You are on page 1of 2

AMERICAN BUREAU OF SHIPPING Cargo Gear Survey

Vessel Name Checklist Date Checklist Item(s): All ONOME 03-Oct-2013 Description Class Number Blank Checklist

CHECKLIST

09178347

Notes

1. All gear as noted in the Cargo Gear Register was examined as follows and found satisfactory: a. CRANES: Visually inspected the crane structure for deformation, excessive wear, corrosion, and damage or fractures. Boom was lowered for examination. Crane hooks were visually examined for deformation, excessive wear or fractures and non-destructive tested carried out (for offshore cranes only). A visual exam and operational test was carried out of the crane machinery including prime movers, clutches, brakes, hoisting, slewing and luffing machinery. The wire rope including end attachment was visually examined for excessive wear, corrosion, flattening, kinks, strand separation, core failure or other defects. The slewing ring assembly was examined for slack bolts, damaged bearings and deformation or fractured weldments. Function tests were conducted for the main and auxiliary load hoisting and lowering, boom raising and lowering, slewing (swinging), safety protective (fail-safe) and limiting devices, and load and boom angle or radius indicators. b. BOOMS: All structural parts, including winches, booms, stayed masts, pins and connections, wire ropes, chains, rings, hooks, links, swivels, and blocks were visually examined. c. Replacement wire rope was supplied with manufacturer's certificate conforming to the construction type, size, and minimum breaking strength specified in the load diagram design data. 2. Endorsed Cargo Gear Register and Issued CHG-7 Certificate as noted in certificate section of AB Report B. CARGO GEAR RETESTING/RENEWAL SURVEY [Requires an annual inspection be carried out. Should all gear not be tested, survey not to be considered complete. Gear tested/remaining to be tested to be noted on form AB Report B.] 1. Cargo gear was load tested and noted in parts section of AB Report B. 2. Post test examination of all gear carried out as follows and found satisfactory. a. CRANES: Examined each crane, together with all critical accessories, including foundation, sheaves and rope guides, wire ropes including end connections, hoist machinery, brakes and clutches, hooks, slewing ring assembly and bolting arrangements for slack bolts, damaged bearings, and deformed or fractured weldments. Additionally, a rocking test, grease sample and a representative sample of the slewing ring assembly bolts, based on the age of the crane, is to be removed and examined by a suitable nondestructive testing method. b. BOOMS: Examined all cargo gear, with the whole of the gear accessory thereto, including all chains, rings, hooks, links, shackles, swivels, pulley blocks or other loose gear for damage or permanent deformation. 3. Calibration of test equipment used in the process was verified as noted below: a. Review of Equipment Calibration Record(s). b. Other: - Specify Other:

CG-PER

Page 1 of 2

AMERICAN BUREAU OF SHIPPING Cargo Gear Survey


Vessel Name Checklist Date Checklist Item(s): All ONOME 03-Oct-2013 Description Class Number Blank Checklist

CHECKLIST

09178347

Notes

4. Annual Inspection of Cargo Gear was carried out. 5. Endorsed Cargo Gear Register and Issued appropriate Certificate as noted in certificate section of AB Report B.

CG-PER

Page 2 of 2