You are on page 1of 23

MWM Canada Inc.

GTM Conference Biogas Experience March 2011

Content
MWM Overview Biogas Experience Plant Examples

MWM Overview

Company History
: HISTORY

Company History - NEW


: HISTORY

Company History
: HISTORY

Engine Product Range 60Hz

Sales + Service Centres in Canada and USA

MWM Canada Inc. 210 Willmott St. Cobourg, ON K9A 4WS Ph. (905) 377 1273

MWMoA Work Shop Salem Ohio MWMoA 3883 Steve Reynolds Blvd. Norcross, GA 30093 Ph. (770) 279 6720

8
8

Biogas Experience

How can biogas be used?

E t ti Extraction

C diti i Conditioning

U Usage

N t entry Net t

Digester

Compression unit, gas conditioning and emergency flare

Combined heat and power plant

substation

10

Biogas

Biogas consists of:


- Methane CH4: 45 - 70% - Carbon dioxide CO2: 30 - 55% - Sulphur hydrogen H2S: 5 25,000 ppm - Humidity H2O: saturated - Take care about it!

11

Critical for Biogas Engines

Humidity
- Biogas - saturated with almost 100% moisture can cause: - Corrosion - block pipes, filters,

H2S/Sulphur in the Biogas


- Reduced Oil lubricity y - SOx + H2O > Corrosion - Deposits in exhaust gas heat exchanger
Clean vs. Deposits + Corrosion
12

Critical for Biogas Engines

Humidity - Biogas treatment gas cooling/drying


Active gas cooling: With Cooling Unit

Passive gas cooling: Longer underground biogas pipe


Gas cooling/drying Example Gas volume Gas temperature IN/OUT Elec. power for cooling system Investment costs approx. 236 Nm3/h 40/10 C C 3.6 kW 34,500.- $

CHP unit

Critical for Biogas Engines H2S Biogas treatment Desulphurization (biological)


Internal H2S removal External H2S removal

Biogas
M
The image cannot be display ed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and then insert it again.

Biogas

Air Air Water

For low and medium H2S contamination - Consider max. air volume - H2S reduction is not constant - The additional air increase corrosion activity
14

For high g H2S contamination\ - The additional air increase corrosion activity - H2S reduction is stable - Higher investment costs
-

Critical for Biogas Engines H2S Biogas treatment - Desulphurization Air dosing g view inside a digester g tank

Biological desulphurisation the H2S will be converted into sulphur

Source: MT-ENERGIE

15

What does a Biogas Engine Cost?


500kWe Gas Engine: Investment Costs: - Engine E i H House D Design: i 800 900 $/kW $/kWe - Containerized System: 1,100 1,250 $/kWe Service Costs: - Engine: - excl. excl major overhaul: 5 - 6 $/oh - incl. major overhaul: 7- 8 $/oh - Containerized Unit: - excl. major overhaul: 6.5 - 7.5 $/oh - incl. major j overhaul: 8.5 9.5 $/oh
*) Major Overhaul: after 64,000 operation hours!
16

Container and Engine House design

Seite 17 17

Plant Examples

18

Biogas Examples
Armstorf, Germany
Biogas: 1 x TCG 2016 V12; 537 kWe

Gut Kletkamp, Germany


Biogas: 1 x TCG 2016 V12; 537 kWe

Gaarestrup Denmark Gaarestrup,


Biogas: : 1 x TBG 616 V16 K; 647 kWe

19

Biogas Examples in Ontario (under construction)


Maryland Farms, Reaboro/Lindsay 1 x TCG 2016 V12; 500kWe C t i i d CHP U Containerized Unit it

Kirchmeier Farms, St. Isidore


1 x TCG 2016 V12; 500kWe CHP Unit in Engine House

Petrocorn/Henrard Biogas, Biogas Curren


1 x TCG 2016 V12; 500kWe CHP Unit in Engine House

20

21

Thank you for your Attention!

22

Contact information:
Gerhard Klammer - CEO MWM Canada Inc. 210 Willmott St., Unit 4B Cobourg, ON P.O. Box 1120, , K9A 4W5 Ph: +1 905 377 1273 Cell: +1 716 238 3534 Fax: +1 905 248 3168 Fa E-mail: gerhard.klammer@mwm.net www.mwm.net