AX324 - Engineering HVAC Cheklist PLANT ROOM/SUBSTATION No._________________________ Shop Drawing No.

_____________________________________ ENGINEER'S NAME:____________________________________ START DATE:_________________________________________ a) GENERAL: No. QUERY REPLY 1 Is the drawing first issue of re-submittal? 2 If re-submittal, has previous revisions been commented/coded? 3 If yes to above, have you read and seen commented drawings? 4 Name of Electrical Engineer assigned to Plant Room: 5 If first submission, what is the number of Contract Issue Drawing? (including revision) 6 What is the single line diagram used as reference? 7 Have you got a copy of Architectural Layout with beams overlaid and site measurements of levels on? 8 Have any drawings been produced for areas outside the Plant Room? 9 If yes, can you co-ordinate the services at entry and exit to Plant Room? 10 If no to above, have you resolved the problem with Engineer responsible for area outside Plant Room? (attach any relating documentation). 11 If no, contact your Manager. Manager's Signature:____________________ Date:_______________

12 Is there any issues that require an SCR to be raised? 13 If yes, attach the relevant Documentation. 14 Have the SCR been answered? 15 If yes, can you incorporate answer/reply? 16 If no to above, contact your Manager. Manager's Signature:____________________ Date:_______________

17 If no to Point No.14, then area clouded and noted refering to SCR. b.1) EQUIPMENT: SILENCE ATTENUATORS No. 1 Have any been selected? 2 If no, attach relevant documents to support size indicated. 3 Can all attenuators be accommodated in Plant Room? 4 If no, attach Documentation to HVAC Engineer responsible for area outside the Plant Room so that he can accomodate it. QUERY REPLY

187801033.xls.ms_office_11/12/2013

Page 1 of 3

AX324 - Engineering HVAC Cheklist b.2) EQUIPMENT: AHU's No. QUERY REPLY 1 Is there any possibility that the unit may change to meet specified duties? 2 If yes, attach documentation. 3 Has the plinths been sized to accommodate new size? 4 If no, ensure CAD updates Plant Room equipment SEM Details. 5 Are there enough FD2 that can be relocated to suit AHU condense drain location? 6 If no, can the condense drain be routed in the screed to TDI location? 7 If no, take print of problem and ask Manager to resolve. Manager's Signature:____________________ Date:_______________

8 If relocated FD2 drains, attach doument informing Engineer of area below of change. 9 Attach all P-trap calculations for each AHU. 10 Is there enough head room for AHU and ductwork connections. 11 If no, contact Manager and raise SCR. Manager's Signature:____________________ b.3) EQUIPMENT: PUMPS No. 1 Have pumps been selected? 2 If no, attach Documentation supporting sizes used. 3 Have inertia basis been selected/sized? 4 If no, attach Doucumentation supporting sizes used. 5 Is plinth for pumps correct size and spacing of inertia bases? 6 If no, ensure it is changed by CAD. b.4) EQUIPMENT: WATER HEATERS No. 1 Have these been selected? 2 If no, attach Documentation supporting sizes used. 3 What is the Thermastatic Mixing Valves arrangement ? Cabinet/Individual QUERY REPLY QUERY REPLY Date:_______________

187801033.xls.ms_office_11/12/2013

Page 2 of 3

AX324 - Engineering HVAC Cheklist b.5) EQUIPMENT: FANS (Fresh Air, Extract, Smoke Extract) No. 1 Have these been selected? 2 If no, attach Documentation supporting sizes used. 3 Can soung attenuators be fitted? 4 Have sound attenuators been selected? 5 Attach Documentation supporting sizes used. b.6) EQUIPMENT: FCU's No. 1 Have these been selected? 2 If no, attach Documentation supporting sizes used. 3 Attach document that states Handing Required and Transmittal to C.E.D. 4 Are invert levels marked up on drawing? QUERY REPLY QUERY REPLY

Drawing commented by HMRT Eng'r.:_________________________

Date:_______________

Completion date & given to CAD for cadding (first issue) :_______________ Date returned from CAD for checking:_______________ Drawing commented alongside HMRT Eng'r.:____________________ Date final commented drawing to CAD:_______________ HMRT signature..... Thermo signature.. JAM signature... Date Sign-off:_______________ Date:_______________