For My Junior RF Engineer brothers Steps followed to perform Drive Test Physical Verification Alarm Checking Frequency Plan Verification Hardware Configuration Verification
for primary neighbor. Handover is performed with all the defined neighbor's in the integration sheet.
TRX Test
TRX Test is done to check whether calls originated are being handled by all the TRXs. Call made during the process is tracked by the MAIO number displayed on the screen for all the TRXs. e.g. for Site of configuration 6 TRX per sector the MAIO values for TRX test shall be 0,1,2,3,4. Call can be originated on the BCCH or the TCH frequencies. Hence MAIO values will be reflected only for calls on TCH frequency and not on BCCH frequency.
ful for making decision related to GSM antenna height, tilt, and orientation.
Dedicated Drive
Dedicated drive is an important part of Drive Test. Here call is made to a test number and drive is done for the potential areas of the Site. During drive being carried out one has constantly monitor parameters such as RX Level, RX Quality, SQI, DTX, C/I Ratio, Hopping Channel, Neighbor list, TA (Timing Advance). Constant changes in these parameter are helpful for post Optimization of the site.