You are on page 1of 6

NOSS MATRIK

01.02

01.03
01.04

01.05

INSTALLATIONFRAMES

PLASTERING WORK

FIXINGMOSAIC AND TILE

PAINTING WORK

01.01

BRICK WORK

Use safety
attires & gears
while
performing
various job
Comply with
tools &
equipment
safety rules
Adhere to site
safety
equipment
Demonstrate
the use of fire
fighting
equipment
Apply
emergency first
aid techniques

CONCRETE WORK

NO.TAS
K

PREPARATIONFORMWORK

TASK

IDENTIFICATIONMATERIALS

DUTY

PILING WORK

NO.
DUT
Y
01

TECHNICAL DRAWING

JOB PROFILE CHART

EQUIPMENTTOOLS AND

MODULE

SAFTTY PRACTICE

B-010-1 (BUILDING CONSTRUCTOR)

M01

M02

M03

M04

M05

M06

M07

M08

M09

M10

M11

M12

02

03

USE TOOLS
AND
EQUIPMENT

READ AND
UNDERSTAND
TECHNICAL
AND DRAWING

06

PREPARE
FOUNDATION

07

PREPARE
FORMWORK

08

FABRICATE
REINFORCEME
NT ACCORDING
TO
SPECIFICATION

Identify & use


hand tools &
machine tools
Identify & use
power tools
Identify & use
equipment/
plant
Draw basic
technical
drawing
Identify various
symbols in
technical
drawing &
building plan
Interpret
building plans
Perform piling
works

02.01

Identify
materials &
fabricate
formwork
members to
required shapes
& sizes
Erect formwork
for set up
Erect &
dismantle
formwork for
lintel
Install
necessary
fasteners
needed
Identify types
of materials &
prepare for
required
reinforcement

07.01

02.02
02.03
03.01
03.02

03.03
06.01

07.02
07.03

07.11

08.01

09

11

12

PERFORM
CONCRETE
WORKS
ACCORDING TO
SPECIFICATION
S

INSTALL
FRAMES

LAY BRICKS
ACCORDING TO
SPECIFICATION
S REQUIRED

Fabricate &
place
reinforcement
up to two
storey building
Make spacer
blocks
Install
necessary
spacers
Identify
materials for
concrete
mixtures
Mix concrete
according to
proportions
Place &
compact
concrete
Perform curing
concrete
Install outlet
traps
Select frames &
fix fasteners on
frames
Prepare & fix
frames
Erect lintel over
frames
Identify &
select materials
Prepare mortar
according to
proportions
Construct
stretcher,
English &
Flemish bond
wall in various
forms with
pointing &
jointing

08.02

08.03
08.04
09.01

09.02
09.03
09.04
09.07
11.01
11.02
11.03
12.01
12.02
12.03

16

PERFORM
PLASTERING
AND
RENDERING
WORKS

Construct door
& window
opening on
brick wall
Construct rough
arches
Construct axe
arches
Construct
isolated piers
Dismantle
formwork
accordingly
Erect formwork
for arches
Erect formwork
for staircase
Install
necessary
fasteners
needed
Construct
pavior
Construct block
& slab pavior
Erect coping &
capping on
brickwork
Construct
hollow block
walls
Lay off damp
proof course in
brickwork
Identify &
select materials
Prepare mortar
according to
required
proportion
Prepare plain
vertical surface
Perform
plastering on

12.04

12.05
12.06
12.07
12.08
12.09
12.10
12.11

12.12
12.13
12.14
12.17
12.19
16.01
16.02

16.03
16.04

plain vertical
surfaces with
finishers
Prepare curve
vertical
surfaces for
plastering
Perform
plastering on
curve vertical
surfaces with
finishers
Perform rough
cost finish on
plastered works

17

WALL AND
FLOOR
FINISHING

16.05

16.06

16.07

Identify &
select materials
Prepare vertical
backing surface
Prepare
adhesive for
tiling & mosaic
fixing
Set out & lay
tiles on walls
Perform
rendering &
apply for
backing surface
Set out & lay
tile on floor
Set out & lay
mosaic on floor

17.01

Identify, select
& prepare
materials for
painting works
Prepare
background

17.18

17.02
17.03

17.04
17.05

17.06
17.07

17.19

18
19

Identify &
select
materials
INSTALL
FENCES

surfaces for
painting works
Perform water
based painting
works
Perform oil
based painting
works
Identify &
select materials

17.20
17.21
18.01

Identify &
select materials

19.01

Set out &


construct chain
fences with
valid steel pipe
gate post
Set out &
construct brick
work &
masonry gate
post

19.02

19.03

You might also like