattisgarh Chattisgarh Delhi Delhi Delhi Gujarat Gujarat Gujarat Gujarat Haryana Haryana Haryana Haryana Himachal Pradesh Himachal Pradesh Himachal Pradesh Jammu & Kashmir Jammu & Kashmir Jammu & Kashmir Jharkhand Jharkhand Jharkhand Karnataka Karnataka Karnataka Karnataka Karnataka Karnataka Karnataka Karnataka Kerala Kerala Kerala Madhya Pradesh Madhya Pradesh Madhya Pradesh Madhya Pradesh Maharashtra Maharashtra Maharashtra Maharashtra Maharashtra Manipur

All RE SHP All RE All RE All RE SHP All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE Wind Solar PV All RE All RE All RE All RE All RE All RE SHP All RE WIND All RE All RE Wind Solar PV All RE All RE All RE All RE All RE All RE All RE All RE All RE All RE Others All RE Solar PV Wind All RE Others Others All RE All RE wind All RE

98 08 98 98 98 08 98 98 98 98 98 98 98 98 98 98 01 03 98 98 98 98 98 98 08 98 01 98 98 01 03 98 98 98 98 98 98 98 98 98 98 99 98 03 01 98 99 99 98 98 01 98

317 318

Manipur Meghalaya

Others All RE

99 98

319 320

Meghalaya Nagaland

Others All RE

99 98

321 322 323 324 325 326 327 328 329 330

Nagaland Orissa Orissa Punjab Rajasthan Rajasthan Rajasthan Rajasthan Rajasthan Rajasthan

All RE All RE Others All RE All RE Others Others Others Others Wind

98 98 99 98 98 99 99 99 99 01

331 332 333 334 335 336 337

Tamil Nadu Tamil Nadu Tamil Nadu Tripura Tripura Uttarakhand Uttarakhand

All RE Wind Biomass-Rankine Cycle All RE All RE Others All RE

98 01 01 98 98 99 98

338

Uttar Pradesh

All RE

98

339 340 341 342 343

Uttar Pradesh Uttar Pradesh Uttar Pradesh West Bengal West Bengal

All RE Others Others Others Others

99 99 01 99 98

344

CERC

All RE

98

345 346 347 348 349 350

Punjab Bihar Bihar Meghalaya Arunachal Pradesh Delhi

All RE Biomass-Rankine Cycle Bagasse Co-gen All RE All RE Solar PV

98 04 07 98 98 03

351

Rajasthan

Biomass-Rankine Cycle

04

352 353

Chattisgarh Himachal Pradesh

All RE All RE

98 98

Type

Matter

Date

Code

O R A R

01 01 01 01

010509 090412 130112 020412

AP01O01010509 AR98R01090412 AS98A01130112 CG01R01020412

O O

01 01

080812 250112

GJ01O01080812 HR98O01250112

01

250712

HP08A01250712

A R O R O O R

01 01 01 01 01 01 01

080812 230610 111209 221110 140510 300312 150410

JK98A01000012 JH01R01230610 KA98O01111209 KL98R01221110 MP01O01140510 MH98O01300312 MN98R01150410

01

300811

NL98R01300811

01

140910

OR98O01140910

O R B O R R

01 01 01 01 01 01

190712 230109 080612 310712 230309 060710

PB98O01190712 RJ98R01230109 RJ01B01080612 TN01O01310712 TR98R01230309 UA98R01060710

R A

01 01

220310 100812

UP98R01220310 WB98A01100812

O A R

01 01 01

140610 130112 020810

AP02O01140610 AS98A01130112 BR02R01020810

O R

01 01

290512 020412

BR02O01290512 CG98R01020412

O Z

01 01

270112 000612

GJ02O01270112 HR98Z01000612

A R

01 01

000012 230610

JK98A01000012 JH02R01230610

01

130710

KA02O01130710

O R R

01 01 01

010812 300312 150410

MP02O01010812 MH98R01300312 MN98R01150410

01

150410

MZ98R01150410

01

300811

NL98R01300811

O O

01 01

10212 90712

OR03O0110212 PB98O0190712

01

300512

RJ03O01300512

O R R

01 01 01

270510 230309 60710

TN03O01270510 TR03R01230309 UA98R01060710

01

220310

UP98R01220310

01

100812

WB98A01100812

01

140610

AP02O01140610

A R

01 01

130112 020810

AS98A01130112 BR02R01020810

O R

01 01

290512 020412

BR02O01290512 CG98R01020412

O Z

01 01

270112 000612

GJ02O01270112 HR98Z01000612

A R

01 01

000012 230610

JK98A01000012 JH02R01230610

01

130710

KA02O01130710

O R

01 01

010812 300312

MP02O01010812 MH98R01300312

01

150410

MN98R01150410

01

150410

MZ98R01150410

01

300811

NL98R01300811

O O

01 01

10212 90712

OR02O0110212 PB98O0190712

01

300512

RJ02O01300512

O R R

01 01 01

080710 230309 060710

TN02O01080710 TR02R01230309 UA98R01060710

01

220310

UP98R01220310

01

310309

AP98O01310309

O A

01 01

120911 130112

AP98O01120911 AS98A01130112

R C

01 01

090412 000712

AR98R01090412 BR07C01000712

01

120412

CG98R01120412

01

310510

GJ07O01310510

01

030211

HR98R01030211

01

240712

HP98A01240712

01

000712

JK98A01000712

01

270110

JH07R01270110

O R

01 01

111209 191108

KA98O01111209 KL07R01191108

O R

01 01

130908 070610

MP07O01130908 MH98R01070610

O R

01 01

300312 150410

MH98O01300312 MN98R01150410

01

150410

MZ98R01150410

01

300811

NL98R01300811

01

140910

OR98O01140910

01

190712

PB98O01190712

01

230109

RJ98R01230109

01

310712

TN07O01310712

01

060710

UA98R01060710

01

220310

UP98R01220310

01

100812

WB98A01100812

01

310309

AP98O01310309

R A

01 01

090412 130112

AR98R01090412 AS98A01130112

01

020412

CG98A01020412

01

250112

HR98O01250112

01

240712

HP98R01240712

A O R O R

01 01 01 01 01

000712 111209 221110 300608 070610

JK98A01000712 KA98O01111209 KL08R01221110 MP08O01300608 MH98R01070610

01

150410

MN98R01150410

01

150410

MZ98R01150410

01

300811

NL98R01300811

01

140910

OR98O01140910

01

190712

PB98O01190712

01

230109

RJ98R01230109

01

000310

TN08Z01000310

01

060710

UA98R01060710

01

220310

UP98R01220310

01

100812

WB98A01100812

01

310309

AP98O01310309

R A

01 01

090412 130112

AR98R01090412 AS98A01130112

01

020412

CG98A01020412

01

200111

DL09O01200111

01

300711

GJ09O01300711

01

030211

HR98R01030211

01

240712

HP98A01240712

A O R

01 01 01

000712 280212 070610

JK98A01000712 KA09O01280212 MH98R01070610

01

150410

MN98R01150410

01

150410

MZ98R01150410

01

300811

NL98R01300811

01

140910

OR98O01140910

01

190712

PB98O01190712

01

230109

RJ98R01230109

01

060710

UA98R01060710

01

220310

UP98R01220310

01

100812

WB98A01100812

O R A C

01 01 01 01

20911 90412 130112 010712

AP98O0120911 AR98R0190412 AS98A01130112 BR4C01010712

01

020412

CG98A01020412

01

170510

GJ04O01170510

01

250112

HR98O01250112

01

030211

HR98R01030211

A A R

01 01 01

240712 010712 270110

HP98A01240712 JK98A01000712 JH04R01270110

O R O R O R

01 02 01 01 01 01

111209 191108 20312 070610 300312 150410

KA98O01111209 KL07R02191108 MP04O0120312 MH98R01070610 MH98O01300312 MN98R01150410

01

150410

MZ98R01150410

01

300811

NL98R01300811

O O R O O R

01 01 01 01 01 01

140910 190712 230109 091211 310712 060710

OR98O01140910 PB98O01190712 RJ98R01230109 RJ04O01091211 TN4O01310712 UA98R01060710

01

220310

UP98R01220310

A R O R R

01 01 01 01 02

100812 060212 270312 030707 210312

WB98A01100812 CE98R01060212 CE98O01270312 JH08R01030707 AP98R02210312

O O R R O

02 02 02 02 02

310309 060710 011210 161110 290512

AP98O02310309 AP02O02060710 AS98R02011210 BR98R02161110 BR02O02290512

R R

02 02

040311 011012

CG98R02040311 DL98R02011012

02

301110

GT98R02301110

R R

02 02

170410 030211

GJ98R02170410 HR98R02030211

R R R

02 02 02

260510 031011 110311

HP98R02260510 HP98R02031011 JK98R02110311

02

210710

JH98R02210710

02

160311

KA98R02160311

R R

02 02

231110 191110

KL98R02231110 MP98R02191110

02

070610

MH98R02070610

02

050510

MN98R02050510

02

050510

MZ98R02050510

02

211210

ML98R02211210

R R R R

02 02 02 02

290811 300910 030611 240511

NL98R02290811 OR98R02300910 PJ98R02030611 RJ98R02240511

02

100811

TN98R02100811

R R

02 02

080910 060710

TR98R02160910 UK98R02060710

02

170810

UP98O02170810

02

100812

WB98A02100812

02

210312

AP98R02210312

R R

02 02

011210 161110

AS98R02011210 BR98R02161110

02

040311

CG98R02040311

02

011012

DL98R02011012

R R

02 02

170410 030211

GJ98R02170410 HR98R02030211

R R

02 02

260510 110311

HP98R02260510 JK98R02110311

02

210710

JH98R02210710

02

160311

KA98R02160311

R R

02 02

231110 191110

KL98R02231110 MP98R02191110

02

070610

MH98R02070610

02

050510

MN98R02050510

02

050510

MZ98R02050510

02

211210

ML98R02211210

R R R R

02 02 02 02

290811 300910 030611 301210

NL98R02290811 OR98R02300910 PJ98R02030611 RJ98R02301210

02

100811

TN98R02100811

R R

02 02

160910 060710

TR98R02160910 UK98R02031110

02

170810

UP98O02170810

03

210312

AP98R03210312

O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O

03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 01

041110 241110 091110 181111 160710 061010 190610 030111 210810 010411 031210 070211 010710 070910 070910 201211 030211 301110 160610 071210 080910 020512 040211 210312 220611 160712 270612 131011 030912 290512 030912

AS98Z03041110 BR98Z03241110 CG98O03091110 DL98O03181111 GJ98Z03160710 HR98Z03061010 HP98Z03190610 JK98Z03030111 JH98Z03210810 KA98Z03010411 KL98O03031210 MP98O03070211 MH98O03010710 MN98O03070910 MZ98O03070910 ML98O03201211 OR98O03030211 PJ98O03301110 RJ98O03160610 TN98O03071210 TR98O03080910 UK98O03020512 UP98O03040211 AP98R03210312 CH98O03220611 HP98O03160712 KA98O03270612 RJ98O03131011 TN98O03030912 UK98O03290512 HR98O01030912

01

030912

HR98O01030912

01

030912

HR98O01030912

01

030912

HR98O01030912

01

030912

HR98O01030912

R O Z O O

05 05 05 05 05

080605 261012 260912 200309 110408

AP98R05080605 AP98O05261012 AP03Z05260912 AP98O05200309 AP01Z05110408

A Z R O O Z R O R O R R R O R O O O R O O Z R O Z R A Z R R R R O O O O O O O R O R R O O O R R O O O R

05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05

170812 240108 010805 160511 160511 000307 200506 300312 040311 280412 040311 030111 011012 130712 010611 070412 080812 270112 110112 290312 310312 290310 020510 260612 000006 250106 200810 110712 270605 230610 2306010 121104 300412 031012 300412 300412 300412 300412 300412 021105 250712 060807 160605 060710 140510 170412 210405 210605 210512 090911 241103 020710

AR98A05170812 AR08Z99240108 AS98R05010805 AS98O05160511 AS98O05160511 AS08Z05000312 BR98R05200506 BR98O05300312 CG98R05040311 CG98O05280412 CG98R05040311 DL98R05030111 DL98R05011012 DL98O05130712 GJ98R05010611 GJ98O05070412 GJ01O05080812 GJ03O05270112 HR98R05110112 HR98O05290312 HR98O05310312 HR98Z05290310 HP98R05020510 HP98O05260612 HP08Z05000006 JK98R05250106 JK01A05200810 JK98Z05110712 JH98R05270605 JH01R05230610 JH03R05230610 KA98R05121104 KA98O05300412 KA98O05031012 KA98O05300412 KA98O05300412 KA98O05300412 KA98O05300412 KA98O05300412 KL98R05021105 KL98O05250712 KL99R05060807 MP98R05160605 MP03O05060710 MP01O05140510 MP98O05170412 MH99R05210405 MH99R05210605 MH98O05210512 MH98O05090911 MH01O05241103 MN98R05020710

R R

05 05

250712 270412

MN99O05250712 ML98R05270412

O R

05 01

50912 300811

ML99O05050912 NL98R01300811

R R O O R O O O O O

05 05 05 05 05 05 05 05 05 01

000112 060605 130712 010711 260504 270312 080812 010210 310310 230109

NL98R05000112 OR98R05060605 OR99O05130712 PB98R05010711 RJ98R05260504 RJ99O05270312 RJ99O05080812 RJ99Z05010210 RJ99O05310310 RJ01R01230109

R O O R R R R

05 05 05 05 05 05 05

130411 310712 310712 290410 160910 281010 060710

TN98R05130411 TN01O05310712 TN04O05310712 TR98R05290410 TR98R05160910 UA99R05281010 UA98R05060710

05

070605

UP98R05070605

O O R R R

05 05 01 05 05

191012 191012 191012 120407 100810

UP99O05191012 UP99O05191012 UP01R01220310 WB99R05120407 WB98R05100810

01

251012

CE98B01251012

R O O A R R

05 01 01 01 02 01

121112 301112 301112 050912 110412 121212

PB98R05121112 BR04O01301112 BR07O01301112 ML98A01050912 AR98R02110412 DL03R01121212

01

211212

RJ04O01211212

O R

03 01

141212 171212

CH98O03141212 HP98R01171212

Name of the Regulation/Case as in the Reference Doc

Notification No./ Case No.

Reference Document Link

Determination of Tariff/power purchase Price in respect of "New wind Based power projects" Regulations on Terms and Conditions for Tariff determination from Renewable energy sources Regulations onTerms and Conditions for Tariff determination from Renewable energy sources Regulations on Terms and Conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources. Order on Determination of tariff for procurement by distribution licensees and others from wind power projects Order on Suo-moto petition for determination of levellised generic tariff of renewable energy projects to be commissioned during FY 2011-12 Draft Regulations on promotion of generation from renewable energy sources and terms and conditions for tariff determination Draft Regulations on terms and conditions for determination from renewable energy sources Regulations on determination of tariff for procurement of power from wind electric generators Order in the matter of determination of Tariff in respect of renewable energy sources Second Amendment Regulations on power procurement from renewable sources by distribution licensee Order for procurement of power from wind electric generators Order for determination of Generic Tariff for third year of first control period Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010. Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011 Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation Order on adoption of CERC RE Tariff Regulation and determination of generic RE Tariff for FY 2012-13 RERC (Terms and Conditions of Tariff) Regulations, 2009, Draft Tariff Order on Wind Projects for FY 2012-13 Comprehensive Tariff Order on Wind Energy (Order No. 6 of 2012) dated July 31, 2012 TERC (Cogeneration and Generation of Electricity from renewable source of Energy) regulation 2009 Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010 UPERC - CNCE Regulations, 2009 Draft WBERC(Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012

O.P No. 6/2009 & O.P.No 7 of 2009 APSERC/Notification/7/20 12 AERC.25/2012 N.A

Click Here Click Here Click Here Click Here

Order No. 2 of 2012 Case No. 20 of 2011

Click Here Click Here

No. HPERC/428 Click Here N.A Notification No. 27 Case No. OP/28/2008 NO. 1163/CT/2010/KSERC SMP-20/2010 Case No. 10 of 2012 No. H.13011/17/10 Click Here No.NERC/REGN/2011 Click Here Petition No. 37/2008 Click Here Petition No. 35 of 2012 No. RERC/Secy/ Reg. -76 Click Here Click Here Click Here Order No 6 of 2012 No.F.25/TERC/2009/415 No.F9(21)/RG/UERC/2010/ 697 Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here

Click Here

UPERC / Secy / CNCE Regulation, 2009 WBERC/Regulation/34/1011/0647

Click Here Click Here

Order on Solar Power Tariff Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012 (Draft) Terms and Conditions for Tariff Determination from Solar Energy Sources Regulations, 2010 Order on Determination of long term solar RPO and Solar tariff Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources Regulations, 2012 Determination of tariff for Procurement by the Distribution Licensees and others from Solar Energy Projects Public Notice for Inviting Objections/Suggestions on the Suo Moto Petition for Determination of Levellised Tariff in Respect of Renewable Energy Projects to be Commissioned during FY 2012-13

In. I.A.No.17 of 2010 No. AERC.25/2012 No. BERC-Regl/Solar2/2010-03 Order No. 12 of 2012 -

Click Here Click Here Click Here Click Here Click Here

Order No 1 of 2012 -

Click Here

Click Here

Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012 Terms and conditions for determination of generation tariff for No 26/2010 Procurement of Power from Solar PV and Solar Thermal Power Project Regulation 2010 Determination of tariff for grid connected Solar PV, Solar Thermal power No.S/03/1 plants (other than demonstration projects) and Rooftop Solar Photovoltaic and other small solar power Plants connected to Distribution network at voltage levels below 33KV. Tariff Order for Solar Energy Based Power Generation in Madhya Pradesh Order for determination of Generic Tariff for third year of first control period Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010 Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010 Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011 Suo-motu proceeding for re-determination of generic tariff in respect of Solar PV and Solar Thermal power. Adoption of CERC (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13 In the matter of Determination of Benchmark Capital Cost for Solar PV and Solar Thermal Power Projects and resultant Generic Levellised Tariff Tariff Order for projects covered by Jawaharlal Nehru National Solar Mission RE Regulations, 2009 Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010 UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009 SMP 25/2012 No.MERC/Legal/2010/482 / No. H.13011/17/10- JERC

Click Here Click Here

Click Here

Click Here Click Here Click Here

No. H.13011/17/10- JERC Click Here No.NERC/REGN/2011 Click Here Case No.01/2012 Petition No. 35 of 2012 Click Here Order No. Click Here Order No 1 of 2010 No.F9(21)/RG/UERC/2010/ 697 Click Here Click Here Click Here Click Here

Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Draft West Bengal Electricity Regulatory Commission (Cogeneration and No. Generation of Electricity from Renewable Sources of Energy) WBERC/Regulation/34/10Regulations, 2012 (For replacing existing Regulation) 11/0647

Click Here

Click Here

Order on Solar Power Tariff

In. I.A.No.17 of 2010 Click Here

Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012 (Draft) Terms and Conditions for Tariff Determination from Solar Energy Sources Regulations, 2010 Order on Determination of long term solar RPO and Solar tariff Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources Regulations, 2012 Determination of tariff for Procurement by the Distribution Licensees and others from Solar Energy Projects Public Notice for Inviting Objections/Suggestions on the Suo Moto Petition for Determination of Levellised Tariff in Respect of Renewable Energy Projects to be Commissioned during FY 2012-13

No. AERC.25/2012 No. BERC-Regl/Solar2/2010-03 Order No. 12 of 2012 -

Click Here Click Here Click Here Click Here

Order No 1 of 2012 -

Click Here

Click Here

Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012 Terms and conditions for determination of generation tariff for No 26/2010 Procurement of Power from Solar PV and Solar Thermal Power Project Regulation 2010 Determination of tariff for grid connected Solar PV, Solar Thermal power No.S/03/1 plants (other than demonstration projects) and Rooftop Solar Photovoltaic and other small solar power Plants connected to Distribution network at voltage levels below 33KV. Tariff Order for Solar Energy Based Power Generation in Madhya Pradesh Order for determination of Generic Tariff for third year of first control period Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010 Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010 Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011 Suo-motu proceeding for re-determination of generic tariff in respect of Solar PV and Solar Thermal power. Adoption of CERC (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13 In the matter of Determination of Benchmark Capital Cost for Solar PV and Solar Thermal Power Projects and resultant Generic Levellised Tariff Tariff Order for Solar Thermal Projects covered by Jawaharlal Nehru National Solar Mission RE Regulations, 2009 Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010 UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009 SMP 25/2012 No.MERC/Legal/2010/482 / No. H.13011/17/10- JERC

Click Here Click Here

Click Here

Click Here Click Here

Click Here No. H.13011/17/10- JERC Click Here No.NERC/REGN/2011 Click Here Case No.01/2012 Petition No. 35 of 2012 Click Here Order No. Click Here Order No 2 of 2010 No.F9(21)/RG/UERC/2010/ 697 Click Here Click Here Click Here Click Here

Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696

Click Here

Determination of Tariff / Power Purchase Price (Variable Cost or Single Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of the New and Renewable Sources of Energy in the State of Andhra Pradesh covered by the Commission Order Dated 20-03-2004. Order in the matter of power purchase from non-conventional sources of energy Draft-Assam Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 Terms and Conditions for tariff determination from renewable energy sources regulation - 2012 Discussion paper on Benchmarks For Tariff Determination For Biomass And Bagasse Based Cogeneration Plants To Be Commissioned In 2012-13 And 2013-14. CSERC (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources) Regulations, 2012 Order on Determination of tariff for Procurement of Power by Distribution Licensees from Bagasse based co-generation Power Plants and Other Commercial Issues HERC(Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2010 Draft Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012

O.P. No. 5 /2009 Click Here

O.P no. 1075/2000 -

Click Here Click Here

APSERC/NOTIFICATION/7/ 2012 -

Click Here Click Here

Click Here No. 4 of 2010 Click Here Click Here Click Here

Jammu and Kashmir State Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Tariff Determination for Biomass and nonfossil fuel based co-generation projects) Regulations, 2010 In the matter of Determination of Tariff in respect of Renewable Sources of Energy Kerala State Electricity Regulatory Commission (Power Procurement from Cogeneration Plants by Distribution Licensees) Regulations, 2008 Tariff Order for procurement of power from Bagasse based cogeneration Plants in Madhya Pradesh MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND No.MERC/Legal/2010/482 CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010 / MERC Generic Tariff for FY 2012-13 Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010 Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2011 Terms and Conditions for Determination of Generation Tariff for Renewable Energy Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation No. H.13011/17/10- JERC

Click Here

Click Here

Click Here Click Here Click Here Click Here Click Here Click Here

No. H.13011/17/10- JERC Click Here No.NERC/REGN/2011 Dated Kohima, the 30th August, 2011 Petition No. 37/2008

Click Here

Click Here

Adoption of Central Electricity Regulatory Commission (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13 The Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009 Power procurement by Distribution Licensee from Bagasse based Cogeneration plants and allied issues relating to captive use and third party sale UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010 UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009

Petition No. 35 of 2012 Click Here

No. RERC/Secy/ Reg. -76 Click Here Order No. 7 of 2012 Click Here No.F9(21)/RG/UERC/2010/ 697

Click Here

Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Draft West Bengal Electricity Regulatory Commission (Cogeneration and No. Generation of Electricity from Renewable Sources of Energy) WBERC/Regulation/34/10Regulations, 2012 (For replacing existing Regulation) 11/0647 Determination of Tariff / Power Purchase Price (Variable Cost or Single Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of the New and Renewable Sources of Energy in the State of Andhra Pradesh covered by the Commission Order Dated 20-03-2004. Terms and Conditions for tariff determination from renewable energy sources regulation - 2012 Draft-Assam Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources Regulations, 2012 Petition filed by Haryana Power Generation Corporation Limited (HPGCL), Panchkula vide letter No. 781 / GMP 321 dated 7th June, 2011 for determination of tariff for supply of electricity from 6.5 MW solar power project to be set up by HPGCL at Powerhouse D, WYC Hydel, Yamunanagar (Case No. HERC / PRO - 12 of 2011). Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012 Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012. Determination of Tariff in respect of Renewable Sources of Energy O.P. No. 5 /2009

Click Here

Click Here

Click Here

APSERC/NOTIFICATION/7/ 2012 -

Click Here Click Here

Click Here Click Here

No. HPERC/428

Click Here Click Here Click Here Click Here Click Here Click Here

KSERC (Power Procurement from Renewable Sources by Distribution No. 1163/CT/2010/KSERC Licensee) Second Amendment Regulations, 2010 Tariff Order for Procurement of Power by Distribution Licensees from SMP-77/2011 Small Hydro Based Generation MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND No.MERC/Legal/2010/482 CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010 / Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010 Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2011 Terms and Conditions for Determination of Generation Tariff for Renewable Energy No. H.13011/17/10- JERC

Click Here No. H.13011/17/10- JERC Click Here No.NERC/REGN/2011 Dated Kohima, the 30th August, 2011

Click Here

Suo-motu proceeding initiated by the Commission for finalization of Petition No. 37/2008 Policy on Harnessing of Power from Renewable Energy Sources including Co-generation Adoption of Central Electricity Regulatory Commission (Terms & Petition No. 35 of 2012 Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13 The Rajasthan Electricity Regulatory Commission (Terms and Conditions No. RERC/Secy/ Reg. -76 for Determination of Tariff) Regulations, 2009 Consultative Paper on Procurement of Power from small hydro power (up to 5 MW) UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010 UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009 No.F9(21)/RG/UERC/2010/ 697

Click Here

Click Here

Click Here

Click Here

Click Here

Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Draft West Bengal Electricity Regulatory Commission (Cogeneration and No. Generation of Electricity from Renewable Sources of Energy) WBERC/Regulation/34/10Regulations, 2012 (For replacing existing Regulation) 11/0647 Determination of Tariff / Power Purchase Price (Variable Cost or Single Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of the New and Renewable Sources of Energy in the State of Andhra Pradesh covered by the Commission Order Dated 20-03-2004. Terms and Conditions for tariff determination from renewable energy sources regulation - 2012 Draft Assam Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 Chhattisgarh State ElectricityRegulatory Commission (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based renewable energy sources) Regulations, 2012 Petition for adoption of Tariff and approval of energy purchase entered between Timarpur Okhla Waste Management Company Private Limited and BSES Rajdhani Power Limited, for purchase of 16 MW of Power by BSES on Long-term basis from power station to be set up at Okhla. Approval of tariff for power generated from RDF based power generation plant for sale to Distribution Licensees in the State of Gujarat. Haryana Electricity Regulatory Commission ( Terms and Conditions for Determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate ) Regulations 2010 Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012 Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012. Case between Srinivasa Gayathri Resource Recovery Ltd., and BESCOM, & Govt. of Karnataka, Urban Development and KPTCL MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010 O.P. No. 5 /2009

Click Here

Click Here

Click Here

APSERC/NOTIFICATION/7/ 2012 No. AERC.25/2012/

Click Here Click Here

Click Here Petition No.18/2010 Click Here

Petition No.1052/2010 Click Here Regulation No. HERC/23/2010

Click Here

No. HPERC/428Click Here Case No. OP 14/2011 No.MERC/Legal/2010/482 /

Click Here Click Here Click Here

Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010 Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2011 Terms and Conditions for Determination of Generation Tariff for Renewable Energy

No. H.13011/17/10- JERC Click Here No. H.13011/17/10- JERC Click Here No.NERC/REGN/2011 Dated Kohima, the 30th August, 2011 Petition No. 37/2008

Click Here

Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation Adoption of Central Electricity Regulatory Commission (Terms & Petition No. 35 of 2012 Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13 The Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010 UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009

Click Here

Click Here

No. RERC/Secy/ Reg. -76 Click Here No.F9(21)/RG/UERC/2010/ 697

Click Here

Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Draft West Bengal Electricity Regulatory Commission (Cogeneration and No. Generation of Electricity from Renewable Sources of Energy) WBERC/Regulation/34/10Regulations, 2012 (For replacing existing Regulation) 11/0647 In the matter of purchase of power from Non-Conventional Energy Projects TERMS AND CONDITIONS FOR TARIFF DETERMINATION FROM RENEWABLE ENERGY SOURCES, REGULATIONS, 2012 TERMS AND CONDITIONS FOR TARIFF DETERMINATION FROM RENEWABLE ENERGY SOURCES, REGULATIONS, 2012 Benchmarks For Tariff Determination For Biomass And Bagasse Based Cogeneration Plants To Be Commissioned In 2012-13 And 2013-14. Chhattisgarh State Electricity Regulatory Commission (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources) Regulations, 2012 Determination of tariff for Procurement of Power by Distribution Licensees from Biomass based Power Generator and Other Commercial Issues Petition filed by Haryana Power Generation Corporation Limited (HPGCL), Panchkula vide letter No. 781 / GMP 321 dated 7th June, 2011 for determination of tariff for supply of electricity from 6.5 MW solar power project to be set up by HPGCL at Powerhouse D, WYC Hydel, Yamunanagar (Case No. HERC / PRO - 12 of 2011). Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2010. Draft Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012 Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012. Terms and Conditions for Tariff Determination for Biomass and nonfossil fuel based co-generation projects) Regulations, 2010. Order dated September 02, 2011 APSERC/NOTIFICATION/7/ 2012 AERC.25/2012 a Discussion paper issued for comments

Click Here

Click Here

Click Here Click Here Click Here Click Here

Click Here

Order No. 5 of 2010

Click Here

Click Here

Regulation No. HERC/ 23 / 2010 No. HPERC/428

Click Here

Click Here Click Here

No. 24

Click Here

Determination of Tariff in respect of Renewable Sources of Energy

Click Here Click Here Click Here Click Here Click Here Click Here

Power Procurement from Cogeneration Plants by Distribution Licensees) Regulations, 2008 Tariff Order for procurement of power from Biomass based Power SMP-77/2011 Projects No/MERC/Legal/2010/482 MERC RE Tariff Regulations 2010 / Suo Moto Order by MERC dated March 30, 2012 Case 10 of 2012 Joint Electricity Regulatory Commission for No. H.13011/17/10- JERC Manipur & Mizoram (Terms and Conditions for Tariff determination Dated Aizawl, the 15th from Renewable April, 2010 Energy Sources) Regulations, 2010 Joint Electricity Regulatory Commission for No. H.13011/17/10- JERC Manipur & Mizoram (Terms and Conditions for Tariff determination Dated Aizawl, the 15th from Renewable April, 2010 Energy Sources) Regulations, 2010 REGULATION Terms and Conditions for Determination of Generation Tariff for Renewable Energy No.NERC/REGN/2011 Dated Kohima, the 30th August, 2011

Click Here

Click Here

Suo-motu proceeding initiated by the Commission for finalization of Petition No 37/2010 (Suo Policy on Harnessing of Power from Renewable Energy Sources including Motu Order) Co-generation PSERC Suo Motu Order on RE Generic Tariff by adopting CERC Tariff RERC Tariff Regulation 2009 Revised tariff for sale of electricity by Bio-mass based power plants in the State to distribution licensees commissioned during FY 2011-12 of the control period 2009-14. Comprehensive Tariff Order for Biomass Power Plants UERC(Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010 UPERC (Captive and Non- Conventional Energy Generating Plants) Regulations, 2009 (hereinafter referred to as CNCE Regulations, 2009). West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010. CERC RE Regulations, 2012 CERC RE generic Tariff Order for FY 2012-13 JSERC (Terms and Conditions of tariff determination, Small Hydropower Generation) Regulation, 2007 Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2012 Petition No 35 of 2012 No. RERC/Secy/ Reg. -76 January 23, 2009 Order No 14 Order No 8 of 2012 dated July 31 ,2012 UERC notification No.F9(21)/RG/UERC/2010/ 697: dated July 06, 2010 Notification dated March 22, 2010 and Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Notification No. 47/WBERC dated August 10, 2012 L-1/94/CERC/2011 Petition No. 35/2012 (SuoMotu) No. 360 1 of 2012

Click Here Click Here Click Here Click Here Click Here Click Here

Click Here

Click Here Click Here Click Here Click Here

Click Here Click Here Click Here Click Here Click Here Click Here

Suo-Motu Order on RPPO O. P. No. 16 of 2008 Solar RPO Order O. P. No. 10 of 2010 AERC (Renewable Purchase Obligation and its Compliance) Regulations, 2010 (Renewable Purchase Obligation, its Compliance and REC Framework Implementation) Regulations, 2010. Solar RPO amended vide Order on Case 12 of 2012 dated May 29, 2012

RPO Regulation (No. 36/CSERC/2011) March 04, 2011 DERC RPO Regulations

Click Here No: F.3(292)/Tariff/DERC/201011/3026/ JERC-14/2010 Click Here

Joint Electricity Regulatory Commission for state of Goa & Union Territories (Procurement of Renewable energy) Regulations, 2010. GERC (Procurement of Energy from Renewable Sources) Regulations, 2010. HERC(Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2010 HPERC (Renewable Power Purchase Obligation and its Compliance) Regulations, 2010 HPERC RPO Ammendment Regulations J&KSERC (Renewable Power Purchase obligation, its compliance and REC frame work implementation) Regulations, 2011.

Click Here Notification No. 3 of 2010 Reg 23/2010 Click Here HPERC/438 HPERC/438 JKSERC/10 Click Here Click Here Click Here Click Here

Jharkhand State Electricity Regulatory Commission (Renewable purchase No.28 obligation and its compliance) Regulations, 2010 KERC (Power Procurement from Renewable Sources by Distribution Licensee and Renewable Energy Certificate Framework) Regulations, 2011 KSERC (Renewable Purchase Obligation and its Compliance) Regulations, 2010 Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010 (Revision-I) Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its compliance and REC framework Implementation) Regulations, 2010 Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010. Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010. Meghalaya State Electricity Regulatory Commission (Renewal Energy Purchase Obligation and its Compliance) Regulations, 2010 Nagaland Electricity Regulatory Commission (Renewable Purchase Obligation and its Compliance) Regulations, 2011 OERC (Renewable and Co-generation Purchase Obligation and its Compliance) Regulations, 2010. PSERC (Renewable Purchase Obligation and its compliance) Regulations, 2011 Rajasthan Electricity Regulatory Commission (Power Purchase & Procurement Process of Distribution Licensee) (2nd Amendment) Regulations, 2011. Amendment to Renewable Energy Purchase Obligation Regulations, 2010. T.E.R.C. (Procurement of Energy from Renewable Sources) Regulations, 2010. Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010. Uttar Pradesh Electricity Regulatory Commission (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010 Notification No. S/03/1 dated 16th March 2011 No. 1517/CT/2010/KSERC RG-33(I) of 2010

Click Here

Click Here Click Here Click Here

No.MERC/Legal/2010/483 Click Here No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010 No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010 2 of 2010

Click Here

Click Here

Click Here No.NERC/REGN/2011 No. OERC-Engg-02/2010 No.PSERC/Secy./Reg./55 No.RERC/Secy./Regulation 85 Notification No. TNERC / RPO / 19 / 2, dated 29-072011 No.F.25/TERC/2009/415 No.F9(21)/RG/UERC/2010/ 697 Click Here Click Here Click Here Click Here

Click Here Click Here

Click Here

No. UPERC/Secy/Regulation/1 0 - 787

Click Here

Draft West Bengal Electricity Regulatory Commission (Cogeneration and WBERC/Regulation/34/10Generation of Electricity from Renewable Sources of Energy) 11/0647 Regulations, 2012 (For replacing existing Regulation). APERC - Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2012 AERC (Renewable Purchase Obligation and its Compliance) Regulations, 2010 Bihar Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance and REC Framework Implementation) Regulations, 2010. Chhattisgarh State Electricity Regulatory Commission (Renewable Purchase Obligation and REC framework Implementation) Regulations, 2011. DERC RPO Regulations Reg No. 1 of 2012

Click Here

Click Here No. AERC/21/2010 BERCRegl01/1005 Click Here No. 36/CSERC/2011 Click Here No: F.3(292)/Tariff/DERC/201011/3026/ Notification No. 3 of 2010 Click Here

Click Here Click Here Click Here Click Here Click Here

GERC (Procurement of Energy from Renewable Sources) Regulations, 2010. HERC(Terms and Conditions for determination of Tariff from Renewable Reg 23/2010 Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2010 HPERC (Renewable Power Purchase Obligation and its Compliance) HPERC/438 Regulations, 2010 J&KSERC (Renewable Power Purchase obligation, its compliance and JKSERC/10 REC frame work implementation) Regulations, 2011. Jharkhand State Electricity Regulatory Commission (Renewable purchase No.28 obligation and its compliance) Regulations, 2010 KERC (Power Procurement from Renewable Sources by Distribution Licensee and Renewable Energy Certificate Framework) Regulations, 2011 KSERC (Renewable Purchase Obligation and its Compliance) Regulations, 2010 Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010 (Revision-I) Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its compliance and REC framework Implementation) Regulations, 2010 Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010. Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010. Meghalaya State Electricity Regulatory Commission (Renewal Energy Purchase Obligation and its Compliance) Regulations, 2010 Nagaland Electricity Regulatory Commission (Renewable Purchase Obligation and its Compliance) Regulations, 2011 OERC (Renewable and Co-generation Purchase Obligation and its Compliance) Regulations, 2010. PSERC (Renewable Purchase Obligation and its compliance) Regulations, 2011 Rajasthan Electricity Regulatory Commission(Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework) Regulations, 2010. Amendment to Renewable Energy Purchase Obligation Regulations, 2010.

Click Here

Notification No. S/03/1 dated 16th March 2011 No. 1517/CT/2010/KSERC RG-33(I) of 2010

Click Here Click Here Click Here

No.MERC/Legal/2010/483 Click Here No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010 No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010 2 of 2010

Click Here

Click Here

Click Here No.NERC/REGN/2011 No. OERC-Engg-02/2010 No.PSERC/Secy./Reg./55 No.RERC/Secy./Regulation 82 Notification No. TNERC / RPO / 19 / 2, dated 29-072011 Click Here Click Here Click Here Click Here

Click Here

T.E.R.C. (Procurement of Energy from No.F.25/TERC/2009/415 Renewable Sources) Regulations, 2010. UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 No.F9(21)/RG/UERC/2010/ 697 Uttar Pradesh Electricity Regulatory Commission (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010 Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2012 Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Notification of State agency for REC Order for APPC Order for APPC Order for APPC Order for APPC Order for APPC Order for APPC Order for APPC Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13 Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13 Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13 Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13 Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13 No. UPERC/Secy/Regulation/1 0 - 787 Reg No. 1 of 2012

Click Here Click Here

Click Here

Click Here AERC/341/2010/138 PT No. 40 No. 1370 Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here 10 of 2012 Click Here 10 of 2012 Click Here 10 of 2012 Click Here 10 of 2012 Click Here Click Here Click Here Click Here Click Here Click Here

10 of 2012

Terms and Conditions of Open Access to intra-state transmission system 2 of 2005 Determination of Surcharge and Additional surcharge for FY 2012-13 Andhra Pradesh Solar policy APERC Transmission tariff Order for FY 2009-14 Andhra Pradesh Wind policy 77 of 2012 Go Ms No 39

Arunachal Pradesh open access regulation Arunachal Pradesh Small hydro Policy Assam open Access Regulations Transmission Tariff Order for FY 2010-13 Distribution Tariff Order for FY 2010-13 Assam Small Hydro Policy Bihar Open Access Regulations Tariff Order For FY 2012-13 Chhatisgarh Open Access Regulation Tariff Order FY 2012-13 Chattisgarh RPO & REC Regulation Delhi Open Access Regulation Delhi RPO/REC Regulation Tariff Order for TPDDL Gujarat Open Access Regulation Tariff Order GERC Wind Tariff Order GERC Solar Tariff Order Haryana Open Access Regulation Tariff Order Tariff Order Haryana RE Policy Himachal Pradesh Open Access Regulation Transmission, Wheeling , open access charges Order Himachal Hydro Policy J&K Open Access Regulation J&K Wind Tariff order Open Access Charges Jharkhand Open Access Regulation Jharkhand procurement of power from wind Regultions Order Jharkhand procurement of power from Solar Regultions Karnataka Open Access Regulation Tariff Order for CESC Tariff Order for Hukerri Tariff Order for BESCOM Tariff Order for MESCOM Tariff Order for HESCOM Tariff Order for GESCOM Transmision Tariff order for KPTCL KSERC Open Access Regulation Tariff Order KSERC (Power Procurement from Captive Generating stations to Distribution Licensees) Regulation 2007 MPERC Open Access Regulation MPERC Solar Tariff Order MPERC Wind Tariff Order MPERC Transmission Tariff order FY 2012-13 MERC Transmission OA Regulations MERC Distribution OA Regulations MERC InSTS Order for FY 2012-13 MERC Order on cross subsidy surcharge MERC Wind Tariff Order Joint Electricity Regulatory Commission for Manipur and Mizoram (Terms and Conditions for Open Access) Regulations, 2010. Retail Tariff Order Power & Electricity Department, Government of Mizoram Meghalaya State Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulations, 2012

Petition 7/2010 Petition 6/2010

Petition 05/2012 Notification 3/2011 Case 1152/2011 Order No. 2 of 2012 Order No.1 of 2012 25/2012 34 of 2011 30 of 2011

24 of 2010 Regulation/199

Y/03/4

O.P.23 of 2012

Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here

SMP-45/2010 SMP-20/2010 Petition 21/2012

Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here

Click Here Click Here

Meghalaya SCHEDULE OF RATES & CHARGES FOR OPEN ACCESS Terms and Conditions for Determination of Generation Tariff for Renewable Energy Nagaland Electricity Regulatory Commission (Terms and Conditions for IntraState Open Access) Regulations, 2012 Orissa Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulation, 2005 OERC Order on Open Access Charges Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) Regulations, 2011. Rajasthan Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2004 Order In the matter of petition filed by RVPN for determination of Tariff for FY 2012-13. ARR of FY 2012-13 of Discoms of Rajasthan POLICY FOR PROMOTING GENERATION OF ELECTRICITY FROM BIOMASS, 2010 Determination of Wheeling Charges & Cross Subsidy Surcharge for FY 2010-11. The Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009 TNERC Open Access Regulations TNERC Wind Tariff Order TNERC Biomass Tariff Order Tripura (Terms and Condition of Open Access)Regulations, 2010 T.E.R.C. (Procurement of Energy from Renewable Sources) Regulations, 2010. UERC (Terms & Conditions of Intra-State Open Access) Regulations, 2010 Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010 Uttar Pradesh Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2004 UPPTCLTariff_Order for FY 2012-13 Kanpur Electricity Supply Company Limited ARR for FY 2012-13 UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009 West Bengal Electricity Regulatory Commission (Open Access) Regulations, 2007 West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010 CERC Draft RE generic Tariff Order for FY 2013-14

Click Here

Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here Click Here

Click Here

Click Here Click Here Click Here Click Here Click Here Click Here Petition No. 243/SM/2012 (SuoMotu)

Click Here Click Here Click Here Click Here Click Here Click Here Click Here

Draft Amendment to Intra-State Open Access Regulations Order on Tariff Determination for Biomass Plants to be commissioned in 2012-13 to 2016-17 Order on Tariff Determination for Bagasse base Co-gen Plants to be commissioned in 2012-13 to 2016-17 Draft RE Tariff Regulations, 2012 RPO Regulation 2012 Solar PV Tariff Regulations 2012

Tariff for sale of electricity from Bio-mass based power plants in the State to distribution licensees commissioned during FY 2012-13 of the control period 2009-14 APPC Order for FY 2012-13 HPERC (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012.