Professional Documents
Culture Documents
Sheet
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com
Client
Calcs by
Checked by
Date
Input Data
H1
H2
H3
Hw
Hr
B
D
(m)
(m)
(m)
(m)
(m)
(m)
(m)
Wall Dimensions
5.5 C
0.5 F
0 xf
5.5 At
0.36 Ab
0.5 Cov wall
2.5 Cov base
0.5
0.3
2.40
0.3
0.4
50
50
(m)
(m)
(m)
(m)
(m)
mm
mm
General Parameters
20
()
Soil frict
0
Fill slope ()
15
Wall frict ()
25
Conc kN/m3
18
kN/m3
Soil
fcu
30
(MPa)
fy
450
(MPa)
Design Parameters
SF Overt.
1.5
SF Slip
1.5
DL Factor
1.2
LL Factor
1.6
Pmax
150
(kPa)
Seepage allowed
Active pressure applied on back of shear key for sliding
Theory
: Coulomb
Wall type : Cantilever
:0.442
:3.029
:0.454
:1.345
:0.364
width
1.845
3.300
1.878
3.300
3.560
0.223
0.223
1.767
2.750
5.055
5.055
1.582
-2.592
3.791
-0.000
0.300
34.356
0.861
0.000
0.000
-16.510
0.866
0.840
0.872
0.844
1.700
-82.551
2.267
1.031
0.065
0.065
0.855
0.809
0.809
88.358
103.378
121.399
1.228
2.125
2.150
0.000
0.250
Job Number
Sheet
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com
Client
Calcs by
Checked by
Point load of
0.99 kN on backfill
Line load of
0.99 kN/m on backfill
UDL of 1.5 kPa
Date
0.090
0.990
3.861
1.500
1.500
2.100
width
1.Moment Equilibrium
Point of rotation: bottom front corner of base.
For Overturning moment Mo calculate as follows:
Mo = Sum(hor. forces x l.a.) - Sum(vert. forces x l.a.)
For Stabilizing moment Mr calculate as follows:
Mr = -Sum(hor. forces x l.a.) + Sum(vert. forces x l.a.)
where l.a. = lever arm of each force.
Stabilizing moment Mr : 598.93 kNm
Destabilizing moment Mo : 583.24 kNm
Safety factor against overturning = Mr/Mo = 1.027
1.5 ***
2.Force Equilibrium
Sum of Vertical forces Pv
Frictional resistance Pfric
Passive Pressure on shear key
Passive pressure on base
=> Horizontal resistance Fr
: 254.48 kN
: 92.62 kN
:
5.15 kN
:
2.59 kN
: 100.37 kN
1.50 ***
*** MAXIMUM PRESSURE EXCEEDS SPECIFIED ALLOWABLE PRESSURE BY 2600.3 kPa ***
WALL MOMENTS (ULS) AND REINFORCEMENT TO BS8110 - 1997
Position from
base top (m )
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
Moment
(kNm )
366.56
346.82
326.82
307.61
289.16
271.47
254.51
238.27
222.74
207.90
193.74
180.23
167.37
155.13
143.50
132.47
2901.92
2740.12
2576.72
2421.20
2273.15
2132.20
1998.00
1870.24
1748.64
1632.93
1522.88
1418.24
1318.81
1224.39
1134.79
1049.83
522.60
520.00
517.40
514.80
512.20
509.60
507.00
504.40
501.80
499.20
496.60
494.00
491.40
488.80
486.20
483.60
Job Number
Sheet
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.20
4.30
4.40
4.50
4.60
4.70
4.80
4.90
5.00
Client
Calcs by
122.02
112.14
102.80
94.00
85.71
77.93
70.63
63.80
57.42
51.49
45.98
40.87
36.16
31.82
27.85
24.21
20.91
17.92
15.23
12.82
10.68
8.79
7.13
5.69
4.46
3.41
2.54
1.82
1.24
0.79
0.44
0.22
0.09
0.02
0.00
Checked by
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Date
969.35
896.48
827.21
761.34
698.82
639.58
583.57
530.70
480.93
434.18
390.37
349.44
311.31
275.90
243.14
212.94
185.23
159.90
136.88
116.08
97.40
80.74
66.00
53.09
41.89
32.30
24.20
17.48
12.02
7.70
4.38
2.14
0.87
0.20
0.01
481.00
478.40
475.80
473.20
470.60
468.00
465.40
462.80
460.20
457.60
455.00
452.40
449.80
447.20
444.60
442.00
439.40
436.80
434.20
431.60
429.00
426.40
423.80
421.20
418.60
416.00
413.40
410.80
408.20
405.60
403.00
400.40
397.80
395.20
392.60
Moment
(kNm )
-0.00
-1.90
-7.61
-17.12
-30.43
-47.54
-68.46
-93.19
-121.71
-154.04
-190.18
-209.67
273.79
253.88
241.03
228.51
216.32
204.47
192.96
181.77
170.92
160.41
150.23
140.38
130.86
121.68
112.84
104.32
Top Reinforcing
(mm/m )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1542.19
1423.55
1348.83
1278.77
1210.58
1144.26
1079.81
1017.22
956.51
897.66
840.68
785.57
732.33
680.95
631.44
583.81
Bot Reinforcing
(mm/m )
0.00
10.64
42.57
95.78
170.28
266.06
383.13
521.49
681.13
862.05
1064.26
1173.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Nominal (0.13%)
(mm/m )
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
Job Number
Sheet
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com
1.97
2.04
2.11
2.18
2.24
2.31
2.38
2.45
2.52
2.58
2.65
2.72
2.79
2.86
2.92
2.99
3.06
3.13
3.20
3.26
3.33
3.40
Client
Calcs by
96.14
88.30
80.79
73.61
66.77
60.26
54.08
48.24
42.73
37.56
32.72
28.21
24.04
20.20
16.69
13.52
10.68
8.18
6.01
4.17
2.67
1.50
Checked by
538.04
494.13
452.10
411.93
373.64
337.21
302.64
269.95
239.13
210.17
183.08
157.86
134.51
113.02
93.41
75.66
59.78
45.77
33.63
23.35
14.95
8.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Date
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
650.00
Sketch of Wall
kh =0.02g
kv =0.01g
0.50
2750.3kPa
Wall type: Cantilever
Theory: Coulomb
1.49
20.00
0.50
0.40
0.30
0.50
5.50
15.00
5.50
1.00
0.30
0.00
2.50
2.40
SFslip = 0.53
SFovt = 1.03
Kas=0.45
Kps=1.34
=0.36
V=259.7kN
v= 0.76MPa
vc= 0.66MPa
Job Number
Sheet
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com
Client
Calcs by
Checked by
Date
Wall Moments
5.00
4.50
4.00
3.50
2.50
2.00
1.50
350
300
250
200
150
100
.500
50.0
1.00
0.00
Height (m)
3.00
Job Number
Sheet
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com
Client
Calcs by
Checked by
Date
300
Base Moments
250
150
3.40
3.20
3.00
2.80
2.60
2.40
2.20
2.00
1.80
1.60
1.40
1.20
1.00
.800
.600
50.0
.400
100
.200
200
-50.0
-100
-150
-200
Position (m)
Wall Reinforcement
Wall Reinforcement
Reinf. max = 2900mm/m @ 0.00m
5.00
4.50
Nominal
4.00
3.00
Back
2.50
2.00
1.50
Reinforcement (mm/m)
3000
2500
2000
.500
1500
Front
1000
1.00
500
Height (m)
3.50
Job Number
Sheet
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com
Client
Calcs by
Checked by
Date
Base Reinforcement
Base Reinforcement
1600
1400
1000
800
Nominal
600
400
Top
Position (m)
Schematic Reinforcement
T12@200 (Hor)
T12@200 (Hor)
T32@250 (NF)
T12@200 (FF)
1-R10/m2 clips
1-R10/m2 clips
T12@200 starters
FRONT
T32@220 starters
T20@200 (T1)
T20@250 (B1)
T16@300 (T2)
T16@300 (B2)
T12@200
SECTION
T12@200 (EF)
3.40
3.20
3.00
2.80
2.60
2.40
2.00
1.80
1.60
1.40
1.20
1.00
.800
.600
.200
.400
Bottom
200
2.20
Reinforcement (mm/m)
1200