1 Introduction
11
1.1 Objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.2 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.3 Drilling Rig Types . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1.4 Personnel at Rig Site . . . . . . . . . . . . . . . . . . . . . . . . . 15
1.5 Miscellaneous
. . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
21
31
41
51
. . . . . . . . . . . . . . . . . . . . 512
6 Drilling Hydraulics
61
. . . . . . . . . . . . . . . . . . . . . 62
. . . . . . . . . . . . . . . . . . . . 63
71
81
91
101
iv
A1
List of Figures
1.1 Rig Classication. . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2.1 Typical rig components. . . . . . . . . . . . . . . . . . . . . . . . 21
2.2 A simplied drillstring. . . . . . . . . . . . . . . . . . . . . . . . . 23
2.3 Making a connection.
. . . . . . . . . . . . . . . . . . . . . . . . 24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 232
. . . . . . . . . . . . . . . 104
. . . . . . . . . . . . . . . . . . . . . . . . 1014
10.16
Back rake and side rake angles in PDC bits. . . . . . . . . . . . . 1014
viii
10.17
IADC roller cone bit classication chart. . . . . . . . . . . . . . . 1016
10.18
Tooth wear diagram for milled tooth bits. . . . . . . . . . . . . . . 1021
10.19
Correlation between rock strength and threshold WOB.
. . . . . 1023
10.20
Variation of ROP with different uid properties. . . . . . . . . . . 1024
10.21
Effect of differential pressure in the ROP. . . . . . . . . . . . . . . 1025
10.22
Exponential relationship between of differential pressure and ROP.1026
10.23
Effect of WOB (a) and rotary speed (b) in the ROP. . . . . . . . . 1026
ix
List of Tables
2.1 Heating values of fuels. . . . . . . . . . . . . . . . . . . . . . . . 26
2.2 Blocktackle efciency ($\eta=0.96$). . . . . . . . . . . . . . . . 214
10.1 IADC codes for roller cone bits. . . . . . . . . . . . . . . . . . . . 1017
10.2 Range for IADC bit prole. . . . . . . . . . . . . . . . . . . . . . . 1019
10.3 Range for IADC bit hydraulic design. . . . . . . . . . . . . . . . . 1019
10.4 Range for IADC cutter size and density. . . . . . . . . . . . . . . 1020
A.1 New Drill Pipe Dimensional Data . . . . . . . . . . . . . . . . . . A2
A.2 New Drill Pipe Torsional and Tensile Data. Courtesy API . . . . . A3
A.3 New Drill Pipe Collapse and Internal Pressure Data. Courtesy APIA4
A.4 Premium Drill Pipe Torsional and Tensile Data. Courtesy API . . A5
A.5 Premium Drill Pipe Collapse and Internal Pressure Data. Courtesy API . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A6
xi
xii
Chapter 1
Introduction
1.1
Objectives
The purpose of this text is to give students an introduction to the principles and
some recommended procedures practiced in drilling engineering. All chapters
in general contain a theoretical introduction, examples, and exercises. References for further readings are given at the end of the text. Necessary equations
and procedures to solve the exercises are presented throughout the text.
1.2
General
When a drilling project is commenced, two goals govern its aspects. The rst
is to build the well according to its purpose and in a safe manner (i.e, avoiding
personal injuries and avoiding technical problems). The second is to complete
it with minimum cost. Thereto the overall costs of the well during its lifetime in
conjunction with the eld development aspects shall be minimized. The overall
cost minimization, or optimization, may inuence the location from where the
well is drilled (e.g., an extended reach onshore or above reservoir offshore),
the drilling technology applied (e.g., conventional or slimhole drilling, overbalanced or underbalanced, vertical or horizontal, etc), and which evaluation
procedures are run to gather subsurface information to optimize future wells.
On the other hand, the optimization is inuenced by logistics, environmental
regulations, etc.
To build a hole, different drilling technologies have been invented:
Percussion drilling
Cable drilling Pennsylvanian drilling
Drillstring
* With mud Quick percussion drilling
CHAPTER 1
Introduction to Drilling
Page 11
Page 12
1.3
The diagram in Figure 1.1 shows a general classication of rotary drilling rigs.
Several pictures of the different types of rigs are presented in Figures (a) to (l)
below.
CHAPTER 1
Introduction to Drilling
Page 13
CHAPTER 1
Introduction to Drilling
Page 14
(i) A drillship
1.4
This section describes the crew requirements and tasks of some individual crew
members at the rig site.
People directly involved in drilling a well are employed either by the operating
company, the drilling contractor, or one of the service and supply companies.
The operating company is the owner of the lease/block and principal user of the
services provided by the drilling contractor and the different service companies.
To drill an oil or gas well, the operating company (or simply called operator)
acquires the right from the land owner under which the prospective reservoir
CHAPTER 1
Introduction to Drilling
Page 15
may exist, to drill and produce from it. Usually, when a well has to be drilled,
an auction is run by the operator and various drilling contractors are invited
to place their bid. Since drilling contractors are companies that perform the
actual drilling of the well, their main job is to drill a hole to the depth/location
and specications set by the operator. Along with hiring a drilling contractor,
the operator usually employs various service and supply companies to perform
logging, cementing, or any other special operations, including maintaining the
drilling uid in its planed condition.
Most drilling crews consist of a tool pusher, a driller, a derrickman, a mud
logger, and two or three rotary helpers (also called oormen or roughnecks).
Along with this basic crew conguration the operator sends usually a representative, called company man to the rig. For offshore operations the crews usually
consist of many more employees.
Tool Pusher: The tool pusher supervises all drilling operations and is the leading man of the drilling contractor on location. Along with this supervision
duties, he has to coordinate company and contractor affairs. Two or three
crews operate 24/7, and it is a responsibility of the Tool Pusher to supervise and coordinate these crews.
Company Man: The company man is in direct charge of all companys activities on the rig site. He is responsible for the drilling strategy as well as the
supplies and services in need. His decisions directly effect the progress
of the well.
Driller: The driller operates the drilling machinery on the rig oor and is the
overall supervisor of all oormen. He reports directly to the tool pusher
and is the person who is most closely involved in the drilling process. He
operates, from his position at the control console, the rig oor brakes,
switches, levers, and all other related controls that inuence the drilling
parameters. In case of a kick he is the rst person to take action by
moving the bit off bottom and closing the BOP.
Derrick Man: The derrickman works on the socalled monkeyboard, a small
platform up in the derrick, usually about 90 ft above the rotary table. When
a connection is made or during tripping operations he is handling and
guiding the upper end of the pipe. During drilling operations the derrickman is responsible for maintaining and repairing the pumps and other
equipment as well as keeping tabs on the drilling uid.
Floormen: During tripping, the rotary helpers are responsible for handling the
lower end of the drill pipe as well as operating tongs and wrenches to
make or break up a connection. During other times, they also maintain
equipment, keep it clean, do painting and in general help where ever help
is needed.
Mud Engineer, Mud Logger: The service company who provides the mud almost always sends a mud engineer and a mud logger to the rig site. They
CHAPTER 1
Introduction to Drilling
Page 16
1.5
Miscellaneous
CHAPTER 1
Introduction to Drilling
Page 17
CHAPTER 1
Introduction to Drilling
Page 18
Chapter 2
Rotary Drilling System
The most common drilling rigs in use today are rotary drilling rigs. Their main
tasks are to create rotation of the drillstring and facilities to advance and lift the
drillstring, casings, and special equipment into and out of the hole drilled. The
main components of a rotary drilling rig can be seen in Figure 2.1.
Page 21
For all rigs, the depth of the planned well determines basic rig requirements
like hoisting capacity, power system, circulation system (mud pressure, mud
stream, mud cleaning), and the pressure control system. The selection of the
most costefcient rig involves both quantitative and qualitative considerations.
The most important rig systems are:
1. Power system,
2. Hoisting system,
3. Drilling uid circulation system,
4. Rotary system,
5. Derrick and substructure,
6. Well control system,
7. Well monitoring system.
The proper way to calculate the various requirements is discussed below. The
qualitative aspects involve technical design, appropriate expertise and training
of the drilling crew, contractors track record, and logistics handling.
For offshore rigs, factors like water depth, expected sea, winds, and currents
conditions, and location (supply time) have to be considered.
It should be understood that rig rates are not only inuenced by the rig
type but they are also strongly dependent on by the current market situation
(oil price, drilling activity, rig availability, location, etc). Therefore, for the rig
selection, basic rig requirements are determined rst. Then drilling contractors
are contacted for offers of a proposed spud date (date at which drilling operation
commences) and alternative spud dates. This exibility to schedule the spud
date may reduce rig rates considerably.
Before describe the various rig systems listed above, it is important to understand the drilling process. In rotary drilling, the rock is destroyed by the
action of rotation and axial force applied to a drilling bit. The bit acts on the soil
destroying the rock, whose cuttings must be removed from the bottom of the
borehole in order to continue drilling.
The drilling bit is located at the end of a drill string which is composed of drill
pipes (also called joints or singles), drill collars, and other specialized drilling
tools connected end to end by threads to the total length of the drill string, which
roughly corresponds to the current depth of the borehole. Drill collars are thick
walled tubes responsible for applying the axial force at the bit. Rotation at the
bit is usually obtained by rotating the whole drill string from the surface. (See
Figure 2.2.)
The lower portion of the drill string, composed of drill collars and specialized drilling tools, are called bottom hole assembly (BHA). A large variety of
bit models and designs are available in industry. The choice of the right bit,
CHAPTER 2
Rotary Drilling Systems
Page 22
based on the characteristics of the formations to be drilled, and the right parameters (weight on bit and rotary speed) are the two most basic problems the
drilling engineer faces during drilling planning and drilling operation. The cuttings created by the bit action are lifted to the surface by the drilling uid, which
is continuously pumped from the surface to the bottom through inside of the
hollow drill string. At the bit, the drilling uid is forced through nozzles in a uid
jet action which removes the cuttings from under the bit. The uid returns to
the surface carrying the cuttings, through the annular space between the drill
string and the borehole. The carrying capacity of the drilling uid is an important characteristics of the drilling uid. Other important characteristics are the
capacity to prevent formation uids from entering in the borehole, and the capacity to maintain the stability of the borehole wall. At the surface, the cuttings
are separated from the drilling uid by several solid removal equipment. The
drilling uid accumulates in a series of tanks where it receives the necessary
treatment. From the last tank in this series, the drilling mud is picked up by the
system of pumps and pumped again down the hole.
As drilling progresses, new joints are added to the top of the drill string increasing its length, in an operation called connection. The diagram in Figure 2.3
depicts the process of adding a new joint to the drill string.
During the drilling of the length of the kelly, a new joint is picked from the
pipe rack and stabbed into the mousehole using rig lift equipment. At the kelly
down, the kelly is pulled out of the hole. A pipe slips (see gure 2.4) is used to
transfer the weight of the drillstring from the hook to the master bushing. The
CHAPTER 2
Rotary Drilling Systems
Page 23
Page 24
2.1
Power System
The power system of a rotary drilling rig has to supply power to items 2 to 7 in
the list above. In addition, the system must provide power for pumps in general,
rig light, air compressors, etc. Since the largest power consumers on a rotary
drilling rig are the hoisting, the circulation system, and the rotary system, these
components determine mainly the total power requirements. During typical
drilling operations, the hoisting and the rotary systems are not operated at the
same time. Therefore the same engines can be used to perform both functions.
Drilling rig power systems are classied as direct drive type and electric
type. In both cases, the sources of energy are diesel fueled engines. In the
direct drive type, internal combustion engines supply mechanical power to the
rig. Most rigs use one to three engines to power the drawworks and rotary table.
Power is usually transmitted to the elements by gears, chains, belts, clutches,
and torque converters. The engines are usually rated between 400 hp and
CHAPTER 2
Rotary Drilling Systems
Page 25
800 hp. The power is used primarily to turn the drill string, pump the drilling
uid, and raise the drillstring. Engines also power generators that supply the
electricity used on and around the rig. Usually there are two generator sets
in the rig. The rig can run with one of these units but it would run close to
maximum output at night. The second provides for backup and allows for other
options. These engines are generally rated at 300 hp to 350 hp. Rigs may also
employ one or two engines to power the drilling uid pumps. Total output varies
from 300 hp to 800 hp. In the electric type, several diesel engines are used to
generate electricity (DC and AC at various voltage levels) that are transmitted to
the various rig systems. DC electric motors are compact and powerful, and can
operate in a wide range of power and torque. There is considerable exibility of
equipment placement, allowing better space utilization and weight distribution.
This is extremely important in offshore rigs. As guideline, power requirements
for most onshore rigs are between 1,000 to 3,000 hp. Offshore rigs in general
use much more power.
The performance of a rig power system is characterized by the output horsepower, torque, and fuel consumption for various engine speeds. These three
parameters are related by the efciency of each system.
2.1.1
The energy consumed by the engines comes from burning fuels. Table 2.1
presents the heating values for some types of fuels used in internal combustion
engines.
The engine transforms the chemical energy of the fuel into work. No engine
can transform totally the chemical energy into work. Most of the energy that
enters the engine is lost as heat. The thermal efciency Et of a machine is
dened as the ratio of the work W generated to the chemical energy consumed
Q:
W
Et =
.
Q
Evidently, in order to perform this calculation, we must use the same units
both to the work and to the chemical energy. Important conversion factors are:
1 BTU = 778.17 lbf/ft,
CHAPTER 2
Rotary Drilling Systems
Page 26
To calculate Q we need to know the type of fuel and the rate of fuel consumption in mass per unit time. (Consumption of gaseous fuels is normally
given in mass per unit time, but consumption for liquid fuels is normally given in
volume per unit time. In the latter, we need to know the density of the uid.)
A system produces mechanical work when the sole result of the process
could be the raising of a weight (most time limited by its efciency). In this
case, the work W done by the system is given by
W =F h,
where F is the weight and h is the height. Since power is the rate the work is
produced, if we take the time derivative of the work we obtain power:
P =
dW
dh
=F
=F v,
dt
dt
lbf ft
lbf ft
= 550
.
min
s
rad/s
30 RPM
T [ft lbf]
that is
P [hp] =
CHAPTER 2
Rotary Drilling Systems
1 hp
550 lbf ft/s
= P [hp] .
Q = 31.5
7.2
19000
= 4, 309, 200 BTU/hr
hr
gal
lbm
Converting to hp, results in:
BTU 778.17 lbf ft
1 hr
1 hp
Q = 4, 309, 200
= 1693.6 hp
hr
BTU
3600 s 550 lbf ft/s
The thermal efciency is:
Et =
2.2
397.5
P
=
= 23.5%
1693.6
Q
Hoisting System
The hoisting system is used to raise, lower, and suspend equipment in the well
(e.g., drillstring, casing, etc). The hoisting equipment itself consists of: (See
Figure 2.6.)
derrick (not shown),
CHAPTER 2
Rotary Drilling Systems
Page 28
Page 29
2.2.1
The Derrick
The derrick or mast is a steel tower.1 The purpose of the derrick is to provide height to raise and lower the drillstring (and also casing) out and into the
borehole.
Derricks are rated by the API according to their height and their ability to
withstand wind and compressive loads. API has published standards for the
particular specications. The higher the derrick is, the longer stands it can
handle, which in turn reduces the tripping time. Derricks are designed to handle
two, three, or four joints.
The derrick stands above the derrick oor. The derrick oor is the stage
where several surface drilling operations occur. At the derrick oor are located
the drawworks, the drillers console, the drillers house (or doghouse), the
rotary table, the drilling uid manifold, and several other tools to operate the
drillstring. The space below the derrick oor is the substructure. The height of
the substructure should be enough to accommodate the well control equipment.
(See Figure 2.1.) At about 3 /4 of the height of the derrick is located a platform
called monkey board. This platform is used to operate the drillstring stands
during trip operations. During drillstring trips, the stands are kept stood in in the
mast, held by ngers in the derrick rack near the monkey board, as shown in
Figure 2.7.
If the tower is jacked up, it is called mast. If the tower is erected on the site, it is called
derrick.
CHAPTER 2
Rotary Drilling Systems
Page 210
2.2.2
The Drawworks
The drawworks provides hoisting and braking power required to handle the
heavy equipments in the borehole. It is is composed of a wire rope drum,
mechanical and hydraulic brakes, the transmission, and the cathead (small
winches operated by hand or remotely to provide hoisting and pulling power
to operate small loads and tools in the derrick area). Figure 2.8 shows a typical
onshore rig drawworks.
The reelingin of the drilling line is powered by an electric motor or Diesel
engine, and the reelingout is powered by gravity. To control the reeling out,
mechanical brakes and auxiliary hydraulic or magnetic brakes are used, which
dissipates the energy required to reduce the speed and/or stop the downward
movement of the suspended equipment. (See Figure 2.9.)
CHAPTER 2
Rotary Drilling Systems
Page 211
2.2.3
The drawworks, although very powerful, cannot provide the pull required to
raise the heavy drillstring. The required pull is obtained with a system of pulleys.
The drilling line coming from the drawworks, called fast line, goes over a
pulley system mounted at the top of the derrick, called the crown block, and
down to another pulley system called the traveling block. The assembly of
crown block, traveling block and drilling line is called block-tackle. The number
of lines n of a tackle is twice the number of (active) pulleys in the traveling block.
The last line of the tackle is called dead line and is anchored to the derrick oor,
close to one of its legs. Below and connected to the traveling block is a hook
to which drilling equipment can be hung. As the drilling line is reeled in or out
of the drawworks, the traveling block rises and lowers along the derrick. This
raises and lowers the equipment in the well. The block-tackle system provides
a mechanical advantage to the drawworks, and reduces the total load applied
to the derrick. We will be interested in calculating the fast line force Ff (provided
by the drawworks) required to raise a weight W in the hook, and the total load
CHAPTER 2
Rotary Drilling Systems
Page 212
2.2.3.1
W
.
Ff
For an ideal, frictionless system, the tension in the drilling line is the same
throughout the system, so that W = n Ff . (See Figure 2.11.) Therefore, the
ideal mechanical advantage is equal to the number of lines strung through the
traveling block:
(AM )ideal = n .
In a real pulley, however, the tensile forces in the cable or rope in a pulley
are not identical. If Fi and Fo are the input and output tensile forces of the rope
in the pulley, the efciency of a real pulley is given by the following ratio:
=
Fo
.
Fi
We will assume that all pulleys in the hoisting system have the same efciency, and we want to calculate the mechanical advantage of a real pulley
system. If Ff is the force in the fast line, the force F1 in the line over the rst
pulley (in the crown block) is given by
F1 = Ff .
CHAPTER 2
Rotary Drilling Systems
Page 213
The force in the line over the second pulley (in the traveling block) is
F2 = F1 = 2 Ff .
Using the same reasoning over and over, the force in the ith line is
Fi = i Ff .
The total load W acting in the hook is equal to the sum of the forces in each
line of the traveling block. This means that the load W is given by
W = F1 + F2 + + Fn = ( + 2 + + n )Ff .
It can be easily shown that the expression between parenthesis can be written as
n+1
.
1
Therefore we have:
n+1
W =
Ff .
1
Consequently, the real mechanical advantage is given by:
AM =
n+1
W
=
.
Ff
1
(2.1)
Page 214
2.2.3.2
Hook Power
For an ideal blocktackle system, the input power (provided by the drawworks)
is equal to the output or hook power (available to move the borehole equipments). In this case, the power delivered by the drawworks is equal to the force
in the fast line Ff times the velocity of the fast line vf , and the power developed
at the hook is equal to the force in the hook W times the velocity of the traveling
block vb . That is
Pd = Ff vf = W vb = Ph .
Since for the ideal case n Ff = W , we have that
vb =
vf
,
n
that is, the velocity of the block is n times slower than the velocity of the fast
line, and this is valid also for the real case. Considering the Equation (2.2)
Ff =
W
nE
(2.3)
2.2
which represents the real relationship between the force in the fast line and
the weight in the hook, and multiplying both sides by vf we obtain:
Ff vf = Pd =
W vf
W vb
Ph
=
=
,
nE
E
E
Ph
,
E
which represents the real relationship between the power delivered by the drawworks and the power available in the hook, where E is the overall efciency of
the blocktackle system.
Pd =
Example 2: A rig must hoist a load of 300,000 lbf. The drawworks can provide a maximum input power to the blocktackle system of as 500 hp. Eight
lines are strung between the crown block and traveling block. Calculate (1) the
tension in the fast line when upward motion is impending, (2) the maximum
hook horsepower, (3) the maximum hoisting speed.
Solution:
Using E = 0.841 (average efciency for n = 8) we have:
300, 000 lbf
W
=
nE
8 0.841
(1)
Ff =
(2)
Pd = 500 hp =
CHAPTER 2
Rotary Drilling Systems
Ph
Ph
=
Ph = 421 hp
E
0.841
Page 215
(3)
vb =
2.2.4
Ph = 421 hp
The total load applied to the derrick, FD is equal to the load in the hook plus the
force acting in the dead line plus the force acting in the fast line:
FD = W + Ff + Fd .
The worst scenario for the force in the fast line is that for the real case. From
Section 2.2.3.1 the force in the fast line is:
Ff =
W
nE
(2.4)
2.2
For the dead line, however, the worst scenario (largest force) is that of ideal
case. In this case, the force in the dead line is:
Fd =
W
.
n
W
(n + 1)E + 1
W
+
=
W .
nE
n
nE
The total load FD , however, is not evenly distributed over all legs of the
derrick. In a conventional derrick, the drawworks is usually located between
two of the legs of the derrick. (See Figure 2.12.) The dead line, however must
be anchored close to one of the remaining two legs.2
From this conguration the load in each leg is:
Leg A :
W
n+4
W
+
=
W ,
4
n
4n
W
,
4
W
W
nE + 2
+
=
W .
Legs C and D :
4
2nE
4nE
Leg B :
The side of the derrick opposite to the drawworks is called Vgate. This area must be kept
free to allow pipe handling. Therefore, the dead line cannot be anchored between legs A and
B.
CHAPTER 2
Rotary Drilling Systems
Page 216
E > 0.5 .
Since the efciency E is usually greater than 0.5, leg A will be the most
loaded leg, and very likely it will be the rst to fail in the event of an excessive
load is applied to the hook. If a derrick is designed to support a maximum
nominal load Lmax , each leg can support Lmax . Therefore, the maximum hook
4
load that the derrick can support for a given line arrangement is
Lmax
n+4
=
Wmax
4
4n
Wmax =
n
Lmax .
n+4
The equivalent derrick load, FDE , is dened as four times the load in the
most loaded leg. For the derrick conguration above, the equivalent derrick
load is
n+4
FDE =
W .
n
The equivalent derrick load (which depends on the number of lines) must be
less than the nominal capacity of the derrick.
The derrick efciency factor, ED is dened as the ratio of the total load
applied to the derrick to the equivalent derrick load:
FD
ED =
=
FDE
CHAPTER 2
Rotary Drilling Systems
(n+1)E+1
W
nE
n+4
W
n
(n + 1)E + 1
.
(n + 4)E
Page 217
Example 3: For the data of Example 2, calculate (1) the actual derrick load,
(2) the equivalent derrick load, and (3) the derrick efcient factor.
Solution:
(1) The actual derrick load is given by
FD =
(n + 1)E + 1
(8 + 1) 0.841 + 1
W =
300, 000 = 382, 000 lbf
nE
8 0.841
n+4
8+4
W =
300, 000 = 450, 000 lbf
n
8
2.3
382, 000
FD
=
= 85%
FDE
450, 000
The drilling uid plays several functions in the drilling process. The most important are:
1. clean the rock fragments from beneath the bit and carry them to surface,
2. exert sufcient hydrostatic pressure against the formation to prevent formation uids from owing into the well,
3. maintain stability of the borehole walls,
4. cool and lubricate the drillstring and bit.
Drilling uid is forced to circulate in the hole at various pressures and ow rates.
Drilling uid is stored in steel tanks located beside the rig. Powerful pumps
force the drilling uid through surface high pressure connections to a set of
valves called pump manifold, located at the derrick oor. From the manifold,
the uid goes up the rig within a pipe called standpipe to approximately 1/3 of
the height of the mast. From there the drilling uid ows through a exible high
pressure hose to the top of the drillstring. The exible hose allows the uid to
ow continuously as the drillstring moves up and down during normal drilling
operations.
The uid enters in the drillstring through a special piece of equipment called
swivel (Figure 2.13) located at the top of the kelly. The swivel permits rotating
the drillstring while the uid is pumped through the drillstring.3 The drilling uid
3
CHAPTER 2
Rotary Drilling Systems
Page 218
Page 219
2.3.1
Mud Pumps
The great majority of the pumps used in drilling operations are reciprocating positive displacement pumps (PDP). Advantages of the reciprocating PDP
when compared to centrifugal pumps are:
ability to pump uids with high abrasive solids contents and with large
solid particles,
easy to operate and maintain,
sturdy and reliable,
ability to operate in a wide range of pressure and ow rate.
CHAPTER 2
Rotary Drilling Systems
Page 220
Centrifugal pumps are very sensitive to abrasive solid contents mud, and do
not offer a wide range of operation compared to PDP.
PDP are composed of two major parts, namely:
Power end: receives power from engines and transform the rotating movement
into reciprocating movement.
Fluid end: converts the reciprocating power into pressure and ow rate.
The efciency Em of the power end, that is the efciency with which rotating mechanical power is transformed in reciprocating mechanical power is of the order
of 90%. The efciency Ev of the uid end (also called volumetric efciency),
that is, the efciency that the reciprocating mechanical power is transformed
into hydraulic power, can be as high as 100%.
Rigs normally have two or three PDPs. During drilling of shallow portions of
the hole, when the diameter is large, the two PDPs are connected in parallel to
provide the highest ow rate necessary to clean the borehole. As the borehole
deepens, less ow rate and higher pressure are required. In this case, normally
only one PDP is used while the other is in standby or in preventive maintenance.
The great exibility in the pressure and ow rate is obtained with the possibility
of changing the diameters of the pair pistonliner. The ow rate depends on
the following parameters:
stroke length LS (normally xed),
liner diameter dL ,
rod diameter dR (for duplex PDP only),
pump speed N (normally given in strokes/minute),
volumetric efciency EV of the pump.
In addition, the pump factor Fp is dened as the total volume displaced by the
pump in one stroke.
There are two types of PDP: double-action duplex pump, and single-action
triplex pump. Triplex PDPs, due to several advantages, (less bulky, less pressure uctuation, cheaper to buy and to maintain, etc,) has taking place of the
duplex PDPs in both onshore and offshore rigs.
2.3.1.1
Duplex PDP
The duplex mud pump consists of two doubleaction cylinders (see Figure 2.16a). This means that drilling mud is pumped with the forward and backward
movement of the barrel.
CHAPTER 2
Rotary Drilling Systems
Page 221
Fp =
2d2 d2 LS EV .
L
R
2
A typical duplex pump is shown in Figure 2.16-b.
2.3.1.2
Triplex PDP
The triplex mud pump consists of three singleaction cylinders (see Figure ??a). This means that drilling mud is pumped only in the forward movement of the
barrel.
For a triplex pump the pump factor is given by:
Fp =
3 2
d LS EV .
4 L
Page 222
1
N Fp .
231
Note that in this particular formulation, the volumetric efciency of the pump is
included in the pump factor.
2.3.1.4
Pump Power
Pumps convert mechanical power into hydraulic power. From the denition of
power we can write:
P = F v.
In its motion, the piston exerts a force on the uid that is equal to the pressure
differential in the piston p times the area A of the piston, and the velocity v is
equal to the ow rate q divided by the area A, that is
PH = (p A)
q
= p q .
A
(2.5)
p q
.
1714.29
(2.6)
Example 4: Compute the pump factor in gallons per stroke and in barrels per
stroke for a triplex pump having 5.5 in liners and 16 in stroke length, with a
volumetric efciency of 90%. At N = 76spm, the pressure differential between
the input and the output of the pump is 2400 psi. Calculate the hydraulic power
transferred to the uid, and the required mechanical power of the pump if Em is
78%.
Solution:
The pump factor (triplex pump) in in3 per stroke is:
Fp =
3
5.52 16 90% = 1026 in3
4
1
1
= 4.44gps = 4.44
= 0.1058bps
231
42
Page 223
2400psi 334.44gpm
= 468hp
1714.29
= 667hp
90% 78%
2.3.1.5
Surge Dampeners
Due to the reciprocating action of the PDPs, the output ow rate of the pump
presents a pulsation (caused by the changing speed of the pistons as they
move along the liners). This pulsation is detrimental to the surface and downhole equipment (particularly with MWD pulse telemetry system). To decrease
the pulsation, surge dampeners are used at the output of each pump. A exible
diaphragm creates a chamber lled with nitrogen at high pressure. The uctuation of pressure is compensated by a change in the volume of the chamber.
The schematic of a typical surge dampener is shown in Figure 2.17.
A relief valve located in the pump discharge line prevents line rupture in
case the pump is started against a closed valve.
CHAPTER 2
Rotary Drilling Systems
Page 224
2.3.2
CHAPTER 2
Rotary Drilling Systems
Page 225
Shale Shakers
The shale shaker removes the coarse solids (cuttings) generated during drilling.
It is located at the end of the ow line. It constitutes of one or more vibrating
screens in the range of 10 to 150 mesh over which the mud passes before it is
fed to the mud pits. (See Figure 2.19.)
The screens are vibrated by eccentric heavy cylinders connected to electric
motors. The vibration promotes an efcient separation without loss of uid.
Figure 2.20 shows a typical twoscreen shale shaker.
2.3.2.2
Degassers
Gases that might enter the uid must also be removed. Even when the uid is
overbalanced, the gas contained in the rock cut by the bit will enter the uid and
must be removed. The degasser removes gas from the gas cut uid by creating
a vacuum in a vacuum chamber. The uid ows down an inclined at surface
as a thin layer. The vacuum enlarges and coalesce the bubbles. Degassed
CHAPTER 2
Rotary Drilling Systems
Page 226
uid is draw from chamber by a uid jet located at the discharge line. A typical
degasser diagram is shown in Figure 2.21.
2.3.2.3
Hydrocyclones are simple devices with no internal moving parts. The drilling
uid enters the device through a tangential opening in the cylindrical section,
impelled by a centrifugal pump. The centrifugal force generated by the whirling
motion pushes the solid particles towards the internal wall of the inverted cone.
As the whirling ux moves downwards the rotating speed increased and the
diameters decreases. The uid free of solid particles is squeezed out of the
ow and swirls upwards in a vortex motion, leaving the hydrocyclone from the
upper exit. The solids leave the hydrocyclone from the apex of the cone (underow). For maximum efciency, the discharge from the apex exit of hydrocyclone
should be in a spray in the shape of a hollow cone rather than a rope shape.
Figure 2.22 shows the uid/solids paths in a hydrocyclone.
Hydrocyclones are classied according to the size of the particles removed
as desanders (cut point in the 4045m size range) or desilters (cut point in
the 1020m size range). At the cut point of a hydrocyclone 50% of the particles of that size is discarded. The desander is a set of two or three 8in or 10in
hydrocyclones, and are positioned after the shale shaker and the degasser (if
used). The desilter is a set of eight to twelve 4in or 5in hydrocyclones. It removes particles that can not be removed by the desander. Figures 2.23 shows
a desander (a), and a desilter (b). Note the size and number of hydrocyclones
in each case.
A typical drilling solid particle distribution and particle size range classication are shown in the diagram in Figure 2.24.
CHAPTER 2
Rotary Drilling Systems
Page 227
(a) Desander.
(b) Desilter.
CHAPTER 2
Rotary Drilling Systems
Page 228
Centrifuges
2.3.2.5
Mud Cleaners
Inert solids in weighted uid (drilling uid with weight material like barite, iron
oxide, etc) can not be treated with hydrocyclones alone because the particle
sizes of the weighting material are within the operational range of desanders
and desilters. 4 This is shown in the diagram in Figure 2.24, which includes the
particle size distribution of typical industrial barite used in drilling uids.
A mud cleaner is a desilter unit in which the underow is further processed
by a ne vibrating screen, mounted directly under the cones. The mud cleaner
separates the low density inert solids (undesirable) from the high density weight4
CHAPTER 2
Rotary Drilling Systems
Page 229
2.3.3
Page 230
(a)
Page 231
(a)
(b)
ing a mud jet to any point in the tank. They help to homogenize the properties
of two tanks, and spread liquid additives in a large area of the tank (from a
pre-mixed tank). (See Figure 2.28.) Centrifugal pumps power the mud guns.
The mixing hopper (see Figure 2.29) allows adding powder substances and
additives in the mud system. The hopper is connected to a Venturi pipe. Mud
is circulated by centrifugal pumps and passes in the Venturi at high speed,
sucking the substance into the system.
CHAPTER 2
Rotary Drilling Systems
Page 232
2.4
The rotary system is the set of equipments necessary to promote the rotation
of the bit. The bit must be mechanically and hydraulically connected to the rig.
This connection is made by the drillstring. The purpose of the drillstring is to
transmit axial force, torque, and drilling uid (hydraulic power) to the bit. The
basic drillstring is composed of the following components:
Swivel,
Kelly and accessories,
Rotary table and components,
Drillstring tubulars (drill pipe, drill collars, etc.),
Drill bit.
Several other components and equipment can be connected to the drillstring to
perform several tasks and to lend to the drillstring special features.
2.4.1
Swivel
The swivel is suspended by the hook of the traveling block and allows the drillstring to rotate as drilling uid is pumped to within the drillstring. Without the
swivel, drilling uid could not be pumped downhole, or the drillstring could not
rotate. The swivel also supports the axial load of the drillstring. See Figure 2.30
for cuts of a swivel showing the internal parts.
A exible hose connects to the gooseneck which is hydraulically coupled to
the top of the swivel stem by a stufng box. The stem shoulder rest on a large
thrust tapered roller bearing, which transmits the drillstring weight to the swivel
body, and then to the bail. The thread connector of the swivel is cut lefthand
so that it will not tend to disconnect when the drillstring is rotated by the kelly or
by the top drive.
2.4.2
Page 233
Page 234
CHAPTER 2
Rotary Drilling Systems
Page 235
the drill pipe tool-joints to allow stripping into the hole during control operations.
2.4.3
Torque and is transmitted to the kelly by the kelly bushing. The kelly bushing
has an inside prole matching the kellys outside prole (either square or hexagonal), but with slightly larger dimensions so that the kelly can freely move up
and down inside it (see Figure 2.33).
Figure 2.34: Master bushings ([a] and [b]), and casing bushing (c).
The kelly bushing ts in the master bushing, which, in turn, attach to the
rotary table. It connects to the master bushing either by pins of by a squared
CHAPTER 2
Rotary Drilling Systems
Page 236
(a)
(b)
Figure 2.36: Drillpipe slip (detail when set in the master bushing).
CHAPTER 2
Rotary Drilling Systems
Page 237
(a)
(b)
(c)
2.5
The functions of the well control system are to detect, stop, and remove any
undesired entrance of formation uids into the borehole. An undesired entrance
of formation uid into the borehole is called kick and may occur due to several
CHAPTER 2
Rotary Drilling Systems
Page 238
Page 239
(a)
(b)
(c)
Blind ram: The blind rams (normally one at the top of all other rams) allows
shutting the borehole with no drillstring element in front of it. (See Figure 2.41-a, upper ram.) If the blind ram is applied to a drillpipe, the pipe
will but no seal is obtained.
Pipe rams: The pipe rams allows shutting the annular in front a compatible
drill pipe (not in front of tool joints.) Normally two rams are used (a special
CHAPTER 2
Rotary Drilling Systems
Page 240
spool between the two is used where the kill and choke line is connected.
(See Figure 2.41-a, lower ram.) The use of two pipe rams also permit to
snub the drillstring during the well control operation.
Shear rams: The shear ram (normally one below the blind ram or below all
other rams) can shear a drill pipe and provide seal. (See Figure 2.41b.) This is a last resource when all other rams and annular had failed.
Circulation through the drillstring is lost and, if the shear ram is the lower
one, the drillstring falls into the borehole.
(a)
(b)
Figure 2.41: BOP: (a) blind and pipe rams, (b) shear rams.
All these safety devices are hydraulically actuated by a pneumatichydraulic
system (actuators and accumulators), which can operate completely independent of the power system of the rig. Two control panels are normally used, one
at the rig oor, and a remote one away from the risky area.
The accumulators are steel bottles lined with a elastomeric bladers forming
two separated compartments. One compartment is lled with oil, which powers
the BOP. The other compartment is lled with air or nitrogen at high pressure.
The pressure of the gas pressurizes the oil across the elastomeric liner. Rig
power, during ordinary operation, keeps the gas in the accumulators under
pressure. The accumulators should be able to provide hydraulic power to close
and open all elements of the BOP stack a number of times without external
power.
Choke Manifold
During a kick control operation, some of the BOP stack devices are actuated to
close the annulus and divert the the returning uid to the choke line. The choke
line directs the returning uid to a manifold of valves and chokes called choke
manifold, which allows to control the ow pressure at the top of the annular
adjusting the ow area open to ow. The choke manifold also direct the ow to
a are (in case of a gas kick), or to the pits (if mud) or to special tanks (if oil).
CHAPTER 2
Rotary Drilling Systems
Page 241
CHAPTER 2
Rotary Drilling Systems
Page 242
2.6
Several sensors, gauges, meters, indicators, alarms, and recorders exist in the
rig to provide all data required to control (safely, efciently, and reliably) of all
operations under way in the rig. Among the most important parameters are:
weight on bit (WOB) and hook load,
rate of penetration (ROP),
rotary speed,
torque,
circulating (pump) pressure,
ow rate (in and out),
drilling uid gain/loss,
mud temperature,
mud density,
total hydrocarbon gas in the drilling uid.
Accurate and reliable indication of hook load and weight on bit are essential
for the efcient control of rate of penetration, bit life, borehole cleaning, and
borehole direction.
The weight indicator works in conjunction with the deadline anchor using
either tension or compression hydraulic load cells. The deadline anchor senses
the tension in the deadline and hydraulically actuates the weight indicator. Most
weight indicators have two hands and two scales. The inner scale shows the
hook load and the outer one shows the weight-onbit.
To obtain the weightonbit, the driller perform the following steps: with
the bit out of the bottom, the drillstring is put to rotate and the weight of the
drillstring is observed in the central scale; using the knob at the rim of the weight
indicator, the outer scale is adjusted so that the zero of the outer scale aligns
with the longer hand. The driller lowers the drillstring slowly observing the long
hand. When the bit touches the bottom, part of the weight of the drillstring is
transferred from the hook to the bit (the weightonbit.) The amount of weight
transferred corresponds to the decrease of hook load, indicated by the long
pointer (turning counterclockwise).
All modern rigs have control consoles that shows all pertinent parameters in
analog and or digital displays. All parameters and operations may be recorded
in physical (paper) or magnetic media for post analysis. Some automated operations like constant weightonbit and constant torque are possible in most
rigs.
CHAPTER 2
Rotary Drilling Systems
Page 243
(a)
(b)
CHAPTER 2
Rotary Drilling Systems
Page 244
Chapter 3
Drillstring Tubulars and Equipment
The purpose of the drillstring is to transmit mechanical power (torque and rotation), hydraulic power (pressure and ow rate), and weight to the bit.
The drillstring is composed mainly of the following elements:
Drill pipes,
Heavy wall drill pipes,
Drill collars,
Several special elements and tools.
Figure 3.1 shows an schematic of a typical rotary drillstring.
3.1
Drill Pipes
Below the kelly assembly (upper kelly valve + kelly +lower kelly valve + kelly
saver sub) is a length of drill pipes (DP). Drill Pipe is a primary and important
drillstring member.
Since the drill pipes are generally compose the upper and longest portion
of the drillstring, they must be light and strong.
The drill pipe body is a seamless pipe with outside diameter (OD) varying
from 23 /8 in to 65 /8 in. The outside diameter and the wall thickness t determine
the linear weight of the drill pipe. The inside diameter (ID) is equal to OD minus
2t.
Drill pipes are made of high grade steel (there are also drill pipes made of
aluminum, carbon ber, etc). API has standardized four steel grades: E75,
X95, G105, and S135. The gures represent the minimum yield strength
Ys (in ksi) of the the steel. Drill pipes are specied with the following basic
parameters:
CHAPTER 3
Drillstring Tubulars and Equipment
Page 31
Page 32
having coarse, tapered threads and sealing shoulders designed to sustain the
weight and to transmit torque along the drillstring. The threads of the tool joints
are specially designed to offer strength (axial and torsional), easy handling, fast
connections (number of turns to make the connection), and leak-proof sealing
(metal to metal). Tool joints might be welded or screwed to the ends of the drill
pipe body.
Figure 3.2: Typical tool joint designs. (A) Internal upset DP with fullhole
shrinkgrip TJ, (B) External upset DP with internalush shrinkgrip TJ, (C)
External upset DP with ashweld unitized TJ, (D) Externalinternal upset DP
with Hydrillpressure welded TJ.
Two other common properties of drill pipes are capacity and displacement.
Pipe Capacity: The capacity Ap of a drill pipe is a measure of its internal area,
expressed as volume/length, usually gal/ft or bbl/ft.1 If Di is the inside
diameter (ID) of a drill pipe in inches, then
Ap =
2
2
2
Di
Di
Di [in2 ] =
[gal/ft] =
[bbl/ft] .
4
24.51
1029.41
Sometimes the capacity is expressed as the reversal of the area, usually in ft/bbl. The
reader should be attended to the units.
CHAPTER 3
Drillstring Tubulars and Equipment
Page 33
2
2
D2 Di
D2 Di
2
2
Do Di [in2 ] = o
[gal/ft] = o
[bbl/ft] .
4
24.51
1029.41
Annulus Capacity: The annulus capacity Aa is not a property of the pipe because it depends on the diameter of the hole opposite to the pipe. If DW
is the diameter of the well, the annulus capacity Aa in bbl/ft is given by:
Aa =
2
2
D2 Do
D2 Do
2
2
DW Do [in2 ] = W
[gal/ft] = W
[bbl/ft] .
4
24.51
1029.41
The capacity and displacement formulas above do not take into account the
tool joints, and manufacturer tables must be consulted when more accurate
values are required. In particular, the nominal weight that specify a given drill
pipe represents neither the pipe body linear weight, nor the the average linear
weight (body plus tool joint divided by its length). It is just a nominal value. For
example, a typical 5in DP with 19.5 lb/ft has an internal diameter of 4.276in.
The density of steel is 489.5 lb/ft3 . Therefore, one foot op pipe body weights
2
5 4.2762
4
1ft3
144in3
Considering a 30 ft long DP (Range II), the tool joints (pin and box) comprise
about 21 /2 ft of its length. Outside and inside diameters of the tool joints are 6in
and 31 /2 in respectively. Therefore, the linear weight of the tool joint is
1 ft3
144 in3
2
6 3.52
4
Page 34
3.1.1
Drill pipes are handled during tripping using a drill pipe elevator. (The swivel
and kelly are set aside in the rat hole.) It is connected by two links to the
hook body (See Figures 3.3 and 2.4) . A hinge and latch allows opening and
closing the biparted collar around the drill pipe. The elevator is operated by
the roughnecks at the rotary table level, and by the derrick man at the monkey
board.
Drill pipes extend across almost the whole length of the drillstring and, although relatively light, they contribute with a signicant part of the drillstring
weight (50% or more). However, drill pipes are, in general, used only under
tension. They should not be subjected to compression due to its low resistance
to buckling. Therefore, they cannot be used to apply weight on the bit. 2
3.2
Drill Collars
Since drill pipes cannot be used to apply weight on bit, this role is played be
the drill collars (and also by heavy weight drill pipes as shown next). Drill col2
In horizontal wells, drill pipes can be put under compression if located in a suitably curved
section of the hole; in addition, compression service drill pipes (CSDP, S-135 grade DP with 2 or
3 wear knots) are specially designed to work under compression to drill short radius horizontal
wells.
CHAPTER 3
Drillstring Tubulars and Equipment
Page 35
lars (DC) are thick walled steel pipes located normally right above the bit, and
their purpose is to provide weight (axial force) to the bit. Drill collars are manufactured with carbon steel (AISI 4115), or some non-magnetic alloy (stainless
steel, monel metal). The outside of drill collars may be slick (small diameters)
or spiral grooved (any size.). Figure 3.4 shows a spiraled and a slick drill collars. The purpose of the groves is to reduce or avoid the risk of differential
sticking opposite to permeable formations . The depth of the grooves is made
larger than the average thickness of a occulated mud cake (see Figure 3.5).
Average length of drill collars is 34 ft, but rethreading normally makes them
shorter.
The elevators for drill collars are very similar to the elevators for drill pipes.
They differ in the shape of the internal hole that clamps on the pipe. Most drill
collars are recessed so as to be handled with the elevator. If the drill collar is
not recessed (sometimes even if it is!), a special sub called lift sub is used. Lift
subs have the shape of the upper end of a drill pipe, and connects to the top of
sections of drill collars during trips. Then the drill pipe elevator can be used to
lift or lower the drillstring.
3.3
In addition to drill pipes and drill collars, there are special pipes called heavy
wall drill pipes (HWDP). They are intermediary pipes between drill pipes and
drill collars, being strong enough to be put under compression (they contribute
CHAPTER 3
Drillstring Tubulars and Equipment
Page 36
to the available weight to apply to the bit), and they are exible enough to be
used in directional drilling (less torque and drag than drill collars.) The use
of HWDP also allow a gradual transition between the exible drill pipes and
the stiff drill collars (less stress concentration, and therefore, less mechanical
fatigue on the threads.)
HWDPs look very similar to regular drill pipes, being of the same length of
Range II DP (27 to 30 ft), but with longer tool joints (to permit rethreading).
HWDPs have a central external upset as shown in Figure 3.8. This central
upset provides an additional third point of contact, increasing the overall stiffness and protecting the pipe sections from excessive wearing in high inclination
wells (normally the tool joints and central upset have a band of hard material to
prevent/reduce wear).
3.4
Special Tools
Several drilling equipment are used in the drillstring. The most important are:
stabilizers,
reamers,
holeopeners.
3.4.1
Stabilizers
Stabilizers provide localized additional support points (localized larger diameter) in one or more positions along the drillstring. For vertical wells, the stabilizer
prevents low frequency vibration in the drillstring during rotation. The advantages are:
reduce wear (of both drillstring and casing),
reduce mechanical fatigue,
reduce mechanical instability of formation (caving),
reduce tortuous hole.
CHAPTER 3
Drillstring Tubulars and Equipment
Page 37
(a)
(b)
(c)
(d)
Figure 3.9: Some Stabilizers: (a) integral, (b) interchangeable, (c) nonrotating,
(d) replaceable.
CHAPTER 3
Drillstring Tubulars and Equipment
Page 38
3.4.2
Reamers
The purpose of the reamer is to keep the diameter of the open hole in gauge,
that is, with the expected original diameter of the bit. Two reasons may cause
a decrease in the original diameter:
1. formation swelling (hydrated shales, moving salt),
2. bit diameter reduction (hard and abrasive formations).
The reamer also functions as a stabilizer since the rollers touch the borehole
wall. Different types of rollers can be selected to suit the formations being
reamed. (See Figure 3.10.)
3.4.3
Holeopeners
Page 39
3. to enlarge a section below a casing with a diameter larger than the internal
diameter of the casing. In this case, a special hole opener (also caller
underreamer) with hinged arms actuated hydraulically is used (the drilling
uid pressure actuates in rams that open the arms forcing the cutters
against the borehole wall).
3.5
Page 310
3.5.1
Case 1: 90
Hmax [f t] = 0.053
CHAPTER 3
Drillstring Tubulars and Equipment
Ymin LT S
Tmu
Page 311
Ymin LT S
Tmu
CHAPTER 3
Drillstring Tubulars and Equipment
Page 312
(54 4.2764 )
= 5.71 in3
32 5
Tmu = 27, 076 ft lbf
a) 90 :
Hmax = 0.053
Hmax = 0.038
b) 180 :
3.5.2
Makeup Torque
It is very important to apply the right torque during the makeup of a connection. Too little torque will not provide a suitable seal between the pin and box
shoulders, and leakage might wash out the threads causing failure of the connection. Too much torque may cause mechanical failure of the threads, either
in the box or in the pin. The API RP7G tables present the maximum (tb.9) and
minimum (tb.10) torques for each standard connection.
3.6
Drill Bit
The bit is connected to the lower end of the drill collars. Bits are manufactured
with a pin, so that to connect to the lower pin of the drillstring, a bit sub is used.
The bit sub is a short sub (11 /2 to 2 ft) with two box connections.
There are a large variety of bits. Each type is designed to drill rocks of
different hardness, composition, abrasiveness, etc, encountered during drilling
operations. It is a duty of the drilling engineer to select the most appropriate
bit and the drilling parameters (nozzle sizes, weight-on-bit, rotation speed, and
ow rate) to optimize the performance of the operation. A more detailed study
of drill bits is covered in Chapter 10.
CHAPTER 3
Drillstring Tubulars and Equipment
Page 313
3.7
In addition to the kellyrotary table assembly, two other methods can be used
to promote rotation to the bit:
Top drive,
Bottom hole motors (positive displacement motors and turbines).
3.7.1
Top Drive
The top drive, also called power swivel, takes the place of the kelly, and the
torque is applied to the top of the drill pipe section by mean of hydraulic or
electric motors. The assembly slides along tracks (most models incorporate
a swivel in the design,) and is suspended by the hook. The reactive torque is
transmitted to the rig structure directly through the tracks or by a torque reaction
beam.
Page 314
3.7.2
Bottom hole motors are special engines located above the bit to promote bit
rotation. Bottom hole motors convert hydraulic power of the drilling uid (P =
q p) into mechanical (rotational) power.
Turbines use uid momentum conversion on the blades of stator/rotor to
generate rotation and torque. Turbines operates in high speed and has a narrow
range of operation. The torque decreases steadily from the maximum at 0 rpm
(stalled) to zero at the maximum speed.
CHAPTER 3
Drillstring Tubulars and Equipment
Page 315
CHAPTER 3
Drillstring Tubulars and Equipment
Page 316
Chapter 4
Introduction to Hydraulics
By denition, a static uid cannot sustain shear stresses, otherwise it will enter
in motion (and will not be static anymore). The consequence of this is that
the state of stress inside a uid is such that the normal stresses are the same
in any direction. This state of stress is called hydrostatic state of stress. The
magnitude of the stress is called pressure.
4.1
Hydrostatic Pressure
The hydrostatic pressure inside a homogeneous uid comes from the pressure
at the surface and the weight of the uid above the point in question. To calculate the pressure at any point inside a column of uid of density (gas or liquid),
we consider an innitesimal element of uid with volume dV = dx dy dz as
shown in Figure 4.1.
Page 41
4.1.1
For incompressible uids (liquids in general are in this class), the density is
constant and integrating the (4.1) yields:
p1 = p0 + g (D1 D0 ) ,
which allows us to calculate the pressure at a point with depth D1 if we know
the pressure p0 at a point of depth D0 . For pressure in psi, density in lbm/gal,
and depth in feet we have:
p1 = p0 +
CHAPTER 4
Introduction to Hydraulics
12
(D1 D0 ) p0 + 0.0519(D1 D0 )
231
Page 42
12 D1 D0
p0 + 0.1704(D1 D0 )
231 0.3048
Example 7: Calculate the uid density required to drill a permeable formation at 12,000 ft if the pore pressure of the formation is 8,200 psig, with an
overbalance of 50 psi.
Solution:
8200 psig + 50 psid = 0.0519 12000 ft
= 13.25 lbm/gal
4.1.1.1
i Ti ,
where i is the density of the ith layer of uid and Ti its thickness.
For a complex uid column, the equivalent uid density at a given depth
is the density of a homogeneous uid that would cause the same hydrostatic
pressure at that depth. Note that the equivalent density depends on the depth
in consideration.
1
The zero point of an absolute reference is the absence of all matter. There is no pressure
at absolute zero. On the other hand, a gauge pressure measures pressure relative to the local
atmosphere. Changes in local atmospheric pressure occur due to weather, altitude, and/or
depth. Gauge pressure indications usually use a "g" after the unit as in "psig". Absolute pressure may have the letter "a" after the unit as in "psia". For pressure differential, it is common to
use a "d" after the unit.
CHAPTER 4
Introduction to Hydraulics
Page 43
Ti is
i Ti
.
D
Example 8: A borehole is lled with uid of density 8.8 lbm/gal from the surface to the depth of 8,000 ft, and a uid with 10.0 lbm/gal below 8,000 ft. Calculate the absolute pressure at 12,200 ft. What is the equivalent density of the
uid at 12,200 ft. Assume standard atmospheric pressure.
Solution:
p12200 = 14.696 psi+0.05198.8
lbm
8000
gal
ft+0.051910
lbm
(12200
gal
ft8000 ft)
4.1.2
pV = z n R T = z
RT ,
M
where z is the real gas deviation factor (see Figure 4.2) of the real gas at
pressure p and temperature T . Solving for = m/V results in:
=
M
p.
zRT
(4.2)
Mg
p dD .
zR T
Mg
z
dp = (D2 D1 ) .
p
RT
p1
2
CHAPTER 4
Introduction to Hydraulics
Page 44
CHAPTER 4
Introduction to Hydraulics
Page 45
Mg
dp
= (D2 D1 ) ,
p
RT
z
p1
M g
p 2 = p 1 e z1 R T
(D2 D1 )
(4.3)
z1 + z2
,
2
where z2 is the deviation factor for p2 calculated using the expression above.
Using this new average value of the compressibility factor, a new pressure p2 is
obtained from
M g
p2 = p1 e zR T (D2 D1 ) ,
and compared with the previous one. The process is repeated until convergence is obtained.
Values for the universal gas constant R for various units are:
R = 10.732
psi ft3
lbmole R
lbf ft
lbmole R
kPa m3
R = 8.3145
kgmole K
J
R = 8314.5
kgmole K
R = 1545.4
CHAPTER 4
Introduction to Hydraulics
Page 46
Example 9: What is the density of the air at 13 psia and 60 F? (assume ideal
gas)
Solution:
With sufcient accuracy, the molecular weight of the air is:
Mair = 22% 32 + 78% 28 = 28.88
lbm
lbmole
144 in2
1 ft2
= 0.0673 lbm/ft3
Example 10: Consider a 10,000 ft deep borehole with a drillstring and bit
to the bottom. The annular is completely lled with methane (CH4 ), and the
drillstring is lled with a 8.4 lbm/gal mud. After closing the BOP, the pressure
in the drill pipe at the surface is 640 psia. What is the expected pressure in the
casing at the surface, assuming ideal gas and average temperature of 150 F.
Solution:
The mass of one lbmole of methane is 1x12+4x1 = 16 lbm. The drillstring
annular system form a Utube system. The pressure at the bottom of the borehole can be calculated using the uid inside the drill pipe and the surface pressure:
pbottom = 640 psi + 0.0519 8.4 lbm/gal 10000 ft = 5000 psi
This pressure is balanced by the pressure of the casing at the surface and the
hydrostatic pressure of the gas. Using Equation (4.3) gives:
161
4.2
Buoyancy
CHAPTER 4
Introduction to Hydraulics
f
b
Page 47
where W is the weight of the body (in the air), f is the density of the uid,
and b is the density of the body. The term 1 f is called buoyancy facb
tor. This expression is valid only for homogeneous bodies fully immersed in
homogeneous uids.
For homogeneous bodies, the geometric center of the body coincides with
the center of mass. For nonhomogeneous bodies, an equivalent density (total
mass/volume) can be used, but it is important to keep in mind that the geometric
center (where the buoyant force applies) may not coincide with the center of
mass. In these cases, stable or instable equilibrium may exist.
Example 11: What is the weight of 0.4 ft3 of carbon steel? What is its buoyed
weight when submerged in a 9.3 lbm/gal uid? What is the equivalent density
of the buoyed body in lbm/gal?
Solution:
The average density of carbon steel is 490 lb/ft3 = 65.5 lb/gal, so that the
weight of the body is
W = s g Vb = 490
lbm
1 G 0.4 ft3 = 196 lbf
ft3
f
s
W =
9.3
65.5
The equivalent density is the density that would result in the same buoyed
weight:
f
f
1
Wb = 1
b g Vb = eq g Vb
b
b
eq = b f = 65.5 lbm/gal 9.3 lbm/gal = 56.2 lbm/gal
1 2
8 in DC: w = (82 32 ) 144ftin2 490 lbm/ft3 = 147.0 lbf/ft
4
CHAPTER 4
Introduction to Hydraulics
Page 48
CHAPTER 4
Introduction to Hydraulics
Page 49
1 2
(72 32 ) 144ftin2 490 lbm/ft3 = 106.9 lbf/ft
4
The weight in the air of the drillstring is
7 in DC: w =
Wair = 420 147.0 + 840 106.9 + (12000 420 840) 22.28 = 390823 lbf
The buoyed weight of the drillstring is:
Whook = Wbuoyed =
8.9
65.5
If the body is either not totally submerged, or submerged in a inhomogeneous uid, the expression above cannot be used. This may be complicated
for complex shape bodies. A more general way to calculate the buoyed weight,
even for partially immersed bodies and for complex uid column is to calculate
the effect of the hydrostatic pressure on the body. This is demonstrated in the
next example.
Example 13: Recalculate the hook load of Example 12 using the effect of the
hydrostatic pressure on the drillstring.
Solution:
Here we face a problem: the tool joints of the drill pipes causes a considerable
increase in the average linear weight os the drill pipe body. Although we can
consider each tool joint of the drillstring, a most appropriate way is to consider
an equivalent cross section of the drill pipe. Since the purpose is to determine
the effect of the uid in the weight, it is not important if we choose to change
the inside or the outside diameter (or both). In the present example, we chose
to change both, such that the average diameter remains the same. In this case,
the average diameter is Dave = 5+4.276 = 4.638 in, and the area is given by
2
As = Dave t ,
where t is the thickness of the equivalent drill pipe. The equivalent outside
diameter is Dave + t and the inside diameter is Dave t. Therefore, for a drill
pipe with 22.28 lb/ft, we have:
4.638 in t 490
lb
ft3
1 ft2
144 in2
= 22.28
lb
ft
t = 0.449 in
Do = 4.638 + 0.449 = 5.087 in
Di = 4.638 0.449 = 4.189 in
Note that these gures are for buoyancy calculation only, and should never be
used for strength calculations (torque, tensile, burst, collapse, etc).
CHAPTER 4
Introduction to Hydraulics
Page 410
Now, the uid pressure acts in the cross section areas at 10,740 ft, 11,580 ft,
and 12,000 ft. In the rst and second areas, the forces are downwards, and in
the third case the force is upward. These forces add and subtract to the weight
of the drillstring. To calculate the force we need the pressures at each depth
and the area exposed to the uid. The values are:
p10740 = 0.0519 8.9 10740 = 4961 psi
p11580 = 0.0519 8.9 11580 = 5349 psi
p12000 = 0.0519 8.9 12000 = 5543 psi
A10740 =
CHAPTER 4
Introduction to Hydraulics
Page 411
CHAPTER 4
Introduction to Hydraulics
Page 412
Chapter 5
Drillstring Design
The drillstring must be designed to support (with a safety margin) all the static
and dynamic loadings that occur during normal and special operations. It also
must support some extreme situations like pipe sticking problems, curved holes,
harsh environment, etc. In addition, it must be able to provide a suitable conduit
for the drilling uid ow without causing excessive frictional pressure drop both
inside and outside the pipe. The mechanical aspects of drilling design are
covered in this chapter.
5.1
One of the purposes of the drillstring is to apply weight on the bit, and as mentioned before, this is obtained by slacking part of the drillstring weight on the
bit. When this is done, a portion of the lower end of the drillstring will be put in
compression, and the upper portion will remain in tension. Since drill pipe can
not be compressed, a sufcient length of drill collars and/or heavy weight drill
pipes should be used so that the required weight on bit can be applied without
compressing the drill pipes.
The reason drill pipes can not be put in compression is that the moment
of inertia1 of drill pipes are small compared to its length (a parameter called
slenderness = length/radius of gyration). On the other hand, the slenderness of
the drill collars are relatively low and compression is allowed. The slenderness
is an important parameter to determine the mechanical buckling resistance of
a column.
The cause of buckling is the moment created by compressive forces. Therefore, a lot of discussion occurred to determine the right way to account the
effects of hydrostatic pressure in the tendency to buckle a column.
One of the considerations was that both the compressive force due to the
weight on bit and the compressive force due to the hydrostatic pressure of the
CHAPTER 5
Drillstring Design
Page 51
Page 52
FT = s g A xf Assumption1pressurecontributestobuckling.g D AFb = g A (s x f D)
The stress at x is calculated dividing FT by the area A:
=
FT
Fb
= g (s x f D)
.
A
A
FT
Fb
= g (s xn f D)
.
A
A
Fb
f
D+
s
s g A
xn =
f
Fb
D+
.
s
wc
where wc = s g A is the linear weight of the drill collar. Note that even if the
weight on bit is zero (drillstring hanging off the bottom), this expression tells
us that the neutral point is quite above the bit, and that the lower end of the
drillstring will be under compression.
Example 14: Calculate the position of the neutral point for a column 10,000 ft
long hanging off bottom and submerged in a borehole lled with a 9.3 ppg
(pound per gallon) uid. What is the length of drill collar with 147 lb/ft is required to apply 100,000 lbf on the bit, assuming that, for safety, only 85% of
the total length of DC is compressed. Calculate the suspended weight of the
drillstring using nominal 19.5 lb/ft DP (actual 22.28 lb/ft). Use the assumption
that pressure contributes to buckle the drillstring.
Solution:
Off bottom:
xn =
Fb
9.3
0
f
D+
=
10000 +
= 1420 ft
s
wc
65.5
147
On bottom:
xn =
f
Fb
9.3
100000
D+
=
10000 +
= 2100 ft
s
wc
65.5
147
Since this length should be 85% of the total, the minimum length of DCs is
LDC =
CHAPTER 5
Drillstring Design
2100
= 2471 f t
85%
Page 53
9.3
65.5
= 455592 lbf
The fact, however, is that the neutral point position calculated as above is
calculated assuming that the forces created by hydrostatic pressure will contribute to the buckling of the column. But this is not true.
If we recall the Archimedess effect, the resultant force due to hydrostatic
pressures is equal in magnitude and opposite in direction to the weight of the
displaced uid. But that is not all. In addition to that, the resulting moment of
the hydrostatic pressure must be ZERO, otherwise, the uid would rotate about
its center of mass.
This means that the hydrostatic pressure acting on an immersed column
can not contribute to buckle it. The easiest (and correct) way to gure out the
required length to apply a weight on bit is exactly doing this, that is, calculating
the length of a column whose buoyed weight is equal to the required weight on
bit. Considering the diagram in Figure5.2 we have:
W = s g A x n
B = f g A x n
Fb = W B = (s f ) g A xn =
CHAPTER 5
Drillstring Design
f
s
s g A x n
Page 54
Fb
xn =
f
s
wDC
where wDC is the linear weight of the drill collar. Note that the denominator
corresponds to the buoyed linear weight of the drill collar.
The length calculated with this expression determines the neutral point of
buckling. Above this point the drillstring will not buckle. Bellow this point, which
depends on the weight on bit, the drillstring might be buckled or not, and this
will depend, among other factors, on the weight on bit and on the polar moment
of inertia of the drill collars.
Example 15: Calculate the position of the neutral point for a column 10,000 ft
long hanging off bottom and submerged in a borehole lled with a 9.3 ppg
(pound per gallon) uid. What is the length of drill collar with 147 lb/ft is required to apply 100,000 lbf on the bit, assuming that, for safety, only 85% of
the total length of DC is compressed. Calculate the suspended weight of the
drillstring using nominal 19.5 lb/ft DP (actual 22.28 lb/ft). Use the assumption
that pressure dos not contribute to buckle the drillstring.
Solution:
Off bottom:
The neutral point position is given by
Fb
xn =
1
f
s
.
wDC
For the off bottom condition the weight on bit Fb = 0 and the neutral point is at
xn = 0 ft. For a weight on bit of 100,000 lbf we have
100000
= 793 f t
9.3
1 65.5 147
xn =
Since this length should be 85% of the total, the minimum length of DCs is
LDC =
793
= 933 f t
85%
9.3
65.5
= 291008 lbf
A more general expression for the neutral point position includes the possibility that the uids inside and outside the pipe have different densities:
xn =
CHAPTER 5
Drillstring Design
wDC
Fb
.
(o Ao i Ai )
Page 55
5.2
Once the length of the drill collars and the total weight of the drillstring had been
determined, we must check if the drillstring will be able to resist the loadings
it will be submitted during normal and special operations. The drill pipe section may be composed by one or several types of drill pipes (diameter, linear
weight, and steel grade). We must check for maximum tensile strength, maximum torque, maximum burst, and collapse pressure. In addition, since these
loadings very likely occur simultaneously (for example, tension and torque), the
conjoined strength must be determined.
5.2.1
During normal operation, the maximum tensile force occurs at the top of the
drill pipe section during pickups. Since this point has (normally) the smallest
section area, it is also the point of maximum stress. In addition to static load
(the buoyed weight of the drillstring), inertial effects (the force to accelerate the
drillstring), friction effects between the drillstring and the borehole wall, and viscous effects must be considered. Also, in the event of stuck pipe1 , the drillstring
must be able to support the overpull applied during pipe freeing operations.
Due to several uncertainties involved in the calculation of the various loadings, relative large safety factors must be used. It is practice to use 125% of
the static load as the design parameter (25% of overpull.) In addition, it is important to note that the API denes yield stress as the stress that will cause
a certain permanent (plastic) deformation. Based on this, the minimum yield
strength of a pipe is dened. The minimum yield strength is the minimum axial
tensile load that will cause the yield of the material. Normally we want to avoid
any plastic deformation of the drill pipes. Therefore, only a fraction (normally
90%) of the minimum yield strength is allowed during drilling operations. This
gure is called tensile strength of the pipe.
The margin of overpull (MOP) is dened as the excess of the tensile load capacity of the drillstring to the normal tensile load for normal operations. Knowing
the MOP is important in case of stuck pipe. In practice, the determined MOP
must not be exceeded since the drillpipe would fail. Typical values of MOP requirements for drillpipe selections are in the range from 50,000 to 100,000 lbf.
Example 16: Calculate the minimum yield strength required for the drill pipe
of the previous example.
1
A stuck pipe is the situation in which the force required to move, or the torque required to
rotate the drillstring is larger that its strength.
CHAPTER 5
Drillstring Design
Page 56
Solution: The drillstring buoyed weight is 291000 lbf, and 125% of this value
(25% of overpull) is 1.25 x 291000 lbf = 363750 lbf. The minimum tensile
strength required is
363750
Fy =
= 404167 lbf
0.9
If a new 5 in, 19.5 lb/ft (nominal) is used, the minimum yield stress is:
Ymin =
Fy
=
As
404167
= 76625 psi
4.2762 )
(52
OD2 ID2 Ys
where Ys is the yield strength of the material. For the example above we have:
Fy =
This gure is for new pipe dimensions. For premium pipes (every new pipe
is reclassied to premium in the rst time it goes to operation), it should be
considered that the wall thickness is reduced to 80% of the original wall thickness. Normally, the worst scenario is used and, in this case, we assume that the
thickness reduction occurred in the outside diameter (external wear). Therefore, the new dimensions are:
ID = 4.276 in
OD = ID + 80% (OD ID) = 4.276 + 80% (5 4.276) = 4.8552 in
Therefore, for premium DP, the minimum yield strength is:
Fy =
CHAPTER 5
Drillstring Design
Page 57
Example 17: Calculate the drillstring for the previous example data using premium drill pipes of 5 in19.5 lb/ft and grades E-75, X-95, and G-105.
Solution:
This problem is simplied by the fact that the total weight of the drillstring
is the same, no matter the grade and length of the drillpipe. Using 25% of the
buoyed weight, the MOP is
M OP = 25% 291000 = 72750 lbf .
It is important to realize that any overpull applied to the top of the drillstring
will manifest in every element of the drillstring (assuming that the stuck point is
in the bit).
The minimum yield strength and maximum tensile load for 5 in19.5 lbf/ft
(actual 22.28 lbf/ft) drill pipes for the various grades, and using a maximum of
90% as operational limits are:
E75: Fy =
(4.85522 4.2762 ) 75000 90% = 280382 lbf
4
9.3
65.5
= 280382 72750
LE75 = 4705 ft
The maximum length is 933 + 4705 = 5638 ft, and the partial weight is
933 147 + 4705 22.28 = 241978 lbf .
Continuing with the next grade (X95):
(241978 + LX95 22.28) 1
9.3
65.5
= 355150 72750
LX95 = 3912 ft
The maximum length is 5638 + 3912 = 9550 ft, and the partial weight is
241978 + 3912 22.28 = 329137 lbf .
Continuing with the next grade (G105):
(329137 + LG105 22.28) 1
CHAPTER 5
Drillstring Design
9.3
65.5
= 392535 72750
Page 58
LG105 = 1956 ft
The maximum length is 9550 + 1956 = 11506 ft, enough to reach the depth of
10000 ft.
Note that if different DP diameters or different linear weights are used, the
nal weight of the drillstring is not known before it has been designed, and
the MOP cannot be imposed directly (and an iterative process will be needed).
In this case, we can set the MOP absolutely, based, for example in the worst
scenario (heaviest DP) or using eld experience.
5.2.2
Maximum Torque
The torque applied to the drillstring is the reaction due to the bit action on
the bottom of the borehole, and due to friction forces between the drillstring
elements and the borehole wall. In vertical wells, most of the torque comes
from the bottom hole assembly (bit, stabilizers, etc.). For directional wells, the
torque is distributed along the borehole trajectory below the kick-off point (the
point of the trajectory where the borehole leaves the vertical). In any case,
the torque accumulates and the point of higher torque is always at the top of
the drillstring. The torsional yield strength of a pipe is given by the following
expression:
J
Ty = 0.577 Ys ,
r
where Ty is the torsional yield strength, J is the polar moment of inertia of the
circular section, and r is the outside diameter of the section. The coefcient
1
0.577 3 comes from the von MisesHencky distortion energy theory of failure of ductile materials, which determines the shear yield strength based on
the tensile yield strength. The polar moment of inertia for circular pipes is given
by:
OD4 ID4 .
J=
32
For Ty in ft lbf, the expression for the torsional yield strength is given by:
Ty =
Ys OD4 ID4
.
105.92
OD
Example 18: Calculate the torsional yield strength for a new and for a premium 5 in19.5 lbf/ft, grade E75 drill pipe.
Solution:
75000 54 4.2764
a) new: Ty =
= 41166 ft lbf
105.92
5
75000 4.85524 4.2764
b) premium: Ty =
= 32285 ft lbf
105.92
5
CHAPTER 5
Drillstring Design
Page 59
The gures in the example above can be found in Tables A.2 and A.4 (API
RP7G). Note that the calculation of the torsional yield strength for a premium
DP uses the worst scenario for the wall thickness reduction. Although these
values represent the maximum torque allowed in the body of the drill pipe, the
maximum should not exceed the actual makeup torque of the connection.
5.2.3
The API criteria for internal pressure strength (burst resistance) assumes that
drill pipes are thinwalled pipes. Since API accepts pipes with a minimum of
87.5% of the nominal wall thickness, the formula for the internal pressure for
new pipes (and also for casing) is:
pint = 0.875
2 (OD ID)
Ys .
OD
If thickwall and von MissesHencky theories are used, the formula is:
OD2 ID4
Ys .
pint =
3 OD4 ID4
Note that in this formula, the allowed wall reduction to 87.5% has not been
considered. Data for internal pressure strength for new and premium drill pipes
are shown in Tables A.3 and A.5 (API RP7G) respectively.
In operations like drill stem testing, the drill pipe may be subjected to external pressure higher than the internal pressure. The most critical point is the
lower end of the drill pipe section. The net collapse pressure is determined by
the depth of the uid inside the pipe, the depth of the lower end of the drillstring
section, and the density of the uids in the annular and inside the drill pipe. The
expression for the net external pressure is:
pext = 0.0519 [0 D i (D d)] ,
where pext is the external net pressure, D is the depth of the lower end of the
drill pipe section, d is the depth of the uid surface inside the pipe (make d = D
if d > D), o and i are the densities of the uid in the annular and inside the
drill pipe. A safety factor of 1.125 is normally used for collapse pressure.
The minimum collapse pressure is also in Tables A.3 and A.5. The collapse
strength is calculated using API Bulletin 5C3. The discussion of the formulation
is beyond the scope of this work, and will be covered in the Casing Design
chapter in Advanced Drilling.
Collapse pressure is detrimentally affected by tensile force in the drill pipe
(the benecial effect in burst resistance is neglected). the combined effect of
CHAPTER 5
Drillstring Design
Page 510
tensile load to collapse resistance is obtained using the biaxial (r = 0) expression of the von Misses failure theory:
2
2
z z t + t Ys2
The equality holds when for a given axial stress z , an effective tangential yield
stress Ys occurs. Then we have:
2
z Ys t + Y
2
s
= Ys2 .
.
Ys
2 Ys
2 Ys
API dene 4 types of collapse: yield, plastic, transition, and elastic. All collapse types but the elastic depends on the yield strength (elastic collapse depends on the modulus of elasticity E). API indicates that the collapse pressure
of drill pipes are reduced due to tensile load by the fraction Ys above.
Ys
Example 19: Determine the the collapse resistance corrected for tension
loading for a premium 5 in19.5 lbf/ft, grade E75 drill pipe subjected to a
tensile load of 50,000 lbf.
Solution:
The outside and inside diameters of the DP are 4.8552 in and 4.276 in
respectively (premium DP). Therefore the cross section area is:
A=
50000
= 12037 psi .
4.1538
The ratio of the equivalent yield stress to the nominal yield stress is:
Ys
=
Ys
13
12037
2 75000
12037
= 0.9100 .
2 75000
The minimum collapse resistance for the premium pipe is 7041 psi (see Table A.5), and the corrected collapse pressure is
7041 0.9100 = 6407 psi .
CHAPTER 5
Drillstring Design
Page 511
5.2.4
Drillstring Elongation
Due to the weight of the drillstring and the elastic characteristic of the steel
(and many other metals and alloys), an elongation occurs when the drillstring
is suspended inside the borehole. In addition, if an additional force acts at the
bottom end (be it tensile or compressive) additional elongation (or shortening)
occurs. The expression for the total elongation of a drillstring of length L is:
s g L2 F L
+
,
2E
AE
where s is the density of the drillstring metal, E is the longitudinal modulus of rigidity (or modulus of elasticity or Young
modulus), F is the force acting on the bottom, and A is the
area of the right section of the drillstring. Note that this
expression is valid only for a homogeneous drillstring suspended in the air. If the drillstring is submerged in a uid
with density f , a hydrostatic pressure will act at the lower
end (upward) such that the total elongation becomes:
L =
L =
s g L2 F L f g L2
+
,
2E
AE
E
(s 2f ) g L2 F L
+
.
2E
AE
For in lbm/gal, E in psi, L and L in ft, and A in in2 we
have:
(s 2f ) L2 F L
L = 0.0519
+
.
2E
AE
L =
This formulation is not considering the effect of the Poissons ratio due to the (varying) pressure acting along the drillstring.
Example 20: Calculate the elongation of 10,000 ft of drill pipe hanging offbottom inside a borehole lled with 10 ppg drilling uid. The modulus of elasticity of the steel is 30 106 psi.
Solution:
For a tapered drillstring we calculate the elongation of each section, considering force acting at the bottom of each section (including pressure effects),
and add all contributions.
CHAPTER 5
Drillstring Design
Page 512
2
8 32 = 43.197 in2
4
LDC = 0.0519
65.5 6002
257644 600
+
= 0.099 ft
2 30 106 43.197 30 106
2
5 4.3762 = 5.2746 in2
4
F = 257644 lbf + 147 lbf/ft 600 ft + 0, 0519 10 ppg 10000 ft (43.197 5.2746) in2
F = 27373 lbf
65.5 100002
27373 10000
+
= 7.40 ft
6
2 30 10
5.2746 30 106
L = DC + DP = 0.099 + 7.40 = 7.30 ft
LDP = 0.0519
Note that in this case (and in most cases), the elongation of the drill collars can
be neglected, compared with elongation of the drill pipes.
CHAPTER 5
Drillstring Design
Page 513
CHAPTER 5
Drillstring Design
Page 514
Chapter 6
Drilling Hydraulics
During most of the drilling operations, the drilling uid is circulating through
the circulating system and/or the drillstring is moving with respect to the uid.
These dynamic components cause pressure gradients and pressure losses that
must be determined, predicted, and controlled in order to perform the drilling
operation safely and optimally. The most important parameters to be determined are:
The pressure along the borehole while circulating (equivalent circulating
density ECD)
The pressure along the borehole while moving the drillstring (surge and
swab pressures)
The optimum circulating parameters and bit nozzle sizes
The cuttings transport capacity of the uid (hole cleaning)
The pressure along the borehole during well control operations (kick removal)
In order to proceed with these studies, we need to use basic physical principles
like mass conservation and energy conservation. Also, the ow behavior of the
uid must be understood and determined (rheological properties of the uid,
laminar and turbulent ow, etc.)
6.1
Mass and energy (two different forms of the same thing), can be neither created
nor destroyed and, for nonrelativistic scenarios, one cannot be converted into
the other. This results in the mass and energy conservation laws.
CHAPTER 6
Drilling Hydraulics
Page 61
6.1.1
Mass Conservation
the net ow of mass into any volume is equal to
the rate of increase of mass within the volume
dm
= m = i q i o q o .
dt
where m is the mass within the volume, is density, and q is ow rate. It is
evident that a volume under study may have several inuxes and several out
uxes so that a general expression can be written:
dm
=m=
dt
i q i
o q o .
Considering only steady-state conditions (the mass inside the volume under
control does not change) this expression reduces to:
0=
i q i
o q o .
Page 62
Example 22: A 11 lb/gal uid is being circulated at 280 gal/min. The diameter
of the hole is 81 /2 in. The drill collars have 8 in OD and 3 in ID, and the drill
pipes have 5 in OD and 4.276 in ID. Calculate the average uid velocities inside
the DPs and DCs, and in the annular space opposite to the DPs and DCs.
Solution:
A 11 lb/gal uid can be consider incompressible. Therefore we can write for
the ow rate at any point of the circuit:
q=Avv=
q
A
where q is the uid ow rate, A is the area in the point of interest, and v is the
2
average velocity at the point. or v in ft/s, A in in , and q in gal/min we have:
v [ft/s] =
q[gal/min]
A[in2 ]
231 in2
1 gal
v [ft/s] = 0.3208
1 min
60s
1 ft
12 in
q[gal/min]
A[in2 ]
280 gal/min
= 6.26ft/s
4.2762
4
vDC = 0.3208
280 gal/min
= 12.71ft/s
32
4
vannDP = 0.3208
vannDC = 0.3208
6.1.2
280 gal/min
= 2.42ft/s
(8.52 52 )
280 gal/min
= 13.86ft/s
(8.52 82 )
Energy Conservation
Page 63
kinetic,
chemical,
thermal,
etc.
The best way to apply the energy conservation in drilling is using the Bernoullis
equation:1
at any point of an ideal steady state incompressible ow system
the sum of the specic kinetic energy, the pressure, and the
specic potential energy and pressure is constant
or, in mathematical terms:
1
v 2 + p + g h = constant ,
2
where is the density of the uid (considered incompressible) and h a height
with respect to any xed reference. The value of the constant is not relevant,
because we can chose any arbitrary reference to the height. Since we will
be more concerned to depth instead of height, the following expression for the
Bernoulli equation is more appropriate:
1
v 2 + p g D = constant ,
2
where D is depth. If we take two points in a ow eld (points 1 and 2), we can
write:
1
1
v2 + p g D =
v2 + p g D .
2
2
2
1
Note that this expression can be used to express hydrostatic pressure as presented before. In this case, the velocities are zero and we have:
p2 g D2 = p1 g D1 ,
p2 = p1 + g (D2 D1 ) .
The meaning of the Bernoulli equation is that the total energy at point 1 is
equal to the total energy at point 2. This is true for ideal system in which no
energy loss occurs in the path between point 1 and point 2. For real systems,
however, a loss of energy always occurs because of the internal viscous friction
in the uid. This energy loss reveals itself as a friction pressure drop. Therefore,
if the uid ows from point 1 to point 2 we have, for real ow:
1
v2 + p g D
2
1
=
2
1
v2 + p g D
pf .
1
CHAPTER 6
Drilling Hydraulics
Page 64
=
2
1
v2 + p g D
+ pp pf .
1
1
v2 v1 + pp pf
2 2
2
(6.1)
Example 23: Determine the pressure at the lower end of the drillstring if the
frictional pressure loss in the drillstring is 1650 psi, the ow rate is 340 gal/min,
the mud density is 11 lb/gal, and the well depth is 11500 ft. The internal diameter of the drill collars at the lower end of the drillstring is 213 /16 in, and the pump
increases the pressure by 3000 psi.
Solution:
Consider the simplied diagram beside. We can assume that the velocity
of the uid at the tank (point 1) is very low so that v1 = 0. In addition we have
CHAPTER 6
Drilling Hydraulics
Page 65
Note the small contribution of the kinetic energy to the pressure at point 2
(2.74 psi.) In most of the situations, we can neglect the kinetic energy term. A
situation, however, where we cant neglect the kinetic energy term is in the ow
through bit nozzles.
6.2
The drilling uid exits the drillstring through nozzles at the bit (normally 3 or 4
nozzles). The nozzles accelerate the uid forming a high-velocity jet below the
nozzles, which are hurled against the recently cut formation. The uid jets help
to clean the bit cones and to remove the cuttings from beneath the bit (to avoid
regrinding them) and so improving the drilling efciency.
6.2.1
As the uid exits the drillstring through the nozzles, its velocity accelerates from
v1 inside the bit to v2 at the jet at the expense of a pressure drop across the bit.
CHAPTER 6
Drilling Hydraulics
Page 66
1
v2 v1 .
2 2
2
The velocity of the uid inside the bit is much less than the velocity in the jet.
Therefore we can write for the pressure drop across the bit:
pb = p1 p2 =
1
vj ,
2
2
(6.3)
The pressure drop across the bit is an important parameter in drilling engineering. If we solve Equation (6.3) for the average nozzle jet velocity, we
obtain:
2 pb
.
vj =
This ideal exit velocity, however, is never obtained because of the frictionless assumption made in the beginning of the derivation. The friction pressure
loss depends on parameters of the nozzle like the shape, material, and surface
roughness. Based on experimental measurements comparing ideal to real nozzle jet velocities, the following expression was proposed:
vj = Cd
CHAPTER 6
Drilling Hydraulics
2 pb
,
(6.4)
Page 67
pb
= 35.2 Cd
8.073 104
pb
.
A drilling bit has several nozzles distributed in the bit body (normally equal
to the number of cones.) If they have different areas, the total ow q splits to
the nozzles depending on their areas. The pressure drop is the same for each
nozzle (equal to the pressure inside the bit less the pressure outside the bit),
therefore the nozzle velocity is must be the same for each nozzle. Since the
ow q is be equal to the sum of the ows in the nozzles we have (assuming 3
nozzles):
q = q1 + q2 + q3 = vj A1 + vj A2 + vj A3 = vj (A1 + A2 + A3 ) = vj At ,
q
,
At
where At is the total area of the bit nozzles. Therefore, the pressure drop
across the bit can be expressed by:
vj =
vj =
q
= Cd
At
2 pb
,
q2
.
pb =
2
2 Cd A2
t
(6.5)
pb = 8.310 10
q2
q2
=
,
2
2
Cd A2
12034 Cd A2
t
t
(6.6)
6.2.2
The power across the bit is obtained by multiplying the pressure drop across
the bit by the ow rate:
q3
Pb = q pb =
.
(6.7)
2
2 Cd A2
t
6.2.3
The Jet of uid exert a force at the bottom of the hole called jet impact force. It
is due to the change in the jet momentum as it hits the bottom. An innitesimal
volume dV of uid in the jet with velocity vj has a linear momentum given by
Page 68
dM = dV vj .
As this volume hits the surface, the momentum is totally transferred to the surface (the vertical velocity becomes zero), and the force due to this moment
transfer is given by:
dV
dM
=
vj = q vj .
Fj =
dt
dt
Using Equation (6.4) results in:
Fj = q Cd
2 pb
= Cd
Fj = Cd
2 q 2 pb ,
2 q 2 pb .
(6.8)
q 2 pb .
(6.9)
Cd
54.85
Note that the impact force as derived is only true for nozzles close enough
to the formation so that the viscous friction between the uid in the jet and the
uid in the vicinity of the bit can be neglected.
The sizes of the nozzles are usually measured in 1/32nd of inch (hole diameter), and are reported in thirty-seconds of inch. Nozzles range from 6/32 to
32/32. The area of a #14 nozzle for example is:
A(14)
CHAPTER 6
Drilling Hydraulics
=
4
14
32
= 0.1503 in2 .
Page 69
Example 24: A 12 ppg drilling uid is owing through a bit containing three
#13 nozzles. The pump pressure increase is 3000 psi at a ow of 400 gpm.
Calculate (a) the pressure drop across the bit, (b) the hydraulic power delivered
by the pump, (c) the power spent at the bit, and (d) the hydraulic impact force.
(Use 0.95 for the discharge coefcient.)
Solution:
The total area of the nozzles is:
At = 3 A13
=3
4
13
32
= 0.3889 in2
q2
= 1169 psi
2
12034 Cd A2
t
3000 400
= 700 hp
1714.29
1169 400
= 272 hp
1714.29
6.3
0.95
12 4002 1169 = 821 lbf
54.85
Consider the expression for the pressure downstream from the uid tank to the
bottom of the borehole along the drillstring (see Figure 6.2). If the pressure in
the tank is p1 , the pressure at the bottom p2 , after the bit is:
p2 = p1 + g (D2 D1 )
1
v2 v1 + pp (pf )ds pb ,
2 2
2
where pf ds is the frictional pressure drop along the drillstring. Consider now
the expression for the pressure downstream from the bottom of the borehole to
the uid tank along borehole annular.
p1 = p2 + g (D1 D2 )
CHAPTER 6
Drilling Hydraulics
1
v1 v2 pf ann ,
2 2
2
Page 610
where pf ann is the frictional pressure drop along the annular. Adding these two
equations we obtain:
pp = pb + pf ,
(6.10)
where pf = (pf )ds + (pf )ann is the pressure drop along the whole (closed)
ow circuit. This expression says that the pressure increase in the pump is
equal to the friction pressure drop (considered the whole circuit) plus the pressure drop across the bit. Therefore, since the pump adds energy to the uid
system, we clearly see that this energy is spent part in friction, pf , and part
to accelerate the uid in the nozzles, represented by the pressure drop across
the bit, pb .
Multiplying the expression above by the ow rate q, and recalling that power
P is equal to q p we obtain the following relation:
PH = Pb + Pf
where PH is the hydraulic power delivered by the pump to the uid, Pb is the
power spent at the bit to accelerate the uid through the nozzles, and Pf is the
power spent to overcome viscous friction.
6.4
(6.11)
where c and m are constants that determine the behavior of the pressure drop
of the whole circulation system.
CHAPTER 6
Drilling Hydraulics
Page 611
The values of both c and m change as the borehole deepens, but not much.
The appropriate way to determine the values of c and m (to be used for the next
bit) is to run a simple test just before a dull bit is changed.
The test consists in circulating the uid at two different ow rates and measuring the pump pressures. Normally one of the ow rates is close to the minimum required to lift the cuttings and the other close to the expected ow rate
to be used for the next bit. Using the nozzles sizes of the dull bit and the values
of the pump pressures and ow rate, the friction pressure drop is calculated for
the two ow rates. Then these two values are used to determine the values of
c and m for the next bit run.
pp
[psi]
3000
1000
The dull bit has one #13 nozzle and two #12 nozzles. The uid density is
10 ppg. Determine the constants c and m for the next bit run. The discharge
coefcient is Cd = 0.95.
Solution:
The total nozzle area is:
At =
4
13
32
+2
4
12
32
= 0.3505 in2
10 4752
q2
= 1691 psi
=
2
12034 Cd A2
12034 0.952 0.35052
t
pf = 3000 1691 = 1309 psi
10 2502
= 468.4 psi
12034 0.952 0.35052
Page 612
475
250
m = 1.404
psi
gpm1.404
Therefore, for the next bit run, the frictional pressure drop should quite accurately be expressed by:
pf = 0.2286 q 1.404
6.4.1
The two most common criteria used to select the nozzles are
Maximum hydraulic power at the bit,
Maximum jet impact force.
6.4.1.1
qopt
CHAPTER 6
Drilling Hydraulics
pp
=
c(m + 1)
1
m
(6.12)
Page 613
6.4.1.2
pp
,
m+1
m
pp .
m+1
(6.13)
Fj = Cd
Substituting pb = pp c q m we obtain:
Fj = Cd
2 q 2 (pp c q m ) = Cd
2 (pp q 2 c q m+2 ) .
qopt
2 pp
=
c(m + 2)
1
m
(6.14)
The pressure drop at the bit for maximum jet impact force is:
pb = pp
pb =
6.4.1.3
2 pp
,
m+2
m
pp .
m+2
(6.15)
For a given optimum pressure drop at the bit pb (calculated using one of the
criteria above), the total nozzle are is calculated using Equation (6.5):
pb =
CHAPTER 6
Drilling Hydraulics
q2
,
2
2 Cd A2
t
Page 614
(At )opt =
qopt
Cd
.
2 (pb )opt
qopt
109.7 Cd
.
(pb )opt
Example 26: For the data of Example 25 and pp = 3000 psi, determine the
optimum ow rate, the pressure drop at the bit, and the total nozzle area for (a)
maximum hydraulic power at the bit, and (b) maximum jet impact force.
Solution:
The frictional pressure drop model for Example 25 is
pf = 0.2286 q 1.404 .
Then we have
(a) maximum hydraulic power at the bit
qopt
pp
=
c(m + 1)
pb =
(At )otm =
1
m
3000
=
0.2286 (1.404 + 1)
1
1.404
= 459 gpm
m
1.404
pp =
3000 = 1752 psi
m+1
1.404 + 1
qopt
109.7 Cd
459
=
(pb )opt
109.7 0.95
10
= 0.333 in2
1752
qopt
2pp
=
c(m + 2)
pb =
1
m
1
1.404
= 587 gpm
m
1.404
pp =
3000 = 1237 psi
m+2
1.404 + 2
(At )otm =
CHAPTER 6
Drilling Hydraulics
2 3000
=
0.2286 (1.404 + 2)
587
109.7 0.95
10
= 0.506 in2
1237
Page 615
6.4.2
Graphical Analysis
p q
.
1714.29
(2.6)
Taking the logarithm of this expression and solving for log pp we obtain:
log pp = log (1714.29 PH ) log q .
For the maximum pump pressure (PH )max , plotting log pp versus logq results in a a straight line with slope -1, as shown in Figure 6.6 (other values for
PH plots as lines parallel to the maximum power line).
The pump can theoretically operate in any condition below the maximum
hydraulic power line. In addition, three other constraints limit the operational
area:
1. the maximum allowable surface pressure (pp )max ,
2. the minimum ow rate to carry the cuttings qmin ,
CHAPTER 6
Drilling Hydraulics
Page 616
Page 617
too much as the well deepens, the optimum ratio pf (for one of the criteria)
p
remains quite constant. Therefore, as the pump operational conditions change
during the drilling, the optimum condition is that for which the values of the
frictional pressure drop pf follows the bold line in Figure 6.9. This line is
called the path of optimum hydraulics.
Consider now the expression for the pressure drop due to friction, pf =
c q m , where c and m depend on the depth. Taking the logarithm of this expression results in the following expression:
log pf = log c + m log q
Therefore, the graph of log pf log q plots as a straight line with slope m
as shown in Figure 6.10.
The point where a frictional pressure drop line intercepts the path of optimum hydraulics denes the pair qopt and (pb )opt . These values of optimum
ow rate and optimum pressure drop at the bit are used to calculate the total
bit nozzle area for the next bit run.
Example 27: Determine the proper pump operating conditions and bit nozzle
sizes for maximum hydraulic power for the next bit run. The bit currently in use
has three #12 nozzles. The driller has recorded that when the 9.8 lbm/gal uid
is pumped at a rate of 485 gal/min, a pump pressure of 2900 psig was observed
and when the pump was slowed to a rate of 260 gal/min, a pump pressure of
980 psig was observed. The nominal power of the pump is 1250 hp with an
efciency of 95%. The minimum ow rate to lift the cuttings is 230 gal/min. The
CHAPTER 6
Drilling Hydraulics
Page 618
1714.29 1188
= 679 gpm
3000
Now we need to calculate the frictional pressure drop for the two owing test
points. The total nozzle area is
At = 3
4
12
32
= 0.3313n2
The pressure drop across the bit and the frictional pressure drop for q = 485 gpm
are:
q2
9.8 4852
pb =
=
= 1934 psi
2
12034 Cd A2
12034 0.952 0.33132
t
pf = pp pb = 2900 1934 = 966 psi
The pressure drop across the bit and the friction pressure drop for q = 260 gpm
are:
9.8 2602
= 556 psi
pb =
12034 0.952 0.33132
pf = 980 556 = 424 psi
CHAPTER 6
Drilling Hydraulics
Page 619
psi
gpm1.321
For the maximum hydraulic power criterion, the optimum pressure drop due to
friction and the optimum pressure drop across the bit are:
(pf )opt =
(pb )opt =
3000
pp
=
= 1292 psi
m+1
1.321 + 1
m
1.321
pp =
3000 = 1708 psi
m+1
1.321 + 1
which denes the optimum hydraulics for the maximum hydraulic power at the
bit. A plot of the path of optimum hydraulics, the line of frictional pressure
drop line (the straight line passing at the two test points), and the optimum
operational point are shown in the graph in Figure 6.11.
The frictional pressure drop line intercepts the path of optimum hydraulics at
1292 psi. The optimum ow rate is calculated from the frictional pressure drop
model for the condition of the operation:
1292 = 0.2741 q 1.321 q = 603 gpm
CHAPTER 6
Drilling Hydraulics
Page 620
603
109.7 0.95
9.8
= 0.4383 in2
1708
CHAPTER 6
Drilling Hydraulics
Page 621
CHAPTER 6
Drilling Hydraulics
Page 622
Chapter 7
Introduction to Drilling Fluids
The objective of a drilling operation is to drill, evaluate, and complete a well that
will produce oil and/or gas efciently. Drilling uids perform numerous functions
that help make this possible. The responsibility for performing these functions
is held jointly by the mud engineer and those who direct the drilling operation.
The duty of those charged with drilling the hole including the oil company
representative, drilling contractor, and rig crew is to make sure that the correct
drilling procedures are conducted. The chief duty of the mud engineer is to
assure that mud properties are correct for the specic drilling environment. The
mud engineer should also recommend drilling practice changes that will help
reach the drilling objectives.
7.1
Drilling uid (also called drilling mud) is a mixture of water, oil, clay, and various
physical chemical additives. It performs various functions in drilling and contributes with a large portion to the total well cost. In this way the drilling uid
system (or mud program) has to be carefully designed to ensure a successful
drilling project.
The drilling uid serves many purposes, which may not all be achieved simultaneously for all parts of the well. In this way, an individual prioritization has
to be followed. Below is a summary of some main drilling uid functions:
1. Transport the drilling cuttings from the bottom of the hole to the surface.
For this, a higher uid circulation velocity and a higher uid viscosity are
favorable.
2. Create an overbalanced drilling condition to control the formation pressure. Fluid density (or mud weight) is increased with additives like barite,
iron oxide, etc, to maintain a hydrostatic pressure inside the well which is
slightly higher than the formation pressure. Normally, an overbalance of
100 to 200 psi has proven to be adequate to establish safe drilling.
CHAPTER 7
Introduction to Drilling Fluids
Page 71
7.2
The composition of a particular drilling uid system depends on the actual requirements of the individual well or well section. Wells are drilled through different formations, which require different mud properties to achieve optimum
1
The ability of a uid, such as cement or drilling mud, to develop gel strength over time when
not subject to shearing, and then to liquefy when agitated.
CHAPTER 7
Introduction to Drilling Fluids
Page 72
7.2.1
WaterBase Fluids
Waterbase uids are any drilling uid in which the continuous phase, where
some materials are in suspension and others are dissolved, is water. Thus any
waterbase uid system consists of a water phase, inert solids, reactive solids
phase, and chemical additives. Each of these parts contribute to the overall
uid properties. The individual contributions are:
water: create initial viscosity,
inert solids: (low-gravity solids like sand and chert, and high-gravity solids like
barite and lead suldes) produce required mud weight,
reactive solids: ( low-gravity solids like bentonite and attapulgite clays) cause
additional viscosity and gel,
chemical additives: (thinners [phosphate, chrome, lignosulfonate, lignites, surfactants] and thickeners [lime, cement,polymers]) provide control to viscosity, yield point, gel strength, uid loss, pH, ltration behavior, etc.
Caustic soda (NaOH) is used to keep a high pH required to control corrosion, hydrogen embrittlement and the solubility of Ca2 + and Mg2 +.
CHAPTER 7
Introduction to Drilling Fluids
Page 73
7.2.1.1
To drill compact formations which are normally pressured2 , fresh water and
saltsaturated water can be used as drilling mud. Native muds are the result
of mixing water and clays or shales from the cuttings drilled. Here the clays
or shales are dissolved by the water and returned to the surface. Clear water
and native muds are the cheapest mud systems since no additional material is
needed to form the mud. They are also environmentally best accepted.
7.2.1.2
When swelling and hydration of clays and shales are expected, inhibitive water
base muds can be used. Calcium muds are best suited to drill formations
that contain gypsum and hydrite. A subclassication of inhibitive waterbase
muds distinguishes seawater muds, saturated saltwater muds, lime muds, and
gypsum muds.
7.2.1.3
Dispersed muds are used when the following characteristics are required:
relative high mud weight (larger than 14 ppg),
tolerance to moderately high formation temperatures,
low ltration loss
high tolerance for contamination by drilling solids.
Some of the disadvantages of dispersed muds are sloughing of shales and
formation damage due to dispersing of formation clays in the presence of lignosulfonate.
Dispersed mud systems consist of:
fresh or salty water,
bentonite,
lignosulfonate,
caustic soda
colloidal polymers (carboxymethylcellulose or stabilized starch).
In general, these mud systems exhibit better control of viscosity, higher solids
tolerance, and better control of ltration than nondispersed muds.
2
CHAPTER 7
Introduction to Drilling Fluids
Page 74
7.2.1.4
To drill sloughing shales and water sensitive rocks such as productive sands,
which are prone to formation damage, fresh water nondispersed muds are
used. Commonly, nondispersed muds are associated with low mud weights
and low solid concentrations.
Nondispersed mud systems consist of:
fresh water or brine,
potassium chloride (KCl),
inhibiting polymer,
viscosier,
stabilized starch or carboxymethyl cellulose,
caustic soda,
lubricants.
Lowsolids polymer mud systems are widespread in the industry since they
offer advantages like increased penetration rate, hole stability, shear thinning
ability, hole cleaning with maximum hydraulics, and lower equivalent circulation density over conventional deocculated muds. Besides these advantages,
they also have disadvantages like instability at temperatures above 250 F, irreversible absorption of the polymer on clay, higher dilution, the requirement of
adequate solids removal equipment, and the fact that they are more corrosive.
7.2.1.5
Flocculated Muds
SaltSaturated Muds
Several mud systems have been included in this classication. Saturated salt
systems have a chloride concentration near 190,000 mg/l (saturated) and are
CHAPTER 7
Introduction to Drilling Fluids
Page 75
7.2.2
OilBase Muds
In oilbase mud systems, crude or diesel oil forms the continuous phase in the
waterinoil emulsion. In this way oilbase mud can have as little as 3% to 5%
or as much as 20% to 40% (invert emulsions) of water content. Oilbase mud
systems are used when:
1. Drilling sensitive production zones or troublesome shales,
2. Directional drilling and slim hole drilling,
3. Drilling of depleted reservoirs,
4. Drilling salt sections and formations that contain hydrogen sulde,
5. High risk of pipe sticking problems,
6. Drilling formations with higher temperatures.
Lowgravity solids content has to be monitored closely when drilling with oil
base muds. The reason is because there is no hydration of solids (clays),
which frequently causes the contents of lowgravity solids to exceed acceptable
levels. This results in reduction of penetration rate, increase risk of formation
damage, and increase risk of differential sticking.
Since oilbase muds contain substantially less colloidal particles, they exhibit an increased spurt uid loss 3 . Due to the higher ltration rates, the monitoring of highpressure/hightemperature ltration and the drilling conditions
are important to ensure that excessive ltration or lter cake buildup does not
lead to drilling problems.
3
The instantaneous volume (spurt) of liquid that passes through a lter medium prior to
deposition of a competent and controlling lter cake.
CHAPTER 7
Introduction to Drilling Fluids
Page 76
7.2.3
Synthetic Fluids
Synthetic uids are designed to mirror oilbased mud performance without the
environmental hazards. Primary synthetic uids are esters, ethers, poly alpha
olen and isomerized alphaolen. They are environmentally friendly, can be
discharged offshore, and are nonsheening and biodegradable.
7.2.4
Aerated Fluids
Four basic operations are included in this specialized category. These include:
1. Dry air drilling, which involves injecting dry air or gas into the wellbore at
rates capable of achieving annular velocities that will remove cuttings;
2. Mist drilling, which involves injecting a foaming agent into the air stream
that mixes with produced water and coats the cuttings to prevent mud
rings, allowing drill solids to be removed;
3. Foam uses surfactants and possibly clays or polymers to form a high
carrying-capacity foam;
4. Aerated uids rely on mud with injected air (which reduces hydrostatic
head) to remove drilled solids from the wellbore.
These uids are discussed in details in advanced drilling courses (air drilling,
underblanced drilling, etc).
7.3
Laboratory Tests
The API has recommended standard methods of conducting eld and laboratory tests for drilling uids and detailed procedures may be found in the API
publication, Recommended Practice: Standard Procedure for Field Testing
WaterBased (OilBased) Drilling Fluids, API RP13B1, 13B2 and supplements (also see 13I for Laboratory Testing Drilling Fluids, 13J for Testing Heavy
Brines and supplements).
7.3.1
7.3.1.1
The density or weight of the mud may be determined by the use of any instrument of sufcient accuracy to permit measurement to within 0.1 lb/gal (0.5 lb/ft3
or 5 psi/1000 ft of depth).
CHAPTER 7
Introduction to Drilling Fluids
Page 77
For all practical purposes, density means weight per unit volume and making a density test means weighing the mud. The weight of mud may be expressed as a hydrostatic pressure gradient in psi/1000 ft of vertical depth, as a
density in lb/gal, lb/ft3 , or specic gravity.
7.3.1.2
Marsh Viscosity:
The Marsh funnel is used for routine eld measurement of the viscosity of
drilling mud. It is a simple device for indicating viscosity on a routine basis.
When used with a measuring cup, the funnel gives an empirical value for the
consistency of a uid.
7.3.1.3
The rotary viscometer is used to supplement the information obtained from the
Marsh funnel, particularly with respect to the gel characteristics of the mud.
It is capable of giving the apparent viscosity, plastic viscosity, yield point, and
gel strengths (initial and timed). Drilling uid contained in the annular space
between two concentric cylinders is sheared by the rotation of the outer cylinder
(rotor sleeve) at a constant RPM (rotational velocity). The torque at the rotor
sleeves is transmitted by the uid to the inner cylinder (bob). A torsion spring
restrains the movement of the bob, and a dial indicates displacement of the
bob. Instrument constants are adjusted so that plastic viscosity and yield point
are obtained by using readings from rotor sleeve speeds of 600 and 300 RPM.
A six-speed model (600, 300, 200, 100, 6, and 3 rpm) can be used to fully
characterize a uid.
7.3.1.4
Determines the ltration properties of drilling muds and cement slurries. Generally consists of a mud reservoir mounted in a frame, a pressure source, a
ltering medium, and a graduated cylinder for receiving and measuring ltrate.
CHAPTER 7
Introduction to Drilling Fluids
Page 78
7.3.1.5
HTHP Filtration:
Similar to API lter press (with half ltration area), but can be used in pressures
up to to 1200 psi and temperatures up to 500 F.
CHAPTER 7
Introduction to Drilling Fluids
Page 79
FilterCake Compressibility:
This is not yet an API test. The purpose is to determine some mechanical properties of the mud cake like penetration resistance, adherence, compressibility,
etc.
7.3.1.7
Solid Contents:
7.3.1.8
Sand Content:
Determines sand content by sieve analysis. The volume of sand, including void
spaces between grains, is usually measured and expressed as a percentage
by volume of the drilling uid.
7.3.1.9
Determines the capacity of a clay to absorb cations from a solution, and thereby
predict how the clay will react in its intended use. The clay may be component of
a drilling uid, a binder in foundry sand, or a clay used for some other purpose.
The Methylene Blue Test is based on the property of clays known as base
exchange capacity, that is, clays can exchange some of their ions for the ions
of certain other chemicals. The number of ions available for this exchange
varies with different types of clay.
Page 710
7.3.1.10
pH:
Indicator sticks and/or pH meter are used to determine the hydrogen ion concentration in the mud and in the ltrate.
7.3.1.11
7.3.1.12
Page 711
7.3.1.13
7.3.2
7.3.2.1
The test indicates if an oil is likely to damage elastomers that come in contact
with the oil. It is the lowest temperature (F or C) at which equal volumes of
aniline (C6 H5 NH2 ) and the oil form a single phase. A low AP is indicative of
higher aromatics, while a high AP is indicative of lower aromatics content.
CHAPTER 7
Introduction to Drilling Fluids
Page 712
Electrical Stability:
Indicates the emulsion and oilwetting qualities of the sample. The test is performed by inserting the ES probe into a cup of 120 F (48.9 C) mud and pushing a test button. The ES meter automatically applies an increasing voltage
(from 0 to 2000 volts) across an electrode gap in the probe. Maximum voltage
that the mud will sustain across the gap before conducting current is displayed
as the ES voltage.
7.3.2.3
7.4
Additives are added to the drilling uid in order to bring the uid parameters to
the required values. Density and viscosity are the two most basic parameters
to control.
The drilling uid technician or engineer should carry some calculations, and
laboratory measurements and tests to determine the correct additive and the
correct amount to be mixed to the uid system. Fluid volumes are normally
measured in barrels. Useful conversion factors are:
1 bbl = 42 gal
1 gal = 231 in3
1 ft3 = 1728 in3
1 in3 = 2.543 cm3
CHAPTER 7
Introduction to Drilling Fluids
Page 713
1 lbm = 453.59 g
Powder and dry additives are normally measured in pounds, and liquid additives are normally measured in gallons or barrels. Pilot tests are laboratory
(small scale) tests that aim to determine the amount of additive required to
bring some uid parameters to determinate values. Small scale tests are fast
and cheap to perform. A handy conversion for is that of lbm/bbl to g/cm3:
1
lbm
bbl
453.59g
1lbm
1bbl
42gal
1gal
231in3
1in3
2.543 cm3
1g
350cm3
Therefore, in a pilot test with 350 ml of uid, 1 gram of added additive corresponds to the addition of 1 lbm of dry additive to 1 barrel of uid. A similar
conversion shows that 25 ml of liquid additive in 350 ml or uid corresponds to
3 gallons of additive per barrel of uid.
7.4.1
Density Calculations
Density (lbm/gal)
8.33
7.2
21.7
24.1
21.9
35
21.7
26.2
13.3
18.0
The assumption that the mixture is ideal, that is, that the volume of the
mixture is equal to the volume of the components (not valid for highly soluble
substances like NaCl in water) facilitates the volumedensity calculations. The
relations are:
Vmix =
Vi ,
where Vmix is the volume of the mixture and Vi is the volume of the component
i of the mixture, and
Mmix = mix Vmix =
CHAPTER 7
Introduction to Drilling Fluids
Mi =
i Vi ,
Page 714
i Vi
.
Vi
Example 28: Calculate the volume and density of a uid composed of 25 lbm
of bentonite, 60 lbm of barite, and 1 bbl of fresh water.
Solution:
The volume and the mass of the mixture are:
Vmix = 1bbl
42gal
1bbl
Mmix = 1bbl
42gal
1bbl
8.33
mix =
7.4.2
25lbm
60lbm
+
= 44.87gal
21.7lbm/gal 35lbm/gal
lbm
+ 25lbm + 60lbm = 434.9lbm
gal
434.9lbm
= 9.69 lbm/gal
44.87gal
Density Treatment
The density control of a drilling uid is obtained usually with the use of barium
sulfate (BaSO4) commonly called barite. The specic gravity of pure barite is
4.5, and the average specic gravity of API barite is 4.2 or 35 lbm/gal.
To keep the barite in suspension, a minimum gel strength of 3 lbf/100ft2 is
required and normally obtained with waterbentonite uid. The bentonite itself
adds viscosity and density to the water.
The most common weight treatment is that of increasing the density of the
uid by adding barite. Four basic different procedures exist and must be understood. They are:
1. Increase uid density by adding barite (no volume limit). In this case it is
not necessary to discard part of the original uid.
2. Increase uid density by adding barite (volume limit). In this case it is
necessary to discard part of the original uid before adding barite to the
system. We assume that the nal volume is equal to the original volume.
3. Increase uid density by adding barite and water (no volume limit). In this
case, hydration water is added to avoid increasing the viscosity.
CHAPTER 7
Introduction to Drilling Fluids
Page 715
4. Increase uid density by adding barite and water (volume limit). In this
case it is necessary to discard part of the original uid before adding
barite and hydration water.
5. Reduce uid density by adding water and bentonite (no volume limit).
6. Reduce uid density by adding water and bentonite (volume limit).
7.4.2.1
Let V1 and 1 be respectively the volume and the density of the uid before
the treatment. The required density of the uid after treatment is 2 . Since
there is no limit for the nal volume V2 , no discard of uid is needed before the
treatment. Using volume and mass continuity we have:
V1 + VB = V2 ,
1 V1 + B VB = 2 V2 ,
where VB and B are respectively the volume and density of the barite. Solving
for VB in terms of V1 we get:
VB =
2 1
V1 .
B 2
(7.1)
The barite is added to the uid in mass quantity (usually in lbm), and since
mB = B VB we can write:
mB = B VB .
(7.2)
This is the mass of barite needed to add to obtain a uid with density 2 . The
nal volume V2 is given by:
V2 = V1 + VB .
(7.3)
7.4.2.2
In this case, since the volume is limited (and assumed to be the initial volume
V1), it is necessary to discard a volume Vd before increasing the density. Using
volume and mass continuity we have:
V1 Vd + VB = V1 Vd = VB ,
1 V1 1 Vd + B VB = 2 V1 .
Note that the discarded volume will be equal to the volume of barite added to
increase the density. Substituting Vd for VB in the second equation and factoring
out Vd we obtain:
2 1
Vd = VB =
V1 .
(7.4)
B 1
With VB , the mass of barite to be added is given by
mB = B VB .
CHAPTER 7
Introduction to Drilling Fluids
(7.5)
Page 716
7.4.2.3
If barite is added to the mud, a part of the free water in the mud will be adsorbed
by the particles of barite (particle sizes in the silt and ne sand range - 2 m to
100 m). The water will come from the uid and, as consequence, an increase
of viscosity will occur. To avoid this increase in viscosity, a volume of water is
added along with the barite to serve as hydration water, and thus keeping the
viscosity under control. The amount of water added depends on the amount
of barite added. Normally, 2 to 3 gallons of water are required for 100 lbm of
barite.
Let vh be volume of hydration water per mass of barite, and Vw and w the
volume and density of the hydration water. Then we have:
V1 + VB + Vw = V2 ,
1 V1 + B VB + w Vw = 2 V2 .
The volume of water and the volume of barite are related by the specic volume
vh :
Vw = mB vh = B VB vh .
Substituting this value in the system above we get:
V1 + (1 + B vh ) VB = V2 ,
1 V1 + (1 + w vh ) B VB = 2 V2 .
Solving for VB in terms of V1 we get:
VB =
2 1
V1 .
(1 + w vh ) B (1 + B vh ) 2
(7.6)
With VB , the mass of barite, volume of water, and the nal volume are given by:
mB = B VB ,
Vw = mB vh ,
(7.8)
V2 = V1 + VB + Vw .
7.4.2.4
(7.7)
(7.9)
The nal volume is V1 , and a volume Vd must be discarded before the treatment.
The continuity equations are:
V1 Vd + VB + Vw = V1 Vd = VB + Vw ,
1 V1 1 Vd + B VB + w Vw = 2 V1 .
Using Vw = B VB vh and the rst equation above gives:
Vd = (1 + B vh ) VB .
CHAPTER 7
Introduction to Drilling Fluids
Page 717
Substituting these two results in the second equation and solving for VB results
in:
2 1
V1 .
(7.10)
VB =
(1 + w vh ) B (1 + B vh ) 1
With VB , the volume to discard, the mass of barite, and the volume of hydration
water are:
Vd = (1 + B vh ) VB ,
(7.11)
mB = B VB ,
(7.12)
Vw = mB vh .
(7.13)
Example 29: It is required to increase the density of 300 bbl of a drilling mud
from 9.3 ppg to 10.5 ppg. Calculate the amount of barite and the suitable
procedure (discard, hydration water, etc) for the four cases above. (Assume
B = 35 ppg, vw = 2.4 gal/100 lbm of barite, and w = 8.34 ppg.)
Solution:
Case 1: No volume limit, no hydration water. Using Equations 7.1 to 7.3:
VB =
mB = 35
10.5 9.3
300 bbl = 14.69 bbl
35 10.5
lbm
14.69 bbl
gal
42 gal
1 bbl
10.5 9.3
300 = 14.01 bbl
35 9.3
1 + 8.34
2.4
100
10.5 9.3
35 1 + 35
2.4
100
10.5
Note that the volume of barite is larger than in case 1 because its density is
reduced by the hydration water.
CHAPTER 7
Introduction to Drilling Fluids
Page 718
1 + 8.34
2.4
100
10.5 9.3
35 1 + 35
Vd = 1 + 35
2.4
100
2.4
100
9.3
7.4.3
2.4
= 510 gal = 12.15 bbl
100
Page 719
From the graph in Figure 7.14, we see that premium clay produces 15 cP
mud at the density of 8.94 ppg. We have 3 continuity equations and 1 relationship to solve: Final mud volume and mass equations:
Vw + Vc + Vh + VB = Vm
w Vw + c Vc + w Vh + B VB = m Vm
Mass of the initial mud (water and premium clay):
i (Vw + Vc ) = w Vw + c Vc
Hydration water requirement:
Vh = B VB vh
With numbers (watch out for the units):
Vw + Vc + Vh + VB = 350
8.34 Vw + 21.7 Vc + 8.34 Vh + 35 VB = 9.4 350
Mass of the initial mud (water and premium clay):
8.94 (Vw + Vc ) = 8.34 Vw + 21.7 Vc
Hydration water requirement:
Vh = 35 VB
2.4
100
CHAPTER 7
Introduction to Drilling Fluids
Page 720
CHAPTER 7
Introduction to Drilling Fluids
Page 721
CHAPTER 7
Introduction to Drilling Fluids
Page 722
Chapter 8
Rheology and Rheometry
Rheology is the science that study the ow behavior of uids. Rheometry is the
process or processes to measure the various rheological parameters of a uid.
Both are important to the study of drilling uids.
8.1
All uids encountered in drilling and production operations can be characterized as either Newtonian uids or nonNewtonian uids. Newtonian uids, like
water, gases, and thin oils (high API gravity) show a direct proportional relationship between the shear stress and the shear rate , assuming pressure and
(8.1)
and has a slop . Viscosity usually changes with pressure and temperature.
(See Figure 8.1).
Most uids encountered at drilling operations like drilling mud, cement slurries, heavy oil, and gelled fracturing uids do not show this direct relationship between shear stress and shear rate. They are characterized as non
Newtonian uids. To describe the behavior of non-Newtonian uids, various
CHAPTER 8
Rheology and Rheometry
Page 81
models like the Bingham plastic and the Power Law uid models (two parameter models), the HerschelBulkley and the RobertsonStiff uid models, which
are timeindependent models. There exist timedependent uid models, which
present change of viscosity and other parameters based in time and shear
history. Timedependent uids model are sub-classied as thixotropic(time
thinning) and rheopetic (time-thickening).
It shall be understood that all the models mentioned above are based on
different assumptions that are hardly valid for all drilling operations, thus they
are valid to a certain extend only. Most commonly drilling uids are treated
behaving either aa a Bingham plastic or a powerlaw uid. These two models
can describe relatively well most of the common drilling uid for all ordinary
drilling operations.
8.1.0.1
The Bingham plastic uid model is a linear model (although not proportional),
and is expressed mathematically as follows.
>0
= y + p
= y + p
<0
=0
y y
(8.2)
The constant y is called the yield point usually denoted YP and y is called
plastic viscosity, usually denoted PV. The typical graph of a Bingham plastic
uid is shown in Figure 8.2.
CHAPTER 8
Rheology and Rheometry
Page 82
The power law uid model is nonlinear and do not present a yield stress, and
can be expressed as follows.
= K ()n
n
= K () < 0
(8.3)
The constant K is called the consistency index and n is called behavior index.The typical graph of a powerlaw uid is shown in Figure 8.3.
models. The consistency index K on the other hand gives the thickness uid,
CHAPTER 8
Rheology and Rheometry
Page 83
where larger K represent thicker (more viscous) uids. It should be understood, however, that K has not the dimension of viscosity. Consistency index
K is usually expressed in equivalent viscosity units.
8.2
Rheometry
To determine the rheological properties of a particular uid a rotational viscometer or rheometer is commonly used. Rheometers may have two, six, or
continuous (variable) speeds. The typical rotational rheometer (see Figure 7.3
has an arrangement of two concentric cylinders in which the outer cylinder rotates and the inner cylinder actuate a torsion spring with a dial, as depicted in
Figure 8.4.
The rotation of the rotor (external cylinder) shears the uid between the rotor
and the bob (internal cylinder), which transmits torque from the rotor to the bob.
The torque causes a deection of the dial (proportional to the torque), against
the resistance of the torsion spring. The wide use of rheometers in the eld
leaded to the design of special dimensions that made easy the measurement
of uid parameters.
CHAPTER 8
Rheology and Rheometry
Page 84
8.2.1
The dimensions of the rotor and bob, and the coefcient of the torsion spring
are determined such that the viscosity of a Newtonian uid in centipoise (cP) is
obtained directly by reading the deection of the dial in degrees, when the rotor
rotates at 300 rpm.
8.2.2
300
(N 2 N 1 )
N2 N1
[cP]
N1
p
[lbf/100 ft2 ]
300
Note that any two rotation speeds can be selected, but 300 rpm and 600 rpm
lead to the simplication of the calculation, in addition to cover a range of shear
rates that typically occurs in drilling operations. The simplied expressions for
N1 = 300 rpm and N2 = 600 rpm are:
y = N 1
p = 600 300
[cP]
(8.4)
y = 300 p
[lbf/100 ft ]
The general formulas are useful to determine the parameters in other ranges
of interest (too small or too large).
8.2.3
log (N 2 /N 1 )
log (N2 /N1 )
[1]
K=
510 N
(1.703 N )n
[eq.cP]
Again, any two rotation speeds can be selected. For 300 rpm and 600 rpm the
expressions reduce to:
n=
[1]
(8.5)
510 300
K=
511n
CHAPTER 8
Rheology and Rheometry
[eq.cP]
Page 85
Example 31: A uid rheometry test results in dial readings of 300 = 13 and
600 = 22. Calculate the parameters using powerlaw and Binghamplastic
models Solution:
(a) Powerlaw
log (22/13)
= 0.759
log 2
510 13
= 58.3 eq.cP
K=
5110.759
n=
(b) Bingham
p = 22 13 = 9 cP
y = 13 9 = 4 lbf/100 ft2
8.2.4
Gel Strength
Gel strength is the shear stress measured at low shear rate after a mud has
set quiescently for a period of time (10 seconds and 10 minutes in the standard
API procedure, although measurements after 30 minutes or 16 hours may also
be made).
To measure the gel strength a rheometer with low rotary speed (3 rpm) is
needed. The sample is sheared at 600 rpm for a period (1 to 5 minutes) and
set to rest for the determined time (10 seconds or 10 minutes). Then the shear
is applied at 3 rpm and the maximum deection of the dial is read. The value
indicates the gel strength at 10s or 10m in lbf/100ft2 .
CHAPTER 8
Rheology and Rheometry
Page 86
Chapter 9
Flow in Pipes and Annuli
This chapter discuss the ow of uids, Newtonian and nonNewtonian, both
in pipes and concentric annuli, for the laminar and turbulent regimes. It is assumed also that the ow is steady (not time dependent). We will be primarily
dpf
interested in calculating the frictional pressure drop gradient dL as function of
the ow rate q or vice-versa.
The formulas to be presented are valid for horizontal conduits but since the
ow potential gradient is equal to the frictional pressure drop gradient they can
also be used for inclined and vertical conduit.
To force a uid to ow inside a horizontal conduit, it is required a pressure
differential between upstream and downstream points along the conduit. Or,
conversely, if a uid ows on a horizontal conduit, a pressure differential occurs
between an upstream and a downstream points. This pressure differential is
viewed as a friction pressure drop.
9.1
1
v2 v1 + pp pf .
2 2
2
(6.1)
If there is no pump between points 1 and 2, and if the conduit has constant
cross section, we can write for the friction pressure drop:
pf = p1 p2 + g (D2 D1 ) = (p g D) .
For incompressible uids (constant density) the expression can be written as:
pf = (p g D) .
The term (p g D) is called ow potential, which is responsible for the
ow. In a conduit, it is balanced by the frictional pressure drop as shown in the
CHAPTER 9
Flow in Pipes and Annuli
Page 91
equation. If the ow is horizontal, the gravitational term is zero and the friction
pressure drop between two points along the ow path is equal to the pressure
differential between the upstream and downstream points.
What characterizes a uid is its ability to continuously deform when submitted to a shear stress (some restrictions apply for some nonNewtonian
uids). The continuous deformation is called shear rate and there should
= f () ,
which characterizes the uid behavior and is called the rheological model or
constitutive equation of the uid. Several rheological models were presented in
Chapter 8.
Independently of the rheological model, however, there exist a relationship
involving the forces acting on the owing uid, associated directly with the geometry of the conduit. This is the equilibrium equation of the ow (also called
eld equation) and we will be interested in the eld equation for pipes and annuli
and open slots.
9.1.1
Equilibrium Equations
The following equilibrium equations can be easily obtained from the balance of
forces acting in an innitesimal element of uid. The only forces considered are
due to the pressure between the uid and its surroundings and shear stresses
between the uid and conduit. Body forces due to mass are irrelevant for steady
state situations.
9.1.1.1
9.1.1.2
1 dpf
c
r+ ,
2 dL
r
(9.2)
where is the shear stress at any radial distance r from the axis of the conduit,
and c is a constant to be determined. Note that the equilibrium equation for
CHAPTER 9
Flow in Pipes and Annuli
Page 92
pipes can be obtained from the equilibrium equation for annuli, in which, since
the radius can be zero, the value of c must be zero. Figure 9.1 (right) shows the
velocity prole of laminar ow in annuli. The dashdot line corresponds to the
axis of the annulus.
9.1.1.3
Although an open slot is not a typical cross section for drilling uid conduits,
in some situations, it is advisable to approximate an annulus by an slot. This
assumption simplies the expressions for frictional pressure drop gradient for
non-Newtonian uids. It is usually accepted that slot approximation are accurate enough for annuli in which Di /Do 30%. By open slots we mean that
only the upper and lower surfaces of the slot are subjected to shear stresses.
The lateral surfaces are free of shear stress. The equilibrium equation is
=
dpf
y.
dL
(9.3)
where is the shear stress at any distance y from the axis of the slot. Figure 9.2 shows the velocity prole of laminar ow in a slot. The dashdot line
corresponds to the plane in the median of the slot.
9.1.2
Continuity Equations
In was seen in Chapter 6 that the average velocity of the uid in a conduit is
given by
q
v= ,
A
and this expresses the assumption that every particle of uid in a given section of the ow has the same velocity. This average velocity is a very good
representation of the ow velocity in a given section if all we want is to calculate
CHAPTER 9
Flow in Pipes and Annuli
Page 93
v dA
A
q = 2
v r dr .
0
q = 2
v r dr =
0
R
vr2 0
dv
dr
r2
dr =
dv
dr
dr .
(9.4)
q = 2
v r dr .
Ri
CHAPTER 9
Flow in Pipes and Annuli
Page 94
dv
dr
r2
q =
(9.5)
dr .
Ri
q=w
vdy .
t/2
q = w
dv
dy
(9.6)
dy .
t/2
dv
.
dr
dv
.
dy
The minus sign is an arbitrary choice, and its purpose is to produce positive
shear rates in pipes and outer ow regions of annuli and slots. On the other
hand, the inner ow regions for annuli and slots will have negative shear rates.
All expressions so far are completely general and independent of the uid.
In the following, constitutive equations of uids are coupled with equilibrium
equations of conduits to produce various ow models. The whole process will
be presented for Newtonian uids. Only the nal expressions will be presented
for nonNewtonian uids, but the steps are basically the same.
9.1.3
dv
.
dr
Page 95
To obtain the ow rate (and ultimately the relationship with the pressure drop
gradient) we use the expression for dv and Equation (9.4):
dr
R
dpf
q=
2 dL
r3 dr =
dpf 4
R ,
8 dL
dpf
dL
A dpf 2
R .
8 dL
(9.7)
v
,
=
dL
1500 D2
for
dpf
dL
9.1.4
(9.8)
C
1 dpf
r +
2 dL
r
dv =
0
v(r) =
1
dr ,
Ri
1 dpf 2
r
2
r Ri C ln
.
4 dL
Ri
CHAPTER 9
Flow in Pipes and Annuli
Page 96
Using the fact that v(R0 ) = 0, we can determine the value of the constant C:
v(Ro ) = 0 =
1 dpf
Ro
2
2
Ro Ri C ln
,
4 dL
Ri
C=
2
2
1 dpf Ro Ri
4 dL ln Ro
Ri
(9.9)
dv
dr
Ro
1 dpf 3
r +C r
2 dL
q=
dr ,
Ri
2
2
q = Ro Ri
1 dpf
8 dL
2
2
Ro + Ri +
C
2
2
2
Since (Ro Ri ) is the area of the annulus, and using the denition of
the average velocity for annuli and the value of the constant C [Equation (9.9)]
yields:
2
2
Ro Ri
1 dpf
2
2
Ro + Ri
v=
8 dL
ln Ro
Ri
Solving for
dpf
,results
dL
v=
dpf
8
v
=
2
2
dL
Ro + Ri
2
2
Ro + Ri
2
2
Ro Ri
Ro
ln R
i
2
2
Ro Ri
ln Ro
Ri
32
v
2
2
Do + Di
2
2
Do Di
Do
ln D
(9.10)
v
1500
2
Do
2
Di
(9.11)
2
2
Do Di
ln Do
D
i
for
dpf
dL
Page 97
pp = pb + pf ,
where pf = (pf )ds + (pf )ann . There is no bit (pb = 0), and we need the
frictional pressure drop along the drillstring and along the annulus. Then we
have:
Pressure drop gradient in the drillstring: [Equation (9.8)]
v=
q
250 gal/min
=
A
(4.276 in)2
4
dpf
dL
=
ds
231 in3
1 gal
1 min
60 s
1 ft
12 in
= 5.585 ft/s
15 5.585
= 0.00305477 psi/ft
1500 4.2762
dpf
dL
250
(72 52 )
15 4.255
=
ds
231
60 12
1500
72 + 52
72 52
7
ln 5
= 4.255 f t/s
= 0.015927psi/ft
CHAPTER 9
Flow in Pipes and Annuli
Page 98
9.1.5
dv
dy
t/2
w dpf
q=
dL
y 2 dy =
w dpf 3
t ,
12 dL
t/2
Solving for
dpf
dL
Using t = Ro Ri gives
dpf
12
v
48
v
=
= 2
.
2
dL
Ro Ri
(Do Di )2
(9.12)
Page 99
v
dpf
=
,
dL
1000 (Do Di )2
for
dpf
dL
(9.13)
Example 33: Calculate the frictional pressure drop in the annulus of Example 32 using the slot approximation model and compare the results.
Solution: Using the Equation (9.13) we have:
dpf
15 4.225
=
= 0.015957 psi/f t
dL
1000 (7 5)2
The pressure drop for 10,000 ft is
(p )ann = 10, 000 ft 0.015957 psi/ft = 159.56 psi
Comparing with the result using exact approximation (159.27 psi) we see that
the difference is of less than 0.2%.
9.1.6
The derivation of the expressions for the pressure drop gradient in pipes and
annuli (slot approximation) for both powerlaw and Binghamplastic uids is beyond the scope of this work. The derivations, however follow basically the same
steps presented before (for pipes and slot approximation), with some peculiarities, which result in the expressions presented next. One peculiarity (shared by
all uid models that present yield point) is the fact that for Binghamplastic uid
model there exist a region of the cross section where the uid moves as a plug
(no shear between the adjacent layers).
9.1.6.1
dpf
=
dL
143, 640 Dn+1
24
3n + 1
n
(9.14)
dp
CHAPTER 9
Flow in Pipes and Annuli
Page 910
9.1.6.2
=
dL
143, 640 (Do Di )n+1
for
dpf
dL
48
2n + 1
n
(9.15)
9.1.6.3
y
=
+
2
dL
1500 D
225 D
for
dpf
dL
(9.16)
9.1.6.4
dpf
y
=
2 +
dL
200 (Do Di )
1000 (Do Di )
for
dpf
dL
(9.17)
Example 34: Calculate the pressure loss across a 10,000 ft long annulus with
8.5 in OD, 5 in ID. The uid follows a powerlaw model with behavior index of
0.3, and consistency index of 850 eq.cP. The ow rate is 250 gpm (assume
laminar ow.)
Solution:
The average velocity is:
v=
231
60 12
dpf
850 2.1610.3
=
dL
143, 640 (8.5 5)0.3+1
250
= 2.161 ft/s
(8.52 52 )
2 0.3 + 1
48
0.3
0.3
= 0.00772 psi/ft
CHAPTER 9
Flow in Pipes and Annuli
Page 911
9.2
All formulas for uid ow in the previous section were developed assuming that
the ow is laminar. In a laminar ow, the particles of the uid move in orderly
layers (laminae), although the velocities may change between those layers.
The particle velocities along the conduit change with regularity, and there is no
eddies or streamline crosses. If a dye is carefully poured in the ow it ows as
a streamline. On the other hand, in a turbulent ow, particles follows irregular
paths, with large change in velocity and ow direction compared with other near
particles. Eddies and vortices may occur, and if a dye is poured in the ow, it
promptly looses it streamline shape and get mixed with the owing uid. Factors
that govern the laminar ow are:
1. the velocity of the uid,
2. its density, and
3. the size, shape, and surface roughness of the conduit.
There is a transition between laminar and turbulent ow. In these transition
periods or regions, the ow is normally turbulent in the central portion of the
ow section but may remain laminar close to the boundaries.
Flow equations for laminar ow exist for various conduit shapes and uid
types. However, analytical mathematical models for turbulent ow have not yet
been suitably developed.
Studies of turbulent ow of Newtonian uids in pipe have been extensively
done. Most results are empirical and the subject is still not exhausted, although
the results are quite accurately. Treatment for other geometries (annulus, open
channels, slots, etc), and also for non-Newtonian uids is normally made by
some analogy with Newtonian uid in pipes. Therefore, it is important to study
the latter case in detail, and then to extend the results for other cases (in particular to those related to drilling engineering).
9.2.1
9.2.1.1
Reynolds Number
CHAPTER 9
Flow in Pipes and Annuli
Page 912
now called Reynolds number (Re) is less than 2000, and that the ow will be
turbulent if Re greater than 3000. The Reynolds number is given by
Re =
vD
(9.18)
vD
(9.19)
for D in inches, v in ft/s, in lbm/gal, and in cP. Another common notation for
Example 35: Determine the ow pattern for a brine of 8.9 ppg and 1.1 cP
owing inside a 5 in drillpipe (4.276 in ID) at 480 gpm.
Solution:
The average velocity is:
v=
231
60 12
480
= 10.73 ft/s
4.2762
9.2.1.2
When a uid ows in a pipe, the resistance to the ow, measured by the pressure drop gradient, is caused by the effect of the boundary of the pipe (its
internal wall) upon the uid, more specically, by the shearing stress occurring
in the the uid in contact with the pipe wall.
A dimensionless group that relates shear stress at the surface between a
length of uid in a circular conduit and the specic kinetic energy ek (energy per
CHAPTER 9
Flow in Pipes and Annuli
Page 913
ek
(9.20)
Figure 9.4 shows a uid element of length L owing with average velocity
v = q/Ap .
F = Pp P
dpf
L
dL
Ac ,
1 dpf
D.
4 dL
1
2
m v2
1
= v2 .
V
2
where is the density of the uid. Substituting these two expressions into the
expression for the friction factor and solving for the pressure drop gradient we
obtain:
1 dpf
D
1 dpf D
4 dL
f=
= 1
=
,
2
ek
2 dL v 2
2
dpf
2 v2
=
f.
dL
D
This is called the Fanning equation. In eld units we have
dpf
v2
=
f,
dL
25.8 D
CHAPTER 9
Flow in Pipes and Annuli
(9.21)
(9.22)
Page 914
dpf
dL
If we compare (and equate) the Fanning equation with Equation (9.7) (Poiseuilles
equation) we obtain:
32 v
2 v2
dpf
=
=
f,
2
dL
D
D
16
16
f=
=
(9.23)
vD
Re
This expression for the friction factor f is valid only if the ow is laminar.
For turbulent ow, however, the friction factor must be determined experimentally. Extensive series of experiments performed by Nikuradse in 1933
resulted in an empirical correlation obtained by Colebrook 4 for the friction factor f , which depends on the Reynolds number Re and on the pipe relative
roughness D , where is the absolute roughness (the average depth of the
microscopic irregularities of the internal surface of the pipe). The empirical
correlation called modied Colebrook equation, is an implicit formula given by:
1
= 4 log10
f
/D 1.255 1
+
3.7
Re
f
(9.24)
CHAPTER 9
Flow in Pipes and Annuli
Page 915
Example 36: Calculate the friction factor with four gures for Re = 125, 500
and ( /D) = 0.0037. Compare the result with the Stanton chart.
Solution:
Substituting the value for the Reynolds number and relative roughness into
the modied Colebrook equation, and simplifying we obtain:
1
= 4 log10
f
1.255 1
0.0037
+
3.7
125, 500 f
Any value can be used to start the iterative process. A reasonable guess is
f0 =
16
16
=
= 0.00012749
Re
125500
f
0.0084196
0.0071572
0.0071746
0.0071744
0.0071744
f = 0.0071744
Comparing this value with the Stanton chart we notice that a much higher degree of accuracy is obtained with the iterative procedure.
In most drilling situations, the relative roughness is less than 0.0004 and the
Reynolds number is less than 100,000. For these conditions we can consider
the ow as occurring in a hydraulically smooth pipe, and the simplied equation
is
1.255 1
1
= 4 log10
.
(9.25)
Re
f
f
Attention: It is common in the industry another denition of friction factor
whose value is four times the value obtained with the modied Colebrook equation. The log-log plot of this friction factor is called the Moody chart. If this chart
is used to obtain the friction factor, it must be divided by four before it is is used
in the pressure drop gradient formula obtained previously.
9.2.1.3
Blasius Formula An approximation for the friction factor for 2100 < Re <
100000 and hydraulic smooth pipes was presented by Blasius, and is given by:
f=
CHAPTER 9
Flow in Pipes and Annuli
0.0791
.
Re0.25
(9.26)
Page 916
This expression is shown in the Stanton chart (Figure 9.5), where the curves
for the various relative roughnesses converge to the Blasius approximation in
the range mentioned.
The range of applicability of Blasiuss approximation covers quite well most
conditions in drilling. If this expression is used in Equation (9.21) (Fanning
equation) gives:
dpf
2 v 2 0.0791
2 v2
=
=
dL
D Re0 .25
D
0.0791
v D
0.25
= 0.1582
.
D1.75
(9.27)
dpf
0.25 0.75 q 1.75
.
=
dL
8624 D4.75
(9.28)
dp
f
for dL in psi/ft, in cP, in ppg, q in gpm, and D in inches. This expression for
the frictional pressure drop gradient for turbulent ow in pipes was the motivation of the general expression
pf = c q m
used to determine the total frictional pressure drop in our study of nozzle optimization. The reason for using "m" in place of the theoretical value 1.75 is
for the various different ow regime (turbulent, laminar, transition) that occurs
in the circulation system.
Example 37: Calculate the pressure loss across a 5,000 ft of 5 in OD, 4.276 in
ID drillstring. The uid (assumed Newtonian) has density 9.3 ppg and viscosity
20 cP. The ow rate is 370 gpm. Calculate the friction factor using (a) the
modied Colebrook formula, (b) the Blasius approximation, and (c) the Swamee
and Jain explicit formula.
Solution:
CHAPTER 9
Flow in Pipes and Annuli
Page 917
The rst step is to conrm if the ow is turbulent. The average velocity inside
the pipe is:
231
370
v=
= 8.266 ft/s
60 12 4 4.2762
Re = 928
16
15253
1.255 1
15, 253 f
f
0.0092807
0.0066380
0.0069644
0.0069162
0.0069231
0.0069221
0.0069223
0.0069222
0.0069222
f = 0.0069222
In this case (Colebrook) the frictional pressure drop gradient using Equation (9.22)
(Fanning equation) is
dpf
v2
9.3 8.2662
=
f=
0.0069222 = 0.03987 psi/ft ,
dL
25.8 D
25.8 4.276
and the pressure drop for 5,000 ft is:
pf = 5, 000 0.03987 = 199 psi
(b) Using the formula resulting from Blasius approximation [Equation (9.27)] we
have:
dpf
0.25 0.75 q 1.75
200.25 9.30.75 3701.75
=
=
= 0.04100
dL
8624 D4.75
8624 4.2764.75
and the pressure drop for 5,000 ft is:
pf = 5, 000 0.04100 = 205 psi
CHAPTER 9
Flow in Pipes and Annuli
Page 918
f=
4 log10
0
3.7
5.74
152530.9
= 0.0069163
In this case the frictional pressure drop gradient using Equation (9.22) is
dpf
9.3 8.2662
=
0.0069163 = 0.03984 psi/ft ,
dL
25.8 4.276
and the pressure drop for 5,000 ft is:
pf = 5, 000 0.03984 = 199 psi
9.2.2
One of the questions usually raises is the criterion for laminar, transition, and
turbulent ow for pressure drop calculation. The best procedure is to calculate
the friction factor using the laminar relation, and using one of the turbulent
friction factors (Colebrook, Blasius, Swamee and Jain, etc) and use the larger
to obtain the frictional pressure drop gradient using the Fanning formula. This
is depicted in the graph in Figure 9.6.
In fact, it sufces to select the larger of the friction factors and use Fanning
equation.
CHAPTER 9
Flow in Pipes and Annuli
Page 919
It is important to stress that this approach does not determine the correct
ow regime. In some situations, as for example in cementing operations, it is
desirable that during the cement displacement the ow regime of the ush5 in
the annulus is turbulent.
9.2.3
A large amount of experimental data has been obtained for pipes, but relatively
few have been obtained for other geometries, in special for annuli. There are
several empirical procedures to apply the results for pipes to other geometries.
All these empirical procedures try to determine an equivalent pipe diameter
Deq of the ow cross section geometry, and use this value to determine the
equivalent Reynolds number and in the Fanning equation. Note, however, that
the average velocity must be calculated using the real area of the cross section.
Three criteria are used to determine the equivalent diameter Deq :
1. The hydraulic radius
2. Exact annulus to pipe analogy
3. Slot annulus to pipe analogy
9.2.3.1
Hydraulic Radius
One approach to calculate pressure drop for other conduit geometries is using
the hydraulic radius concept. The hydraulic radius rH is dened as the ratio of
the area of ow to the wetted perimeter. For a circular pipe, the hydraulic radius
is:
R2
R
D
(rH )pipe =
=
= .
2R
2
4
For a concentric annulus, the hydraulic radius is:
(rH )annulus =
2
2
(Ro Ri )
Ro Ri
Do Di
=
=
.
2 (Ro + Ri )
2
4
The concept states that sections with the same hydraulic radius are equivalent for turbulent ow calculation purposes. Therefore, equivalent diameter
is
Deq = Do Di .
(9.30)
5
The ush is a special uid displaced in front of the cement to help remove mud and mud
cake in the annulus to improve the bonding between the cement sheath and the formation.
CHAPTER 9
Flow in Pipes and Annuli
Page 920
9.2.3.2
9.2.3.3
2
2
Do + Di
2
2
Do Di
.
ln Do
Di
(9.31)
2
(Do Di ) = 0.8165 (Do Di ) .
3
(9.32)
Example 38: Calculate the frictional pressure drop gradient using the three
criteria above for the following ow condition: 9.2 ppg brine with 8 cP viscosity,
circulating in an annulus of 81 /2 in OD and 5 in ID, at a ow rate of 280 gpm.
Use the Blasius formula for the friction factor. (Compare with the friction factor
for laminar ow.)
Solution:
The average velocity in the annulus is:
v=
231
60 12
280
= 2.421 ft/s
(8.52 52 )
Page 921
Re = 928
f=
0.0791
0.0791
=
= 0.008111
0.25
Re
90430.25
16
9043
dpf
v2
9.2 2.4212
=
f=
0.008111 = 0.004844 psi/ft
dL
25.8 D
25.8 3.5
b) Exact annulus to pipe analogy:
Deq =
2
2
Do + Di
2
2
Do Di
=
ln Do
Di
Re = 928
f=
8.52 + 52
8.52 52
= 2.864 in
ln 8.5
5
0.0791
16
= 0.008529 >
= 0.002162
0.25
7400
7400
dpf
9.2 2.4212
=
0.008529 = 0.006224 psi/ft
dL
25.8 2.864
c) Slot annulus to pipe analogy:
Deq =
2
(Do Di ) =
3
Re = 928
f=
2
(8.5 5) = 2.858 in
3
16
0.0791
= 0.008533 >
= 0.002167
0.25
7384
7384
dpf
9.2 2.4212
=
0.008533 = 0.006240 psi/ft
dL
25.8 2.858
9.2.4
Page 922
9.2.4.1
To calculate the Reynolds number we need to determinate an apparent viscosity for the uid at a given condition. One approach is comparing the expressions
for the pressure drop gradient for Newtonian and Bingham uids and determine
the apparent Newtonian viscosity a that would cause the same pressure drop
gradient (for laminar ow). The strategy is to determine the viscosity of a Newtonian uid that would cause the same pressure drop as the Bingham uid
under the same ow conditions.
Bingham Fluids in Pipes: Comparing and equating Equation (9.8) (Poiseuilles
equation in eld units) with Equation (9.16) (pressure drop gradient in pipes for
Bingham uids) gives:
v
p v
y
=
+
1500 D2
1500 D2 225 D
Solving for the dynamic viscosity and renaming for apparent viscosity a we
obtain:
y D
(9.33)
a = p + 6.66
v
The apparent viscosity is used to calculate the Reynolds number and then
the friction factor using the same procedure for Newtonian uids, and then the
pressure drop gradient using Fanning equation.
Bingham Fluids in Annulus: Comparing and equating Equation (9.13) (pressure drop gradient in annuli for Newtonian uids slot approximation), with
Equation (9.17) (pressure drop gradient in annuli for Bingham uids slot approximation) gives:
p v
v
2 =
2 +
200 (Do Di )
1000 (Do Di )
1000 (Do Di )
Note that here we opted in using the slot approximation formula for Newtonian
uid for consistency, since there is no explicit exact formula for Bingham uid in
annuli.
Solving for the dynamic viscosity and renaming for apparent viscosity a we
obtain:
y (Do Di )
a = p + 5
(9.34)
v
For consistency also, we should choose to use the equivalent diameter for
annulus based on the slot approximation [Equation (9.32)].
The apparent viscosity and the equivalent diameters are used to calculate
the Reynolds number, and then the friction factor using the same procedure for
Newtonian uids, and then the pressure drop gradient using Fanning equation.
CHAPTER 9
Flow in Pipes and Annuli
Page 923
Example 39: Calculate the frictional pressure drop gradient for the following
lbf
ow condition: 10 ppg Bingham uid with p = 40 cP and y = 15 100 ft2 , circu3
1
lating in an annulus of 6 /4 in OD by 4 /2 in ID, at a ow rate of 600 gpm. Use
the Colebrook formula for the friction factor (assume smooth pipe).
Solution:
The average velocity in the annulus is:
v=
231
60 12
600
= 9.683 ft/s
(6.752 4.52 )
y (Do Di )
15 (6.75 4.5)
= 40 + 5
= 57.43 cP
v
9.683
2
(Do Di ) =
3
2
(6.75 4.5) = 1.837 in
3
v Deq
10 9.683 1.837
= 928
= 2874
a
57.43
16
The laminar friction factor is f = 2874 = 0.0056672. This is used to start the iterative process and to compare with the converging value. Using the Colebrook
equation for smooth pipe [Equation (9.25)] we have:
1
= 4 log10
f
1.255 1
2874 f
f
0.0124949
0.0107768
0.0110702
0.0110160
0.0110259
0.0110241
0.0110244
0.0110244
f = 0.0110244
The pressure drop gradient is:
dpf
v2
10 9.6832
=
f=
0.0110244 = 0.2181 psi/ft
dL
25.8 Deq
25.8 1.837
CHAPTER 9
Flow in Pipes and Annuli
Page 924
9.2.4.2
(9.35)
This implicit formula was developed by Dodge and Metzner for hydraulic smooth
pipe, and is acceptable for most drilling situations.
PowerLaw Fluids in Pipes: We calculate the apparent viscosity equating
Equation (9.8) (Poiseuilles equation in eld units) with Equation (9.14) (pressure drop gradient in pipes for powerlaw uids):
v
K vn
=
1500 D2
143, 640 Dn+1
24
3n + 1
n
Solving for the dynamic viscosity and renaming for apparent viscosity a we
obtain:
n
3n + 1
K v n1
24
a =
(9.36)
95.9 Dn1
n
The apparent viscosity is used to calculate the Reynolds number and then
the friction factor using Dodge and Metzner formula, and then the pressure drop
gradient using Fanning equation.
PowerLaw Fluids in Annulus: We calculate the apparent viscosity equating Equation (9.13) (pressure drop gradient in annuli for Newtonian uids
slot approximation) with Equation (9.15) (pressure drop gradient in annuli for
powerlaw uids slot approximation):
K vn
v
2 =
1000 (Do Di )
143, 640 (Do Di )n+1
2n + 1
48
n
Again we need to use the slot approximation formula for Newtonian uid for
consistency, since there is no explicit exact formula for powerlaw uid in annuli.
Solving for the dynamic viscosity and renaming for apparent viscosity a we
obtain:
n
K v n1
2n + 1
a =
48
(9.37)
n
143.9 (Do Di )n1
Again we should choose to use the equivalent diameter for annulus based
on the slot approximation [Equation (9.32)].
CHAPTER 9
Flow in Pipes and Annuli
Page 925
The apparent viscosity and the equivalent diameters are used to calculate
the Reynolds number, and then the friction factor using Dodge and Metzner
formula, and then the pressure drop gradient using Fanning equation.
Example 40: Calculate the frictional pressure drop gradient for the following
ow condition: 10 ppg uid with K = 205eq cP and n = 0.7885, circulating in an
annulus of 63 /4 in OD by 41 /2 in ID, at a ow rate of 600 gpm. (The uid has the
same 600 and 300 of Example 39.) Solution:
The average velocity in the annulus is:
v=
231
60 12
600
= 9.683 ft/s
(6.752 4.52 )
a =
143.9 (Do Di )n1
2n + 1
48
n
205 9.6830.78851
=
143.9 (6.75 4.5)0.78851
=
2 0.7885 + 1
48
0.7885
0.785
= 56.34 cP
2
(Do Di ) =
3
2
(6.75 4.5) = 1.837 in
3
v Deq
10 9.683 1.837
= 928
= 2930
a
56.34
16
The laminar friction factor is f = 2874 = 0.0054608. This is used to start the
iterative process and to compare with the converging value. Using the (Dodge
and Metzner) equation [Equation (9.35)] we have:
0.7885
4
0.395
1
=
log10 2930 f 1 2
0.75
0.7885
0.78851.2
f
Proceeding iteratively gives:
f
0.0054608
0.0110749
0.0092606
0.0096750
0.0095711
0.0095966
0.0095903
0.0095918
0.0095915
CHAPTER 9
Flow in Pipes and Annuli
f
0.0110749
0.0092606
0.0096750
0.0095711
0.0095966
0.0095903
0.0095918
0.0095915
0.0095915
Page 926
f = 0.0095915
The pressure drop gradient is:
dpf
v2
10 9.6832
=
f=
0.0095915 = 0.1898 psi/ft
dL
25.8 Deq
25.8 1.837
CHAPTER 9
Flow in Pipes and Annuli
Page 927
CHAPTER 9
Flow in Pipes and Annuli
Page 928
Chapter 10
Drilling Bits
The bit is the active drilling tool. Different from any other drilling equipment, it
is designed to perform (drill a length of formation in an economical time), and
eventually it wears out and is discarded. The average life of bits (depending
on the diameter and drilling conditions) can be as short as hours and they may
cost tens of thousand Dollars.
The drill bit performance is a very important issue in drilling design and
operation. There is an extremely large variety of bit types and models made
currently by the bit industry, each one suitable to one or more different kind of
rocks and drilling conditions. Formation rocks can be roughly classied as
1. Soft (low compressive strength, high drillability).
2. Medium soft/hard (low compressive strength, medium drillability).
3. Hard (high compressive strength. low drillability).
4. Abrasive (high compressive strength, low drillability).
5. Plastic (low compressive strength, low drillability).
Drill bit selection is in general a complicated process but, when performed properly, has a major impact on the total well cost. First in this chapter, the different
types of drill bits are discussed. Then, applying their classication and wear
considerations, a drill bit selection is presented. Finally, various parameters
that inuence the rate of penetration are discussed.
10.1
Different bits perform differently in different rocks. Bits can be generally classied in two major groups: roller cone bits, and xed cutter bits (drag bits).
CHAPTER 10
Drilling Bits
Page 101
10.1.1
Roller cone bits are designed to crush rock efciently while incurring a minimal
amount of wear on the cutting surfaces. Invented by Howard Hughes, the roller
cone bit has conical cutters or cones that have spiked teeth around them. As
the drillstring is rotated, the bit cones roll along the bottom of the hole in a circle.
As they roll, new teeth come in contact with the bottom of the hole, crushing
the rock immediately below and around the bit tooth. As the cone rolls, the
tooth then lifts off the bottom of the hole and a high-velocity uid jet strikes
the crushed rock chips to remove them from the bottom of the hole and up
the annulus. As this occurs, another tooth makes contact with the bottom of
the hole and creates new rock chips. Thus, the process of chipping the rock
and removing the small rock chips with the uid jets is continuous. The teeth
intermesh on the cones (but with no interaction), which helps clean the cones
and enables larger teeth to be used. There are two main types of roller-cone
bits, steel milled-tooth bits and tungsten carbide insert bits. Typical roller cone
bits are shown in Figure 10.1. Figure 10.2 shows a cut view it a roller cone bit.
The basic elements in a roller cone bit are the bit body, the bearings, and
the cutting cones.
10.1.1.1
Bit Body
Page 102
Bearings
Page 103
Sealed Roller Bearing Bits Sealed roller bearing bits have a seal between
the internal side of the cones (where the bearings are located) and the outside.
Drilling uid cannot penetrate in the bearing. A lubrication system keeps the
bearing lubricated. The lubrication system has a reservoir holding a supply of
lubricant located in the upper ank of each bit leg. A passage in the bit body
extends from the reservoir to the bearing to allow ow of lubricant to the bearing. A diaphragm at the reservoir provides pressure compensation between the
lubricant and the drilling uid in the annulus between the bit and the wellbore.
The lubrication system increases signicantly the life of the bearings. Sealed
bearing bits are in the intermediate range of price. The life expectancy however,
in most cases, compensates the higher price compared to a similar nonsealed
bearing bit. Figure 10.5 shows a cut of a sealed roller bearing cone.
In roller bearings (both sealed and non-sealed) the rollers are responsible to
support the radial force of the cones, and consequently the axial force applied
to the bit. The ball bearing prevents the cone from falling. As the rollers wear,
however, part of the radial load is transferred to the ball baring. Ball bearing
CHAPTER 10
Drilling Bits
Page 104
Figure 10.4: A sealed bearing bit.Figure 10.5: Cut view of a roller bearing cone.
is not designed to work under radial forces, and if the balls wear out, the cone
may fall out from the bit. Therefore, it is very important to keep the drilling
parameters within the working range and monitor the bit performance so that a
worn bit is changed before extreme wear causes the fall of the cones.
Sealed bearing type roller cutter bits further have a lubrication system including a reservoir holding a supply of lubricant. A passage in the bit body
extends from the reservoir to the bearing to allow ow of lubricant to the bearing. A seal is disposed between the roller cutter and the bearing journal that
holds lubricant in the bit. A diaphragm at the reservoir provides pressure compensation between the lubricant and the drilling uid in the annulus between
the bit and the wellbore.
Journal Bearings Bits In bits with Journal bearings, the internal surface of
the cones maintains direct contact with the bearing pin of the bit legs. An
extremely rigorous tolerance and special metallurgical treatment are required in
this type of bearing, in addition to permanent lubrication. In higher priced bits, a
silver alloy is deposited in the internal surface of the cone, increasing the radial
capacity of the bearing. Journal bearing bits are expensive but have longer life
compared to roller bearing bits. Since Journal bearings are more compact than
roller bearings, more room exists to increase the cone wall thickness and pin
diameter so that the bit can be designed with more robust specications (larger
weight on bit rating). Figure 10.6 shows a cut of a sealed roller bearing cone.
10.1.1.3
Cutting Cones
Page 105
Steel (Milled) Teeth Bits In steel teeth cones, the teeth are machined in the
cone and normally receive heat and surface treatment. These bits are very robust and tolerate severe drilling conditions but wear out relatively quickly. From
this reason they are not well suited for deeper wells where tripping constitutes a
large time factor. A typical milled teeth bit is shown in the left side of Figure 10.1.
Large teeth are designed for soft to medium hard formations. Steel teeth
bits for hard formations have smaller and more robust teeth (shorter, and wider
base). The teeth are distributed circularly in the cones in an intermeshing fashion but without interference. This promotes a better teeth cleaning action.
Tungsten Carbide Inserts Bits Tungsten carbide, WC or W2C, is a chemical compound containing tungsten and carbon. Tungsten carbide insert is a
powder metallurgy technology in ne powder of tungstan carbide cristal are cemented together using tough cobalt as agglutinant in a process called sintering.
Tungsten carbide insert bits designed to drill soft formations have large and
chisel shaped chips, and those designed to drill hard formations have small and
round shaped inserts. Inserts are mounted in the steel cones by pressing the
compacts in precisely bored holes on the cone surface.
These bits do not tolerate shock loadings but they can drill long sections
before being worn out. In general, insert bits of the same bit size are more
expensive than milled tooth bits.
Coating the inserts with a thin layer (about 5 m) of titanium carbide made
by chemical vapour deposition (CVD) process may improved the lifetime of tools
CHAPTER 10
Drilling Bits
Page 106
Cone Geometry
The cone geometry affects the selectivity and action of the bit. Three parameters are important in the cone geometry:
1. cone angle (or angles),
2. offset angle,
3. offset distance.
The shape of the cone is determined by one or more angles (normally two).
The cone angles and the pin angle will dene the crown prole of the bit.
The pin angle (relative to hole bottom) is reduced for softer bits and increased for harder bits. This alters the cone prole which in turn affects tooth
action on the hole bottom and gage cutter action on the wall of the hole. Softer
bits have more highly proled cones than harder bits. This increases the scraping action of both bottomhole and gage teeth. The scraping action is benecial
for drilling soft formations but it will result in accelerated tooth and gage wear if
the formation is abrasive. Scraping action is minimized on hard formation bits
where strength and abrasion resistance are emphasized in the design. (See
Figure 10.7.)
The bit prole also affects the direction tendency of the bit (to cut straight for
straight drilling, or for direction changes in directional drilling). Concave crown
proles tend to keep the drilling straight, and more atten crown proles favor
to direction change (some other important drilling parameters like bit tilt and
lateral force dene the actual tendency of the bit).
During operation, the cones are subjected to two rotations. One about its
own axis, and one due to the rotation of the cone axis itself about the axis of
CHAPTER 10
Drilling Bits
Page 107
10.1.2
Bits used for air drilling have special design. In particular, air drilling is appropriated for hard to very hard formations. Therefore, these bits have zero cone
offset, small and round tungsten carbide inserts and nonsealed bearings. A
system of channels conducts part of the drilling gas (air, N2 , or natural gas),
through the bearings. In addition to cool the moving parts, the owing gas
keeps the bearings clean from small abrasive particles. A screen in the entrance of the channels lters the gas from large particles, which could damage
the bearings. Figure 10.9 shows a cut of an air drilling bit.
10.1.3
Drag bits have an integral cutting element and no moving parts. In the beginning of the drilling industry, the bits were all of the drag type, with cutters (or
blades) made out of hardened steel. Drag bits cut the formations plowing the
rock by the blades under the action of axial force and rotation. It is the same
mechanism used in drill bits to bore holes in metal and masonry. The fact that
drag bits have no moving parts reduces the possibility of leaving junks in the
borehole.
CHAPTER 10
Drilling Bits
Page 108
(a)
(b)
Steel drag bits works well in soft formations, but wear rate increases rapidly in
medium and hard formations, making them inappropriate for deep drilling. With
the advent of the roller cone bits early last century, the steel blade drag bits becomes obsolete and drag bits, in general, were banned from the drilling industry
(except diamond drag bits for hard and abrasive formations and for coring operations) until recently with the introduction of PDC bits. (See Figure 10.10).
10.1.3.2
Diamond Bits
Until early 70s, diamond bits were used exclusively in hard and abrasive formations and for coring. They take advantage of the properties of the (natural)
diamonds like extreme hardness, compressive strength, and thermal conductivity. Nowadays, however, with the advance of the manufacturing technology,
diamond bits have been designed and made to drill also medium hard formations.
The body of diamond bits is made from sintering powdered tungsten carbide
using copper or cobalt as agglutinating agent. A graphite cast with diamonds
suitably distributed on the internal surface is lled with powdered tungsten carbide. A hollow rod is positioned centered with the cast creating the way for the
drilling uid. The cast is put in a high temperature (1050 C to 1170 C) and the
molten agglutinant inltrates under pressure in the pores of the powder. After
the brazing process, a larger rod is welded to the previous one and the pin is
lathed.
When properly operated (right formation and right drilling parameters), only
CHAPTER 10
Drilling Bits
Page 109
CHAPTER 10
Drilling Bits
Page 1010
Page 1011
turers indicate that the ideal hydraulic parameters should be 2.0 to 2.5 hp/in2
and pressure drop between 500 to 1000 psi across the face of the bit to properly cool and clean the diamonds. Since the pressure drop depends on the
area open to ow, which in turns depends of the groves distribution and the
distance of the bit body to the formation (and therefore on the weight on the
bit and formation hardness), the pressure drop is determined by the difference
between the pressure when the bit is off the bottom and when weight is applied
to the bit. The hydraulic pressure is determined using Equation (10.1)
Pb =
pb q
,
1714.29
(10.1)
where pb is the pressure increase when the bit is forced against the formation.
Manufacturers provide tables with the estimate required ow rate and pressure
drop for different bit models and formations.
Example 41: A 81 /2 in diamond bit is used to drill a hard formation at 9000 ft.
The ow rate required to suitably carrying the cuttings is 400 gpm. How should
the driller apply the weight on the bit.
Solution:
Using the criterion of 2 to 2.5 hp/in2, the power developed at the bit must be
in the following range:
8.52 = 113.4 hp
4
pmin =
1714.29 113.4 hp
= 486 psi
400 gpm
pmax =
1714.29 1141.9 hp
= 608 psi
400 gpm
Assuming that a minimum of 500 psi is required to properly cool and clean the
diamonds, the driller should apply weight so that the pump pressure increase
remains between 500 psi and 608 psi.
10.1.3.3
PDC Bits
Since late 70s, bits using articial diamonds, called Polycrystalline Diamond
Compact (PDC), have been used with increasing success in the drilling industry.
CHAPTER 10
Drilling Bits
Page 1012
Page 1013
Figure 10.16: Back rake and side rake angles in PDC bits.
CHAPTER 10
Drilling Bits
Page 1014
10.2
Bit Classication
CHAPTER 10
Drilling Bits
Page 1015
Page 1016
Additional Feature
Description
Air Application
Identies a bit specically for applications with air as the drilling uid.
Center Jet
Larger diameter bits are sometimes equipped with center jets (Fig.
5) to provide a more uniform distribution of ow and hydraulic energy
beneath the bit. Almost all extended nozzle bits have center jets to
provide a benecial toothcleaning action that might otherwise be
lost by concentrating all of the hydraulic energy on the bottomhole.
Some manufacturers use diffusertype center jets while others use
standard rock bit jet nozzles. The pressure drop through these two
types of jets is different and should be taken into consideration when
doing hydraulic calculations for bits equipped with center jets.
Deviation Control
Extended Jets
Extended jets (nozzles) are used mainly on soft formation bits for
improved bottomhole cuttings removal. Higher jet impact energy is
delivered to the hole bottom by extended jets. Extended jets (Fig.
6) are generally available on bits larger than 9.5 inches. Miniature
extended jets are not included in the E designation.
Gage/Body Protection
Horizontal/Steering Application
Jet Deection
These bits are used for making trajectory changes where the formations are soft enough to be uid-eroded. Such bits usually contain two
standard jet nozzles and one large jet nozzle and can be oriented to
preferentially excavate the hole in a desired direction (Fig. 8).
Lug pads
Steel pads with tungsten carbide inserts applied to the bit body.
These pads generally are very close to gage diameter (Fig. 9).
Motor Application
Reinforced welds
Two-Cone Bits
Two-cone bits are relatively uncommon but sometimes utilized for obtaining an acceptable combination of deviation control and penetration rate
CHAPTER 10
Drilling Bits
Page 1017
(2) 437X a soft formation, sealed friction bearing insert bit, with gage protection and chiselshaped teeth.
10.2.1
Four characters are used in a prescribed order to indicate seven xed cutter
bit design features: cutter type, body material, bit prole, uid discharge, ow
distribution, cutter size, and cutter density. These design traits were selected
as being most descriptive of xed cutter bit appearance.
The fourcharacter bit code is entered on an IADCAPI Daily Drilling Report Form as shown in Fig. 2. The space requirements are consistent with the
fourcharacter IADC roller bit classication code. The two codes are readily
distinguished from one another by the convention that diamond bit code begin
with a letter, while roller bit codes begin with a number. Each of the four characters in the IADC xed cutter bit classication code are further described as
follows:
First Character Cutter Type and Body Material: The rst character of
the xed cutter classication code describes the primary cutter type and body
material (Fig. 1). Five letters are presently dened:
D natural diamond/matrix body,
M PDC/ matrix body,
S PDC/steel body,
T TSP/matrix body,
0 other.
The term PDC is dened as polycrystalline diamond compact . The term
TSP is dened as thermally stable polycrystalline diamond . TSP material
are composed of manmade polycrystalline diamond which has the thermal
stability of natural diamond. This is accomplished through the removal of trace
impurities and in some cases the lling of lattice structure pore spaces with a
material of compatible thermal expansion coefcient. The distinction of primary
cutter types is made because xed cutter bits often contain a variety of diamond
materials. Typically one type of diamond is used as the primary cutting element
while another type is used as backup material.
Second Character Prole: The numbers 1 through 9 in the second character of the xed cutter classication code refer to the bits longitudinalsectional
prole (Fig. 3). The term prole is used here to describe the longitudinal
section of the cutter/bottomhole pattern. This distinction is made because the
CHAPTER 10
Drilling Bits
Page 1018
High
C > D/4
1
4
7
C Cone height
Medium
D/4 C D/8
2
5
8
Low
D/8 > C
3
6
9
cutter/bottomhole prole is not necessarily identical to the bit body prole. Nine
basic proles are dened by arranging two prole parameters outer taper
(gage height) and inner concavity (cone height) in a 3 x 3 matrix (see Table 10.2). The rows and columns of the matrix are assigned high, medium, and
low values for each parameter. Gage height systematically decreases from top
to bottom. Cone height systematically decreases from left to right. Each prole
is assigned a number. The ranges are based on the bit diameter D.
Third Character Hydraulic Design: The numbers 1 through 9 in the third
character of the xed cutter classication code refer to the hydraulic design
of the bit. The hydraulic design is described by two components: the type of
uid outlet and the ow distribution. A 3 x 3 matrix of orice types and ow
distributions denes 9 numeric hydraulic design codes (see Table 10.3. The
orice type varies from changeable jets to xed ports to open throat from left
to right in the matrix. The ow distribution varies from bladed to ribbed to open
face from top to bottom. There is usually a close correlation between the ow
distribution and the cutter arrangement.
Table 10.3: Range for IADC bit hydraulic design.
changeable jets xed ports open throat
bladed
1
2
3
ribbed
4
5
6
open face
5
8
9
The IADC has not explicitly dened the difference between the three ow
distribution categories but working denitions are offered as follows. The term
bladed refers to raised, continuous ow restrictors with a standoff distance from
the bit body of more than 1.0 inch. In most cases cutters are afxed to the
blades so that the cutter arrangement may also be described as bladed. The
term ribbed refers to raised continuous ow restrictors with a standoff distance
from the bit body of 1.0 inch or less. Cutters are usually afxed to most of the
ribs so that the cutter arrangement may also be described as ribbed. The term
open face refers to non-restricted ow arrangements. Open face ow designs
generally have a more even distribution of cutters over the bit face than with
bladed or ribbed designs.
A special case is dened: the numbers 6 and 9 describe the crowfoot/water
CHAPTER 10
Drilling Bits
Page 1019
course design of most natural diamond and many TSP bits. Such designs are
further described as having either radial ow, crossow (feeder/collector), or
other hydraulics. Thus, the letters R (radial ow), X (crossow), or O (other) are
used as the hydraulic design code for such bits.
Cutter Size and Placement Density The numbers 1 through 9 and 0 in the
4th character of the xed cutter classication code refer to the cutter size and
placement density on the bit. A 3 x 3 matrix of cutter sizes and placement
densities denes 9 numeric codes (see Table 10.4.
Table 10.4: Range for IADC cutter size and density.
Density
light medium heavy
large
1
2
3
medium
4
5
6
small
5
8
9
The placement density varies from light to medium to heavy from left to right
in the matrix. The cutter size varies from large to medium to small from top to
bottom. The ultimate combination of small cutters set in a high density pattern
is the impregnated bit, designated by the number 0.
10.3
Since a well is drilled only once and each well penetrated the formations at
different locations with different drilling parameters, a selection of a best bit
can not be performed. The next best way to nd an optimum bit is to compare
bit performances of drilling bits when they were run under similar conditions.
Then a costperfoot value of each bit application can be calculated. Along with
this criteria, the individual bit wear are evaluated. This knowledge is applied to
the well to be drilled (length, inclination, drillability, abrasiveness, etc of the
different sections).
In practice, when the well is planned, bits that have been used previously
in this area (by this drilling team) are evaluated according to their applicability.
Sometimes when a bit manufacturer has developed a new bit, it is introduced to
the industry with an expected minimum performance. Thus, when such a new
bit is applied and the proposed performance is met (usually better than ones
of already applied bits), the operator has increased the pool of possible bits to
use for future wells. In case the performance proposed by the manufacturer is
not met, agreements that the bit is given at reduced cost to the operator are
common.
Another way of bit evaluation is the determination of the specic energy
CHAPTER 10
Drilling Bits
Page 1020
2N T
W OB
+
,
Ah
Ah ROP
(10.2)
10.3.1
Tooth Wear
With tooth wear, the reduction of tooth height is graded after a bit was run. The
grading is reported in nearest eighth, thus a bit whose teeth are worn out to half
of its original height, is reported as T4. Normally the tooth wear of a bit is not
even distributed over the bit, some teeth are worn more than others, some are
broken out. Broken teeth are generally remarked as BT. The reported wear is
an average one based on the most severely worn teeth. Reporting of the tooth
wear is possible when the teeth are measured before and after the bit was run.
In general, tooth wear has no direct relationship with the drilling rate realizable.
For insert bits, tooth wear occurs, due to the hardness of the teeth, as breaking
or losing of them. Thus a T-4 graded insert bit may have half of its teeth broken
or lost. A diagram of tooth wear for milled bits is shown in Figure 10.18.
10.3.2
Bearing Wear
Evaluation of bearing wear in the eld is difcult since the bit would need to
be disassembled for inspection. Thus it is mainly determined if the bearings
are intact or failed. Failed bearings is the situation that the cones are stuck
(no rotation possible), or that they are worn out and the bearings are exposed.
The classication is similar to the tooth wear, using a B instead of T. Thus a bit
which bearings are worn to 7 is marked as B7.
CHAPTER 10
Drilling Bits
Page 1021
Often the bearing wear is reported based on the total bit running hours.
Thus, when a bit is expected to have a rotation time of 40 hours and was rotating
on bottom for 10 hours, the bearing wear is reported as B-2.
10.3.3
Gage Wear
When the gauge diameter of a bit is worn, the drilled hole will be undergage
(and tapered) with may lead to damage of the next bit and stuck pipe.
Measurement of the gauge wear is performed with the help of a calliper and
a ruler. The loss of diameter in eighth of inches is reported, denoting with the
letter O for out of gage. In this way, a bit which diameter is reduced by 0.5 in
is reported as GO4 . When the bit is in gauge, it is reported using the letter I.
In addition to the wear gradings listed above, the bit record commonly includes
a column of comments. Here the bit conditions are commonly remarked.
10.4
Although throughout the text various aspects that inuence the ROP are mentioned whenever appropriate, the following considerations are often applied to
determine the recommended drilling parameters.
10.4.1
Bit Type
The type of bit used to drill a certain formation has a large impact on the
achieved penetration rate. Roller cutting bits with long teeth exhibit commonly
the highest penetration rates but they are only applicable at soft formations. At
hard formations where PDC bits dominate, the realized ROP is mainly a function of size and amount of cutters, along with an optimum combination of drilling
parameters.
10.4.2
Formation Characteristics
The most important formation properties that determine the penetration rate
are the elastic limit and the ultimate rock strength. The strength of a formation
is usually estimated using the Mohr failure criteria.
When drilling is initiated, a threshold force or bit weight
W
db
has to be
t
overcome. This threshold force can be found when plotting drilling rates as a
function of bit weight per diameter and then extrapolated to zero drilling rate. A
correlation between threshold and shear strength is shown in Figure 10.19.
CHAPTER 10
Drilling Bits
Page 1022
10.4.3
Among the various drilling uid properties, the following are identied as inuencing the penetration rate:
[(a)]
1. drilling uid density,
2. rheological ow properties,
3. ltration characteristics,
4. solids content and distribution,
CHAPTER 10
Drilling Bits
Page 1023
R
= m (pbh pf ) ,
R0
Page 1024
10.4.4
Operating Conditions
The effects of changes in the operating conditions, namely WOB and rotary
speed, are shown in Figure 10.23.
Ideally, the ROP should increase linearly with the WOB (for a xed rotary
speed), as shown in the segment abc in the graph . However, eld tests show
that above a given value the response departs from the linear behavior, and an
increase in WOB does not correspond to the expected increase in ROP, as in
the segment cd. In situations as in the segment de, the rate of penetration
may even reduce. This behavior is called oundering. Two factors contribute
to the oundering behavior. One is the reduction of hole cleaning capacity due
to the increase of ROP (assumed the hydraulics is kept constant). The second
is the complete imbedding of the cutters (teeth or inserts) into the formation.
It is important, therefore to nd the onset of the oundering region. Drillers
conduct a variety of tests to optimize performance. The most common is the
drill rate test, which consists of simply experimenting with various WOB and
CHAPTER 10
Drilling Bits
Page 1025
(a)
(b)
Figure 10.23: Effect of WOB (a) and rotary speed (b) in the ROP.
RPM settings and observing the results. The parameters are then used that
resulted in the highest ROP. In some sense, all optimization schemes use a
similar comparative process. That is, they seek to identify the parameters that
yield the best results relative to other settings. Another scheme is the drilloff.
In the drilloff test, the driller applies a high WOB and locks the brake to prevent the top of the string from advancing while continuing to circulate and rotate
the string. As the bit drilled ahead, the string elongated and the WOB declined.
ROP was calculated from the change in the rate of drill string elongation as the
weight declined. The point at which the ROP stops responding linearly with
increasing WOB is dened as the ounder point. This is taken to be the optimum WOB. This process has enhanced performance, but does not provide an
objective assessment of the true potential drill rate, only the ounder point of
the current system.
CHAPTER 10
Drilling Bits
Page 1026
10.4.4.1
Bit Wear
As the bit is worn during drilling, the penetration rate decreases. This reduction
of ROP is generally less severe for insert bits as for milled tooth bits.
10.4.4.2
Bit Hydraulics
Practice has shown that effective bit hydraulics can improve the penetration
rate dramatically. The enhanced jetting action promotes a better cleaning of
the teeth as well as the bottom of the hole. To improve the cleaning capacity
of the bit extended nozzles are often used where the discharging nozzle ends
are closer to the hole bottom. Extended nozzles usually requires the use of a
4th central nozzle, to guarantee a suitable cleaning of the cones, particularly in
gummy formations
As discussed in well hydraulics, maximum hydraulic horsepower and maximum jet impact force are the most used criteria to optimize hydraulics. When
a low WOB is applied and drilling rates are low, the required hydraulics for efcient hole cleaning is small. When the WOB is increased and the well is drilled
faster, efcient hydraulic programs have to be followed to realize the higher
penetration rates.
CHAPTER 10
Drilling Bits
Page 1027
CHAPTER
Drilling Bits
Page 28
Appendix A
Drill Pipe Dimensions (as in API
RP7C)
CHAPTER A
Drill Pipe Dimensions
Page A1
(2)
Nominal Weight
Threads and
Couplings,
lb/ft
4.85
6.65
(3)
(4)
(5)
ID
in.
d
1.995
1.815
(6)
Section Area
Body of Pipe
sq. in.
A
1.3042
1.8429
(7)
Polar Sectional
Modulus
cu. in.
Z
1.321
1.733
Plain end
Weight
lb/ft
4.43
6.26
Wall
Thickness
in.
0.190
0.280
27
8
6.85
10.40
6.16
9.72
0.217
0.362
2.441
2.151
1.8120
2.8579
2.241
3.204
31
2
9.50
13.30
15.50
8.81
12.31
14.63
0.254
0.368
0.449
2.992
2.764
2.602
2.5902
3.6209
4.3037
3.923
5.144
5.847
11.85
14.00
15.70
10.46
12.93
14.69
0.262
0.330
0.380
3.476
3.340
3.240
3.0767
3.8048
4.3216
5.400
6.458
7.157
41
2
13.75
16.60
20.00
22.82
12.24
14.98
18.69
21.36
0.271
0.337
0.430
0.500
3.958
3.826
3.640
3.500
3.6004
4.4074
5.4981
6.2832
7.184
8.543
10.232
11.345
16.25
19.50
25.60
14.87
17.93
24.03
0.296
0.362
0.500
4.408
4.276
4.000
4.3743
5.2746
7.0686
9.718
11.415
14.491
51
2
19.20
21.90
24.70
16.87
19.81
22.54
0.304
0.361
0.415
4.892
4.778
4.670
4.9624
5.8282
6.6296
12.221
14.062
15.688
65
8
25.20
27.70
22.19
24.22
0.330
0.362
5.965
5.901
6.5262
7.1227
19.572
21.156
23
8
CHAPTER A
Drill Pipe Dimensions
Page A2
Table A.2: New Drill Pipe Torsional and Tensile Data. Courtesy API
CHAPTER A
Drill Pipe Dimensions
Page A3
Table A.3: New Drill Pipe Collapse and Internal Pressure Data. Courtesy API
CHAPTER A
Drill Pipe Dimensions
Page A4
Table A.4: Premium Drill Pipe Torsional and Tensile Data. Courtesy API
CHAPTER A
Drill Pipe Dimensions
Page A5
Table A.5: Premium Drill Pipe Collapse and Internal Pressure Data. Courtesy
API
CHAPTER A
Drill Pipe Dimensions
Page A6