the module
This modular unit consists of a steel frame that rests on the existing concrete slab-on-grade. With the height of the ceiling being 9 the steel frame consists of beams and columns that support k-bar floor joist.s. The framing has galvanized steel studs on 16 centers. The sole plates are secured to the concrete slab with J-hooks and the studs are fastened with stud screws. The rough-in MEP runs through the knockouts in the metal studs and is covered with expanded polysterene insulation. The sheathing of the unit is composed of 1/2 OSB and is covered with a vapor barrier and then the brick cladding. The interior of the unit is finished with gyp board and level three finishes and painted per specification.
brick cladding
PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT
UP
phasing
cost estimate 4 3 2 1
$$5 million
asbestos removal demolition construction
$1.2 million
$460,000
$2.5 million
asbestos removal demolition new construction site work / landscape
$10 million
$15 million
shell
$30,00
interior
$8
00 4,5
$56,500
floor construction roof construction exterior walls $410,500 exterior doors roof coverings
partitions
interior
doors
$111,000
furnishings
$32,500
$135,000
services
elevators plumbing fixtures domestic water distribution rain water drainage
$84,500
$351,500
$61,000
$92,500
$187,000
8/30/12
november
january
march
may
july
Phase 1
Phase 2
Phase 3
Phase 4
8/12/13
Start
project duration
Finish