Project Data Sheets (PDS) contain summary information on the project or program: Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
25 Apr 2013
PDS Updated as of
23 Jul 2013
Project Name
Country
Regional
Akmola Electricity Distribution Company (AEDC), and Central-Asia Electric Power Corporation (CAEPCO)
Project/Program Number
46933-014
Status
Approved
Geographical Location
Akmola province
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Thematic Classification
FINANCING
Type/Modality of Assistance PS Approval Number Source of Funding Private Sector Loan (Approved) Approved Amount (US$ thousand) 15,000
TOTAL
15,000
DESCRIPTION
The proposed transaction is to support expansion, augmentation and modernization of AEDC's electricity distribution network in the Akmola province and in a small area within Astana, the nation's capital. AEDC s investment plan from 2013 to 2015 includes rehabilitation and augmentation of 19 substations, 60km of 110kV lines, 142.8km of 10kV lines and 52 km of 0,4kV lines. Further, it will add 1 new substation, 141km of 35kV lines, 114km of 110kV lines and 2 transformers to AEDC s distribution network as well as additional metering devices to improve the automated system for commercial power balancing and settlements.
DEVELOPMENT IMPACT
To promote sustainable economic growth by reducing the risk of power distribution system failure caused by obsolete infrastructure with inadequate maintenance, increasing supply of reliable energy and enhancing access to electricity for households, business and industry. Improved performance of a provincial private sector power utility will act as a showcase for further private sector participation in the sector.
PROJECT OUTCOME
Description of Outcome Progress Towards Outcome
The Project will rehabilitate, augment and expand AEDC's distribution network and system including 2,250 substations, 8,130km of distribution lines, and automated system for commercial power accounting, and measuring devices. Additional power supply is expected through improved distribution infrastructure with additional connection to households and industries while maintaining low technical losses. The Project will achieve the more reliable performance of the power distribution system in the rapidly growing Akmola province and capital region in the north of Kazakhstan, and will prevent network failure caused by obsolete infrastructure with inadequate repair and maintenance.
AEDC's regional distribution network in Akmola province and Astana improved. Repair or modernization of substations. Construction of new substations. Repair or modernization of km distribution lines.
BUSINESS OPPORTUNITIES
Date of First Listing
Consulting Services
Procurement
http://www.adb.org/projects/46933-014/business-opportunities
TIMETABLE
Concept Clearance 13 Aug 2012
Fact-finding
22 Jul 2013
Approval
02 Sep 2013
MILESTONES
Closing Approval No. Approval Signing Effectivity Original Revised Actual
Executing Agencies
LINKS
Project Website http://www.adb.org/projects/46933-014/main
http://www.adb.org/projects/46933-014/documents