SINGAPORE STANDARD
CP52 : 1990
(UDC 614.844)
CODE OF PRACTICE FOR
Automatic Fire Sprinkler System
(Incorporating Amendment No. 1, November 1991)
Copyright Reserved
Singapore Institute of Standards and Industrial Research
1 Science Park Drive, Singapore 0511
Cable: SISIR SINGAPORE
Telex: RS 28499 SISIR
ISBN 9971-67-405-XcP 52: 1990
‘This Singapore Standard having been approved by the Building and Construction Industry Practice
Committee was endorsed by the Standards Council on 10 February 1990.
First published, 1990.
First reprint, 1992.
‘The Building and Construction industry Practice Committee appointed by the Standards Council
consists of the following members:
Name Organisation
Chairman : Mr Chow Kok Fong Standards Councit
Deputy
Chairman : Mr Quak Ser Khoon Construction Industry Development Board
Secretary : Mr Stephen Chua Singapore Institute of Standards and Industrial
Research
Members : Mr Chee Keng Yam ‘Association of Consulting Engineers, Singapore
Mr Chia Kok Leong Singapore Institute of Architects
Mr Lai Chong Meng Singapore Contractors’ Association Limited
Mr Lum Teng Wai Singapore Manufacturers’ Association
Dr Gary Ong Khim Chye National University of Singapore
A/Prof Phang Kok Wai Nanyang Technological Institute
Mr Phang Pock Tong Housing and Development Board
Mr Song Wee Ngee Institution of Engineers, Singapore
Mr Benedict Tan Public Works Department
Mr Harry K W Wong Department of Industrial Safety
‘The Technical Committee appointed by the Building and Construction Industry Practice Committee
and responsible for the preparation of this standard consists of representatives from the following
organisations:
Name Organisation
Chairman : Mr Daniel A Gunaseelan Individual Capacity
Secretary : Mrs Joanna Chang-Peh ‘Singapore Institute of Standards and Industrial
‘An Yoh Research
Members : Mr Khoo Lee Meng ‘Singapore Institute of Standards and Industrial
Research
Mr Koh Boon Aik Public Utilities Board
Mr Lau Kwong Chung ‘Singapore Institute of Architects
Mr Loh Kah Loon ‘Singapore Fire Service
Mr Loh Peng Sum*> Individual Capacity
Mr Siew Yee Cheong Individual Capacity
Mr Tan Heng Wee Association of Consulting Engineers, Singapore
Mr Eric Tse Pak Seng ‘Singapore Institute of Architects
Mr Ung Cheng Eng Development and Building Control Division
Mr Wong Yew Wan Institution of Engineers, Singapore
++ Served sil April @8
++ Sorved til May 69cP 52 : 1990
CONTENTS
Page
Foreword = = - So 2 ¢ : ; 8
CODE OF PRACTICE
1. Soope - etl s 6 : - oo - 9
2. Definitions - - : : se : - 9
3. Classes of sprinkler system and design data - : - - "
3.1 Classes of system - - - - - 4
3.2 Classification of occupancies - : se So 1"
3.3 Types of systems : eae 5 : 20
3.4 Design data - : : a . 5 : 23
4, Installation = os 5 4 : : 24
4.1 Confirmation of class of hazard = : - 24
42 Information to be provided for approval of spre oystoms - oe 24
4.3. Sprinklered buildings - - - 26
44 Transmission of alarm signal 1 Fire Service * - - a
45 Local alarm - oe : - - 27
46 Maintenance - = - - : : oe - 28
5. Water supplies - : : - cas 5 = 28
5.1 Generale - - G= 4 - - 28
5.2 Acceptable sources of supply - oe : - - 28
- : arc - - - 28
5.4 Connections to other services - = =~ : : - 29
5.5 Pressure and flow requirements» : - oe - 30
5.6 Pressure limitations - - - - - - 30
5.7 Minimum capacity of stored water supplies - - - - 30
5.8 Pump suction tanks - - : - 30
5.9 Water supplies from private reservoirs and aravty tanks- : : 33
5.10 Pump installations - - - - : 34
5.11 Pump sets - - : see - - 37
5.12 Proving of water supplies - se - - - 45
8. Spacing and tocaion of sprinklers = - - + - 46
6.1 Standard spaci se : - : 46
6.2 Staggered spacing - : : oo 5 46
6.3. Minimum distance between sprinklers ~~ - : : 46
6.4 Location of sprinklers (other than sidewall sprinklers) : - a7
65 Spacing and location of sidewall sprinklers = = - : 49
6.6 Location or conditions involving special consideration
(supplementary protection) - - oe : - - 49
6.7 Obstructions below sprinklers - = = - : - 53
68 Film and television production studios - oo - 55
89. Theatres and music hals (protection on tho stage side of the
proscenium wall) - - - : - 55
6.10 Cold storage warehouse : : - oe - - 56