063KA Design & Construction of Tamar Development Project, Hong Kong for The Government of the Hong Kong Special Administrative Region
Revision No. a b c c1
Distribution List:
For and on behalf of Scott Wilson Limited
ArchSD - SO ArchSD SOR/PTL ArchSD SOR/A ArchSD SOR/SE ArchSD SOR/BSE ArchSD SOR/QS ArchSD SOR/EME ArchSD SOR/LA ArchSD SOR/IT ArchSD SOR/COW ArchSD SOR/BSI ArchSD SOR/EM
GHHJV RDL MCS (RSE) LAM (RGE) JRP (BSE) HOK GMB GTR ALT SMW
Endorsed by Company GHHJV for and on behalf of Signature Name Position Date Edward Yeung Project Director
Date: Building Services Design Checker
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
CONTENT 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Introduction Design Criteria System Description Resilience Design and Expansion Flexibility MVAC Provision Interconnection Between BRI System And Electronic AV Systems T&C Procedures Statutory Submission A B C D E F G H I J K
APPENDIX Drawing Schedule, Legend and Schematic Diagram Schedule of Major Materials and Equipment Estimate of Maintenance Cost Satellite Channel List Proposed BRI System Channel List Running Cost Estimation Signal Loss Calculation of BRI system Corresponding Letters Diagram for BRI interfacing with IT system Reply to ASD Comments on 1st Submission of 2nd AIP Reply to IDC Comments on 1st Submission of 2nd AIP
-2-
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
(e)
The Specification No. HKTA 1105:2001 Technical Information for Frequency Planning of In-Building Coaxial Cable Distribution System issued by OFTA.
1.0
Introduction
The Broadcast Reception Installation (BRI) and in-building optical fiber/coaxial/Cat 6 cable distribution system (IBCCDS) will be installed for CGC Office Block. Separate BRI system will be provided for CGC Office Block and CGC Low Block. The BRI systems will be used to distribute the TV/FM signals, AV signals from meeting broadcast system, satellite TV signals including STAR TV and cable TV, and signals from the burglar alarm and security system (e.g. door phone and CCTV system), as well as the information from the IT/computer network. Satellite Master Antenna Television (SMATV) system will also be installed for LegCo Complex and connected to the BRI systems. A separate SMATV system will be provided for CGC Office Block, which also serving CGC Low Block. An additional BRI system link between the BRI systems in Legco Complex and CGC Office Block will be provided. It will be used to supply the BRI system in CGC Office Block with the signals of the meeting 2.1 (h) (g) (f)
The Specification No. HKTA 1108:2007 Technical Information for Digital Terrestrial Television Baseline Receiver Requirements issued by OFTA. Fire Service (Installations and Equipment) Regulations, Fire Services Ordinance, Chapter 95, and other subsidiary legislation made under the Ordinance. Waste Disposal Ordinance, Chapter 354 and other subsidiary legislation made under the Ordinance.
(i)
Environmental Impact Assessment Ordinance, Chapter 499 and other subsidiary legislation made under the Ordinance.
BRI system performance requirement (i) (ii) The signal to noise ratio of the system shall not be less than 40dB. The cross talk ratio shall not be less than 40dB between adjacent programmes or channels The total harmonic distortion shall not exceed 5% at full power Variation of signal strength shall not exceed 3dB between an outlet nearest to the amplifier and any other outlet in the system (v) A load variation of 50% shall not affect the quality of signal or cause the output voltage at any outlet to vary by more than 6dB
broadcast system of LegCo Complex. This 2nd AIP is not fully consistent with the 2
nd
accordance with the revised SOA. Consideration of seismic condition as per ER requirement shall be addressed in next AIP submission.
2.0
Design Criteria
The broadcast reception installation shall comply with the following: (a) Telecommunications Ordinance, Chapter 106, and other subsidiary legislation made under the Ordinance. (b) (c) Electricity Ordinance, Chapter 406, and other subsidiary legislation made under the Ordinance. The Specification No. HKTA 1103:2000 Performance Requirements of Television Signals Input to the Head End of Subscription Television System issued by Office of the Telecommunications Authority (OFTA). (d) The Specification No. HKTA 1104:2007 Performance Requirements for In-Building Coaxial Cable Distribution System (IBCCDS) issued by OFTA (hereinafter referred to as the Performance Specification. (viii)
(vi)
The outlet field strength for each channel shall be within the range 48-75dB and 60-80dB for FM and TV respectively
(vii)
The SMATV system including dish antenna for the satellites, feedhorn, low noise block converter, satellite receiver, channel amplifier, filter, RF modulator / combiner, etc The dish antenna for receiving programmes from 3 satellites. The target satellites are Asiasat 2 ( 100.5E) / Asiasat 3s ( 105.5E) / JCSAT 2/B Sat 1A/1B ( 110.0E) / Palapa C2 ( 113.0E)
(ix)
-3-
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
3.0
3.1
System Description
The Broadcast Reception Installation (BRI) system for LegCo Complex will include the following: (a) (b) (c) (d) (e) The terrestrial television antenna system The satellite master antenna television system (SMATV) The cable television system (cable TV, Now TV, etc.)
The system signal will be transmitted by digital/data signal links and the signals will be converted from analogue to digital and vice versa before and after the transmission so as to minimize the loss in long distance transmission. The meeting broadcasting system will facilitate official broadcasting for the public meeting proceedings held in the LegCo Chamber, Conference Room A, B, C, D, E, Press Conference Room A, B.
The BRI signal link between BRI systems of LegCo Complex and CGC shall be provided. The signal shall Interfacing with the meeting broadcasting system of LegCo Complex Interfacing with the security system (door phone, CCTV, etc.) and if necessary the IT network in the building (f) (g) High Definition TV broadcasting Three frequency channels are reserved for future connection to public broadcasting system be converted to transmit between buildings in digital form to minimise the signal loss. The equipment for digital to analogue conversion equipment shall be provided at the receiving ends The cable link between the BRI system and the IT network (Server Rooms) with necessary connection equipment shall be provided so that the TV/FM signals can be received by the IT servers when needed and vice versa for distribution of IT audio-visual signals. All necessary analogue/digital conversion equipment shall be included. The BRI is designed and to be suitable and capable of receiving, processing and transmitting digital High The broadcast reception installation shall include facilities to provide a high quality reception for FM radio, UHF television, channels for reception of signals from at least three satellites under SMATV, cable TV services, STAR TV services, signals from the meeting broadcasting system in LegCo Complex, audio/video (A/V) and digital signals from the burglar alarm and security system and digital signals from the IT network. The number of channels will be provided in detail design stage. TV outlets will be provided according to the schedule of accommodation, room data sheets and other parts of the ER, and at least two outlets or termination points shall be provided on every floor excluding car park floor and roof. In addition, TV outlets shall be provided as per the room data sheet including President and President Deputy of LegCo Complex, and the offices of their press officers, conference rooms, meeting rooms, LegCo chambers, ante-chambers, multi-purpose conference room, interview rooms, press rooms, resources centre, libraries, galleries, education activities rooms, briefing rooms, server rooms, IT network rooms, technical rooms, building management rooms, security control rooms, electronic equipment rooms, TV/radio rooms, photographers rooms. System links between the TV production room as well as the meeting broadcasting system in LegCo Complex and the BRI systems of CGC will be provided, so that it is possible for the occupants in CGC Office Block and CGC Low Block to view the live broadcast of the meeting on one of the channels on the TV. The BRI backbone(IBCCDS) shall use a digital optical fibre cable Interactive TV series is subject to the equipment provided by service providers once users permitted their interfacing at the combiner of the BRI system. All major equipment of the BRI system, including as head-end equipment, amplifier, splitter, tee-units are completed with return path function, shall be capable for the transfer of digital interactive TV services (interactive digital TV) Definition TV broadcasting signal for delivering the high visual quality and high-fidelity sound. The BRI system offered is capable of the reception of High Definition TV and the corresponding channel amplifiers will be provided.
-4-
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
The frequency plan for the BRI and IBCCDS as shown below:
3.2 The terrestrial television antenna system will include the following: (a) Aerials (both terrestrial TV and FM) Bandpass filter or preamplifier for terrestrial TV and FM Amplifiers (plus, if necessary channel translators, converters) and combining units Power supply units Equalisers Trunk, branch, spur feeders, feeders and tap-off units TV/FM duplex outlet units including isolator for safety Lead- in connection for the Cable TV services Channels for SMATV and STAR TV system Channels for meeting broadcasting system Interfacing work with the meeting broadcasting system in LegCo Complex so that the information and data from the meeting broadcasting system can be broadcasted into the BRI system of LegCo Complex and BRI system of CGC office block(s) and low block (l) Channels for other systems such as security CCTV systems, IT network, etc
3.3 The Satellite Master Antenna Television (SMATV) system will include the following: (a) SMATV system including dish antenna for the satellites, feedhorn, low noise block converter, satellite receiver, channel amplifier, filter, RF modulator/combiner, etc (b) 6.2 metre diameter dish antennae for receiving programmes from following satellites. Asiasat 2 (100.5E); Asiasat 3s (105.5E); BSAT 1A (110.0E); and Palapa C2 (113.0E) (c) (d) Antenna support C-band/Ku-band feedhorns
-5-
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
(e) (f)
Low noise block down converters Satellite receivers for receiving 20 nos. channels
AC provision Under BRI G.S. requirement section A3.1.4(6), the normal operation temperature for BRI equipment and material is 0 ~ 35 . Ventilation fan will be provided into head-end equipment room. Detail will be
3.4 Please refer to the appendix for the satellite channel list that can be received from the above satellites. 3.5 Spare channels, associated modulators and cable links will be provided for the interface with IT network so that the the BRI system can be used to broadcast the audio-visual information and digital messages from the IT system directly, and IT system may access information from the BRI system for web broadcasting on the IT network. The cable link between BRI system and IT network will take place at the combiner of BRI system. See Appendix I for detail descriptioion 3.6 Satellite antenna, UHF/VHF antennas and the head-end equipment will be located at the roof of LegCo High Block
shown in the clause 5. Lighting and Small Power Pendant type florescent lighting fitting will be provided according to equipment layout. General 13A power sockets will be provided for general cleaning and maintenance propose. Earthing Arrangement Suitable earthing terminals shall be provided inside each of BRI head-end equipment room. Dedicated BRI earthing riser of 25mm x 3mm tinned copper tape completed with earth terminal will be installed for BRI
3.7
Spare channels, associated modulators and cable links will be provided for the interface with security system (door phone, CCTV, etc.) so that the the BRI system can be used to broadcast the visual information from the security system
equipment. The maximum earth impedance for BRI system earth will be 1 ohm.
3.12
Power Arrangement Essential supply will be provided for the entire BRI System. The detail of trunking system shall be refered to our electrical installation AIP package.
3.8 3.9
Total signal loss from head-end equipment will be transmitted to CCMS by receiver sensor. The cable type to be used for BRI installation as shown below: From Headend equipment Headend equipment Receivers at floor levels Combiner / CMTS To Receiver at floor levels Combiner /CMTS Splitter / Users outlet Receivers at floor levels Cable Type Optical Fibre Optical Fibre RG-6 coaxial RG-11 coaxial
3.13
Other TV system service Supplier Cable TV uses the HFC network and VHF bandwidth to transmit the TV system. It will share the fibre backbone but does not occupy any BRI channel. User shall need a Cable TV modem to receive the individual TV service provided by Cable TV company. Now TV system uses the broadband server network (PCCW) for transmitting. It will not take into any BRI system. User shall apply to PCCW company for Now TV service. To refer this report on Appendix H for detail of TV system operator self explanatory email.
4.0
4.1
Distribution of BRI signal to TV/FM outlets will be through ceiling ELV trunking and conduit system, no BRI system cable will be drawn into the raise floor cable containment system. 3.10 Signal loss estimation of BRI equipment is shown on Appendix G. Detail of signal strength calculation for outlet, tee, splitter units and amplifiers will be provided in DDA stage. The criteria of performance have been mentioned on previous clause 2.1. 3.11 Building Services and Structural Provision for BRI Head-end equipment room
affected by the user of the other system. For normal operation, LegCo Complex will has its own BRI system to serve the whole complex and to integrate with LegCo Meeting Broadcasting signals.
-6-
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
4.2
In case of failure of the head-end equipment of LegCo Complex, there will be no signal send out to the BRI backbone. Then the switcher of the system can be manually turn ON to allow signals from CGC Office
4.3
Spare space and slot in the head-end equipment for future addition of channel amplifiers will be allowed. The broadcast reception installation shall allow and incorporate provisions for future connection to at least three other public broadcasting systems. The provision shall include preamplifiers, filters, amplifiers, frequency converters, coaxial cable distribution system, associated trunkings and conduits and power cables. Quantity to be determined in DDA stage.
Block BRI system to in-jet into the LegCo BRI system to support the TV services of LegCo Complex.
4.4
Spare outlets at the receiver on each floor will be allowed for future addition of additional TV/FM outlets. Quantity to be determined in DDA stage.
4.5
In case of LegCo Complex Expansion, the antennas and head-end equipment at roof of LegCo High Block need to be temporarily removed to allow the builders work modification. During this period, the TV
services for the LegCo Complex will be supported by the BRI system of CGC Office block.
-7-
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
Fig. 2 Suspension of LegCo Complex Antenna and Head-end Equipment During Expansion
The switcher of the system shall then be manually turn ON to allow signals from CGC Office Block BRI system to in-jet into the LegCo BRI system to support the TV services of LegCo Complex.
After the builders work of expansion phase has been completed, the antennas and head-end equipment shall be re-installed at the new BRI equipment room and new roof of LegCo High Block. The optical fiber and coaxial backbone shall be extended to re-connect the existing BRI system with the head-end equipment.
-8-
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
5.0
5.1
MVAC PROVISION
Proposed ventilation fan will be installed for each BRI room under the equipment maximum operating temperature condition at 35. The design flow rate value m/s per each wall-mounted fan is indicated below;
BRI Room
Total of BRI Equipment heat dissipation 8200BTU/hr (2.4kW) 4170BTU/hr (1.2kW) 9880BTU/hr (2.9kW)
Fabric Load
6.0
6.1
Then the switched of LegCo BRI system can be manually switch OFF to isolate BRI system of LegCo Complex from CGC Office Block. The BRI systems for CGC Office Block and LegCo Complex can then be operated independently. Similar process shall be carried out for other phases of LegCo expansion.
-9-
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
7.0
7.1
T&C Procedures
General requirement for T&C procedures; i) The contractor shall carry out the tests & inspections after their installation work are completely, the test result shall be submitted to and approved by authorized site BSE / BSI. ii) The contractor shall provide all the necessary precision instruments with valid calibration certificate for the test and inspection of the BRI system installation. iii) Before carrying out any test, the Contractor shall ensure that the installations comply with the statutory requirements and regulations. iv) Visual inspection is to be carried out by the contractor when the installation is completed and ready for acceptance test
above electronic systems interconnection to BRI shall be included in AIP submission package of electronic installation infrastructure. A simple interconnection block diagram between above electronic systems and BRI will be shown as following:
- 10 -
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
7.2
The acceptance test includes the followings: i) Signal level measurement of Terrestrial TV Headend and Trunk Distribution Equipment ii). Measurement of signal levels at TV/FM outlets. iii). Mutual isolation between TV/FM outlets. iv). Functional testing for each TV outlets to check the picture & sound quality. v) Measurement of Azimuth-Elevation (Az-E1) Angles of SMATV Antenna vi) Signal Level and C/N ratio Measurement of SMATV system equipment.
7.3
Statutory Inspection / Commissioning After the proper testing and commissioning of the BRI installation, the Contractor shall notify the appropriate authority, through the PBSE, on the completion of the installation and its readiness for inspection and testing.
7.4
Calibrated Equipment The contractor shall supply calibrated equipment as stipulated in the specification of the contract for the inspection, measuring and testing of the installation. The equipment shall be calibrated by laboratories accredited by the Hong Kong Laboratory Accreditation Scheme (HKLAS) or other recognized accredited laboratories.
7.5
Detail of T&C procedure shall be referred to ASD publication of building services branch - Testing and Commissioning procedure no.7 for BRI in government buildings hong kong 2002 edition
8.0
8.1
Statutory Submission
Since Tamar Development is classified as a Government Project in OFTA, thus no statutory submission for BRI system is required.
8.2
- 11 -
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-A
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-B
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
Appendix B Schedule of Major Materials and Equipment 1.0 Schedule of Major Equipment for Broadcast Reception Installation
Brand Item Equipment/Material 1st UHF Aerial FM Aerial Pre-amplifier Channel amplifier Fagor Fagor Fagor Fagor 2nd 3rd Model Origin Offered NOTE : Some specified model number of equipment / material will be provided in DDA submission
1 2 3 4
Di@na Plus AN02 AMB 800 Micro MATV plus N DA 353 SFS Series A-1160-LSZH A-660-LSZH SKK 04 11-5205-1 SDM 6000+ 11-5205-1 11-1427-1 42U 6.2m Dia.
5 6 7 8 9 10 11 12 13
Fibre transmitter unit Fibre receiver unit Distribution amplifier Splitter & Tee unit Trunk coaxial cable Branch coaxial cable TV/FM outlet LNB C-Band Digital receiver modulator
H.K. H.K Spain H.K H.K H.K H.K USA Spain USA USA PRC P.R.C
14 15 16 17
APP-B
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-C
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
Appendix C Estimation of Maintenance Cost 1.0 Estimation of Maintenance Cost for Broadcast Reception Installation Item Equipment / System 1 BRI System (comprehensive) - Monthly Inspection Total Amount (12 months) : 3,900.00 46,800.00 Monthly cost
3.0
Detail Cost breakdown For monthly inspection of BRI system in LegCo Complex Items 1) Description General cleaning of headend equipment Qty 1 lot Unite rate (HK$) 600 Sub-total (HK$) 600
2)
To carry to function test for the BRI system at equipment room as follows :
lot
1800
1800
i)
Connecting a TV at the test point in headend equipment room for channel reception
2.0
inspection Check reception and make fine-tuning, if necessary To check the condition of the equipment, if necessary, the BRI system (e.g. Pre-amp, Distribution AMP) To check the record of complaints of the corresponding equipments with follow-up action. Detail of it will be provided in DDA submission Total (HK$) : 3900 1 lot (included) 0 1 lot 1500 1500
To check the condition of the equipment, if necessary, the BRI system (e.g. Pre-amp, Distribution AMP) at the equipment room
(d)
To check the record of complaints of the corresponding equipments with follow-up action. will be provided in DDA submission.
Detail of it
Remarks :
The maintenance works listed above are offered as a single package of a comprehensive maintenance contract
APP-C
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-D
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
Press TV ALKASS * APTN Direct BYU Brunei International * Shamshad TV Arabsat/ASBU Bouquet * * * * * * * * * Oman TV Satellite Qatar TV Sudan TV Saudi Arabian TV1 Satellite Saudi Arabian TV2 Sharjah TV Syria Satellite Channel Abu Dhabi TV Europe Libiya Yemen AI Jazeera Channel * * RAI International RTP International Tve RTR Planeta Cubavision Internacional Luxe_TV_SD MSTV - Macau Satellite TV Lotus
APP-D
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
* Satellite AsiaSat 3S Orbital position: 105.5 E Azimuth: 204.5 * Elevation: 62.6 * Aaj TV Fashion TV HK & Asia Programme Maharishi BTV World Video Standard MPEG-2 * * * *
Sahara Samay NCR Sahara Samay National Sahara Samay Mumbai Sahara Samay Madhya Pradesh Sahara Samay Uttar Predesh VOA
Arirang PTV Pacific Century Matrix * Alijazeera PTV World Bloomberg ATV NOW * * * MTA International 1 Global MTA International 2 i - DW-TV Pakistani mux Russia Today National Supreme Master Global * Star Utsav Z Music Wik Kid Z Smile * * Phoenix Info News Phoenix Chinese Sahara Samay Alami Saharar * Sahara Samay Bihar ATV Khyber PTV 1
APP-D
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
Programme TVRI Nasional RCTI Bali TV SCTV Antv Indosiar Satelindo Metro TV Global TV Spacetoon TPI
BSAT 1A
NTSC
APP-D
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
Bloomberg
Breaking financial, business and economic news worldwide from major provider of information services
Phoenix Chinese Offers a diverse variety of Chinese programming with productions from China and abroad. Phoenix Info Chinese The Phoenix InfoNews Channel is the first Chinese language channel that covered news among Greater China regions, including mainland China, Taiwan and Hong Kong. There is 24-hour broadcasting on financial news, stock market information as well as news hea Deutsche Welles television studios are concentrated in Berlin. Germanys international broadcaster, DW-TV, provides news, background information and cultural highlights around the clock. The Voice of America is a multimedia international broadcasting service funded by the U.S. government through the Broadcasting Board of Governors. VOA broadcasts more than 1,000 hours of news, information, educational, and cultural programming every week - / Horizon - A general entertainment satellite channel programmed by the Horizon i-CABLE group to serve Mainland China as well as Chinese communities in the region. With own-produced entertainment news programmes during primetime as backbone, the channel a Japanese TV showing programs of a more educational, cultural or intellectual nature, periodically also showing anime. A similar counterpart would be the Public Broadcasting Service of the United States Japanese TV which is a generalist channel similar to BBC One and it's European counterparts, showing News, Drama, Quiz/Variety Shows, Music, Sports, Anime and Specials which directly compete with it's commercial counterparts.
DW
VOA
CETV
NHK BS1
NHK BS2
NOW TV
APP-D
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-E
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-E
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-E
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
Channel Summary: Required Channels: Analogue TV signal HD TV signal CCTV IT network Public broadcasting system SMATV 4 3 1 1 3 20 32 Vacant Channels Total Channels 17 49
Remarks: 1 ) Cable TV channels are allocated in VHF frequency band and will not occupy any BRI channel.. See clause 3.13 2 ) ER requires 1 channel for LegCo meeting broadcast system ( MBS ) ( ERIV / BS 3.7.1 L), whereas 9 locations were specified. The channel can be one of vacant frequency channels. 3 ) AV signal of electonic voting and announciator system shall be proposed to combine together with all meeting broadcasting system for more BRI channels reservation for future. 4) Conventional vacant frequency band can provide 17 channels available for meeting broadcasting system. They are not enough to service 40 frequency channels (36LegCo+4CGC) for meeting broadcasting system. The technical method for meeting broadcasting system has been reported to user for their further decision and kind consideration.
APP-E
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-F
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
Description
Assumed Operation Hour Sub-Total Energy Consumption per day 1 24 24 24 per day (kWh) 0.293 40.08 7.68 16.13
2 BRI Equipment in Head-end room 3 BRI from G/F to 3/F 4 Air-conditioning for BRI Room
64.18
Total power consumption for BRI system per month: (Assumed 30 days for each month)
1925.49
kWh
1.177
/ kWh
1.270
/ kWh
Unit charge for the first 1,500 units (Fuel Clause Adjustment)
0.105
/ kWh
Unit charge for the first 1,501 units and above (Fuel Clause Adjustment)
0.105
/ kWh
2507.38
30,088.56
Notes: Electricity charge rate of Year 2008 is used for the estimation of electricity cost. The life cycle of BRI system equipment is around ten Years.
APP-F
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-F
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-F
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-H
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-H
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-H
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-I
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
APP-I
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
AIP
APP-J
Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA
Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009
AIP
APP-K