DESIGN OF PILE CAP USING USD MENTHOD

Name of Pile Cap = Yield strength of steel fy Compressive strength of concrete fc' Dia of Pile All Capacity of Pile ,P Ultimate Capacity of pile ,Pu Assumed Effective depth,d Column Perimeter for shear,bo Allowable Punching shear Stress, Vc Required Depth of Pile cap,d Minimum Steel required both direction, As Used Rod Area in short direction ,as Spacing of Steel S in both direction Total Depth of Pile Cap,T PC1 60 3 16 165 249.15 14 104 186.23 12.86 1.68 0.31 6.64 19 ksi ksi in kips kips in in ksi In in2 2 in in C/C in

DEPTH IS OK

h 36 12 12 36 b in in

DESIGN OF PILE CAP USING USD MENTHOD


Name of Pile Cap = Yield strength of steel fy Compressive strength of concrete fc' Dia of Pile All Capacity of a single pile ,P Ultimate Capacity of pile ,Pu Assumed Effective depth,d Col face to Pile face +Pile dia/5, a Allowable Beam shear Stress, Vc Depth of Pile Cap by Beam Shear ,d Moment of Pile cap,Mu Assume value of "a" Required Area of steel As Check The value of "a" Used Rod Area in Long direction ,as Minimum steel Requires, As Spacing of Steel S/ Long direction Steel required in short direction, As Used Rod Area in short direction ,as Spacing of Steel, S/Short direction Total Depth of Pile Cap,T PC2 60 3 16 165 247.5 25.5 17.2 276.09 24.90 5445 2.8 4.18 2.73 0.44 3.06 3.79 8.16 0.31 3.65 30.5 ksi ksi in kips kips in in Psi in K-in in in2 in in2 in2 in c/c in2 in2 in in

OK

h 96 18 9 18 36 in b in in

DESIGN OF PILE CAP USING USD MENTHOD


Name of Pile Cap = Yield strength of steel fy Compressive strength of concrete fc' Dia of Pile Capacity of pile ,P Ultimate Capacity of pile ,Pu Assumed Effective depth,d Col face to Pile face +Pile dia/5, a Allowable Beam shear stress Vc Depth of Pile cap By Beam shear,d Moment of Pile Cap,Mu Assume value of "a" Required Area of steel As Check The value of "a" Used Rod Area "as" Minimum steel Requires As Spacing of Steel, S in both direction Total Depth of Pile Cap,T PC1 60 3 16 165 247.5 20 11.2 332.55 17.72 7920 0.76 7.48 2.09 0.44 5.6 4.94 25 ksi ksi in kips kips in in Psi in K-in in in2 in in2 in2 in C/C in

OK

L 84 in

9 b(in) 18 18 h(in)

in 84 B in

DESIGN OF PILE CAP USING USD MENTHOD


Name of Pile Cap = Yield strength of steel fy Compressive strength of concrete fc' Dia of Pile Col face to Pile face +Pile dia/5, a Ultimate Shear force in Pile Cap ,V Assumed Effective depth,d Considered Width of Pile Cap Allowable Beam shear stress Vc Required Depth of Pile cap,d Moment of Pile cap,Mu Assume value of "a" Required Area of steel As Check The value of "a" Used Rod Area "as" Minimum steel Requires As Spacing of Steel S Total Depth of Pile Cap,T PC1 60 3 16 15 90 12.5 84 155.19 6.90 204 1 3.78 1.06 0.31 3.5 6.89 17.5 ksi ksi in in kips in in Psi In K-ft in in2 in in2 in2 in C/C in

Length of Pile Cap

OK

Length of Pile Cap Breath of Pile Cap

h b