You are on page 1of 2

182

Wallace C
ircle

Lun d

yD

12
r.

1 bedroom apartment

Co lle

ge

Vie w

Dr.

2 bedroom apartment

bus stop
al Dr .

Ve ter an

apples nectarines peaches figs

12

sM

em or i

vegetables

recreational field

Generated by CamScanner

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

UP

UP

PRODUCED BY AN AUTODESK STUDENT PRODUCT

UP UP

UP

PU

PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT


UP UP

UP

UP

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

UP

DN

DN

phase

UP
DN DN

UP

the module
This modular unit consists of a steel frame that rests on the existing concrete slab-on-grade. With the height of the ceiling being 9 the steel frame consists of beams and columns that support k-bar floor joist.s. The framing has galvanized steel studs on 16 centers. The sole plates are secured to the concrete slab with J-hooks and the studs are fastened with stud screws. The rough-in MEP runs through the knockouts in the metal studs and is covered with expanded polysterene insulation. The sheathing of the unit is composed of 1/2 OSB and is covered with a vapor barrier and then the brick cladding. The interior of the unit is finished with gyp board and level three finishes and painted per specification.

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

brick cladding

spray foam insulation

metal stud k-bar floor joist steel beam steel column

PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT
UP

PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT


UP

phasing

cost estimate 4 3 2 1
$$5 million
asbestos removal demolition construction

total construction cost


$49.6 million
$483,000

$1.2 million

$460,000

$2.5 million
asbestos removal demolition new construction site work / landscape

$10 million

$15 million

construction cost per building


$26,500.00
00 $232,0

shell
$30,00

interior

$587,000 $787,000 $571,500

$8

00 4,5

$500,087 structure shell interiors $128,000

$56,500
floor construction roof construction exterior walls $410,500 exterior doors roof coverings

$96,000.00 $40,000 $37,500 $121,000

partitions
interior

doors

services equipment and furnishings site work

fittings wall finishes floor finishes

$111,000

furnishings
$32,500
$135,000

$1,500 $106,500 $96,500

services
elevators plumbing fixtures domestic water distribution rain water drainage

$84,500

moveable furnishings dormitory furniture deluxe


$13,000 $54,000
,000 $43

$351,500

terminal & package units sprinklers standpipes

$61,000

electrical service/distribution lighting/branch wiring communication and security

$92,500

$187,000

8/30/12

november

january

march

may

other electrical systems


$7,0000

july

Phase 1

Phase 2

Phase 3

Phase 4

8/12/13

Start

project duration

Finish