Contract No. SS P318 Programme No.

063KA Design & Construction of Tamar Development Project, Hong Kong for The Government of the Hong Kong Special Administrative Region

2nd AIP Submission Broadcast Reception Installation for LegCo Complex

Revision No. a b c c1

Issue on 6 March 2008 9 July 2008 18 Dec 2008 22 Jun 2009


( ( (

Independent Design Checker (IDC) 2nd AIP Drawing


) in compliance with Contract No.SS P318 ) in compliance with Contract No.SS P318 with conditions ) NOT in compliance with Contract No.SS P318

Distribution List:
For and on behalf of Scott Wilson Limited

ArchSD - SO ArchSD SOR/PTL ArchSD SOR/A ArchSD SOR/SE ArchSD SOR/BSE ArchSD SOR/QS ArchSD SOR/EME ArchSD SOR/LA ArchSD SOR/IT ArchSD SOR/COW ArchSD SOR/BSI ArchSD SOR/EM

GHHJV RDL MCS (RSE) LAM (RGE) JRP (BSE) HOK GMB GTR ALT SMW

MVA WM ERM KAA LDP APL TPS RWDI CW VV EDAW

Endorsed by Company GHHJV for and on behalf of Signature Name Position Date Edward Yeung Project Director
Date: Building Services Design Checker

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

CONTENT 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Introduction Design Criteria System Description Resilience Design and Expansion Flexibility MVAC Provision Interconnection Between BRI System And Electronic AV Systems T&C Procedures Statutory Submission A B C D E F G H I J K

APPENDIX Drawing Schedule, Legend and Schematic Diagram Schedule of Major Materials and Equipment Estimate of Maintenance Cost Satellite Channel List Proposed BRI System Channel List Running Cost Estimation Signal Loss Calculation of BRI system Corresponding Letters Diagram for BRI interfacing with IT system Reply to ASD Comments on 1st Submission of 2nd AIP Reply to IDC Comments on 1st Submission of 2nd AIP

BRI System (LegCo Complex)

-2-

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

(e)

The Specification No. HKTA 1105:2001 Technical Information for Frequency Planning of In-Building Coaxial Cable Distribution System issued by OFTA.

1.0

Introduction
The Broadcast Reception Installation (BRI) and in-building optical fiber/coaxial/Cat 6 cable distribution system (IBCCDS) will be installed for CGC Office Block. Separate BRI system will be provided for CGC Office Block and CGC Low Block. The BRI systems will be used to distribute the TV/FM signals, AV signals from meeting broadcast system, satellite TV signals including STAR TV and cable TV, and signals from the burglar alarm and security system (e.g. door phone and CCTV system), as well as the information from the IT/computer network. Satellite Master Antenna Television (SMATV) system will also be installed for LegCo Complex and connected to the BRI systems. A separate SMATV system will be provided for CGC Office Block, which also serving CGC Low Block. An additional BRI system link between the BRI systems in Legco Complex and CGC Office Block will be provided. It will be used to supply the BRI system in CGC Office Block with the signals of the meeting 2.1 (h) (g) (f)

The Specification No. HKTA 1108:2007 Technical Information for Digital Terrestrial Television Baseline Receiver Requirements issued by OFTA. Fire Service (Installations and Equipment) Regulations, Fire Services Ordinance, Chapter 95, and other subsidiary legislation made under the Ordinance. Waste Disposal Ordinance, Chapter 354 and other subsidiary legislation made under the Ordinance.

(i)

Environmental Impact Assessment Ordinance, Chapter 499 and other subsidiary legislation made under the Ordinance.

BRI system performance requirement (i) (ii) The signal to noise ratio of the system shall not be less than 40dB. The cross talk ratio shall not be less than 40dB between adjacent programmes or channels The total harmonic distortion shall not exceed 5% at full power Variation of signal strength shall not exceed 3dB between an outlet nearest to the amplifier and any other outlet in the system (v) A load variation of 50% shall not affect the quality of signal or cause the output voltage at any outlet to vary by more than 6dB

broadcast system of LegCo Complex. This 2nd AIP is not fully consistent with the 2
nd

AIP building plans, which is being further development in (iii) (iv)

accordance with the revised SOA. Consideration of seismic condition as per ER requirement shall be addressed in next AIP submission.

2.0

Design Criteria
The broadcast reception installation shall comply with the following: (a) Telecommunications Ordinance, Chapter 106, and other subsidiary legislation made under the Ordinance. (b) (c) Electricity Ordinance, Chapter 406, and other subsidiary legislation made under the Ordinance. The Specification No. HKTA 1103:2000 Performance Requirements of Television Signals Input to the Head End of Subscription Television System issued by Office of the Telecommunications Authority (OFTA). (d) The Specification No. HKTA 1104:2007 Performance Requirements for In-Building Coaxial Cable Distribution System (IBCCDS) issued by OFTA (hereinafter referred to as the Performance Specification. (viii)

(vi)

The outlet field strength for each channel shall be within the range 48-75dB and 60-80dB for FM and TV respectively

(vii)

The SMATV system including dish antenna for the satellites, feedhorn, low noise block converter, satellite receiver, channel amplifier, filter, RF modulator / combiner, etc The dish antenna for receiving programmes from 3 satellites. The target satellites are Asiasat 2 ( 100.5E) / Asiasat 3s ( 105.5E) / JCSAT 2/B Sat 1A/1B ( 110.0E) / Palapa C2 ( 113.0E)

(ix)

The satellite receivers for receiving 20 nos. channels

BRI System (LegCo Complex)

-3-

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

3.0
3.1

System Description
The Broadcast Reception Installation (BRI) system for LegCo Complex will include the following: (a) (b) (c) (d) (e) The terrestrial television antenna system The satellite master antenna television system (SMATV) The cable television system (cable TV, Now TV, etc.)

The system signal will be transmitted by digital/data signal links and the signals will be converted from analogue to digital and vice versa before and after the transmission so as to minimize the loss in long distance transmission. The meeting broadcasting system will facilitate official broadcasting for the public meeting proceedings held in the LegCo Chamber, Conference Room A, B, C, D, E, Press Conference Room A, B.

The BRI signal link between BRI systems of LegCo Complex and CGC shall be provided. The signal shall Interfacing with the meeting broadcasting system of LegCo Complex Interfacing with the security system (door phone, CCTV, etc.) and if necessary the IT network in the building (f) (g) High Definition TV broadcasting Three frequency channels are reserved for future connection to public broadcasting system be converted to transmit between buildings in digital form to minimise the signal loss. The equipment for digital to analogue conversion equipment shall be provided at the receiving ends The cable link between the BRI system and the IT network (Server Rooms) with necessary connection equipment shall be provided so that the TV/FM signals can be received by the IT servers when needed and vice versa for distribution of IT audio-visual signals. All necessary analogue/digital conversion equipment shall be included. The BRI is designed and to be suitable and capable of receiving, processing and transmitting digital High The broadcast reception installation shall include facilities to provide a high quality reception for FM radio, UHF television, channels for reception of signals from at least three satellites under SMATV, cable TV services, STAR TV services, signals from the meeting broadcasting system in LegCo Complex, audio/video (A/V) and digital signals from the burglar alarm and security system and digital signals from the IT network. The number of channels will be provided in detail design stage. TV outlets will be provided according to the schedule of accommodation, room data sheets and other parts of the ER, and at least two outlets or termination points shall be provided on every floor excluding car park floor and roof. In addition, TV outlets shall be provided as per the room data sheet including President and President Deputy of LegCo Complex, and the offices of their press officers, conference rooms, meeting rooms, LegCo chambers, ante-chambers, multi-purpose conference room, interview rooms, press rooms, resources centre, libraries, galleries, education activities rooms, briefing rooms, server rooms, IT network rooms, technical rooms, building management rooms, security control rooms, electronic equipment rooms, TV/radio rooms, photographers rooms. System links between the TV production room as well as the meeting broadcasting system in LegCo Complex and the BRI systems of CGC will be provided, so that it is possible for the occupants in CGC Office Block and CGC Low Block to view the live broadcast of the meeting on one of the channels on the TV. The BRI backbone(IBCCDS) shall use a digital optical fibre cable Interactive TV series is subject to the equipment provided by service providers once users permitted their interfacing at the combiner of the BRI system. All major equipment of the BRI system, including as head-end equipment, amplifier, splitter, tee-units are completed with return path function, shall be capable for the transfer of digital interactive TV services (interactive digital TV) Definition TV broadcasting signal for delivering the high visual quality and high-fidelity sound. The BRI system offered is capable of the reception of High Definition TV and the corresponding channel amplifiers will be provided.

BRI System (LegCo Complex)

-4-

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

The frequency plan for the BRI and IBCCDS as shown below:

3.2 The terrestrial television antenna system will include the following: (a) Aerials (both terrestrial TV and FM) Bandpass filter or preamplifier for terrestrial TV and FM Amplifiers (plus, if necessary channel translators, converters) and combining units Power supply units Equalisers Trunk, branch, spur feeders, feeders and tap-off units TV/FM duplex outlet units including isolator for safety Lead- in connection for the Cable TV services Channels for SMATV and STAR TV system Channels for meeting broadcasting system Interfacing work with the meeting broadcasting system in LegCo Complex so that the information and data from the meeting broadcasting system can be broadcasted into the BRI system of LegCo Complex and BRI system of CGC office block(s) and low block (l) Channels for other systems such as security CCTV systems, IT network, etc

Frequency Range Frequency Channels between 470 MHz to 862 MHz

System BRI System SMATV System CCTV System FM Radio Pay TV

(b) (c) (d) (e) (f) (g) (h)

Block diagram showing the interconnection between various blocks as follow:

(i) (j) (k)

3.3 The Satellite Master Antenna Television (SMATV) system will include the following: (a) SMATV system including dish antenna for the satellites, feedhorn, low noise block converter, satellite receiver, channel amplifier, filter, RF modulator/combiner, etc (b) 6.2 metre diameter dish antennae for receiving programmes from following satellites. Asiasat 2 (100.5E); Asiasat 3s (105.5E); BSAT 1A (110.0E); and Palapa C2 (113.0E) (c) (d) Antenna support C-band/Ku-band feedhorns

BRI System (LegCo Complex)

-5-

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

(e) (f)

Low noise block down converters Satellite receivers for receiving 20 nos. channels

AC provision Under BRI G.S. requirement section A3.1.4(6), the normal operation temperature for BRI equipment and material is 0 ~ 35 . Ventilation fan will be provided into head-end equipment room. Detail will be

3.4 Please refer to the appendix for the satellite channel list that can be received from the above satellites. 3.5 Spare channels, associated modulators and cable links will be provided for the interface with IT network so that the the BRI system can be used to broadcast the audio-visual information and digital messages from the IT system directly, and IT system may access information from the BRI system for web broadcasting on the IT network. The cable link between BRI system and IT network will take place at the combiner of BRI system. See Appendix I for detail descriptioion 3.6 Satellite antenna, UHF/VHF antennas and the head-end equipment will be located at the roof of LegCo High Block

shown in the clause 5. Lighting and Small Power Pendant type florescent lighting fitting will be provided according to equipment layout. General 13A power sockets will be provided for general cleaning and maintenance propose. Earthing Arrangement Suitable earthing terminals shall be provided inside each of BRI head-end equipment room. Dedicated BRI earthing riser of 25mm x 3mm tinned copper tape completed with earth terminal will be installed for BRI

3.7

Spare channels, associated modulators and cable links will be provided for the interface with security system (door phone, CCTV, etc.) so that the the BRI system can be used to broadcast the visual information from the security system

equipment. The maximum earth impedance for BRI system earth will be 1 ohm.

3.12

Power Arrangement Essential supply will be provided for the entire BRI System. The detail of trunking system shall be refered to our electrical installation AIP package.

3.8 3.9

Total signal loss from head-end equipment will be transmitted to CCMS by receiver sensor. The cable type to be used for BRI installation as shown below: From Headend equipment Headend equipment Receivers at floor levels Combiner / CMTS To Receiver at floor levels Combiner /CMTS Splitter / Users outlet Receivers at floor levels Cable Type Optical Fibre Optical Fibre RG-6 coaxial RG-11 coaxial

3.13

Other TV system service Supplier Cable TV uses the HFC network and VHF bandwidth to transmit the TV system. It will share the fibre backbone but does not occupy any BRI channel. User shall need a Cable TV modem to receive the individual TV service provided by Cable TV company. Now TV system uses the broadband server network (PCCW) for transmitting. It will not take into any BRI system. User shall apply to PCCW company for Now TV service. To refer this report on Appendix H for detail of TV system operator self explanatory email.

4.0
4.1

Resilience Design and Expansion Flexibility


Interlink cable will be provided between CGC and LegCo Complex to achieve the resilience design to cater for service interruption. Switchers will be provided for both BRI system of CGC and LegCo Complex to let either system operating independently in normal condition. Users in each location can view different channels on TV and will not

Distribution of BRI signal to TV/FM outlets will be through ceiling ELV trunking and conduit system, no BRI system cable will be drawn into the raise floor cable containment system. 3.10 Signal loss estimation of BRI equipment is shown on Appendix G. Detail of signal strength calculation for outlet, tee, splitter units and amplifiers will be provided in DDA stage. The criteria of performance have been mentioned on previous clause 2.1. 3.11 Building Services and Structural Provision for BRI Head-end equipment room

affected by the user of the other system. For normal operation, LegCo Complex will has its own BRI system to serve the whole complex and to integrate with LegCo Meeting Broadcasting signals.

BRI System (LegCo Complex)

-6-

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

4.2

In case of failure of the head-end equipment of LegCo Complex, there will be no signal send out to the BRI backbone. Then the switcher of the system can be manually turn ON to allow signals from CGC Office

4.3

Spare space and slot in the head-end equipment for future addition of channel amplifiers will be allowed. The broadcast reception installation shall allow and incorporate provisions for future connection to at least three other public broadcasting systems. The provision shall include preamplifiers, filters, amplifiers, frequency converters, coaxial cable distribution system, associated trunkings and conduits and power cables. Quantity to be determined in DDA stage.

Block BRI system to in-jet into the LegCo BRI system to support the TV services of LegCo Complex.

4.4

Spare outlets at the receiver on each floor will be allowed for future addition of additional TV/FM outlets. Quantity to be determined in DDA stage.

4.5

In case of LegCo Complex Expansion, the antennas and head-end equipment at roof of LegCo High Block need to be temporarily removed to allow the builders work modification. During this period, the TV

services for the LegCo Complex will be supported by the BRI system of CGC Office block.

BRI System (LegCo Complex)

-7-

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Fig. 1 Normal Condition

Fig. 2 Suspension of LegCo Complex Antenna and Head-end Equipment During Expansion

The switcher of the system shall then be manually turn ON to allow signals from CGC Office Block BRI system to in-jet into the LegCo BRI system to support the TV services of LegCo Complex.

After the builders work of expansion phase has been completed, the antennas and head-end equipment shall be re-installed at the new BRI equipment room and new roof of LegCo High Block. The optical fiber and coaxial backbone shall be extended to re-connect the existing BRI system with the head-end equipment.

BRI System (LegCo Complex)

-8-

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Fig. 3 Resume of BRI System After Expansion

5.0
5.1

MVAC PROVISION
Proposed ventilation fan will be installed for each BRI room under the equipment maximum operating temperature condition at 35. The design flow rate value m/s per each wall-mounted fan is indicated below;

BRI Room

Total of BRI Equipment heat dissipation 8200BTU/hr (2.4kW) 4170BTU/hr (1.2kW) 9880BTU/hr (2.9kW)

Lighting Load 0.33kW 0.18kW 0.25kW

Fabric Load

Total Cooling Load 5.73kW 1.8kW 3.61kW

Flow Rate m/s 2.3 0.735 1.47

CGCO CGCL LEGCO

3kW 0.42kW 0.46kW

6.0
6.1

Interconnection between BRI system and Electronic AV systems.


Some AV signal of electronic systems shall be transmitted to BRI system for TV broadcasting. They are meeting broadcasting system, annunciator system and electronic voting system. Detail description of them shall be referred to AIP submission package of electronic installation infrastructure. All the above systems interlinking will be located at TV production room and BRI head-end room in LEGCO Complex. The relationship between the BRI system and sub-system of electronic installation will be shown in below:

Then the switched of LegCo BRI system can be manually switch OFF to isolate BRI system of LegCo Complex from CGC Office Block. The BRI systems for CGC Office Block and LegCo Complex can then be operated independently. Similar process shall be carried out for other phases of LegCo expansion.

i) Electronic voting system


Two independent sets of electronic voting system shall be installed in two meeting venues in the LEGCO Complex for use at meetings held at these two venues. These two venues are LegCo Chamber and Conference room A. The system shall be able to transmit designated information and other information to the broadcast reception installation (BRI) in the LegCo Complex so that users in the building can receive it with their television sets. The signal from the electronic voting system shall merge with, not take over, the existing video signal (proceeding of a meeting) being broadcast for the meeting venu.

BRI System (LegCo Complex)

-9-

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

ii) Annunciator system


One set of Annunciator system shall be installed in the LegCo Complex to enable the LegCo Secretariat Office to broadcast and announce the latest updates of the meeting proceedings in form of teletext. The annunciator system shall be able to transmit designated information and other information to the broadcast reception installation (BRI) in the LegCo Complex so that users in the building can receive it with their television sets. The signal from the annunciator system shall merge with, not take over, the existing video signal (proceeding of a meeting) being broadcast for the meeting venue.

iii) Meeting broadcasting system


Meeting broadcasting system shall be supplied and installed in the LegCo Complex to allow video capturing, editing and in-house production of all public meeting proceedings held inside the LegCo Complex for TV broadcasting to both within the Legislative Council Complex, Central Government Complex, TV production room located in the low block of the LegCo Complex, for in-house production and broadcasting of public meetings held in the LegCo Chamber, Conference rooms A,B, &C, Press conference rooms A & B and Conference rooms D & E. It shall provide optical fibre TV outlets and infrastructure works linking all above rooms and BRI equipment room. There shall be trunking, optical fibre link and at least two optical TV outlets connecting the TV production room to the BRI system and the TV production and broadcasting network of the LegCo complex for broadcasting of meetings via televisions in the Complex and to places outside the Complex if required. 6.2 After several coordination meetings with EMSD, they agreed to combine all audio video signals from electronic systems into a single audio video signal source and feed into the BRI system. Therefore a single BRI channel can transmit the three different signals information from above electronic systems after video mixer/character generator in TV production room combines these signals. All hardware equipment for

7.0
7.1

T&C Procedures
General requirement for T&C procedures; i) The contractor shall carry out the tests & inspections after their installation work are completely, the test result shall be submitted to and approved by authorized site BSE / BSI. ii) The contractor shall provide all the necessary precision instruments with valid calibration certificate for the test and inspection of the BRI system installation. iii) Before carrying out any test, the Contractor shall ensure that the installations comply with the statutory requirements and regulations. iv) Visual inspection is to be carried out by the contractor when the installation is completed and ready for acceptance test

above electronic systems interconnection to BRI shall be included in AIP submission package of electronic installation infrastructure. A simple interconnection block diagram between above electronic systems and BRI will be shown as following:

BRI System (LegCo Complex)

- 10 -

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

7.2

The acceptance test includes the followings: i) Signal level measurement of Terrestrial TV Headend and Trunk Distribution Equipment ii). Measurement of signal levels at TV/FM outlets. iii). Mutual isolation between TV/FM outlets. iv). Functional testing for each TV outlets to check the picture & sound quality. v) Measurement of Azimuth-Elevation (Az-E1) Angles of SMATV Antenna vi) Signal Level and C/N ratio Measurement of SMATV system equipment.

7.3

Statutory Inspection / Commissioning After the proper testing and commissioning of the BRI installation, the Contractor shall notify the appropriate authority, through the PBSE, on the completion of the installation and its readiness for inspection and testing.

7.4

Calibrated Equipment The contractor shall supply calibrated equipment as stipulated in the specification of the contract for the inspection, measuring and testing of the installation. The equipment shall be calibrated by laboratories accredited by the Hong Kong Laboratory Accreditation Scheme (HKLAS) or other recognized accredited laboratories.

7.5

Detail of T&C procedure shall be referred to ASD publication of building services branch - Testing and Commissioning procedure no.7 for BRI in government buildings hong kong 2002 edition

8.0
8.1

Statutory Submission
Since Tamar Development is classified as a Government Project in OFTA, thus no statutory submission for BRI system is required.

8.2

Submission to EMSD will through AIP/DDA submission process.

BRI System (LegCo Complex)

- 11 -

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix A Drawing Schedule, Legend and Schematic Diagram

BRI System (LegCo Complex)

APP-A

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix B Schedule of Major Materials and Equipment

BRI System (LegCo Complex)

APP-B

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix B Schedule of Major Materials and Equipment 1.0 Schedule of Major Equipment for Broadcast Reception Installation
Brand Item Equipment/Material 1st UHF Aerial FM Aerial Pre-amplifier Channel amplifier Fagor Fagor Fagor Fagor 2nd 3rd Model Origin Offered NOTE : Some specified model number of equipment / material will be provided in DDA submission

1 2 3 4

Di@na Plus AN02 AMB 800 Micro MATV plus N DA 353 SFS Series A-1160-LSZH A-660-LSZH SKK 04 11-5205-1 SDM 6000+ 11-5205-1 11-1427-1 42U 6.2m Dia.

Spain Spain Spain Spain

5 6 7 8 9 10 11 12 13

Fibre transmitter unit Fibre receiver unit Distribution amplifier Splitter & Tee unit Trunk coaxial cable Branch coaxial cable TV/FM outlet LNB C-Band Digital receiver modulator

Cabletech Cabletech Fagor Antek Cabletech Cabletech Antek Chaparral Fagor

H.K. H.K Spain H.K H.K H.K H.K USA Spain USA USA PRC P.R.C

14 15 16 17

LNB Ku-Band Feedhorn C-Band Rack Satellite solid antenna 6.2m

Chaparral Chaparral Delta JJ

BRI System (LegCo Complex)

APP-B

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix C Estimation of Maintenance Cost

BRI System (LegCo Complex)

APP-C

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix C Estimation of Maintenance Cost 1.0 Estimation of Maintenance Cost for Broadcast Reception Installation Item Equipment / System 1 BRI System (comprehensive) - Monthly Inspection Total Amount (12 months) : 3,900.00 46,800.00 Monthly cost

3.0

Detail Cost breakdown For monthly inspection of BRI system in LegCo Complex Items 1) Description General cleaning of headend equipment Qty 1 lot Unite rate (HK$) 600 Sub-total (HK$) 600

2)

To carry to function test for the BRI system at equipment room as follows :

lot

1800

1800

i)

Connecting a TV at the test point in headend equipment room for channel reception

2.0

Description of the Maintenance Service Work for Broadcast Reception Installations


Broadcast Reception Installation Monthly Inspection c) (a) (b) General cleaning of headend equipment To carry out function test for the BRI system at equipment room (c) Connecting a TV at the test point in headend equipment room for channel reception inspection. Check reception and make fine-tuning, if necessary d) ii)

inspection Check reception and make fine-tuning, if necessary To check the condition of the equipment, if necessary, the BRI system (e.g. Pre-amp, Distribution AMP) To check the record of complaints of the corresponding equipments with follow-up action. Detail of it will be provided in DDA submission Total (HK$) : 3900 1 lot (included) 0 1 lot 1500 1500

To check the condition of the equipment, if necessary, the BRI system (e.g. Pre-amp, Distribution AMP) at the equipment room

(d)

To check the record of complaints of the corresponding equipments with follow-up action. will be provided in DDA submission.

Detail of it

Remarks :

The maintenance works listed above are offered as a single package of a comprehensive maintenance contract

BRI System (LegCo Complex)

APP-C

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix D Satellite Channel List

BRI System (LegCo Complex)

APP-D

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix D Satellite Channel List


Satellite AsiaSat 2 Orbital position: 100.5E Azimuth: 215.2 Elevation: 59.9 * * * Programme Iris sat Alalam News Ch Nile News ALEmarat Video Standard MPEG-2

Kuwait Supreme Master Cancao Nova Daystar Record International Satlink

Press TV ALKASS * APTN Direct BYU Brunei International * Shamshad TV Arabsat/ASBU Bouquet * * * * * * * * * Oman TV Satellite Qatar TV Sudan TV Saudi Arabian TV1 Satellite Saudi Arabian TV2 Sharjah TV Syria Satellite Channel Abu Dhabi TV Europe Libiya Yemen AI Jazeera Channel * * RAI International RTP International Tve RTR Planeta Cubavision Internacional Luxe_TV_SD MSTV - Macau Satellite TV Lotus

NOTE : Programme channel names from internet / magazines are used.

BRI System (LegCo Complex)

APP-D

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

* Satellite AsiaSat 3S Orbital position: 105.5 E Azimuth: 204.5 * Elevation: 62.6 * Aaj TV Fashion TV HK & Asia Programme Maharishi BTV World Video Standard MPEG-2 * * * *

Sahara Samay NCR Sahara Samay National Sahara Samay Mumbai Sahara Samay Madhya Pradesh Sahara Samay Uttar Predesh VOA

Arirang PTV Pacific Century Matrix * Alijazeera PTV World Bloomberg ATV NOW * * * MTA International 1 Global MTA International 2 i - DW-TV Pakistani mux Russia Today National Supreme Master Global * Star Utsav Z Music Wik Kid Z Smile * * Phoenix Info News Phoenix Chinese Sahara Samay Alami Saharar * Sahara Samay Bihar ATV Khyber PTV 1

NOTE : Programme channel names from internet / magazines are used.

BRI System (LegCo Complex)

APP-D

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Satellite Palapa C2 Orbital position: 113.0 E Azimuth: 185.4 Elevation: 64.7

Programme TVRI Nasional RCTI Bali TV SCTV Antv Indosiar Satelindo Metro TV Global TV Spacetoon TPI

Video Standard MPEG-2

BSAT 1A

Wowow NHK BS 1 NHK BS 2

NTSC

BRI System (LegCo Complex)

APP-D

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Proposed famous SMATV channels

Bloomberg

Breaking financial, business and economic news worldwide from major provider of information services

Phoenix Chinese Offers a diverse variety of Chinese programming with productions from China and abroad. Phoenix Info Chinese The Phoenix InfoNews Channel is the first Chinese language channel that covered news among Greater China regions, including mainland China, Taiwan and Hong Kong. There is 24-hour broadcasting on financial news, stock market information as well as news hea Deutsche Welles television studios are concentrated in Berlin. Germanys international broadcaster, DW-TV, provides news, background information and cultural highlights around the clock. The Voice of America is a multimedia international broadcasting service funded by the U.S. government through the Broadcasting Board of Governors. VOA broadcasts more than 1,000 hours of news, information, educational, and cultural programming every week - / Horizon - A general entertainment satellite channel programmed by the Horizon i-CABLE group to serve Mainland China as well as Chinese communities in the region. With own-produced entertainment news programmes during primetime as backbone, the channel a Japanese TV showing programs of a more educational, cultural or intellectual nature, periodically also showing anime. A similar counterpart would be the Public Broadcasting Service of the United States Japanese TV which is a generalist channel similar to BBC One and it's European counterparts, showing News, Drama, Quiz/Variety Shows, Music, Sports, Anime and Specials which directly compete with it's commercial counterparts.

DW

VOA

CETV

NHK BS1

NHK BS2

NOW TV

BRI System (LegCo Complex)

APP-D

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix E Proposed BRI System Channel List

BRI System (LegCo Complex)

APP-E

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

UHF Frequency Channels list in IBCCDS (470-862 MHz)


Channel Number E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E36 E37 E38 E39 E40 E41 E42 E43 Frequncy Range 470 - 478 MHz 478 - 486MHz 486 - 494MHz 494 - 502MHz 502 - 510MHz 510 - 518MHz 518 - 526MHz 526 - 534MHz 534 - 542MHz 542 - 550MHz 550 - 558MHz 558 - 566MHz 566 - 574MHz 574 - 582MHz 582 - 590MHz 590 - 598MHz 598 - 606MHz 606 - 614MHz 614 - 622MHz 622 - 630MHz 630 - 638MHz 638 - 646MHz 646 - 654MHz Allocation to be avoided TVB (Analogue) (Temple Hill) Digital TV ATV ( Analogue) (Temple Hill) SMATV 01 Pearl (Analogue) (Temple Hill) SMATV 02 ATV World (Analogue) (Temple Hill) SMATV 03 SMATV 04 SMATV 05 SMATV 06 SMATV 07 SMATV 08 SMATV 09 Digital TV SMATV 10 Digital TV SMATV 11 SMATV 12 SMATV 13 SMATV 14 SMATV 15 SMATV 16 Remark Existing analogue TV Existing digital TV Existing analogue TV ER requirement Existing analogue TV ER requirement Existing analogue TV ER requirement ER requirement ER requirement ER requirement ER requirement ER requirement ER requirement HDTV ( TVB ) ER requirement HDTV ( ATV ) ER requirement ER requirement ER requirement ER requirement ER requirement ER requirement Y Y Y Y OFTA specified Y Y Y

BRI System (LegCo Complex)

APP-E

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

UHF Frequency Channels list in IBCCDS (470-862 MHz)


Channel Number E44 E45 E46 E47 E48 E49 E50 E51 E52 E53 E54 E55 E56 E57 E58 E59 E60 E61 E62 E63 E64 E65 E66 E67 E68 E69 Frequncy Range 654 - 662MHz 662 - 670MHz 670 - 678MHz 678 - 686MHz 686 - 694MHz 694 - 702MHz 702 - 710MHz 710 - 718MHz 718 - 726MHz 726 - 734MHz 734 - 742MHz 742 - 750MHz 750 - 758MHz 758 - 766MHz 766 - 774MHz 774 - 782MHz 782 - 790MHz 790 - 798MHz 798 - 806MHz 806 - 814MHz 814 - 822MHz 822 - 830MHz 830 - 838MHz 838 - 846MHz 846 - 854MHz 854 - 862MHz SMATV 17 SMATV 18 SMATV 19 Public broadcasting system SMATV 20 Vacant Frequency Band Vacant Frequency Band IT network Vacant Frequency Band Vacant Frequency Band Vacant Frequency Band Vacant Frequency Band Vacant Frequency Band Vacant Frequency Band Vacant Frequency Band Vacant Frequency Band Vacant Frequency Band Vacant Frequency Band Public broadcasting system Public broadcasting system Vacant Frequency Band Vacant Frequency Band Vacant Frequency Band Vacant Frequency Band Vacant Frequency Band Building CCTV Allocation to be avoided Remark ER requirement ER requirement ER requirement ER requirement ER requirement available available ER requirement available available available available available available available available available available ER requirement ER requirement available available available available available ER requirement Y Y OFTA specified

BRI System (LegCo Complex)

APP-E

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Channel Summary: Required Channels: Analogue TV signal HD TV signal CCTV IT network Public broadcasting system SMATV 4 3 1 1 3 20 32 Vacant Channels Total Channels 17 49

(Provision future connection)

Remarks: 1 ) Cable TV channels are allocated in VHF frequency band and will not occupy any BRI channel.. See clause 3.13 2 ) ER requires 1 channel for LegCo meeting broadcast system ( MBS ) ( ERIV / BS 3.7.1 L), whereas 9 locations were specified. The channel can be one of vacant frequency channels. 3 ) AV signal of electonic voting and announciator system shall be proposed to combine together with all meeting broadcasting system for more BRI channels reservation for future. 4) Conventional vacant frequency band can provide 17 channels available for meeting broadcasting system. They are not enough to service 40 frequency channels (36LegCo+4CGC) for meeting broadcasting system. The technical method for meeting broadcasting system has been reported to user for their further decision and kind consideration.

BRI System (LegCo Complex)

APP-E

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix F Running Cost Estimation

BRI System (LegCo Complex)

APP-F

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Estimation of Running Cost


Running Cost of BRI System for LegCo Complex

ITEM 1 Lighting (14.63 sq m)

Description

Estimated Loading (kW) 0.293 1.67 0.32 0.672

Assumed Operation Hour Sub-Total Energy Consumption per day 1 24 24 24 per day (kWh) 0.293 40.08 7.68 16.13

2 BRI Equipment in Head-end room 3 BRI from G/F to 3/F 4 Air-conditioning for BRI Room

Total 2. Total Running Cost for BRI system

64.18

Total power consumption for BRI system per month: (Assumed 30 days for each month)

1925.49

kWh

Block Rate Tariff

Unit charge for the first 1,500 units (Basic Charge)

1.177

/ kWh

Unit charge from 1,501 units and above (Basic Charge)

1.270

/ kWh

Unit charge for the first 1,500 units (Fuel Clause Adjustment)

0.105

/ kWh

Unit charge for the first 1,501 units and above (Fuel Clause Adjustment)

0.105

/ kWh

Running cost for each month :

2507.38

Annual running cost :

30,088.56

Notes: Electricity charge rate of Year 2008 is used for the estimation of electricity cost. The life cycle of BRI system equipment is around ten Years.

BRI System (LegCo Complex)

APP-F

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix G Signal Loss Calculation of BRI System

BRI System (LegCo Complex)

APP-F

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Signal loss estimation of BRI system


General signal level is estimated on each floors for different individual BRI equipment Building Floor R/F Channel Amp. Main splitter 9/F Fibre Rx (elect room) Amp. & Splitter End User outlets 8/F Fibre Rx (elect room) Amp. & Splitter End User outlets 7/F Fibre Rx (elect room) Amp. & Splitter End User outlets 6/F Fibre Rx (elect room) Amp. & Splitter End User outlets 5/F Fibre Rx (elect room) Amp. & Splitter End User outlets 4/F Fibre Rx (elect room) Amp. & Splitter End User outlets Notes: Detail signal loss calculation for each location on floors will be submitted in DDA. LegCo Description Signal level 90 100dB 75 85 dB 70 80 dB 80 89 dB 60 80 dB 70 80 dB 80 89 dB 60 80 dB 70 80 dB 80 89 dB 60 80 dB 70 80 dB 80 89 dB 60 80 dB 70 80 dB 80 89 dB 60 80 dB 70 80 dB 80 89 dB 60 80 dB G/F GM/F 1/F 1M/F 2/F Floor 3/F Description Fibre Rx (elect room) Amp. & Splitter End User outlets Fibre Rx (elect room) Amp. & Splitter End User outlets Fibre Rx (elect room) Amp. & Splitter End User outlets Fibre Rx (elect room) Amp. & Splitter End User outlets Fibre Rx (elect room) Amp. & Splitter End User outlets Fibre Rx (elect room) Amp. & Splitter End User outlets Signal level 70 80 dB 80 89 dB 60 80 dB 70 80 dB 80 89 dB 60 80 dB 70 80 dB 80 89 dB 60 80 dB 70 80 dB 80 89 dB 60 80 dB 70 80 dB 80 89 dB 60 80 dB 70 80 dB 80 89 dB 60 80 dB

BRI System (LegCo Complex)

APP-F

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix H Corresponding Letters

BRI System (LegCo Complex)

APP-H

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

BRI System (LegCo Complex)

APP-H

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

BRI System (LegCo Complex)

APP-H

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix I Diagram for BRI interfacing with IT system

BRI System (LegCo Complex)

APP-I

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

BRI System (LegCo Complex)

APP-I

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix J Reply to ASD Comments on 1st Submission of 2


nd

AIP

BRI System (LegCo Complex)

APP-J

Building Services Installation

Design and Construction of Tamar Development Project, Hong Kong For The Government of the Hong Kong Special Administrative Region Contract No. SS P318 Programme No. 063KA

Building Services, J. Roger Preston Limited nd 2 AIP Submission rev. c1 22 Jun 2009

Appendix K Reply to IDC Comments on 1 Submission of 2


st nd

AIP

BRI System (LegCo Complex)

APP-K

Building Services Installation