Prepared by Uptime Institute Professional Services, LLC Copyright 2011 by Uptime Institute, LLC 20 West 37th Street - 6th Floor New York, NY 10018 All rights reserved. The Uptime Institutes (Institute) publications are protected by international copyright law. The Institute requires written requests at each and every occasion that the Institutes intellectual property or portions of the Institutes intellectual property are reproduced or used. The Institute copyright extends to all mediapaper, electronic, and video contentand includes use in other publications, internal company distribution, company Web sites and marketing materials, and handouts for seminars and courses. For more information, please visit www.uptimeinstitute.org/resources to download a Copyright Re- print Permission Request Form. , LLC
Continuous Cooling This Technical Paper supplements Data Center Site Infrastructure Tier Standard: Topology. UPTIME INSTITUTE ATD Technical Paper Series: Continuous Cooling 2 This technical paper clarifies the requirements for Continuous Cooling in the context of the Uptime Institutes Tier Standard: Topology. Tier IV is the only Tier that requires Continuous Cooling. Additionally, this paper serves to recommend Continuous Cooling at densities beyond 4 kilowatts (kW)/rack, regardless of Tier. As the power densities in the data center increase, the need for Continuous Cooling becomes more profound. The risk of the loss of cooling during a UPS ride-though event can be catastrophic to a business. IT equipment may fail or become wounded. However, depending on the cooling or UPS technology deployed, the definition and requirement for Continuous Cooling can widely differ. This paper clarifies the definition of Continuous Cooling and details its deployment with varying types of technology choices. Regardless of technology, Continuous Cooling is defined as the ability to provide stable cooling to the IT and UPS environment without any interruption. Continuous Cooling provides this stable cooling capability for the duration of the UPS ride-through time. For example, for a static UPS system with 15 minutes of battery, the Continuous Cooling will need to provide stable cooling for 15 minutes. Note, however, that if there are redundant modules and battery strings available, the 15 minute ride-through time could become 30 minutes or more (depending on redundancies). Careful consideration should be taken by the owner to determine if the stated ride-through time or the available ride-through time should be the requirement for the Continuous Cooling solution. The American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE), in concert with major IT equipment manufacturers, established Thermal Guidelines for Data Processing Environments that includes recommended computer equipment inlet air temperatures necessary to enable reliable operation of servers, storage, and network devices. As of 2010, the ASHRAE guideline (accepted on a global basis) recommends that the device inlet be between 66-81F (18-27C) and 20-80% relative humidity to meet the manufacturers established criteria. As a point of reference, Uptime Institute conducted a demonstration on a 6-kW/rack average computer room. Intake air temperatures in computer rooms will exceed the top value in this range within 60 seconds after a loss of cooling or even air movement. Consider the scenario of a utility failure, during which the UPS continues to power the IT devices, but mechanical plant operation is interrupted. Depending on the technology of the cooling deployed, this interruption may continue for several minutes. During this time, elevated temperatures in the computer room may damage IT equipment. Continuous Cooling provides the bridge to enable stable cooling to continue until the mechanical or other cooling resumes. TIER STANDARD: TOPOLOGY REQUIREMENTS Tier IV is the only Tier that requires Continuous Cooling. Continuous Cooling for a chilled water system is generally accomplished with thermal energy storage (TES) capability (also known as chilled water storage). Secondary pumps and computer room air handlers (CRAHs) are required to be on UPS. This can be the IT UPS or a separate, Concurrently Maintainable and Fault Tolerant, mechanical UPS system. If the cooling system is in a primary-direct configuration, then the primary pumps are required to be on UPS. Continuous Cooling for direct exchange (DX) systems requires both the computer room air conditioners (CRACs) and the external condensers to be on a Concurrently Maintainable and Fault Tolerant UPS system. The same requirement exists for split- system air conditioning units. Continuous Cooling for 100% outside air systems that can provide cooling throughout the year require the fans (or the system that delivers the air to the computer room) to be on UPS. When rotary UPS systems are deployed as the IT UPS, then the cooling system must be on the no-break bus. This allows provision of cooling throughout a UPS ride-through event. If there is a chilled water system deployed in tandem with a rotary UPS with no batteries, typically no TES is required. However, each specific case should be reviewed to ensure stable cooling is provided during a loss of power event. Regardless of any of the cooling or UPS technology deployed in a particular data center, consideration must be given to the time required to restore mechanical cooling. For example, in a chilled water system, although the engine generators may assume the electrical load within seconds after loss of utility, the result of the momentary loss of power to the chillers may require a restart cycle lasting up to 15 minutes or even more. Although manufacturers are reducing the restart times, 20 West 37th Street, 6th Floor, New York, NY 10018 +1 206.706.4149 Fax: +1 206.706.3083 uptimeinstitute.org professionalservices.uptimeinstitute.com 2011 Uptime Institute, LLC UI109110-411 , LLC 3 UPTIME INSTITUTE ATD Technical Paper Series: Continuous Cooling the interval between the loss of power and a resumption of the systems ability to produce stable cooling needs to be incorporated as a data point in the ride-through time. For example, if a UPS ride-through time is set at 5 minutes, yet it takes 15 minutes to resume stable mechanical cooling after a loss of power, then the TES must be able to provide 15 minutes of chilled water storage. Providing thermal stability to the IT and UPS environment during the transition from utility outage to engine-generator power, Continuous Cooling ensures that a utility event does not result in costly heat damage to IT hardware or critical equipment. A requirement only for Tier IV, but justifiable for average densities above 4 kW in light of potential damage to facilities and IT investment. RELATED PUBLICATIONS Tier Standard: Topology Accredited Tier Designer Technical Paper Series: Engine-Generator Ratings Accredited Tier Designer Technical Paper Series: Makeup Water Further information can be found at www.uptimeinstitute.com/resources.
The Complete HVAC BIBLE for Beginners: The Most Practical & Updated Guide to Heating, Ventilation, and Air Conditioning Systems | Installation, Troubleshooting and Repair | Residential & Commercial
Power of Habit: The Ultimate Guide to Forming Positive Daily Habits, Learn How to Effectively Break Your Bad Habits For Good and Start Creating Good Ones