Introduction
Structured Approach to Project Management Project Management Institute (PMI) USA Project Management Body of Knowledge (PMBOK) Role Delineation Study (RDS) & PMP Examination
SMC 2010-2013
2|Page
Honors at NADRA
1st Position is National Wide Selection of Assistant Directors (ADs) in 2002 1st Position is First Abroad Selection Test, Severed in England Over 12 certified PMPs students in NADRA Second Batch of PMP Training at NLDC.
Honor
Contributor PMBOK 5th Edition
3|Page
Introductions
Introduce Yourselves
Name Background and Relevant Experience If you could go back in time and give yourself one lesson, what would it be?
Y?
10
SMC 2010-2013
4|Page
http://www.ginaabudi.com/articles/using-return-on-investment-to-evaluate-project-management-training/
PMI Statistics
13
www.pmi.org
PMBOK 5th Edition SMC 2010-2013
5|Page
15
SMC 2010-2013
6|Page
Surface Learning
Information
Knowledge Wisdom
Deep Learning
Smart Management Consultants (SMC)
Transformation
Brain Rules
E N G A G E M E N T
Data
17
SMC 2010-2013
7|Page
www.brainrules.net
Stay on time
Ground Rules
Engaged Learning Experience
Avoid Interruptions
Energy Monitors Ask Questions Stay on topic I m talking to PMs Conduct one conversation at a time Reflect Avoid Group Think
18
Groupthink
Groupthink is a tendency for strong conformity pressures within groups to lead to the breakdown of critical thinking and encourage premature acceptance of questionable decisions Smart Management Consultants (SMC)
PMBOK 5th Edition SMC 2010-2013
8|Page
20
The training will not cover any project management tool or software. PMI methodology (only) will be followed.
Smart Management Consultants (SMC)
21
SMC 2010-2013
9|Page
Simulative Software
23
SMC 2010-2013
10 | P a g e
Better control of financial, physical, and human resources Improved customer relations Improved productivity Better internal coordination Shorter development times Higher quality and increased reliability Lower costs Higher profit margins
Smart Management Consultants (SMC)
THINK BIG
Module 1 - Introduction 36
http://www.youtube.com/watch?v=IQK4QN-NqgM&list=UUMAZzWeWAipboxxBRjzedg&index=24&feature=plcp
PMBOK 5th Edition SMC 2010-2013
11 | P a g e
Project Challenges
203
5,000 17,800 22,000 7.7 million
Countries
OLYMPIC FAMILY Athletes & team officials Media Tickets sold Workforce including volunteers Global audience
38
100,000
4 billion
http://www.london2012.com/
PMBOK 5th Edition
http://www.bbc.co.uk/news/uk-15655611
SMC 2010-2013
12 | P a g e
Business drivers fully identified, agreed upon and must add value.
Smart Management Consultants (SMC)
43
http://www.pmsolutions.com/collateral/research/Strategies%20for%20Project%20Recovery%202011.pdf
SMC 2010-2013
13 | P a g e
Project Management
International Standards
Project Management Organisation ISO (21500) PMI Head office Number of members
Genava USA
387,199
IPMA
APM AIPM
Europe
UK Australia
30,000
15,000 7,100
Planning Commission
Pakistan
Govt.
Selecting a PM Standard
The selection of a project management standard by a company is an important decision. It can influence processes, documentation, training and other operational areas over a long time. We will Focus PMBOK 5th Edition 2013
44
SMC 2010-2013
14 | P a g e
Application of standards enhances the chances of success over a wide variety of projects. But, all the processes may not apply uniformly to all projects. Hence, it is the RESPONSIBILITY of your organization and/or the project management team to determine what is appropriate for any given project. The project manager, along with project team, is always responsible for determining: 1. What processes are appropriate? 2. What is the appropriate degree of rigor for each process? THIS IS CALLED TAILORING!
46
SMC 2010-2013
15 | P a g e
48
At a macro level, PMBOK Guide is a Body of Knowledge and PRINCE2 is a method and takes prescriptive approach for Project Management, complete with Templates.
PMBOK 5th Edition SMC 2010-2013
16 | P a g e
ISO 21500
Project Management Standard
ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies) ISO 21500 was prepared by Project Committee ISO/PC 236, Project Management. Mostly Similar to PMBOK Standard, has 40 Processes and only gives standard, does not elaborate it. First Time published in September 2012.
Smart Management Consultants (SMC)
50
SMC 2010-2013
17 | P a g e
Member Benefits
PMI (Continued)
Annual seminars and symposiums Educational activities Professional Awards Project Management Periodicals
AB1
https://my.pmi.org/Content/pdf/brochure/DMB_Presentation_Animated_FINAL.pdf
SMC 2010-2013
18 | P a g e
Human Resources
Troubled Projects
Automation Systems
Healthcare
Consulting
Government
Design-ProcurementConstruction
Financial Services
Metrics
Pharmaceutical
eBusiness
55
PMI Chapters
PMI has a number of geographically-organized chapters in Pakistan and around the world.
PMI Islamabad Chapter www. pmiislamabad.org PMI Lahore Chapter www.pmilhr.org.pk PMI Karachi Chapter: www.pmikarachi.org
Chapter helps the local PMI members community with attaining and retaining and enhancing PMI credentials.
Smart Management Consultants (SMC)
56
SMC 2010-2013
19 | P a g e
Chapter Benefits
Chapter events Opportunities to network with peers Knowledge resources (articles, white papers, presentations, case studies) Tools and templates from the Chapter Electronic communications Opportunities to volunteer with Chapter Webinars from Chapter An expert to respond to member submitted questions Readily available responses to frequently asked questions
Smart Management Consultants (SMC)
58
SMC 2010-2013
20 | P a g e
PMIs PMBOK
Project Management Body of Knowledge (PMBOK) was developed by PMI.
Worlds most used PM Standard
2013
64
SMC 2010-2013
21 | P a g e
PMBOK Processes
Each process is characterized by its inputs, the tools and techniques that can be applied, and the resulting outputs.
No. Of Process Groups No. of Knowledge Areas No. Processes No of Total ITTOs Unique ITTOs = = = = = 5 10 47 615 197
Process Groups
Planning
Monitoring and
Controlling
Initiating
Executing
Closing
66
SMC 2010-2013
22 | P a g e
Knowledge Areas
Integration Management
Scope Management
Time Management Cost Management Quality Management
Smart Management Consultants (SMC)
67
Knowledge Areas
Human Resource Management Communication Management
Risk management
Procurement management Stakeholders Management
Smart Management Consultants (SMC)
68
SMC 2010-2013
23 | P a g e
SMC 2010-2013
24 | P a g e
Process Approach
A process approach is a powerful way of organizing and managing activities to create value for the customer and other stakeholders. The process approach introduces horizontal management, crossing the barriers between different functional units and unifying their focus to the main goals of the organization. The processes are managed as a system, by creating and understanding a network of the processes and their interactions PMI believes in Process Approach
Smart Management Consultants (SMC)
70
What is a Process
A Process can be defined as a set of interrelated or interacting activities, which transforms inputs into outputs.
Step 1
Step 2
Step 3
Result
inputs
activity
Smart Management Consultants (SMC)
outputs
Def.: A process is a series of actions directed toward a particular result Project management can be viewed as a number of interlinked processes Process groups include: Initiating processes, Planning processes, Executing processes, Monitoring and controlling processes, Closing processes
SMC 2010-2013
25 | P a g e
Processes
In order for a project to be successful, the project team must:
Select appropriate processes required to meet the project objectives, Comply with requirements to meet stakeholder needs and expectations, and Balance the competing demands of scope, time, cost, quality, resources, and risk to produce the specified product.
Smart Management Consultants (SMC)
Actions taken during one process typically affect that process and other related processes.
Processes
PROJECT MANAGEMENT PROCESSES PRODUCT ORIENTED PROCESSES
Ensure the effective flow of the project throughout its existence. These processes apply the skills and capabilities described in the knowledge areas Project management processes apply globally and across industry groups.
Specify and create the project's product. Product-oriented processes are typically defined by the product life cycle and vary by application area. The scope of the project cannot be defined without some basic understanding of how to create the specified product.
SMC 2010-2013
26 | P a g e
Inputs
Outputs from previous Processes
EEP, OPAs
Changes
Occurrences 34 21
74
Analytical Techniques
Expert Judgment
3 Major Tools & Techniques Expert judgment Occurrences 19
Reserve analysis
Communications methods
4
4
75
SMC 2010-2013
27 | P a g e
Outputs
3 Major Outputs
Project document updates Project management plan updates
Occurrences
20 15
Change requests
14
Product
Lessons Learned
Smart Management Consultants (SMC)
Updates
76
PMP EXAM
79
SMC 2010-2013
28 | P a g e
PDU?
Professional Development Unit It is the measuring unit used to quantify approved learning and professional service activities. Typically, 1 PDU is earned for every one hour spent in planned, structured learning experience or activity.
SMC 2010-2013
29 | P a g e
SMC 2010-2013
30 | P a g e
Exam Structure
Time: 4 hours - Total Questions : 200 Pre-Test: 25 Questions will not be scored Exam tests knowledge, application and analysis. Mix of Easy, Difficult and Complex and Few are out of Box Questions; Dont be Scary! Questions Carry different Marks No PMP exams will ever be same Qualitative Scoring Model.
Proficient (P) Moderately Proficient (MP) Below Proficient (BP)
Smart Management Consultants (SMC)
84
Question
? Format
Exam questions are given in a multiple choice format, with four possible answers, marked A, B, C, and D, and only one of those four answers is correct. There is no penalty for guessing, so answer every question on the PMP exam, leaving none of them blank. Many of the PMP questions are quite short in format; however, the PMP Exam is famous (or infamous) for its long, twisting and scenario based questions.
Smart Management Consultants (SMC)
85
SMC 2010-2013
31 | P a g e
Questions Distribution
Process Group
Initiating Planning Executing Monitoring & Controlling Closing
Percentage %
13 24 30 25 8
Questions
26 48 60 50 16
Total
100
Smart Management Consultants (SMC)
200
86
PMI-ism
It refers to the PMI way of thinking that many of the Practicing Project Managers might not be aware of. Also, understanding PMI-ism will help you pick up the best answer among what may appear more than one correct answer in the exam. Technically and Ethically Best Correct Answer Choice, to be Selected.
Smart Management Consultants (SMC)
87
SMC 2010-2013
32 | P a g e
2
All Moderate Proficient
3
Any Combination Proficient or Moderate Proficient
4
BP
5
BP
6
P
MP
P P BP
MP
P P P
P
MP MP BP
88
Evaluate Vertically
Smart Management Consultants (SMC)
Qs
26
1
BP
2
MP
3
BP
4
MP
5
MP
48
60 50
MP
BP BP
BP
MP BP
MP
BP MP
BP
MP MP
MP
MP BP
16
MP
MP
MP
MP
89
SMC 2010-2013
33 | P a g e
BECOMING A PMP
How long it took to become PMP certified
Average
9.1 months
Median:
6.0 months
Min:
1.0 months
Max:
40.0 months