the year in Infrastructure
Bentleys mission is to provide innovative software and services for the enterprises and professionals who design, build, and operate the worlds infrastructure sustaining the global economy and environment for improved quality of life.
The Year in Infrastructure 2012 is a Bentley Systems, Incorporated publication that showcases the extraordinary work of Bentley users sustaining the worlds infrastructure. For additional print copies, go to www.bentley.com/2012yearbook. For information about how to enter your innovative project for consideration in the next Be Inspired Awards competition or for additional information about this program, visit www.bentley.com/beinspired. onlIne VerSIonS digital versions of Be Inspired Awards publications are available online at www.bentley.com/yearininfrastructure. choose to view a specific issue or search within each issue or across all issues using terms, titles, or keywords. also browse Bentleys Be Inspired project portfolios at www.bentley.com/projects, which feature the winners and finalists in Bentleys annual Be Inspired Awards competition. through these multimedia portfolios of exemplary project achievements, Bentley shares innovative best practices with the architects, engineers, constructors, geospatial professionals, and owneroperators who sustain the worlds infrastructure.
ISBn number: 978-1-934493-19-9. published by Bentley Systems, Incorporated 685 Stockton drive exton, pa 19341 USa www.bentley.com
More than ever, architects, engineers, constructors, and owner-operators are working smarter, together, as advances in information mobility empower information reuse and streamlined collaboration that benefit all project stakeholders and facilitate the creation of sustainable, inspiring infrastructure!
2012 Bentley Systems, Incorporated. The Year in Infrastructure 2012 is published by Bentley Systems, Incorporated, 685 Stockton drive, exton, pa USa 19341. Bentley, the B logo, Bentley, Be, Bentley learn, Bentley map, Bentley plantSpace, Bentley plantWise, Bentley Select, autopIpe, autoplant, cloudWorx, conSpan, culvertmaster, eB, Flowmaster, Generativecomponents, GeopaK, Geo Web publisher, gInt, Hammer, Hevacomp, Inroads, InspectTech, LEAP, MicroStation, MicroStation PowerDraft,, MicroStation PowerDraft, MX, MXRAIL, MXROAD, Optram, PlantWave, PlantWise, Pointools, PondPack, PowerCivil, ProConcrete, ProjectWise, promise, ProSteel, RAM, SacS, Select, Sewercad, SewerGemS, speedikon,Staad, Staad.pro, Stormcad, Watercad, and WaterGemS are either registered or unregistered trademarks or service marks of Bentley Systems, Incorporated, or one of its direct or indirect wholly owned subsidiaries. Google earth is a trademark of Google Inc. adobe is a registered trademark of adobe Systems Incorporated in the United States and/or other countries. oracle is a registered trademark of oracle and/or its affiliates. microsoft is a registered trademark of microsoft corporation in the United States and/or other countries. other brands and product names are trademarks of their respective owners.
Table of Contents
About the 2012 Be Inspired Awards About the 2012 Be Inspired Awards Jurors Special Recognition Award Winners
Sustaining Our Society Sustaining Our Environment Sustaining the Professions Attaining Return on Innovation Advancing Information Mobility Innovation in Asset Performance Management Bentley Developer Network Educator of the Year
3 48 9 17 10 11 12 13 14 15 16 17 19 190 19 27 29 32 33 41 43 58 59 62 63 72 73 77 79 81 83 88 89 93 95 102 103 110 111 119 121 128 129 134 135 148 149 166 167 172 173 176 177 190
Index
2012 BE Inspired Awards
Daniel J. Belcher, P.E., P.S. Design Services Manager, Michigan Department of Transportation
Dan Belcher is design services manager for the Michigan Department of Transportation and a licensed civil engineer and land surveyor in the state of Michigan. His 23 years in consulting and state service spans construction inspection, surveying, photogrammetry, and environmental and civil engineering with an emphasis in information technology.
Shunji Kusayanagi, Professor, Dr. Eng. Professor, Kochi University of Technology, Japan
Dr. Shunji Kusayanagi is a professor who specializes in international construction project management at Kochi University of Technology, Japan. He provides technical and educational lectures on international construction management, estimating, cost control, scheduling, productivity analysis, quality control, and quantitative analysis in contract administration for groups of engineers working in the construction field. Dr. Kusayanagi is a civil engineer with over 36 years of experience as construction and consulting engineer on domestic and international projects.
Marc Thomas is the owner of the United Kingdom-based CAD and BIM consultancy Isisst Project Technology. A chartered architect with over 28 years of experience in the building industry, he has been working as a specialist consultant since 2008. Thomas has been involved with CAD and IT since the early 1990s and regularly writes on these topics for AEC Magazine and Building Design. Previously he spent 17 years at Architects Design Partnership, where he transitioned from his architectural role to develop the firms CAD capabilities from modest beginnings into an integrated nationwide ICT system.
Joseph Young Editorial Director and Publisher, O Empreiteiro and Minrios & Minerales
Born in China, Joseph Young is the editorial director and publisher of O Empreiteiro, a trade magazine dedicated to infrastructure and construction in Brazil for 50 years, and Minrios & Minerales, a trade magazine dedicated to the mining industry in Brazil for 35 years. O Empreiteiro publishes yearly research on the 500 largest construction and engineering companies in Brazil, and Minrios & Minerales conducts an annual review of the 200 largest mines in Brazil. Young has extensive knowledge of the infrastructure, construction, mining, and metals industries in Brazil, Europe, and the United States; equipment industries and technology; infrastructure design; and construction processes.
Sharifah Zaida-Nurlisha General Manager of Project Management Services, MMC Oil and Gas Engineering Sdn Bhd
Sharifah Zaida-Nurlisha began her career as an instrument engineer before moving on to project management at MMC Oil and Gas Engineering. She has been involved in the oil and gas industry for 22 years in design positions ranging from conceptual, detailed, and construction to hookup and commissioning of onshore and offshore oil and gas facilities. Zaida-Nurlisha received her bachelors of electrical and electronics and an M.B.A. from Nottingham University, England.
The award in this category is given to a project that best demonstrates the power of infrastructure to benefit society by accomplishing one or all of the following: improving quality of life, promoting economic development, and providing responsiveness and resilience to natural disasters or climate change.
The award in this category is given to a project that excels in meeting the challenge of preserving the environment as it addresses the needs of mankind through infrastructure. Technology is a key element in how infrastructure can help reduce our ecological footprint, increase bio-capacity, and embody a wise use of non-renewable resources.
This award recognizes organizations that demonstrate a commitment to sustain the infrastructure professions through continuous learning, professional development, and mentoring the next generation of infrastructure professionals, while providing an exceptional environment for learning.
The award is given to an organization that best exemplifies innovation by utilizing technology and creative workflows to create value and deliver better-performing infrastructure with demonstrated, quantifiable results.
The ultimate goal of interoperability is to enable information mobility. The award for this category is given to a project that best illustrates the innovative reuse of engineering information throughout the design and construction of a project, and provides the ability to deliver a digital asset for use in ongoing operations.
The award recognizes a project that optimizes infrastructure asset performance to make operations and maintenance more efficient, to improve safety, and to increase throughput of the asset over its lifecycle.
The award for this category is given to an organization that leverages the power of Bentleys platform technology to develop unique and innovative custom applications.
Bentley Systems, Incorporated
An educator of the year demonstrates achievements that stand out above those of his or her peers. In addition, he or she brings a passion for inspiring students to not only participate in science and engineering fields, but also sets the expectations for them to excel in their chosen profession, all while interlacing cutting-edge technologies and theories that ultimately enhance and sustain infrastructure.
WINNER
FINALIST
Company Name Project Name
Location
A vital addition to Brisbanes road network, this project provides a critical new link between the citys northern suburbs and two of southeast Queenslands most important economic centers. It encompasses two tunnels and a new airport connection: 6.7 kilometers of the mainly underground Airport Link toll road, the Windsor to Kedron section of the Northern Busway, and an upgraded interchange improving access to the Brisbane Airport precinct.
2012 BE Inspired Awards
Parsons Brinckerhoff and Arup teamed in 2006 to form Parsons Brinckerhoff and Arup JV, which delivered the detailed design and carried out construction phase services for this AUD 5.6 billion project. Bentley software was used for the design (MicroStation, MXROAD, InRoads, Structural Modeler, and gINT) and project collaboration document control (ProjectWise), all of which proved critical to the integration of the geographically dispersed project team.
Leading-edge on many levels, the Airport Link project has delivered an economic and social legacy for the broader Brisbane community. It has literally redefined the urban fabric of the city through an innovative and inspired design. The Airport Link project took an approach that strongly recognized that communities and clients increasingly expect urban-design excellence to be a key feature of major infrastructure projects.
10
WINNER
VIEW PRESENTATION
The Northern Treatment Plant in Denver, Colo., will bring new wastewater treatment capacity to the Metro Wastewater Reclamation District as it continues to meet the rising demands of its customers now and into the future. Designed with keen awareness of the environmental impact, the new plant will set the standard for both local and regional treatment by taking advantage of the latest proven technologies across every aspect of its design.
To ensure consistent data definition across the over 20 facilities on site, CH2M HILL utilized intelligent modeling tools including MicroStation, ProjectWise, Bentley Navigator, Bentley PlantSpace, OpenPlant, InRoads, and Bentley Raceway and Cable Management that were configured to meet the building information modeling goals as agreed to by the client.
The primary focus of this USD 475 million project is to return treated water back into the environment. Sustainability is at the heart of the process as treated output is re-integrated to preserve and enhance what remains of the planets water resources. The energy required for the treatment process is also carefully planned and optimized to reduce the carbon footprint of the overall project throughout its lifecycle.
11
WINNER
FINALIST
Company Name Project Name
Location
Established in 1949, HydroChina Zhongnan employs more than 3,700 people across three continents. Serving clients around the world, the company has won numerous industry awards and is recognized as one of the top five design institutes in China for hydropower and wind power design. The companys core values of teamwork, integrity, innovation, and efficiency have enabled the organization to deliver exceptional results to its clients.
Corporate goals include training existing staff; attracting and retaining new talent; teaching staff how to better compete in the global market; and fostering a proactive culture in which colleagues take the initiative to further educate themselves. Senior management has made it compulsory for each unit to have at least 40 percent of its staff attend 40 hours of job-related technical training each year.
As a result of the training initiative, commitment by senior management to invest in learning has resulted in a total of 593 colleagues being trained in basic 3D design using MicroStation in a two-month period in 2011. In 2012, more than 900 colleagues will receive Bentley application-related training through the Bentley LEARN training subscription. Applying incremental learning has improved the quality of their deliverables while also reducing cost.
12
WINNER
VIEW PRESENTATION
Pacific Gas and Electrics Substation Engineering Services department is responsible for over 1,000 substations throughout its service territory, which spans two-thirds of California. Using traditional CADD methods required not only limited resources devoting significant hours to substation design, but it also had the potential to generate errors that ultimately led to costly rework in the field.
Using Bentley Substation allowed the team to utilize 3D symbols with an integrated database to link and track all components of the project design. The company expects to gain over 40 percent efficiency on its physical arrangement designs by using 3D symbols and automatic project documentation. It also foresees a gain of over 40 percent efficiency on schematics by using intelligent and integrated designs.
Projected annual savings based on 120 internal projects is USD 1.9 million on physical arrangements and USD 2.8 million on schematics. By gaining accuracy and efficiency on engineering drawings, the expected construction savings could average 40 man-hours per project, or USD 1 million annually. Total projected annual savings is projected to be USD 5.7 million. Taking the learning curve into consideration, this project could have a return on investment in less than two years.
13
WINNER
FINALIST
Company Name Project Name
Location
Shaw Power Group executed an engineering, procurement, and construction project to design and construct a 585 megawatt circulating fluidized bed (CFB) greenfield electric power generation station near St. Paul, Va. The USD 1.5 billion project included a 650 megawatt steam turbine generator and two CFB boilers, associated infrastructure and equipment, and vendor-supplied systems.
With four major areas of work being performed by various design firms using different design systems, Shaw configured Bentley PlantSpace so the vendor models were superimposed as one. The success of the Bentley PlantSpace, i-models, and Bentley Navigator coordination has resulted in Bentley Navigator becoming the preferred means of accessing all 3D design information at construction sites regardless of which CADD design system has been used.
The project was completed interference free with no rework on site because interferences were resolved in the 3D models. Design reviews were conducted efficiently and ahead of schedule by using i-models to collaborate and share information, and man-hours were reduced on site due to readily available, accurate quantities and 3D model visualization. ConstructSim, AutoPIPE, and Structural Modeler were also utilized.
14
WINNER
VIEW PRESENTATION
The reasons for wind energys rise to prominence may be well known, but perhaps less well known is that wind energy now accounts for over one-third of all capital expenditure in power generation, second only to thermal (coal and gas-fired) plants. At this USD 30 million test site in the Netherlands, Ecofys was able to reduce costs and improve safety and efficiency of wind turbines through better management of project and asset information throughout the lifecycle.
The high-level project goal was to increase the scale and minimize the complexity of the wind turbines, reduce project and construction costs, and make operations and maintenance more efficient. Through the use of AssetWise configuration management technology from the nuclear industry reapplied to the wind energy industry for an offshore wind farm with 30x3 megawatt turbines, Ecofys estimates it will achieve cost savings of USD 4.3 million over a 20-year lifetime.
Ecofys first identified information sources and relationships from which it was possible to build an intelligent asset register and comprehensive data model, and then focused on replicating and streamlining workflows around administrative tasks such as permit-to-work requests and other health, safety, and environment issues. These procedures were modeled in AssetWise to provide efficient and tight control of the information.
15
WINNER
FINALIST
Company Name Project Name
Location
Because any error occurring in the upstream phase considerably affects construction in the downstream phase, Hitachi-GE Nuclear Energy developed a high-quality and reliable power plant construction system that provides consistent and coordinated project control throughout the engineering, procurement, and construction (EPC) lifecycle and improves quality and efficiency by closely managing and monitoring field work.
On this JPY 400 billion project Hitachi-GE Nuclear Energy utilized MicroStation to leverage the EPC integrated construction system, which has now been deployed in the field. It supports a design team distributed over multiple locations and accelerates information sharing and communications across project teams.
Bentley Developer Network members develop complementary applications exclusively for in-house customization, integration, and use on Bentley products. For this project, MicroStations versatility of support for various devices like mobile terminals, laptops, desktops, and largescreen devices and its information handling and visualization coordinates information through field construction from planning to execution and management.
16
WINNER
VIEW PRESENTATION
Dr. Guenter Maresch holds a doctorate in computeraided design and eLearning from the University of Salzburg, and a masters in geometry and math from the Technical University of Vienna. For 22 years, he has taught geometry and math at schools and universities for the information and communication technologies (ICT).
Students studying technology, engineering, architecture, and design as well as fields such as art, mining, and medicine require a knowledge of geometry. Dr. Maresch designed a new way of teaching geometry using professional CAD systems such as MicroStation, and tools including videos, podcasts, and presentations. His methods go beyond the 2D approach to teaching geometry using pencil and ruler to teach in three dimensions.
Curricula include eLearning and computer-aided design (ELCAD)/MicroStation for students and teachers. These curricula are being used in approximately 90 classes in schools, and have been presented to close to 600 students at university. According to external evaluations, students exposed to Dr. Mareschs innovative technique increase their spatial, geometrical, and logical intelligence up to six times faster than through traditional lessons.
17
18
19
WINNER
FINALIST
Company Name Project Name
Location
Saudi Electricity Company was established in 2000 with the merger of dozens of electricity producers throughout Saudi Arabia. At a cost of USD 2 million over 12 years, eight subprojects consolidated and standardized Saudi Electricitys information infrastructure in an enterprise-level engineering document management system (EDMS) based on ProjectWise.
ProjectWise enabled Saudi Electricity to support high availability, load balancing, distributed processing, and open standards, which allows integration with other enterprise systems. Nahil provided the software, implementation, training, support, and backlog conversion and migration of all technical documentation into the EDMS. Nahil is also the Bentley SELECT support partner providing kingdom-wide support.
20
VIEW PRESENTATION
FINALIST
The USD 2.1 billion RTD FasTracks Eagle P3 project is part of the Denver, Colo., Regional Transportation Districts (RTD) initiative to expand and improve public transit through three commuter lines, a maintenance facility, and 14 stations. As design lead, Fluor/HDR Global Design Consultants assembled a core team of 210 professionals supported by 300 auxiliary team members scattered across 77 offices in the United States, Europe, and Japan.
VIEW PRESENTATION
FINALIST
The USD 1.4 billion I-74 Mississippi River Crossing Corridor will connect Davenport, Iowa, and Moline, Ill. The project requires maintenance of traffic for 75,000 motorists while not only building new bridges, retaining walls, and ramps, but also demolishing old structures. Collaboration among the Iowa and Illinois Departments of Transportation, 10 consultants, and 10 state and local agencies was facilitated by a web-based portal for sharing project documents.
VIEW PRESENTATION
21
FINALIST
22
23
24
25
26
Robins & Morton Power & Industrial Carbo Ceramics Millen Proppant Facility
Millen, Georgia, United States
Robins & Morton formed the Power & Industrial Division in April 2011 to provide engineering, procurement, and construction services to the power and industrial markets. In July 2011, the division was awarded contracts for Carbo Ceramics proppant facility in Millen, Ga. To quickly deploy resources in two newly formed offices, ProjectWise was installed, configured, and running via the web by mid-August 2011. ProjectWise was selected to enable work sharing between multiple engineering and construction sites as well as to share information among offices, construction teams, suppliers, and clients. Using ProjectWise saved approximately three hours per drawing, resulting in significant savings on the projects 1,200 drawings. MicroStation, Bentley Navigator, and STAAD were also used on the project.
27
28
29
WINNER
FINALIST
Company Name Project Name
Location
Having successfully implemented eB Data Quality Manager to leverage asset information for its USD 2.8 billion Plant Ratcliffe project a 582 megawatt clean-coal facility with nearly 300,000 assets Southern Company is now deploying eB Data Quality Manager across its fleet of 70 fossil fuel units. The software ensures that complete and accurate asset information is delivered to the startup and commissioning, construction, and operations and maintenance departments.
2012 BE Inspired Awards
Southern Company spent USD 1.8 million over five years to implement the system, but in one year eB Data Quality Manager demonstrated a potential ROI of USD 200 million over 40 years of plant operation via automated document searches vendor data access, and turnover package assignments for Plant Ratcliffe. When it is deployed across its fleet, the company expects to realize a further ROI of USD 1.5 million for a 6,000 asset system over a 20-year system lifecycle.
30
VIEW PRESENTATION
FINALIST
The Ameren Callaway Energy Center generates electricity at the 1,190 megawatt nuclear unit power plant near Fulton, Mo. Planned outages for modifications and maintenance require the nuclear reactor to be shut down, costing nearly USD 1 million per day in lost revenue. With approximately 7,500 tasks outlined in roughly 3,000 work packages for a typical outage, it is essential to expedite the location and review of documentation to stay on schedule.
VIEW PRESENTATION
FINALIST
Crossrail will link London and South East England via twin 21 kilometer tunnels connecting surface sections and eight new stations. With more than 1 million assets to be recorded in the Crossrail Asset Information Management System (AIMS), the projects scope encompasses the transfer of all asset data created during design and construction through the information lifecycle into maintenance and operations.
VIEW PRESENTATION
31
FINALIST
I sleep easier because I dont have to remember all the details involved in this multistakeholder, multiaction project.
Nico Stolk, Site Manager, Test Site Lelystad, Ecofys Netherlands
32
Innovation in Bridges
Improved capabilities in bridge information modeling are helping to make the most challenging bridge projects a success. The projects in this category demonstrate how advanced technology can enhance problem solving at every stage of the project delivery process, from planning, design, and engineering to construction simulation and analysis.
33
INNOVATION IN BRIDGES
Company and Name Modjeski Masters, Inc. Project Name Huey P. Long Bridge Widening
Location New Orleans, Louisiana, United States
WINNER
FINALIST
Company Name Project Name
Location
The USD 1.2 billion Huey P. Long Bridge Widening project in New Orleans, La., will have three 11-foot lanes for both east and west bound traffic that feature eight-foot outside and twofoot inside shoulders. Previously, the bridge had two narrow, nine-foot lanes in each direction, along with two railroad tracks. New approaches and interchanges include continuous steel and prestressed girder spans with ramps connecting main line structures to the street level.
2012 BE Inspired Awards
LEAP CONSPAN was used to design the Type III, IV, and BT prestressed girders for these structures. For the curved approach to the west bank, girder lengths varied by span and within a span. The software permitted the beam and girder designs to be performed efficiently. The bridge design enabled highway, rail, and marine transportation to continue with minimal interruptions and delays.
34
VIEW PRESENTATION
INNOVATION IN BRIDGES
Armando Rito Engenharia SA
FINALIST
The April 4 Bridge connects the cities of Benguela and Lobito, Angola, replacing a one-lane steel bridge dating from the early 20th century. Now the Catumbela river crossing takes minutes instead of several hours. Located in the heart of Catumbela village, the EUR 26 million, cable-stayed bridge symbolizes freedom and the end of war to the people of Angola.
April 4 Bridge
Catumbela, Angola
Armando Rito Engenharia selected RM Bridge to conduct a tridimensional model analysis. The software helped define pylon geometry, design stay cables, and determine installation forces. The optimization module allowed for stress operations and time-dependent behavior. Innovations included a special saddle for the stays that reduced steel quantities and allowed for slimmer concrete masts.
VIEW PRESENTATION
FINALIST
The Pennsylvania Turnpike Commission replaced twin northbound and southbound bridges on I-476 over the Lehigh River and Pohopoco Creek with four new bridges. A dramatic increase in steel prices prompted the original curved-steel, long-span design to be set aside in favor of a less costly concrete alternative, which required complete structural redesign, a new geotechnical program, and environment permit amendments.
VIEW PRESENTATION
35
INNOVATION IN BRIDGES
Anhui Transport Consulting & Design Institute Co., Ltd. The Application of 3D Design Technology in Complex Bridge Design
Hefei City, China
The USD 45.23 million Zhaohe River Bridge is situated near Chaohu Lake, which is part of a scenic tourism area in Hefei, China. It was important that the bridge design reflect the art and culture of the nearby villages. Anhui Transport Consulting & Design Institute used 3D modeling technology to design the complex structure, consisting of a main bridge and approach span totaling 907 meters. The design was presented to reviewers in the context of area topography using MicroStations 3D modeling and visualization technology. The visualization combined the bridge model with a surface model, creating an accurate 3D representation. The artful design was unanimously approved. The 3D visualization facilitated cooperation among disciplines and saved approximately four weeks of design time, or USD 160,000.
36
INNOVATION IN BRIDGES
Finley Engineering Group, Inc. Palmetto Section 5, SR 826/836 Interchange Bridge 11 Precast Segmental
Miami, Florida, United States
New connections between SR 826 (Palmetto Expressway) and SR 836 (Dolphin Expressway) in Miami, Fla., include four segmental bridges costing USD 125 million. Finley Engineering Group reduced construction costs for Bridge 11 with innovative use of pier caps to support the balanced cantilever, which eliminated temporary falsework, and diabolos to allow variable tendon geometry and continuous external tendon ducts, which eliminated bent steel pipes. Finley designers used RM Bridge, MicroStation, and Bentley Rebar to generate segment and tendon geometries, reinforcing layouts, and integrated drawings. The software enabled the geometry for four segmental bridges to be evaluated within weeks, and segmental dimensions to be established early in the design stage. The firms design of the longest span (774 meters) eliminated two interior expansion joints, reducing labor and materials by 50 percent.
Guizhou Province Traffic Planning, Survey, and Design Institute Limited Application of RM Bridge V8i to the Longjiang River Super-large Bridge
Bijie City, China
The Longjiang River Bridge in Guizhou Province, China, extends from the mountainous region of Zhijin to the Nayong Expressway. To deliver the complex design for this USD 31.45 million structure, the Guizhou Province Traffic Planning, Survey and Design Institute (Bridge Design Institute) compiled and implemented guidelines for the design of a low-tower, cable-stayed bridge with plane curve and longitudinal cross slopes. The Bridge Design Institute adopted RM Bridge to perform 3D analysis of the structural system, including steel cable settings, structural supports, main beam stiffness, and static and dynamic forces. Compared to other software, RM Bridge reduced modeling time by 80 percent, achieved at least 95 percent precision, and reduced calculation time by more than 65 percent. As a result, approximately USD 410,000 was saved on this project.
37
INNOVATION IN BRIDGES
Iowa Department of Transportation New Bridge Inspection Software System
Des Moines, Iowa, United States
The Iowa Department of Transportation (DOT) needed an integrated bridge inspection and management system to serve as a one-stop location for data on 4,000 state-owned bridges and 21,000 locally owned bridges. The system had to allow data storage, search, and access for better decision making and resource allocation. With 830 people in 99 counties and 300 cities statewide, the DOT also needed to streamline workflows and minimize oversight. Iowa DOT selected InspectTech Collector and InspectTech Manager to provide a customizable solution. The DOTs inspection forms, electronic files, and 13 databases were integrated at one location, accessible via the web at any time. A field version runs on tablets and laptops for inspectors to generate complete reports. Iowa DOT estimates the system will save about USD 70,000 per year and has already realized a 25 percent boost in efficiency.
38
INNOVATION IN BRIDGES
PEDELTA Colombia S.A.S. Huasco Viaduct Bridge
Vallenar, Chile
The USD 13 million Huasco Viaduct replaced an obsolete bridge on Route 5 North in Vallenar, Chile. Located near the Atacama fault, the deep valley crossing had to meet strict seismic and geometric requirements. The solution was a 116-meter main span with 42-meter lateral spans and a 23.3-meter-wide single-cell deck. Use of a segmental continuous girder with variable depth optimized material usage. RM Bridge enabled PEDELTA to achieve low material ratios using hollow concrete piers on shallow foundations. The software allowed designers to consider all possible loads and conditions during each phase of development and estimate deformations, allowing fast and controlled construction using the cantilever method. Design was performed on time and under budget using RM Bridges optimization tools and built-in AASHTO LRFD specifications.
39
INNOVATION IN BRIDGES
PEDELTA Colombia S.A.S. The Triplet Bridges
La Paz, Bolivia
La Paz, the seat of government in Bolivia, commissioned the USD 14.3 million Triplet Bridges to connect the eastern and western parts of the city. Each bridge crosses a steep valley at 60 meters. PEDELTAs emblematic design featured three extradosed bridges with three spans each. Main spans ranged from 92.5113.5 meters and were partially suspended by a single plane of 28 stay cables, deviated at the two pylons by built-in saddles. With spans of over 100 meters, the project called for balanced cantilever construction and a stayed-cable supported deck. RM Bridge allowed PEDELTA to model all construction stages and easily adapt parameters throughout. Changes, such as widening from two to four lanes on deck, were introduced quickly with parametric data entry and rapid structural re-evaluation.
40
INNOVATION IN BRIDGES
Saanvi Infrastructure Pvt Ltd Hill Bypass Road Kharkhari to Motichur Station
Haridwar, India
The River Ganges enters the North Indian River Plain for the first time at Haridwar, a pilgrimage city and municipality in the Haridwar district of Uttarakhand, India. The USD 60 million Hill Bypass Bridge, with two carriageways and a footpath on either side, aims to reduce traffic congestion on road networks around the citys busy Kharkhari to Motichur train station. Saanvi Infrastructure designed the seven-span reinforced concrete, curved-arch bridge using STAAD.Pro for analysis of the structures complex geometry as required by IRC codes. The alignment is along the curve, with a 99.2 meter radius of curvature. STAAD.Pros element library allowed 3D modeling of the site conditions. The firm also used STAAD.Pro for analysis of approach viaducts connecting the existing road to the main bridge on one end.
It is not sufficient to just do things better. We need to do better things. Bentleys solutions make every engineers dream become reality.
P.V. Mayur, Director, Saanvi Infrastructure
41
42
Innovation in Building
Advanced technology aids in the delivery of high-quality buildings in terms of aesthetics, adherence to program, and meeting budget. It is also increasingly critical in areas of environmental sustainability, operational performance, and compliance with regulations and accreditations. Moreover, todays buildings must provide a clear return on investment. The projects in this category demonstrate excellence in designing, building, or operating one or more buildings.
43
INNOVATION IN BUILDING
Company Name John McAslan + Partners Project Name Kings Cross Station Redevelopment
LocationUnited Kingdom London,
WINNER
FINALIST
Company Name Project Name
Location
The GBP 547 million redevelopment of Kings Cross station will transform the historic rail station into a modern transport interchange and iconic gateway to London. Restoring the historic faade, vaulted train shed, and other features as well as interfacing with existing rail, underground rail, and road networks required ongoing verification of the design. John McAslan + Partners used MicroStation to produce an accurate 3D representation at all stages.
2012 BE Inspired Awards
The 3D representation of the western concourse roof which covers 7,500 square meters, rises 20 meters, and spans 150 meters allowed an international team to coordinate 16 steel tree-form columns that support the single-span structure amid a network of subway and service tunnels. The benefits of rapid file sharing and high-quality validated data extended from schematic design through to construction, producing time and cost savings.
44
VIEW PRESENTATION
INNOVATION IN BUILDING
Arthur Golding and Associates
FINALIST
Arthur Golding and Associates prepared a conceptual design for the new Helsinki (Finland) Central Library international design competition. Budgeted for EUR 69.9 million, the concept proposed a building within a building with a transparent/translucent outer skin that forms a veil independent of the library floors within. Technological innovations included a multistory climate wall and advanced structural system without perimeter columns, beams, or mullions.
VIEW PRESENTATION
FINALIST
The Giant Interactive Group headquarters in Shanghai, China, defies current trends toward vertical urban development with a compact campus on the outskirts of the city. Its integrated 3D design methodology achieved an organic approach to space for work, recreation, and socialization. The 3D models improved communication of the design intent and allowed simultaneous exploration of complex architectural spaces and coordination of building systems.
VIEW PRESENTATION
45
INNOVATION IN BUILDING
Aestudio Competition for New Trade Center
Scandiano, Italy
Aestudio entered the design competition for a new trade center in Scandiano, Italy. The EUR 9.2 million complex will be the first low-energy consumption complex in town. The buildings of the trade center will be low-lying and feature double-curved roofs to blend into the landscape near the Secchia River. The firm used MicroStation and Bentley Tas Simulator to model, simulate, and predict energy consumption, CO2 emissions, operating costs, and occupant comfort. Working with intelligent reference files saved significant time during the design stages.
46
INNOVATION IN BUILDING
Andrea Girotto Architetto Real Classic Mood Caf
Caserta, Italy
The new owner of a caf and bakery in Casertas Vanvitelli Square had high expectations for its dcor. The shop is located near the Royal Palace of Caserta, a UNESCO World Heritage Site and emblem of Baroque architecture in Italy. The project goal for Andrea Girotto Architetto was to create a classic mood for the caf. The firm used MicroStation to provide a realistic visualization of the design with ultra-detailed views in every frame and angle. Communicating through 3D renderings and 3D PDFs allowed real-time checking of furnishing components, colors, and textures. Changes took less time than expected, and the final 3D version became the working drawing for the manufacturer.
47
INNOVATION IN BUILDING
Bassani Edilizia S.p.A. Centro Residenziale Dogana
Ortonovo, Italy
Bassani Edilizia designed a EUR 2.5 million mixed-use development for a residential area in the municipality of Ortonovo, Italy. The project is comprised of a residential building, a commercial building, gardens, and parking. Goals for the complex included creation of comfortable living spaces, use of energysaving materials, and improvement of the environment and quality of life both indoors and outdoors. MicroStation was used for conceptual design and 3D modeling. The solution accelerated design while providing transparency and identifying priorities in design areas and elements. Efficiencies achieved using MicroStation enabled Bassani Edilizia to provide estimates within about two business weeks. Overall, MicroStation saved 10 percent of the design time and related costs.
48
INNOVATION IN BUILDING
Building Studio Architects The Lantern
Melbourne, Australia
Located at the gateway to the Melbourne Docklands in Victoria, Australia, this project encompasses a 9,884-square-meter commercial new-build in the landmark Lantern building and 10,076 square meters of commercial refurbishment in the heritage-listed Goods Shed South. Building Studio Architects designed the AUD 45 million complex to achieve maximum lettable area and a five-star Green Star rating. Bentley Architecture was used from the projects inception for design, documentation, and visualization to ensure delivery of documentation ahead of the fast-track construction program. GenerativeComponents was used to design the facetted faade, which had variable panel geometry that required key node points along the building perimeter. The software also allowed the faade and heritage building roof to be accurately designed and detailed.
49
INNOVATION IN BUILDING
Ekofarma S.r.l. Furnishing of a Pharmacy
Rome, Italy
Ekofarma specializes in studying, designing, and manufacturing custom furnishings for pharmacies. S. Onofrio, a privately owned pharmacy in Rome, Italy, retained Ekofarma to update the stores retail space and functionality to achieve a more modern image and customer experience. The EUR 260,000 redesign created a contemporary pharmacy that featured emotional cues to capture consumers attention. Ekofarma chose MicroStation to achieve the project goals and Progenio to coordinate the project. Progenio is a MicroStation-based Bentley Channel Partner-developed application for the furniture, exhibition, building, and other markets. From design through development, MicroStation allowed the team to meet the requirements for flexibility and 3D photorealistic renderings that communicated the design concepts to the customer.
50
INNOVATION IN BUILDING
Ingenieurbro Zammit GmbH Production Facility for Auto Body Construction
Emden, Germany
Volkswagen commissioned Ingenieurbro Zammit to plan the ventilation/air conditioning and sprinkler systems for a EUR 100 million auto-body production facility in Emden, Germany. The 550-by-120-meter facility required planning for a total supply/exhaust volume of 1.5 million cubic meters per hour. More than 20 supply/exhaust units and 40 technical extraction units were integrated within the limited space of a penthouse. To ensure no interferences with other technical systems in the facility, Ingenieurburo Zammit used MicroStation and a building information modeling toolkit for 3D project implementation. The 3D representation of technical systems in conjunction with the 3D structural model enabled engineers to coordinate the technical systems, verify clearances with the building structure, and support Volkswagens decision-making process.
51
INNOVATION IN BUILDING
John Wardle Architects Mineral & Materials Research Hub
Adelaide, Australia
The AUD 48 million Mineral & Materials Research Hub in Adelaide, Australia, was designed to catalyze education and engagement among students, researchers, and industry stakeholders. MicroStation and Bentley Architecture allowed John Wardle Architects to visualize the design potential for spatial interconnection and flexibility throughout the building. Layout, orientation, faade, and materials contributed to achieving a five-star Green Star rating. Bentley Architecture integrated other CAD platforms and facilitated model exchange and coordination among subconsultants. The software also enabled the management of documentation to suit a progressive procurement schedule. Drawing extraction from the single building model produced productivity gains of 15 percent compared to 2D methods. Efficient design data management allowed a smaller team to manage drawing production.
52
INNOVATION IN BUILDING
LCA Borgo Della Neve
Montefiore Conca, Italy
Located in Montefiore Conca, Italy, Borgo Della Neve is a new residential block of 30 apartments with buildings arranged in a square around a central garden and playground. The challenge for this EUR 5 million development was to blend in with the neighboring historic buildings while achieving an environmentally, socially, and economically sustainable design. LCA used MicroStation and Bentley Architecture to connect control, display, and calculation tools used on multiple platforms and office locations. All of the data from consultants working with different software products was merged on MicroStation. The ability to exchange data between platforms and offices allowed the team to quickly and effectively deliver quality work, saving time and money.
53
INNOVATION IN BUILDING
Ochs Schmidhuber Architekten Unterfhring Nursery
Unterfhring, Germany
Located on the edge of a business park in Unterfhring, Germany, this two-story building is a nursery school for 48 children. Ochs Schmidhuber Architekten designed and built the Unterfhring Nursery with the sustainable use of resources in mind. A unique hybrid construction technique combined the advantages of wood panel and solid construction, resulting in fast construction at reduced costs. MicroStation and MicroStation PowerDraft enabled the seamless integration of project functions, from basic evaluation of the design and visualizations to detailed planning and execution to documentation. The integration of participating firms was comfortable and uncomplicated due to the availability of various exchange formats. Rendering allowed the client to visualize the nursery during preliminary stages and ensure the building met expectations.
54
INNOVATION IN BUILDING
RendArk Shop Monnalisa Red Leaf
Shanghai, China
RendArk, an architectural design and graphics firm, designed a new Monnalisa brand shop in Shanghai, China. Bentley software allowed the project to be delivered in record time to meet an aggressive schedule. By using MicroStation for the entire project, RendArk took advantage of the tools that enable an efficient and effective workflow. Dynamic displays facilitated discussions about design concepts, and the Luxology rendering engine for MicroStation saved time.
55
INNOVATION IN BUILDING
schweizermessebau AG The Diamant
Basel, Switzerland
Based in Basel, Switzerland, schweizermessebau conceptualized the architectural design for a CHF 250,000, custom-built exhibition stand incorporating 3D graphics. The unique faade created a conceptual architectural design that featured dynamic interaction between the virtual and real world of the exhibition space. MicroStations modeling tools allowed the designers to create a unique stand that successfully sells the customers ideas. By using MicroStation in conjunction with a Bentley SELECT subscription, schweizermessebau maintains the software by gaining access to the latest upgrades.
56
INNOVATION IN BUILDING
Studio Agnellini Renovation of Residential Building
Lerici, Italy
A EUR 600,000 residential building renovation project located in Lerici, Italy, required the application of bio-building principles. The design had to create a space that was healthy for both people and the environment, using ecocompatible technologies and materials. Energy conservation was also a goal. Studio Agnellini achieved the project goals using MicroStation. The softwares processing speed, intuitive commands, and use of reference files for creation of drawings contributed to a 20 percent time savings during design. The efficiency with which the project team executed this design saved approximately 5 percent of project costs.
57
INNOVATION IN BUILDING
Warren and Mahoney BRANZ Headquarters
Porirua City, New Zealand
Warren and Mahoney transformed the 1960s-era corporate campus of the Building Research Association of New Zealand (BRANZ) into headquarters that reflect best practices in sustainable design. The NZD 11.4 million refurbishment created a contemporary staff facility and laboratory that facilitates interdepartment communications, with the goal of fostering a more interactive and sustainable culture. The rural setting is 13 kilometers from Porirua City, requiring on-site provision of core services, ranging from sewage treatment to technology infrastructure. Warren and Mahoney collaborated with BRANZ to discuss ideas and review concept drawings, sketch renderings, and design models. Consolidation on MicroStation and Bentley Architecture streamlined workflows and minimized the risk of cost and time overruns.
58
59
WINNER
Multiple system operators store, analyze, and retrieve massive amounts of hybrid fiber coaxial outside plant (OSP) data. Automated quality control checks and procedures maintain the accuracy and consistency of data used for critical applications such as serviceability analysis, customer provisioning, inventory tracking, facility and equipment maintenance, and network planning.
IMMCO developed an automated Quality Control Toolkit that works seamlessly with Bentley Expert Designer Communications. The toolkit takes advantage of Bentleys relational database storage model so OSP data analysis can be quickly performed against enterprise-wide databases. The toolkit improves accuracy and data consistency, saves time, and reduces costs. A typical analysis now takes about 24 minutes instead of one week.
60
VIEW PRESENTATION
FINALIST
A major multiple-system operator (MSO) awarded Precision Valley Communications a fast-track project to design construction work packages for 1,000 Wi-Fi hot spots throughout the greater Boston region within five months. Working from the MSOs network map in Bentley Expert Designer Communications, the company used Bentley Coax and Bentley Fiber to identify antenna locations, route and verify connections, and generate bills of material.
VIEW PRESENTATION
61
Bentleys communications software is the most effective system to manage and collaborate within a company with many divisions.
Ignatius Andy Setiawan, Element Management & Engineering Support Div. Head, PT. Link Net
62
Innovation in Construction
Projects in this category exemplify overall excellence during the construction phase of a project. They demonstrate a clear return on investment via shortened project schedules, mitigated risks to avoid overruns, and the application of technology for advanced work processes within the construction workforce to benefit all stakeholders.
63
Innovation in Construction
Company Name Taylor Woodrow-BAM Nuttall JV Project Name Victoria Station Upgrade Jet Grouting
LocationUnited Kingdom London,
WINNER
FINALIST
Company Name Project Name
Location
Eighty million people pass through Victoria Station on the London Underground in the United Kingdom each year. The station upgrade currently under construction includes a series of sprayed concrete tunnels connecting new and existing parts of the station. To make the gravel substrate suitable for tunnel construction, 2,500 jet-grout columns were installed by the Taylor Woodrow-BAM Nuttall Joint Venture in a GBP 37 million work package.
2012 BE Inspired Awards
Initial design of jet grout column orientation was carried out using MicroStation. Survey information on the location of services and utilities was fed into the 3D model, column orientations were adjusted, dynamic sectional views were reviewed, and construction planning visualizations were created. Geometry data was transferred from the model to the rig control system, and as-built data was fed back into the model, eliminating data entry errors.
64
VIEW PRESENTATION
Innovation in Construction
HNTB Corporation
FINALIST
HNTBs TrueViz Q-Assist program develops protocols to align quality procedures with the aggressive schedules and 3D deliverables associated with alternative delivery projects. These procedures make data from multiple sources available for review by staff at multiple locations and capture results in a managed environment. HNTB standardized this process on integrated software.
VIEW PRESENTATION
FINALIST
Located in Bostons Roxbury neighborhood, the USD 86 million Dudley Square Municipal Building will occupy the site of the historic Ferdinand Building in Massachusetts. The urban location posed significant challenges, including preservation of three historic facades, coordination among two architectural design teams and dozens of subcontractors, and six construction-document release packages.
VIEW PRESENTATION
65
Innovation in Construction
Hitachi-GE Nuclear Energy, Ltd. Integrated Plant Construction System
Hitachi, Japan
Hitachi-GE Nuclear Energy provides engineering, procurement, and construction services for nuclear power plant construction and maintenance. The Japanese company adopted a design approach to developing a construction system that provides field work information intuitively. The system uses 4D visualization to display procedures and information via simulations or movies featuring real field objects and situations as seen from any viewpoint or aspect.
FINALIST
MicroStation was adopted as the platform because it is customizable and extensible, offers an easy-to-use tool for field workers, interoperates with in-house CAD, features fast and expressive graphics, and supports a range of hardware. The system provides 4D information handling and visualization from planning to execution and management. Hitachi-GE Nuclear Energy expects the integrated construction system to reduce field installation work by 20 percent.
66
Innovation in Construction
Afcons Infrastructure Ltd. Jammu-Udhampur Section Construction
Udhampur, India
This USD 291 million project involved construction, rehabilitation, and expansion to four lanes of NH-1A from Jammu to Udhampur in India. The section required 67 bridges to be constructed in difficult terrain. Afcons Infrastructure determined that a uniform bridge deck structure was needed and selected 20-meter pretension I-girders. The cost-effective solution involved launching the girders with a launching truss. Afcons Infrastructure constructed an analysis model in STAAD.Pro to simulate the kinematics of the launching truss by providing the correct loading and boundary conditions. This required testing numerous load cases, a process that took two weeks as opposed to the two months it would have taken using an alternative means of analysis. The STAAD.Pro simulation successfully predicted the actual performance of the structure.
67
Innovation in Construction
COMSA Multipurpose Hall of Gran Canaria
Las Palmas de Gran Canaria, Las Palmas, Spain
As contractor for the Multipurpose Hall of Gran Canaria in Las Palmas, Spain, COMSA anticipated a number of design changes and a short fulfillment time. The goal for constructing this EUR 54 million multipurpose hall was to manage information effectively and minimize fulfillment mistakes. MicroStation was used to verify the geometry and create a complete 3D model of the structure. Displaying the original project plan and 3D model together allowed COMSA to detect mistakes. Proposed changes were incorporated in the model for review and issuance of updated plans. Using a constantly updated, live model during fulfillment sped up communications and aided decision making.
68
Innovation in Construction
DSD Ferrometalco SAE New Doha International Airport Cargo Facility
Doha, Qatar
Qatar Civil Aviation Authority is adding capacity at the New Doha International Airport in preparation for the 2020 World Cup Tournament in Qatar. DSD Ferrometalco was tasked with fast-track delivery of steel for the EUR 80 million cargo terminal currently under construction. The company detailed, fabricated, and shipped 18,000 metric tons of steel by truck from Egypt to Qatar within 12 months, which was a company record. The shipments included curved trusses, handrails, beams, and columns with complex configurations. Using ProSteel enabled DSD Ferrometalco to meet the tight schedule. Modeling revealed optimal designs for efficient construction and reduced waste in material and cost. Shop-welding trusses reduced bolted connections by 30 to 40 percent. A 25 percent reduction in bolts and spice plates shortened erection time.
69
Innovation in Construction
Guangzhou Panyu District Shiqiao Architectural Design Institute Co., Ltd. Audi 4s Construction
Guangzhou, China
The iconic Audi brand shop in Guangzhou, China, is a 13,000-square-meter facility with a three-story exhibition hall and four-story workshop. The exhibition hall is a large truss structure with a 32 meter span. As chief technical engineers, Guangzhou Panyu District Shiqiao Architectural Design Institute was responsible for the entire project from design concepts through construction completion and operation. STAAD for China was used for steel structural analysis and design, achieving a seamless connection between design and construction by leveraging 3D modeling. The STAAD solution facilitated clear cost accounting, reduced computational time, and shortened the construction period to just 90 days.
70
Innovation in Construction
IDM E&C Woonmoon Dam Auxiliary Spillway
Daecheon-ri, South Korea
Located in North Gyeongsang Province, South Korea, Woonmoon Dam is threatened by unpredictable weather such as typhoons. An USD 87 million, tunnel-type auxiliary spillway is being constructed to improve dam safety and minimize environmental disruption. At 14.4 meters in diameter and 600 meters in length, the spillway required innovative construction methods to be completed within the tight schedule. IDM E&C developed 4D construction simulations to demonstrate equipment operations and procedures, and gather ideas for reducing costs and equipment idle time. Digital terrain models were used to demonstrate coinciding cut-andfill activity. The firm used MicroStation for 3D modeling, construction schedule, and method simulation; GEOPAK for 3D terrain modeling; and Bentley Navigator for construction simulation demonstration.
71
Innovation in Construction
Tianjin FAW Toyota Motor Co., Ltd. New Toyota Factory
Tianjin, China
FAW Toyotas 25,000-square-meter supply factory under construction in Tianjin, China, will produce USD 320 million in parts for 10 automobile models. Preliminary 2D design of the USD 174 million project caused problems with material estimates, interferences, on-site changes, and construction delays. To overcome these difficulties, Tianjin FAW Toyota Motor Co. created a 3D digital factory model that improved work efficiency by 80 percent. Using MicroStation, Bentley Navigator, Bentley Architecture, Structural Modeler, and Bentley PlantSpace, FAW Toyota accurately quantified materials and estimated construction costs. Interferences were eliminated during the design phase, reducing on-site changes valued at USD 240,000. Construction progress simulation, sequencing, and work package optimization maximized the use of construction space and shortened the construction period by eight weeks.
72
73
WINNER
FINALIST
Company Name Project Name
Location
The Park House is a 1.04-acre city block redevelopment on the edge of Mayfair in London, United Kingdom, calling for retail space at the basement, ground, and first-floor levels; seven floors of office space on the western end; and 39 private residential flats to the east. The GBP 100 million project posed structural challenges due to its unique faade, mixed use, proximity to a London Underground tunnel, and retail requirements of a worldrenowned location.
2012 BE Inspired Awards
GenerativeComponents enabled Robin Partington Architects to explore various iterations of glass technology and its abilities, which allowed the team to use cold-bending on over 85 percent of the glass panels to minimize the need for curved panels. The advanced technology of MicroStation, Bentley Architecture, and Structural Modeler ensured that the team was never distracted from the main goal of design and development.
74
VIEW PRESENTATION
FINALIST
A collaboration between LAB Architecture Studio and ERGA Progress, the Guardian Towers project in Abu Dhabi, United Arab Emirates, is a mixed-use complex comprised of an 18-story residential tower, 18-story commercial office tower, and a two-level retail podium. The offset tower footprints break the static tradition of extruded, rectangular tower blocks.
Guardian Towers
Abu Dhabi, United Arab Emirates
LAB Architecture Studio used GenerativeComponents for extensive testing and visualization of the double-skinned faades and fritted glazing, which were designed specifically for the extreme heat and humidity of the locale. The project was delivered two months early with considerable savings, and the office and residential towers are now fully occupied. Utilizing MicroStation streamlined not only the complexities of the design, but also the logistical challenges of the team of international partners.
VIEW PRESENTATION
FINALIST
The goal of the Stanley Beaman & Sears submission to the Atlanta History Center Design Competition was to reflect the energy coursing through Atlanta, Ga. The existing space is a series of outdated, darkened galleries and undersized public areas. The proposed USD 8 million design is a light-filled space featuring a dynamic wing-like ceiling flanked by bright, freshly renovated galleries on either side.
VIEW PRESENTATION
75
76
Our innovative application of experience and knowledge sharing enables us to create aesthetically, functionally, economically, and environmentally friendly designs. Architecture is our passion.
Chun Qing Li, Managing Director, Pavilion Architecture
77
78
79
WINNER
FINALIST
Company Name Project Name
Location
A disjointed workflow for processing geotechnical field data in the geotechnical and materials departments had resulted in information being archived as Excel or PDF files with no search capabilities. Manual transfer of data between departmental reporting tools also introduced errors. The Mississippi Department of Transportation implemented gINT to streamline the collection, processing, and storage of geotechnical data for use in boring log reports and GIS applications.
2012 BE Inspired Awards
The first phase of the project involved creating a geotechnical database structure, report templates, and gINT subroutine to import existing spreadsheets. Phase two expanded the database structure to accommodate triaxial test data and reports, and to import external lab data. The final phase will import legacy data. gINT reduced boring log production time from one hour to 15 minutes and reduced project time by 50 percent.
80
VIEW PRESENTATION
FINALIST
ArcelorMittal, the worlds leading steel and mining company, operates a blast furnace that had disposed of slag at a landfill site in Zumrraga, Spain. The landfill was closed in compliance with the strict environmental regulations of the Basque region, and a slag recycling plant was constructed in its place on the same site.
VIEW PRESENTATION
Bentleys commitment to meeting our vision for customizing the gINT software allowed us to transition flawlessly to its use with very little training and substantial time savings for every project from here out.
Virgil Payne, P.E., Mississippi Department of Transportation
81
82
Innovation in Government
The submissions in this category have demonstrated excellence in local, state, provincial, federal, and national government projects. These projects leverage engineering content and team collaboration, geospatial, civil engineering, and communications network technology, or combinations thereof. They also use innovative and cost-effective techniques to manage land parcels, create cadastral fabric, analyze land uses, and execute land and site development projects.
83
INNOVATION IN GOVERNMENT
Company Ltd Name Crossrail Project Name Crossrail
LocationUnited Kingdom London,
WINNER
FINALIST
Company Name Project Name
Location
Crossrail is being built under central London to link network rail lines to the east and west of the United Kingdoms capital. The GBP 14.8 billion project includes 21 kilometers of twin tunnels and multiple below-ground stations. The project demonstrates a federated data approach that links systems and 2D/3D data repositories. Crossrails strategy incorporates a combination of standards, methods, and procedures as well as software, tools, and hardware.
2012 BE Inspired Awards
To ensure integrated data management throughout all phases of the project, Crossrail integrated MicroStation, ProjectWise, Bentley Map, Bentley Geo Web Publisher, gINT, Hevacomp, Bentley RailTrack, and STAAD.Pro. The interoperable software provides data management solutions across the Crossrail enterprise. The lifecycle approach saved more than 5,000 manhours in 12 months on the tunnel project alone.
84
VIEW PRESENTATION
INNOVATION IN GOVERNMENT
City of Copenhagen
FINALIST
Copenhagen, Denmark, will be the worlds first carbon-neutral capital in 2025 as a result of 60,000 square meters of solar panels being installed on existing and new buildings owned by the municipality. The panels will reduce carbon dioxide by 80,000 tons per year compared to 2010. The 3D city model of Copenhagen, which covers 74.4 square kilometers, was analyzed to identify optimum locations for the solar panels in about two weeks.
VIEW PRESENTATION
FINALIST
The Napier, New Zealand, city council consolidated its infrastructure asset management systems known as WorkIT to create a single authoritative data source for surveying, CAD, GIS, and asset management applications. Standardizing on one technology platform allowed data to be reused without being reworked. WorkIT II has improved workflow and data flow while maintaining data accuracy.
VIEW PRESENTATION
85
INNOVATION IN GOVERNMENT
Georender srl Arco DAugusto
Aosta, Italy
This urban regeneration and environmental improvement project regenerated the old city square where the Arch of Augustus is located and which connects with a pedestrian path to the Dora Baltea River in the town of Aosta, Italy. Characterized by heavy urban traffic, buildings, schools, and shops, this archeological site was surveyed using laser scanning. The major challenge for the team was to collect and manage the as-built data of the area with a high degree of accuracy. The laser scanner survey provided the data that was to be converted in 3D elements, onto which a photorealistic texture was applied. MicroStation enabled the design team to manage the asbuilt data for the urban regeneration design.
I.P.S. Vial S.L. Global Cities and Roads Inventory Management (InCa)
Madrid, Spain
The Madrid, Spain, municipality traffic enforcement authority is in charge of maintaining vertical traffic signs, road markings, parking reserves, and vehicle entrances on all Madrid public roads, which translates into 171,592 coded signs, 6,526 address signs, and 3,297,036 meters of road line paintings, 585,889 square meters of surface in pedestrian crossing, 11,192 reserved parking zones (private and public), and 43,579 vehicle entrances. The goal was to upgrade a custom-developed solution called InCa. I.P.S. Vial used MicroStation and MicroStation PowerDraft to develop an intuitive tool for large volumes of managed information and Bentley Geo Web Publisher allowed users to access the latest version of the municipality information. Once the project is completed in Madrid, it will be implemented in more than 20 other Spanish cities.
86
INNOVATION IN GOVERNMENT
Sarawak Land and Survey Department Integrated Photogrammetry Solution With MicroStation
Sarawak, Malaysia
The vision of the Sarawak Land and Survey Department in Malaysia is to provide excellence in land administration and land management through reliable geospatial data. Unlike cadastral mapping that typically involves individual land surveyors to acquire data, topographic mapping requires specific high-accuracy airborne surveying technology that can enable users to extract geospatial features from the survey data outputs.
2400000 2405000 2410000
10m 10m 10m
MicroStation is unique because it can be used for other digital airborne surveying technologies such as LiDAR and radar as well as imagery, which allowed Sarawak Land and Survey Departments to deploy the relevant geospatial data collection technology in this USD 4 million project as an efficient digital workflow to accelerate the mapping process. The team is now able to produce digital topographical data based on 1:25,000, 1:10,000, 1:5,000, and 1:2,500 scales.
2415000
5m
5m
Restricted. For Official use only. Compiled by Director of Lands & Surveys on 02/08/2012
15m
10m
5m
5m
5m
10m
5m
15m
20m
10m
5m
5m
15m
5m
25m
30m 10m
10m
35m
20m
35m 0 25m
10m
30m
20m
10m
10m
25m
35m
20m
20m
10m
5m
25m
15m
10m
10m
10m
35m
10m
20m
10m
25m 10m
20m
15m
15m
15m
15m
10m
5m
20m
15m
20m
15m
10m
5m
10m
10m
10m
15m
5m
20m
15m
10m
20m
20m
10m
15m
10m
10m
20m
15m
20m
10m
15m
10m 10m
25m
5m
10m
30m
20m
10m
5400000
25m
SHIP. Z
25m
EC
25m
25m
20m
KPG
15m
6
10m
KPG KPG
25m
10m
15m
30m
25m
45m
25m 30m
10m
45m
25m
15m
25m
15m
15m
30m
30m
25m
35m
25m
20m
30m
10m
IND. A
5m
5m
KPG SC
20m
10m
15m
25m
25m
15m
10m
10m
25m
15m
15m
30m 20m
15m
25m
25m
25m
EC
40m
20m 30m
15m
30m
40m
KPG
30m
30m
15m
25m
15m
30m
40m
15m
10m
10
15m
25m
35m
25m
15m
10m
45m
20m
30m
IND. A
50m
20m
20m
50m
EC
20m
KPG
25m
15m
25m
40m
20m
15m
15m
15m
45m
50m
IND. A
EC CSC
30m
40m 60m
10m
15m
55m
35m
EC
10m
30m
IND. A
55m
40m
EC
50m
10m
15m
30m
50m
30m
35m
35m
40m
35m
45m
IND. A
45m
60m
50m
45m
50m
50m
SUB STN
20m
40m
4
10m
40m
20m
30m
40m
EC
40m 40m
60m
55m
35m
EC
50m 20m
15m
35m
25m
15m
APSFIC
25m
55m
40m
45m
25m
20m
40m
40m
25m
10m 30m
EC CSC
50m
45m
4
5m
15m
10m
IND. A
50m
40m
REC.Z
15m
30m 30m
15m
25m
20m
50m 30m
25m
15m
50m
35m
15m
15m
10m
35m
35m
35m
30m
15m
40m
40m
25m
30m
10m
15m
55m
20m
30m
25m
5m
40m
35m
IND. A
EC
40m
35m
20m
35m
35m
20m
30m
40m
35m
REC.Z
45m
15m
25m
40m
40m 45m
35m
20m
45m
APSFIC
35m
30m
30m
35m
30m
35m
45m 40m
5m
30m
20m
20m
10m
35m
10m
50m
40m
45m
35m
60m
5395000
40m
35m 55m
25m
70m
65m
70m 60m
55m
10m
25m
35m
25m
40m
50m
45m
55m
35m
40m
35m
50m
25m
50m
55m
50m
35m
35m
35m
45m
35m
CUR
35m 40m 50m
60m
30m
40m
30m
45m
55m
35m
45m
40m
35m
40m
25m
30m
30m
45m
25m
35m
40m
40m
C
10m
10m
10m 35m
30m
45m
25m
70m
65m
45m 50m
40m
RES A
35m
25m
45m
50m
10m
40m
40m
20m
SUB STN
REC.Z
35m 25m
40m
35m
30m
25m
APSFIC
35m 40m
35m 40m
30m
65m
50m
50m
EC
60m
35m
35m
30m
60m
EC CSC
40m
45m
55m
55m
15m
40m
APSFIC
40m
50m
60m
25m
30m
20m
20m
PORT
20m
50m
40m
25m
EC
15m
15m
15m
15m
EC
50m
20m
35m
40m
35m
45m
25m
25m
30m
35m 40m
20m
25m
35m
40m
35m
30m
25m
25m
30m
B A
15m
20m
35m
40m
45m
50m
25m
25m
45m
40m
20m
50m
40m
40m
55m
45m
25m
30m
30m
15m
45m
45m
40m
45m
35m
APSFIC
30m
APSFIC
45m
30m
45m
45m
20m
APSFIC
45m
40m
40m
25m
25m
35m
15m
20m
30m
30m
30m
25m
45m
20m 20m
35m
30m
40m
35m
25m
15m
20m
20m
S.I.A
35m
IND. A
40m 35m
20m
45m 50m
20m
APSFIC EC
10m
25m
25m
40m
15m
40m
40m
50m 45m
30m
APSFIC
30m
20m
20m
20m
APSFIC
30m
20m
EC
APSFIC
50m
EC
35m
20m
40m
EC IND. A
45m
50m
35m
25m
45m
35m
IND. A
40m
40m 50m
25m
20m
25m
35m
45m
45m
45m
SUB STN
35m
35m
40m 35m
50m
45m 40m
45m
45m
40m
40m
40m
35m
45m
35m
35m
IND. A
DRAIN EWC
30m 35m 25m
45m
DRAIN
40m
45m
45m
20m 20m
20m
CWC
30m
20m
EC
25m
EC DRAIN APSFIC
40m
30m
SHIP. Z
15m
15m
35m
35m
45m
S.I.A
20m
30m
30m
EC EC
20m
25m
20m
15m
20m
15m
30m
IND. A
40m
25m
35m
45m
40m
50m
45m
10m
20m
40m
S.I.A
15m
15m
SHIP. Z
APSFIC
20m
45m
20m
EC EC EC S.I.A
20m
20m
35m
20m
40m
30m
SC
20m
REC.Z
25m
APSFIC
IND. A
55m
60m
70m
45m
40m
20m
20m
20m
20m
25m
10m
15m
S.I.A
10m
EC
15m
EC
25m
35m
50m
EC
15m
S.I.A
EC
APSFIC
25m
DRAIN IND. A
45m
EC IND. A EC
EC EC
45m
50m
55m
55m
35m
25m
30m
ECCSC
50m
APSFIC
30m
15m
45m
45m
10m
20m
25m
25m 35m
20m
45m
45m
45m
40m
30m
35m
45m
40m
20m
25m 30m
50m
45m
30m
45m
45m
45m
55m
45m
APSFIC
40m
50m
45m
45m
50m
55m
50m
IND. A
45m
45m
40m
30m
40m
20m
IND. A
40m
65m
25m
40m
REC.Z
45m
40m
35m
Legend
DESCRIPTION
APPSFIC CSC CUR
15m 20m
20m
15m
25m
25m
APPROVE SITE FOR INDUSTRIAL COMPANY COMMON SERVICES CORRIDOR COMMON UTILITIES RESERVE
5390000
20m
30m
15m
15m
10m
10m
15m
25m
SUB STN
25m
20m
25m
APSFIC
25m
5390000
20m
15m
15m
30m
30m
EC
25m
30m
E.R
CWC
40m
50m
50m
COMPANY WORKERS CAMP DRAIN RESERVE ENERGY CORRIDOR EXISTING REFINERY EXISTING WORKER CAMP INDUSTRIAL AREA KPG NYALAU SETLEMENT RECREATIONAL ZONE RESIDENTIAL AREA SAMALAJU PORT SERVICES CENTRE SEWERAGE TREATMENT PLAN SHIP BUILDING ZONE SOPPORTING INDUSTRIAL AREA SUB STATION TOWN CENTRE WATER TREATMENT PLAN PROPOSED_ROAD_RESERVE EXISTING_ROAD_RESERVE
CONTOUR (5 meter) SAMALAJU CONTOUR5M_MASTER_NEW.dxf Polyline
25m
25m
APSFIC
10m
EC S.T.P
35m 25m
DRAIN EC ER
25m
25m 25m
20m
25m
15m
25m
EC
45m
25m
20m
APSFIC
25m
EC
30m
IND. A
40m
45m
45m
40m
EWC IND. A
5m
20m
15m
30m
WTP
30m
35m
20m
25m
30m
45m
50m
45m
20m
15m
20m
25m
20m
REC.Z 25m
30m
50m
30m
30m
45m
40m
40m
5m
50m
40m
45m
45m
50m
45m
20m
40m
35m
35m
30m
30m
25m
40m
40m
20m
45m
40m
30m
35m
40m
30m
30m
30m
40m
30m
45m
30m
30m
35m
30m
35m
40m
45m
45m 35m
WTP
20m
30m
40m
45m
40m
25m
25m
25m
30m 20m
TERHAD
2400000 2405000 2410000 2415000
Orthophoto 2010_2011
25m
spot_height (meter)
5395000
40m
45m
35m
EC CSC
REC.Z
70m
50m
60m
15m
20m
30m
10m
20m
25m
25m
30m
60m
45m
5m
25m
40m 15m
30m
15m 45m
15m
65m
25m
50m
5m
25m
25m
25m
20m
15m
30m
40m
35m
REC.Z
40m
45m
50m
50m
5m
45m
35m
50m
30m
IND. A
40m
15m 10m
25m
45m
55m
40m
30m
35m
35m
25m
5m
T.C
15m
40m
25m
35m
EC CSC
45m
40m
60m
30m
45m
15m
65m
85 m
80m
50m
55m
30m 20m
25m
5m
30m
10m
5m
30m
10m
10m
5m
30m
50m
T.C
5400000
25m
25m
15m
10m
25m
10m
20m
10m
25m
10m
10m
20m
20m
15m
20m
20m
10m
20m
20m
30m
25m
30m
10m
20m
25m 20m
10m
25m
10m
10m
30m
25m
20m
30m
35m
25m
35m
30m
40m
15m
10m
35m
15m
15m
15m
30m
40m
35m
20m
25m
5m
30m
35m
30m
5m
60m
35m
60m
5m
35m
30m
30m
50m
35m
20m
30m
60m
10m
55m
65m
65m
60m
45m
35m
45m
50m
45m
55m
25m
50m
50m
35m
35m
45m
45m
25m 20m
55m
40m
50m
25m
45m
45m
30m
60m
60m
60m
30m
30m
30m
30m
50m
30m
40m
20m
25m
45m
20m
40m
15m
40m
20m
45m
15m
40m
35m
40m
15m
25m
50m
30m
In this INR 55 million project for Bhiwandi, India, Seh Nirman created a GIS that has increased property tax collection by 10 times through an increase in tax collection from 30 percent to 86 percent, which includes a 50 percent increase of property tax collection for new properties. By implementing a GIS and conducting accurate GIS survey information, the city is now able to conduct more accurate tax assessments.
20m
20m
30m
20m
20m
20m
25m
45m
25m
20m
20m
30m
15m
40m
20m
20m
45m
20m
30m
20m
35m
20m
40m
20m
25m
40m
45m
10m
15m
87
INNOVATION IN GOVERNMENT
South Carolina Department of Transportation Outdoor Advertising Permitting System
Columbia, South Carolina, United States
The South Carolina Department of Transportation (SCDOT) manages more than 6,400 active billboard permits, 3,180 inactive billboard permits, and 1,400 vegetation maintenance permits. The Outdoor Advertising Permitting System manages the application data including transfer of sites, revision of active permitted billboards, and the replacement of permit tags and allows sign owners to review their applications and permits online. Bentleys task was to integrate three permitting systems into one database that would allow for easy access of data, timely retrieval of information, a webbased interface, and a system that puts SCDOT on the cutting edge of billboard management. The application streamlines these workflows and manages data in a single database as well as transfers data residing in existing databases. The workflow-driven solution is now available to other DOTs.
SCDOT _ Outdoor Advertising Permitting ofTab_1 the citys information system, which also acts as an experimental laboratory municipal buildings, a priority for the municipality of Grenoble, System France, is toImages
optimize the management of municipal real estate. The goal of this project was to federate and exploit heterogeneous data from an Oracle real estate database, GIS, CAD software (DGN and DWG), and Bentley Map. The challenge was to offer a user-friendly solution without redundancy. for implementing ProjectWise and Bentley Map in other cities. The system integrates a design team distributed over multiple locations, facilitates rapid deployment of a project team, and accelerates information sharing and communications across project teams.
88
89
WINNER
FINALIST
Company Name Project Name
Location
Located on 7,600 acres of land managed by the Bureau of Land Management near Ely, Nev., the Spring Valley Wind Farms 66 turbines will generate 152 megawatts of wind power. Mortenson Construction modeled each stage of construction to optimize the layout of turbine parts and equipment. Reducing the project footprint minimized the cultural, historical, and biological impact.
Using MicroStation, InRoads, Bentley Map, and Bentley View, Mortenson reduced each turbine site by nearly 40 percent, resulting in a 77-acre reduction in approved ground disturbance area. When identification of pygmy rabbit habitat required a redesign of roads, turbines, and electrical connections, InRoads enabled quick changes and model delivery for machine control grading with no impact on the project schedule.
90
VIEW PRESENTATION
FINALIST
Rapid growth of passenger traffic at Rzeszw-Jasionka Airport in southeastern Poland prompted investment in infrastructure improvements. The USD 30 million design-build project included a 3,000-meter-long parallel taxiway; 375and 400-meter rapid-exit taxiways; 182.5-, 205-, and 510-meter perpendicular taxiways; and a 4,600-square-meter apron extension. The new taxiways nearly tripled the airports capacity, enabling a single runway to handle up to 16 planes per hour.
VIEW PRESENTATION
FINALIST
The USD 1.2 billion Nadaprabhu Kempegowda Green City Project was initiated by the Bangalore Development Authority as a sustainable alternative to the haphazard growth typical of India. The site covers 4,043 acres encompassing 12 villages. As the primary consultant on the project, Tandon Urban Solutions is responsible for planning and design through construction and maintenance.
Tandon Urban Solutions Pvt. Ltd. Nadaprabhu Kempegowda Green City Project
Bangalore, India
The company used MicroStation and Geo Web Publisher for survey, mapping, and public information; PowerCivil for land development; MicroStation GeoGraphics for town plots; MXROAD for roads and bridges; WaterGEMS, StormCAD, and PondPack for water supply; SewerCAD for sewerage and sewage treatment; and Bentley Substation for power supply. This approach cut planning time from 12 to 18 months to six months and saved about USD 1 million.
VIEW PRESENTATION
91
92
93
94
95
WINNER
FINALIST
Company Name Project Name
Location
Located in the Northern Cape province of South Africa, the Finsch mine is operated by majority owner Petra Diamonds, which developed a ZAR 700,000 integrated spatial data management system to manage geospatial data for five departments that were functioning in isolation. The company also co-manages the mining town of Lime Acres, for which the GIS-based system captures data and bills residents for water and electricity usage.
2012 BE Inspired Awards
The GIS links spatial data and information scattered in various databases. Survey and plan data are captured and digitized in MicroStation; Bentley Map links features representing the mining lifecycle, town layout, and residential setup; and Bentley Geo Web Publisher makes the geospatial mining and town information accessible to the whole mining group. For billings, the database interrogates the human resources system and automatically sends invoices to residents.
96
VIEW PRESENTATION
FINALIST
As part of the Cloudbreak Enhancement Project Team Joint Venture, AMEC was awarded an AUD 247 million engineering, procurement, and construction contract for FMGs Cloudbreak ore-handling plant wet front-end project in Western Australia. The first phase examined a previous design, established feasibility, and recommended agreed-upon improvements. Phase two entailed delivery of the project within 19 months.
VIEW PRESENTATION
FINALIST
Kumba Iron Ore developed an integrated environmental monitoring data management system for the Kolomela Mine in Postmasburg, South Africa. The ZAR 1 million project saves time by providing a one-stop shop for environmental monitoring data, such as water, dust, and biodiversity. An innovative handheld unit allows field data to be captured and automatically downloaded when the unit is docked, eliminating human error during data transfer.
VIEW PRESENTATION
97
98
99
100
101
Turkish Hard Coal Mining Authority Gas Tracing at -1,000 Meters With Bentley Geo Web Publisher
Zonguldak, Turkey
The Turkish Hard Coal Mining Authority digitized 1,200 archived paper maps to improve accessibility and productivity for all project teams. In addition, galleries, wells, shafts, boreholes, and equipment for five branches were modeled in MicroStation. The USD 350,000 project encompassed 300 kilometers of galleries, 8 million tons of coal reserve, and 250 boreholes. ProjectWise and Bentley Navigator enabled project collaboration and data standardization, which reduced man-hours by about 15 percent. A significant part of the final data was published using Bentley Geo Web Publisher and now enables the authority to monitor gas-tracing sensors located in the galleries and take precautions in case of emergency, making it an effective emergency warning system.
102
103
WINNER
FINALIST
Company Name Project Name
Location
The new JPY 600 billion D-runway at Tokyo International Airport is needed to accommodate growing demand and provide additional arrival and departure slots. With limited space, the only option is to build into the sea on an island 3,120 meters long with a 1,100-meter-long steel jacket-type pier. The first to be used in construction of airport infrastructure, the jacket structure is 520 meters wide, has an area of 520,000 square meters, and comprises 198 separate units.
2012 BE Inspired Awards
Nippon Steel & Sumikin Engineering performed detailed design and led the five-year construction phase. SACS was used to conduct the complex fatigue analyses for the jacket units totaling nearly 40,000 checkpoints in just six months. Automatic calculation of stress concentration factors shortened the time required, and material take-offs allowed quantity estimates to be made immediately upon completion.
104
VIEW PRESENTATION
FINALIST
Designed for offshore oil field development on the northern shelf of the Caspian Sea, the LSP-1 is an ice-resistant stationary 20,000-ton platform that has a fixed rig and custom-designed steel-plate jacket. The support units were designed to sustain the platforms massive weight as well as prevent ice load damage. Using 3D modeling from design through construction staging enabled CNGS Engineering to design the platform in less than one year.
VIEW PRESENTATION
FINALIST
The USD 37 billion Gorgon project is developing the Gorgon and Jansz gas fields off the northwest coast of Western Australia. Part of this project is the 59.4-kilometer-long subsea DomGas pipeline. Robert Elks & Associates was retained to perform structural and mechanical engineering design and fabrication detailing for the rock bolting rig, which will install 1,546 pairs of stabilization anchors on the seabed along the pipeline.
VIEW PRESENTATION
105
106
107
108
Ramboll Engineering Consultancy Services India Pvt. Ltd. Small Bore Branch Support
Doha, Qatar
Ramboll Engineering Consultancy Services is a multidisciplinary engineering, design, and consultancy company working across seven markets: buildings, transport, environment, energy, oil and gas, telecoms, and management consulting. The goal for this project was to design a small bore branch support system that minimized the number of supports to the small bore. To accomplish this, it was critical to visualize the support shown in the 2D drawings. Ramboll used MicroStation to model and visualize the small bore and its supports. Supports of variable size were set up for parametric modeling. This enabled the engineers to optimize the design and perform clash detection during design review.
109
Zentech Engineering Co., Ltd. Modularization Design for Ruwais Refinery Project
Geyjea, South Korea
The Abu Dhabi Oil Refining Company (Takreer) Ruwais refinery expansion will increase Takreers refining capacity by 417,000 barrels per day and double its production of transportation fuels. The USD 10 billion project is being developed in eight packages, including crude distillation and sulphur recovery facilities, a residue fluidized catalytic cracker, off sites and utilities, storage tanks, infrastructure work, marine works, and two packages for site preparation. Zentech Engineering provided modularization design and construction for a USD 3.5 billion package. The company used SACS to design pipe support for the offshore structure. The software analyzed static and dynamic load conditions for load-out, transportation, and lifting as well as performed safety checks. SACS improved the design process and saved onsite construction time.
110
Power professionals from the largest utility to the smallest rural or municipal utility work to efficiently produce and deliver energy. They share the common goals of improving efficiency, reducing cost, and delivering better customer service while sustaining and expanding aging power generation plants and adding new generation capacity. This category recognizes innovative projects ranging from the traditional fossil fuel power plants to nuclear power stations and renewable energy sources such as hydroelectricity, solar, and wind power.
111
WINNER
FINALIST
Company Name Project Name
Location
Using MicroStation, ProjectWise, Structural Modeler, Bentley PlantSpace, GEOPAK, AECOsim, and Bentley Raceway and Cable Management, HydroChina Zhongnan Engineering has created standardized designs for large-scale pumped storage power stations, moving from one-off designs to repeatable schemes for power generation capacities of 4x300 megawatts and 6x300 megawatts.
The collaborative process produced a 3D information model that will be applied to the design, construction, and management of future pumped storage power stations for a total savings of more than USD 1.57 million for each project. Thousands of man days for each project will also be saved through a 90 percent reduction in design errors and shortening project feasibility studies from six months to four months.
112
VIEW PRESENTATION
FINALIST
Located on the Lixian River in Yunnan, China, the USD 610 million Gelantan Hydropower Station is a 450 megawatt plant capable of generating 2 billion kilowatt hours of electricity per year. The narrow riverbed, complex geological conditions, and slope stability problems complicated design of the rollercompacted concrete gravity dam.
VIEW PRESENTATION
FINALIST
Located in Kemper County, Miss., the USD 2.8 billion Plant Ratcliffe project is Southern Companys first foray into clean-coal power generation using transport integrated gasification technology. The 582 megawatt plant is expected to emit 65 percent less carbon dioxide than traditional coal-fired plants. The company leveraged its software to create a fully integrated, managed environment that significantly improved design quality.
VIEW PRESENTATION
113
FINALIST
After initiating the project on MicroStation and Intergraph PDS, Shaw transitioned to Bentley PlantSpace to improve engineering and construction performance. The integrated application suite was implemented while the project was in full swing with no impact on budget or the 58-month schedule. Interferences were resolved during 3D design, and construction was completed with no on-site rework.
114
Desein Indure Pvt. Ltd. VISA Raigarh Super Thermal Power Project
Raigarh, India
VISA Power awarded Desein Indure a USD 400 million engineering, procurement, and construction contract for an ash-handling plant at its super thermal power plant in Raigarh, India. Limited land space was a major challenge. The 3D modeling for the plant was started simultaneously with the basic engineering and design. Using data, catalogs, and specifications built for previous projects reduced the development time for piping and steel. The fast-track project was executed using AutoPLANT, which provided a 3D environment for virtual walkthroughs and design optimization. MicroStation, Bentley Navigator, and ProSteel interoperability allowed project information to be shared by multiple disciplines. Drawings were extracted only after clash-free routing. Using 3D design shortened the design cycle by 15 percent and reduced project costs by 10 percent.
115
116
KEPCO Engineering & Construction Company, Inc. Yonghung Thermal Power Plant Units 3 & 4
Yonghung, South Korea
KEPCO Engineering & Construction provided comprehensive design services for Yonghung Thermal Power Plant, Units 3 and 4, which added two 800-megawatt units to the coal-fired power plant located on Incheons Yonghung Island southwest of Seoul, South Korea. KEPCO achieved time-saving efficiencies in all aspects of design, engineering, and construction support for the USD 4 billion plant. Using MicroStation and Bentley PlantSpace established an intelligent design environment, enabling designers to become 20 percent more productive. Other Bentley products that improved communication among the contractors, vendors, engineers, and the client included AutoPIPE and STAAD.Pro. Snapshot views of the 3D model were used instead of traditional 2D drawings at the construction site.
117
L&T-Sargent & Lundy Limited 375 Megawatt Phase III Combined Cycle Plant
Dhuvaran, India
The joint venture team of Larsen & Toubro and Sargent & Lundy was responsible for engineering the 375 megawatt combine-cycle power plant in Dhuvaran, India. Located on the premises of existing units, the new plant was built within the constraints of a 14-acre site. A compact single-shaft turbine train was chosen to reduce space requirements by 30 percent. The team used MicroStation, Bentley Navigator, Structural Modeler, and STAAD.Pro for integrated analysis and modeling, which enabled engineers to identify hindrances and optimize the layout in the turbine generator building. 3D modeling resolved interferences in the routing of the main steam piping and visualized structural erection of the main pipe rack within the confined space. These efficiencies reduced engineering cycle time by 8 percent.
118
Bentley solutions have extensively supported our efforts for environmentally friendly infrastructure.
Pius Kumar, General Manager, L&T-Sargent & Lundy
119
120
121
WINNER
FINALIST
Company Name Project Name
Location
Zeton designed and built the worlds first modular gas-to-liquids (GTL) commercial demonstration plant using Compact GTLs mini-channel reactor technology. The USD 20 million plant incorporated all aspects required for commercial application in treating gas at remote and offshore oil fields. Access to a real-time 3D model during fabrication improved accuracy and reduced rework.
AutoPLANT provided the robust 3D plant modeling solution required to scale GTL technology from pilot to commercial and allowed team members on four continents to work together to resolve issues related to design of a compact, modular GTL plant. In addition to AutoPLANT, the 3D design was completed using ISOGEN for isometric piping drawings, AutoPIPE for pipe stress analysis, and ProStructures for structural steel design.
122
VIEW PRESENTATION
FINALIST
The USD 720 million Booster Compressor Station under construction at Novateks Yurkharovskoye oil field was designed by the oil and gas R&D engineering company Giprotyumenneftegaz. The Russia-based company created an integrated information space that allowed engineering disciplines to work in parallel and exchange information between stages.
MicroStation and Bentley Descartes were used to create the digital terrain model and Bentley PlantSpace was used for equipment selection, process flow diagramming, and process pipeline design. The 3D design reduced the number of mistakes when generating design documentation and automated laborintensive processes such as detecting collisions, generating specifications, and producing cost estimates. The resulting time savings produced 15 to 20 percent cost savings.
VIEW PRESENTATION
FINALIST
The USD 320 million Jambi Betara Complex Development Phase 3 & 4 Gas Plant in Jabung, Indonesia, is owned by PetroChina. As a subcontractor on the project, PT. Intl Karya Persada Tehnik performed the detailed engineering of the Betara Gas Plant using Bentley tools to gain speed, accuracy, and reduce costs, and delivered PDS models as the owner mandated.
VIEW PRESENTATION
123
124
125
126
127
128
129
WINNER
FINALIST
Company Name Project Name
Location
The USD 1.5 billion Hallandss Railway project includes a tunnel section that will increase capacity from four to 24 trains per hour as well as allow the weight of freight trains to be doubled. The Swedish Transport Administration manages and provides template and control files that support building information modeling (BIM), which was implemented to create value during several stages of the project.
Sweco used MicroStation, InRoads, Bentley Rail Track, ProjectWise, and Bentley Navigator as the BIM platform for the railway from Frslv to Bstad, Sweden. A 3D object library was set up so objects can be reused in future projects, and the project coordination model resolved collisions, improved constructability, and saved time and money during construction.
130
VIEW PRESENTATION
FINALIST
The Illinois Department of Transportation and Federal Railroad Administration partnered to create a USD 1.8 billion high-speed rail system between Chicago, Ill., and St. Louis, Mo. With natural resources preservation a condition for construction, Quigg Engineering performed environmental studies along 35.24 miles of mainline track to locate sensitive areas, endangered species, and wetlands within 100 feet of the centerline.
High-speed Rail
Chicago, Illinois, to St. Louis, Missouri, United States
MicroStation and GEOPAK enabled the team to produce aerial plan sheets for field work, associate correct plane coordinates with DGN files, attach GIS shape files to correct locations, and identify natural features on aerial plan sheets for the environmental assessment. Quigg Engineering completed the environmental study in half the usual time. Study results reduced time required to identify harmful impacts, and review potential mitigation.
VIEW PRESENTATION
FINALIST
The Utah Transit Authority was awarded funding for a Federal Transit Administration Transit Asset Management (TAM) pilot program to demonstrate best practices in managing structures, track, and rolling stock. The TAM program combines asset inventories and condition assessments to provide a unified, one-stop system for maintaining assets, and is also used to develop maintenance budgets, identify critical issues, prepare lifecycle plans, and mitigate risk.
VIEW PRESENTATION
131
132
133
134
Innovation in Roads
The challenge of todays civil and transportation engineers, contractors, governments, and owner-operators is to work more productively, collaborate more globally, and deliver better-performing infrastructure assets. The projects in this category have demonstrated excellence in planning, engineering, analysis, and design of roads or highways in a mission to sustain transportation infrastructure.
135
INNOVATION IN ROADS
Company Name Creighton Manning Engineering Project Name Fuller Road and Washington Avenue
Location Albany, New York, United States
WINNER
FINALIST
Company Name Project Name
Location
The USD 14.5 million reconstruction of the at-grade intersection of Fuller Road and Washington Avenue in Albany, N.Y., will decrease traffic congestion, improve pedestrian and bicycle access, and enhance safety. The project realigned Washington Avenue with a bridge over a two-lane roundabout on Fuller Road. The bridge consists of two 95-foot-long single-span structures.
Creighton Manning Engineering was challenged to design the alignment within the constraints of I-90 and a new university building site. The firm designed the entire project in 3D using MicroStation and InRoads for accurate dimensions, section details, and plan sets. The 3D model was used to produce visualizations for public information meetings as well as to provide 3D data to the contractor for stakeless and automated grading.
136
VIEW PRESENTATION
INNOVATION IN ROADS
Foth Infrastructure & Environment, LLC
FINALIST
Expansion of DuPont Pioneers world headquarters in Johnston, Iowa, required improvements to NW 62nd Avenue. Foth Infrastructure & Environment led the USD 7 million project to widen and reconstruct nearly 1.5 miles and implement a nontraditional intersection solution incorporating four multilane roundabouts.
VIEW PRESENTATION
FINALIST
Sotepa has been participating as a consultant in the 2050 Blumenau Program for urban infrastructure development in Brazil. The BRL 25 million Humberto de Campos Street extension was designed within right-of-way restrictions of a narrow river valley. The firm defined a cross section that accommodates three lanes in each direction, pedestrian sidewalks, and a bicycle lane.
VIEW PRESENTATION
137
INNOVATION IN ROADS
Parsons Brinckerhoff and Arup JV Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade
Brisbane, Australia
Arup and Parsons Brinckerhoff formed PBA JV to design Australias largest transportation infrastructure project the AUD 5.6 billion Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade. Rapid mobilization of the project necessitated fast-track deployment of ProjectWise, which came online within three weeks of the project being awarded in 2008. ProjectWise ultimately managed 1.5 million documents with 4.8 terabytes of data accessed by over 2,000 users in 40 global locations. The system saved time and costs in locating data (23,000 hours), controlling documents (USD 1 million), updating drawings (260 weeks), and traveling (USD 3.6 million). Other products utilized in the project included MicroStation, MX, InRoads, gINT, and Structural Modeler.
FINALIST
138
INNOVATION IN ROADS
AECOM Udaipur Ring Road
Udaipur, India
AECOM was tasked with a greenfield project located on western side of Udaipur, India. Known as the City of Lakes, Udaipur has an average elevation of 598 meters that features two national highways that intersect at Udaipur City. The INR 6 billion project encompassed designing the missing link of the Udaipur Ring Road between Kavita to Kaya. It would typically have taken AECOM three months to complete this project, but using MXROAD enabled AECOM to complete it in half the time. MXROAD also helped interface Google Earth terrain information to generate 3D terrain models along the proposed alignment options in 50 percent less man days. STAAD.Pro was used to calculate bending moments and shear force.
139
INNOVATION IN ROADS
CIMA+ Turcot Interchange
Montreal, Canada
The Turcot Interchange is a Montreal traffic hub, with links to three highways and access to Champlain Bridge, the international airport, and city center. Nearing the end of its service life, the interchange is being reconstructed by Quebecs Ministry of Transport. The CAN$3 billion project will construct and commission a new interchange with four access points and then demolish the old interchange. Management of traffic for more than 290,000 vehicles per day is a major challenge. CIMA+ used 3D modeling to validate phasing of the work and eliminate conflicts with crossings and clearances. InRoads offered a single solution for geometric design as well as provided data for visualizing real-time navigation through the project, building a physical model from laser tracings, and producing videos for the project launch.
Conseil General de lAin Using Point-cloud Data for Public Consultation for a Road Improvement
Pont de Veyle, France
Reducing traffic in urban areas is an objective of the General Council of Pont de Veyle, France to not only improve safety, reduce accidents, and enhance quality of life, but also address environmental concerns, including reducing noise and atmospheric pollution, and mitigating flooding. Encompassing 4 million square meters including five roundabouts, this EUR 50,000 projects objective was to divert truck traffic away from the city. MicroStation, MXROAD, PowerCivil for France, and Bentley Descartes facilitated the project from conception to execution of the work. The acquisition of LiDAR surveys and display of point-cloud data enabled efficient communication and decision making. Without the software and point-cloud technology, a part of this project would have had to be subcontracted.
140
INNOVATION IN ROADS
Egis International A63 Motorway Widening and Improving
Salles to Saint Geours de Maremne, France
The EUR 1.1 billion improvement project for the A63 highway between Salles and Saint Geours de Maremne, France, will convert a rural dual carriageway into a three-lane tolled motorway. Because the 104kilometer section suffered from severe congestion, the public-private partnership required the fast completion of a detailed design to ensure an early construction start. Egis International was charged with project management, planning, and design. Located in three offices across France, the design team used MicroStation, ProjectWise, GEOPAK, and GeoMacao. The collaboration technology and 3D modeling ensured a coordinated design delivered on schedule. GeoMacao, which was first developed by Egis for new builds and then later enhanced by Bentley, demonstrated advanced capabilities in refurbishment design.
Feedback Infrastructure Services Private Limited Design Rimuli to Roxy Section of NH 215
Rimuli, India
The four-laning of NH 215 from Rimuli to Roxy will facilitate the free movement of vehicles traversing east-west in northern Orissa, India. The prime arterial road for traffic in a major mining area, NH 215 will be safer and less congested with local traffic traveling on ground-level facilities. Feedback Infrastructure Services used MXROAD to deliver this INR 6.5 billion project in minimum time. Using the toolset, one person designed horizontal and vertical alignments for the highway, ramps, and interchange; provided a traffic management scheme and construction sequence; and selected the best-fit alignment, and permanent or false grade-separated structures. MXROAD integrated tasks from processing survey data to preparing bills of quantities, saving 25 percent of total design costs and cutting 30 days from design time.
141
INNOVATION IN ROADS
Halcrow Consulting India Pvt. Ltd. Two Lane to Four Lane Widening of NH 59
Godhra, India
At the border of Gujarat and Madhya Pradesh, India, NH 59 traverses agricultural plains and rolling hills to connect the ports of Kandla and Mundra. The National Highways Authority of India is widening the section from two to four lanes as part of the National Highways Development Project Phase III. This USD 130 million project is being built under a design, build, finance, operate, and transfer agreement. The project included 11 major junctions, four grade separations, four vehicle underpasses, and three at-grade intersections. Halcrow Consulting, a CH2M HILL company, performed detail geometric design of the road and junctions with MXROAD, and design of the bridge with STAAD.Pro. A team of two people met project milestones despite changes in widening schemes and inclusion or deletion of project components.
142
INNOVATION IN ROADS
Kokusai Kogyo Co., Ltd. Sustainable Road Maintenance Using Mobile Mapping System
Minamiawaji City, Japan
To assess the physical condition of roads and prioritize maintenance on this JPY 5 million project, Kokusai Kogyo deployed a high-performance mobile mapping system with high-resolution LiDAR scanners, a stereo camera, and a 360-degree camera. The mobile mapping system was bundled to efficiently execute a road and related asset survey including measurement of road surface cracks, ruts, and flatness. Kokusai Kogyo filtered data to differentiate between the road surface and non-road surface features using TerraScan and MicroStation. This process was seven times faster than the conventional manual method. Bentley Descartes was used to display and overlay a stereo image pair and LiDAR point cloud for data quality checks. The mobile mapping system enabled digital road data acquisition for sustainable asset management.
143
INNOVATION IN ROADS
Mouchel Regional Road South Part
Kuwait
In association with Gulf Consult, Mouchel was commissioned by the Ministry of Public Works in Kuwait to undertake the study, design, and construction supervision for the construction and maintenance of the Regional Road South Part (Section One). The regional road will form part of the international Middle East Arab highways network under the Development of the Integrated Transport System Program. Over 40 engineers and an additional 50 experts across all civil engineering disciplines collaborated on this USD 11.3 million project. MX was used to develop detailed schemes that kept clients abreast of the many changes and the ramifications. MXs parametric design ensured that plan layouts, vertical alignments, and cross sections were directly related and linked. MX generated all element features in 3D.
144
INNOVATION IN ROADS
Soyuzdorproekt Ltd Reconstruction of the E-1 15 (M8 Kholmogory)
Moscow, Russia
The USD 220 million reconstruction of this section of Russian route M8, also known as the Kholmogory Highway, provided a convenient connection between a major radial road in Moscow and the nearby cities of Korolev and Mytischi. Challenges included excavating soft soils near the Yauza river, preserving a historic church near the roadway, and designing multilevel directional exits. Soyuzdorproekt delivered the design on schedule. Together with a Russian software application called Rocada, InRoads enabled the designers to solve all problems related to planning the roadway and drainage system. The integrated isopach capabilities were most useful. The project team successfully defined the optimal base of slope design for excavation.
145
INNOVATION IN ROADS
TranSystems Kansas Star Casino Interchange Design
Mulvane, Kansas, United States
The USD 7.3 million Kansas Star Casino interchange involved retrofitting an existing trumpet interchange as a dual-roundabout interchange with a separate exit for the state-run casino. The Kansas State Gaming Agency mandated that the casino be fully operational within a timeline that allowed just three months for design and six months for construction. Existing traffic had to be maintained throughout. To keep the interchange operational, TranSystems redesigned the interchange ramps for temporary operating conditions while construction was performed on the roundabouts. GEOPAK was used to update grading as needed for temporary paving arrangements. The softwares integration enabled TranSystems to essentially design the interchange twice in three months. In the past, this design would have taken nine to 12 months.
URS Scott Wilson India Pvt Ltd Re-engineering Design of Pune Bypass
Pune, India
URS Scott Wilson was challenged to widen an existing four-lane divided carriageway in the congested corridor between Mumbai and Bangalore, India. The 45 kilometer section of NH 4 from Pune to Satara passes through industrial zones with restricted right-of-ways and includes 16 bridges, one tunnel, 10 vehicular underpasses, two viaducts, two flyovers, five overpasses, four pedestrian underpasses, and 20.5 kilometers of service roads. Adding one lane with paved shoulder on either side of the carriageway and 75 kilometers of service roads increased daily capacity from 40,000 to 60,000 cars. MXROAD was used from survey data analysis through detailed design and drawings. STAAD.Pro was used for all structures. The software saved 10 percent in project time and USD 2 million in implementation costs on this USD 120 million project.
146
INNOVATION IN ROADS
Washington State Department of Transportation Point Defiance Bypass
Tacoma, Washington, United States
The USD 91 million Point Defiance Bypass project will enable Amtrak Cascades to expand service from four to six daily round trips between Seattle, Wash., and Portland, Ore. The Washington State Department of Transportation (WSDOT) provided visualizations of draft proposals for rail grade separations at two locations along the bypass route. The 3D concept models allowed for an indepth understanding of design options. MicroStations raster image handling allowed WSDOT to work with early sketches of the proposed design options, which were attached to the design file in plan view using Raster Manager, then matched into existing oblique aerial photos using Photomatch. Basic vertical clearances, roadway slopes, and general design criteria were used to develop 3D models on top of the sketches. The Luxology rendering engine produced the visualizations.
147
INNOVATION IN ROADS
Wyoming Department of Transportation Wyoming Diverging Diamond Interchange
Cheyenne, Wyoming, United States
The USD 2.3 million Diverging Diamond Interchange at the junction of I-25 and College Drive in Cheyenne, Wyo., will improve traffic flow without impacting the existing bridge over I-25. The Wyoming Department of Transportation (WYDOT) designed the interchange to be forward compatible with a future four-lane design, as well as to provide capacity for a 20-year horizon without costly modifications to the bridge. WYDOT used MicroStation and GEOPAK to develop the plans and cross sections for the project. The digital terrain model/triangulated irregular network, road design, and 3D object files were constructed, and videos were created, to show traffic movement from above the interchange as well as from a drivers perspective. Showing the videos at public meetings helped the public understand how the interchange would look and work.
Bentley software is integrated and provides us with a single application solution to go from 2D design to accurate 3D models to get clearances and quantities, as well as provide the video animation tools needed to present the project at public meetings.
Destry Schildmeier, Project Engineer, Wyoming Department of Transportation
148
149
WINNER
Nicolas O.S. Marques, Photekt
FINALIST
Company Name Project Name
Location
The USD 2 billion Tom Bradley International Terminal Modernization Program will add approximately 500,000 square feet of new concourses and nearly 475,000 square feet of new terminal space adjacent to the existing international terminal and concourses at Los Angeles International Airport. Designed for the coastal location, the structure features rhythmic, overlapping waves with a multiplanar, sloped, and curved roof.
The complex structural system includes long-span steel special moment frames with non-orthogonal connections between beams and columns a first for this unique design in California. RAM allowed the evaluation, analysis, and design of beam sizes, column loads, framing schemes, and framing and loading configurations. The new facilities will achieve a minimum LEED Silver certification from the U.S. Green Building Council.
150
VIEW PRESENTATION
FINALIST
The AUD 650 million South Morang rail extension will improve access to public transport for the northern suburbs of Melbourne, Australia. The fast-track project included redevelopment of two existing stations, 3.5 kilometers of new double track extension, and the new South Morang Station and modal interchange. Arup provided structural, mechanical, electrical, and hydraulic engineering for each station.
VIEW PRESENTATION
FINALIST
Fitzpatrick Engineering Group worked with its client, which had recently implemented building information modeling (BIM) and adopted an integrated project delivery method for a USD 18 million inpatient rehabilitation hospital. The project is a two-story, 65,000-square-foot steel building designed for a future floor. In addition to paper deliverables, the client required Revit deliverables from all design disciplines and expected the structural model data to be shared with the fabricator.
VIEW PRESENTATION
151
152
153
154
155
156
HCR Bridge Machinery (M) Sdn. Bhd. Kelana Jaya Light Rail Transit Line Extension
Klang Valley, Malaysia
The Light Rail Transit Line Extension project of Kelana Jaya Line in Malaysia crosses several major expressways. Construction of the elevated viaducts required lifting 3,200 precast segmental box girders. HCR Bridge Machinery supplied launching gantries designed for unique site conditions requiring launching gantries supports to be set on the centerline of 29 types of piers. Height and radius constraints further complicated the erections. HCR simulated the structural frame configuration and loading conditions to optimize section members and achieve the maximum allowable launching gantries weight on pier structures. A 3D model incorporating various boundary conditions and critical load combinations was imported into STAAD.Pro, and a utility determined the section properties. STAAD.Pros efficient workflow reduced man-hours by about 50 percent.
157
Hindustan Petroleum Corp. Ltd. (HPCL) Softened Water to DM Water Service and Condensate Heat Recovery and Integration
Mumbai, India
At the Hindustan Petroleum Corp. plant in Mumbai, India, hot condensate was being cooled by using air fin coolers in the Diesel Hydro Desulphurisation (DHDS) Condensate Recovery Unit. The process was intended to conserve energy, but heat and electricity were being wasted. To improve energy efficiency, softened water was piped to the Demineralized Water Service and DHDS Condensate Heat Recovery Unit. Hindustan Petroleum Corp. designed a new road crossover bridge that could accommodate the new pipeline load. The new bridge was erected at the same location as an existing bridge without disturbing existing pipelines or plant operations. Interferences were quickly resolved without compromising on design. The company reduced project time by one month using STAAD.Pro and STAAD.foundation on this INR 5 million project.
158
159
Kirby Building Systems India Ltd. Renault Nissan Automotive India, Tamil Nadu
Chennai, India
The Renault-Nissan Alliance plant in Chennai, India, seamlessly mixes the production of both Renault and Nissan products on the same line to achieve an annual capacity of 400,000 units. The 310,000-square-meter facility is the largest pre-engineered building in the world, with a maximum width of 260 meters and single slope of 130 meters. The design took into account thermal stress due to temperature fluctuations. Kirby Building Systems India performed engineering-to-construction services using STAAD.Pro for design and analysis in a flexible modeling environment. Kirbys alternative design scheme reduced the pre-engineered building tonnage by 4,110 metric tons and saved the client INR 348 million. Building elements were erected stage by stage on site. The company reduced man-hours by 20 percent and costs by 15 percent.
160
Larsen & Toubro Limited 375 Megawatt GSECL Dhuvaran Heat Recovery Steam Generator
Anand, India
Gujarat State Electricity Corporation Limited (GSECL) is building a 375 megawatt combined cycle power plant at Dhuvaran village located in Anand district of Gujarat, India. The INR 11 billion project is the first single shaft machine configuration combined cycle power plant to be set up by Larsen & Toubro, which designed and manufactured the heat recovery steam generator. Larsen & Toubro modeled the 1,000metricton structure for the heat recovery steam generator in STAAD.Pro, which integrated the steel structure, ductingcasing plate, and steel stack in a single model. The STAAD.Pro Advanced Analysis Module was implemented for fast analysis of 570 load combinations. The thorough analysis of steel components resulted in an optimized design at reasonable cost savings.
161
Larsen & Toubro Limited ECC Division TSL Raw Material Handling System Package-1
Jamshedpur, India
This INR 3 billion Raw Material Handling System project is part of a 3millionton perannum expansion project at the Tata Steel plant in Jamshedpur, India. The RMHS feeds material to the pellet plant, which stores 8,800 million tons of pellets in a 44.5-by-10-by-13.1 meter bunker for continuous delivery to the blast furnace. Larsen & Toubros Construction division used STAAD.Pro to model the building in three parts. Modeling the structure in 3D allowed the engineers to fit the project into the existing plant while avoiding underground and overhead structures. Any necessary changes were immediately incorporated in the design and drawings for faster construction. The design team achieved a 5 percent cost savings and 15 percent time savings by using STAAD.Pro.
162
163
164
165
The robust features of AECOsim and Bentleys continued commitment to interoperability have allowed Fitzpatrick Engineering Group to move beyond the traditional beams and columns of BIM and set itself apart as an industry leader while collaborating in mixed environments.
Douglas G. Fitzpatrick, P.E., President, Fitzpatrick Engineering Group
166
167
WINNER
FINALIST
Company Name Project Name
Location
Enogex and its subsidiaries own and operate more than 8,200 miles of pipe, seven processing plants, and 24 billion cubic feet of natural gas storage capacity in Oklahoma and Texas. In 2009, Enogex implemented AutoPLANT to standardize and reduce design and drafting time for gas gathering compressor stations. Within three years, the USD 10 million initiative reduced cycle time by 85 percent.
In 2009, average cycle time was 1,450 man-hours. Leveraging AutoPLANT reduced average cycle time to 220 man-hours in 2012. AutoPLANTs multilevel model structure allowed several users to access and modify files concurrently. Subsequent integration with ProjectWise improved file organization, workflow, and information dissemination. As a result, project request delivery turnaround time was shortened from 16.4 workdays in 2010 to 11.65 workdays in 2012.
168
VIEW PRESENTATION
FINALIST
The Henan Electric Power Survey and Design Institute unified management and operation of the 500 kilovolt power grid in Chinas Henan province through an integrated application for planning, design, construction, maintenance, and emergency and dispatch. 3D visualization of the grid included about 1,000 electrical design models in more than 200 categories as well as 800 structural, 100 building, and 400 overhead line structure models.
The company used MicroStation, Bentley Substation, GEOPAK, and Bentley PlantSpace to build an integrated model of the power grid incorporating data for 26 transformer substations, 96 transmission lines totaling more than 7,000 kilometers in length, and associated buildings and equipment. ProjectWise enabled collaboration among about 200 people and allied power companies, which reduced labor costs by USD 320,000 over the first two years.
FINALIST
The 800 kilovolt extra-high voltage Jinhua Converter Station in Jinhua, China, is part of the USD 3.75 billion Xiluodu Zuoan-Jinhua project, which will distribute power to east China. With a converter capacity of 800 megawatts, the new station will improve the regional power grid. Zhejiang Electric Power Design Institute implemented 3D modeling to solve design challenges such as fitting the field layouts within a confined space.
VIEW PRESENTATION
169
FINALIST
170
Hokkaido Aero Asahi Co. Ltd. Suspended Power Line Route Planning
Hokkaido and Tsugaru Peninsulas, Japan
After the earthquake of March 11, 2011, Japan suffered a severe electricity shortage that resulted in planned power outages. In response, the power distribution grid is being revised to provide a stable electricity supply. Rebuilding the 50- to 100-year-old transmission line towers is urgent, so to quickly study potential tower routes, Hokkaido Aero Asahi obtained detailed 3D data using aerial laser measurements for this JPY 10.39 million project. LiDAR data was processed using MicroStation with TerraScan and TerraModeler. The laser point-cloud data was then used to calculate current and future timber heights, conduct offset simulations with virtual power lines, and estimate the amount of timber to be cut at installation locations. Route selection time and cost were halved compared to conventional on-site survey methods.
171
Tenaga Nasional Berhad Visualizing Digital Terrain Models From Airborne LiDAR
Slim River, Sungkai, Tapah, and Tanah Rata, Malaysia
As the largest electricity utility in Malaysia, Tenaga Nasional Berhad needs accurate digital terrain models (DTMs) during the preliminary design stage of transmission line route planning. Airborne LiDAR presented an affordable solution for obtaining point-cloud data, but the data set tended to be unwieldy for use in visualization. Tenaga Nasional Berhad invested USD 500,000 to implement MicroStation as its LiDAR point-cloud data processing platform. Integrated with Terrasolid applications, MicroStation enabled the display, navigation, and visualization of data. Using GEOPAK data acquisition tools enabled the generation of DTMs from point-cloud data with high-resolution imagery dynamically draped on top of the DTMs. This solution eliminated the need for high-end workstations to manipulate LiDAR data. The tools streamlined workflows and improved outputs for better client communications.
172
173
WINNER
FINALIST
Company Name Project Name
Location
The Metro Wastewater Reclamation District in Denver, Colo., is modifying and upgrading the South Secondary Treatment facilities to treat 114 million gallons of wastewater per day. The USD 136 million project had to be completed within the statemandated compliance schedule, requiring the contractor to place approximately 75,000 cubic yards of concrete and install the major electrical, mechanical, and instrumentation equipment in the first 2.5 years.
2012 BE Inspired Awards
As design engineer and owners representative, Carollo Engineers used MicroStation, Bentley Navigator, ProjectWise, and InRoads to link 12,154 activities from the contractors Primavera P6 baseline schedule with the 3D model to create a 4D visualization. The detailed 4D model aided the project team in evaluating whether the accelerated schedule was achievable. Proactive coordination resulted in 20 days of float ahead of the early completion date.
174
VIEW PRESENTATION
FINALIST
GE Water is building a USD 4.6 million thermal zero liquid discharge plant to treat 260 cubic meters per day of wastewater generated by existing chemical plants at the Lanxess Complex in Nagda, India. The treated water will be reused for boiler feedwater make-up in power generation. GE Water reduced man-hours during design and modeling by about 42 percent, which saved approximately USD 16,800.
The entire plant was modeled using MicroStation and Bentley PlantSpace, which enabled the visualization, coordination, and optimization of equipment, piping, pipe supports, and cable tray layouts. Structural and piping analysis and design were performed using STAAD.Pro and AutoPIPE. The 3D model also enabled accurate bill of materials extraction.
VIEW PRESENTATION
FINALIST
The AUD 418 million upgrade of Melbourne Waters Eastern Treatment Plant in Melbourne, Australia, will add an advanced tertiary treatment plant to produce 708 megaliters per day of high-quality recycled water for non-potable applications. The plant will also improve treated effluent quality at the ocean discharge outfall and so benefit the marine environment. Automated piping isometrics alone saved about 8,000 man-hours.
VIEW PRESENTATION
175
FINALIST
176
177
WINNER
FINALIST
Company Name Project Name
Location
Azersu OJSC is in charge of policy and strategy for Azerbaijans water supply and sanitation services. With the influx of oil revenues in Azerbaijan, Azersu embarked on a four-year infrastructure development program. AzersuCIS was launched in conjunction with this program to gather and store infrastructure data for better operation and maintenance of the system.
The USD 3 million GIS project is an advanced urban infrastructure and environmental management solution that provides data security and access to maps and information for planning, production, operation, and emergency management. Using MicroStation and MicroStation PowerDraft, AzersuCIS is web-accessible to more than 100 users in disparate locations. Azersu saved USD 800,000 in just seven months using the spatial database technology.
178
VIEW PRESENTATION
FINALIST
Gannett Fleming worked with Lehigh County Authority to develop and apply a water system model, which involved establishing links to automate data transfer between the model and existing GIS, customer data, and SCADA. The USD 125,000 project resulted in a more accurate model requiring significantly less financial and time commitment to maintain compared to a traditional model.
VIEW PRESENTATION
FINALIST
The city of Agra, India, had an intermittent water supply, with pumping stations operating for a few hours twice a day. The INR 34 billion Agra Water Supply Project will deliver an adequate supply of treated water 24/7. Undertaken by NJS Engineers for Uttar Pradesh Jal Nigam, the project includes construction of a 144 million-liter-per-day water treatment plant, sedimentation tank, and 130-kilometer transmission pipeline.
NJS Engineers India Pvt. Ltd. JICA-assisted Agra Water Supply Project
Agra, India
Rehabilitation and repair of two water treatment plants, overhead tanks, clear water reservoirs, and distribution networks were also planned. WaterGEMS was used to develop a hydraulic model for existing, intermediate, and future water supply zones. The model was used to evaluate network flow, capacity, and pressure; plan system rehabilitation, improvement, and expansion; monitor non-revenue water; and develop efficient operational strategies.
VIEW PRESENTATION
179
AECOM India Pvt. Ltd. Sewerage Master Plan of Delhi for Delhi Jal Board
New Delhi, India
Charged with sewerage collection, treatment, and disposal in Indias capital city, Delhi Jal Board engaged AECOM India in association with WAPCOS to prepare a sewerage master plan for 2031. The plan considered existing infrastructure and a provision for new facilities, including unauthorized colonies and rural villages. The process combined survey and investigation, GIS integration, map scheme standardization, hydraulic modeling, and design and planning. Coupling hydraulic modeling in SewerGEMS with GIS visualization in Bentley Map and feature and attribute standardization in Bentley Water facilitated the interpretation of results for thousands of kilometers of survey data. Multiple iterations of more than 100 SewerGEMS submodels yielded optimal designs that were imported into one SewerGEMS file, possibly the largest integrated hydraulic model in India.
180
181
182
Frischmann Prabhu (India) Pvt. Ltd. Mega City Water Supply System
Panvel, India
Patterned after Dubais Media City and Qatars Energy City, the INR 15 billion mixed-used development called Mega City in Panvel, India, will create a sustainable satellite township on 1,400 acres. Frischmann Prabhu was retained to plan and design the water supply system including pipelines, and elevated and ground service reservoirs to serve a population of about 450,000. WaterGEMS was used to perform hydraulic modeling of scenarios involving various system constraints, and determine pipe diameters for different pump hours and water tank levels. The water supply scheme sources water from a government authority pipeline, transports the water 1 kilometer to a master balance reservoir, and pumps the water to three elevated ground service reservoirs at different elevations at 3, 5, and 10 kilometers distance from the master balance reservoir.
183
184
185
186
187
188
189
WAPCOS Limited Sewerage Master Plan of Delhi for the Year 2031
New Delhi, India
Delhi Jal Board engaged AECOM India in association with WAPCOS to prepare a sewerage master plan for year 2031 as part of its responsibilities for sewage collection, treatment, and disposal in Indias capital city. The project covered Delhi, its unauthorized colonies, and rural villages. The scope included a topographical survey and geotechnical investigation of 1,100 unauthorized colonies. Integrated survey data and population projections were transferred to SewerGEMS. Integration of the hydraulic model and GIS database introduced spatial visualization to the iterative design process. SewerGEMS reduced the time required for redesign based on site feasibility. WAPCOS also carried out a performance audit of 15 existing wastewater treatment plants, along with hydraulic modeling of trunk sewers.
190
WINNERS W
PROJECT NAME
Wieliczka Salt Mine Laser Scanning Electricity of Portugal Deulgaon Raja Sujal Reform Project Detailed Design of NH 6 Udaipur Ring Road Sewerage Master Plan of Delhi for Delhi Jal Board Competition for New Trade Center Strategic Center for Earthquake Emergency Underwater Metro Tunnel Project JammuUdhampur Section Construction Metro Rail Viaduct Construction Air Separation Unit Plant Automation System of DEYA Lamias Process Structure for a Refinery Complex Cloudbreak Enhancement Project eB Supports Nuclear Outage Management Real Classic Mood Caf Geospatial Integration Project Application of 3D Design Technology in Complex Bridge Design SEA Highspeed Track Bridges Friends Arena April 4 Bridge Greater Nicosia Sanitary Sewerage Project Helsinki Central Library Competition South Morang Rail Extension 200seat Capacity Auditorium Restoration of a Recycled Slag Landfill Stamping Pit Wiggins Island Coal Export Terminal GISbased Infrastructure Asset Management Reengineering Substation 35/6 Kilovolts Trebs Oil Field: Central Collection Point Centro Residenziale Dogana Conceptual Design With PlantWise Taxiways at RzeszowJasionka Airport Caval Ridge Coal Mine 33 Units Alamesra Lehigh/Pohopoco Bridge Replacement The Lantern AkzoNobel Swedish Head Office Jirau Hydropower Plant South Secondary Improvements Project South San Francisco Generator Building Stackerchase Coalblending Facility Residential Buildings Four Laning of LudhianaTalwandi Section of NH 95 Auditorium at Mohali Metro Wastewater Reclamation District, Northern Treatment Plant Tongling Nonferrous Metals Copper Smelting Project
PAGE
98 66 180 138 139 180 46 46 152 67 67 124 181 152 97 31 47 98 36 36 47 35 181 45 151 153 81 153 99 178 170 124 48 125 91 99 48 35 49 154 22 174 154 114 49 139 155 11, 176 100
191
PROJECT NAME
Gelantan Hydropower Station (GLTHPP) Chongqing Water Networks Operation Demonstration Turcot Interchange Solar Exposure of Copenhagen City Iceresistant Offshore Platform LSP1 Jukbuin Multipurpose Hall of Gran Canaria Using Pointcloud Data for Public Consultation for a Road Improvement 3D Property Mapping Using SOSI Standards Fuller Road and Washington Avenue Asset Information Management System Crossrail Saudi Kayan Highdensity Polythylene Plant Sewerage Master Plan 2031 for Delhi Kerala Highspeed Rail 2X20 MW Thermal Power Plant VISA Raigarh Super Thermal Power Project New Jersey Turnpike Arizona State University New Business School New Doha International Airport Cargo Facility Wind Turbine Test Site A63 Motorway Widening and Improving Furnishing of a Pharmacy Intelligent Substation Information Modelling TeestaIII Hydro Electric Project Implementation of AutoPLANT and ProjectWise CNRL Primrose East Pipelines Nestle R&D Centre Store Furnishing Design Rimuli to Roxy Section of NH 215 Palmetto Section 5, SR 826/836 Interchange Bridge 11 Precast Segmental Rehabilitation Center RTD FasTracks Eagle P3 Project Global Gateway Logistic City NW 62nd Avenue Improvements Villa 567 Cote d'Azur Mega City Water Supply System Innovative Model Data Integration Processes Lanxess India Thermal Zero Liquid Discharge Wastewater Treatement Plant Automated Drawing Release Using ProjectWise FCCU and PRU Revamp Project (A & C) Automotive Paint Shop Arco D'Augusto Sutter Health Eden Medical Center Booster Compressor Station on the Yurharovskoye Oil Field 3D Modeling of the Village of Casette Ruwais Refinery Expansion Project Package 2
PAGE
113 182 140 85 105 76 68 140 92 136 31 84 155 182 132 115 115 23 68 69 15, 32 141 50 171 156 168 125 156 50 141 37 151 21 183 137 106 183 179 175 23 126 69 86 24 123 92 126 70
Ecofys Netherlands B.V. Egis International Ekofarma S.r.l. ElectraNet Pty Ltd Energy Infratech Pvt. Ltd.
Enogex LLC Equinox Engineering Ltd. ESCOM Consultants Pvt. Ltd. Falegnameria Grottaroli S.a.s. Feedback Infrastructure Services Private Limited Finley Engineering Group, Inc.
F F
Foth Infrastructure & Environment, LLC Francis Design Consulting SARL Frischmann Prabhu (India) Pvt. Ltd.
F F
Gannett Fleming, Inc. GE Water GE Water & Process Technologies GEI Industrial Systems Ltd. Geico S.p.A. Georender srl
GHAFARI Associates, LLC F Giprotyumenneftegaz Giulio Vatteroni Architetto GS Engineering & Construction Corporation
Guangzhou Panyu District Shiqiao Architectural Design Audi 4s Construction Institute Co., Ltd.
192
WINNERS W
PROJECT NAME
Application of RM Bridge V8i to the Longjiang River Superlarge Bridge Professor, University of Salzburg Two Lane to Four Lane Widening of NH 59 Atlantic Residential Project I74 Mississippi River Crossing Corridor Qinghai Magnesium Smelter Dehydration Facility WindsorEssex Parkway Kelana Jaya Light Rail Transit Line Extension
PAGE
37 17 142 157 21 100 142 157 116 169 158 158 16, 66 65 171 112 12 106 107 86 70 71 60 61 51 38 107 159 116 150 44 51 52 132 38 117 117 159 160 160 108
Heilonjiang Province Investigation and Design Institute Fendou Reservoir of Water Resources and Hydropower F Henan Electric Power Survey and Design Institute Hindustan Petroleum Corp. Ltd. (HPCL) Hindustan Petroleum Corp. Ltd. (HPCL)
W| F
Henan 500kilovolt Power Grid 3D Digitized and Integrated Operations Platform IFO Cooling Facility Softened Water to DM Water Service and Condensate Heat Recovery and Integration Integrated Plant Construction System Firmwide Designbuild Quality Plan Suspended Power Line Route Planning Standard Design and Application for the Pumped Storage Power Station Utilization of the Bentley LEARN Training Subscription BP Quad 204 Project Shwe Gas Project Global Cities and Roads Inventory Management (InCa) NIBUG Woonmoon Dam Auxiliary Spillway Quality Control Automation InfiPlan Office Suite Production Facility for Auto Body Construction New Bridge Inspection Software System Upending Hinge Installation of Mono Piles Alcaravan Bioenergy Enka de Colombia LAX International Terminal Expansion King's Cross Station Redevelopment Bao'an Oct Hotel Mineral & Materials Research Hub MoscowSt. Petersburg Highspeed Rail Line Continuous Bridges Formed by Precast Beams ShinUljin Nuclear Plant Units 1 & 2 Project Yonghung Thermal Power Plant Units 3 & 4 Pipavav Shipyard Preengineered Building Works for Kalyani Global Engineering RenaultNissan Automotive India, Tamil Nadu Offshore Production Platform Deluge Skid Sustainable Road Maintenance Using Mobile Mapping System GoYang Samsong Combined Heat and Power Generation Kolomela Environmental Management Systems 375 Megawatt Phase III Combined Cycle Plant Plant Structures: Interconnecting Coal Gallery Guardian Towers Museum of Bristol M Shed
HitachiGE Nuclear Energy, Ltd. HNTB Corporation Hokkaido Aero Asahi Co. Ltd.
W W
HydroChina Zhongnan Engineering Corporation HydroChina Zhongnan Engineering Corporation Hyundai Heavy Industry Hyundai Heavy Industry I.P.S. Vial S.L. IBUG 21, S.L. IDM E&C
IMMCO, Inc. Infotech Enterprises Ltd Ingenieurbro Zammit GmbH Iowa Department of Transportation ISC Consulting Engineers A/S ISGEC Heavy Engineering Ltd. ISGEC John Thompson Ltd.
W W
John A. Martin & Associates, Inc. John McAslan + Partners John Portman & Associates John Wardle Architects JSC Mosgiprotrans K2 Ingeniera KEPCO Engineering & Construction Company, Inc. KEPCO Engineering & Construction Company, Inc. Kirby Building Systems India Ltd. Kirby Building Systems India Ltd. Kirby Building Systems India Ltd. Knowsley SK Ltd Kokusai Kogyo Co., Ltd. Korea District Heating Engineering Co., Ltd.
Kumba Iron Ore Limited L&TSargent & Lundy Limited L&TSargent & Lundy Limited
193
PROJECT NAME
375 Megawatt GSECL Dhuvaran Heat Recovery Steam Generator 375 Megawatt GSECL Dhuvaran III Ammonia Plant Feedstock Changeover Project GDUGSU Module for MHN Project Reformer for Ammonia Syngas Plant India's Largest Coke Oven Plant TSL Raw Material Handling System Package1 SamakhialiGandhidham Road Project Borgo Della Neve ProjectWise Custom PDF Publishing 1X500 Megawatt Bokaro A Cricket Stadium Hydraulic Modeling for Gondia City Hydraulic Modeling for Hingoli City Hydraulic Modeling for Kagal City Improving Efficiency of Pump Operations in Manila The Virtual Store Project Eastern Treatment Plant Tertiary Upgrade Western Turner Syncline Phase 1
PAGE
161 119 127 108 127 162 162 143 53 24 163 163 184 184 185 185 53 175 101 80 34 25 45 90 144 25 85 104 179 54 101 26 76 13, 170 128 26 10, 22, 138 77 27 39 39 40 96 186 61 54 123 62
Mississippi Department of Transportation Geotechnical gINT Implementation at Mississippi Department of Transportation Department Modjeski and Masters, Inc. Moh and Associates, Inc. Huey P. Long Bridge Widening Collaboration and Integration of ProjectWise Giant Interactive Group Corporate Headquarters Spring Valley Wind Project Regional Road South Part ProjectWise for Railway Business GIS and Asset Management Tokyo International Airport Reexpansion Project JICAassisted Water Supply Project Unterfhring Nursery Hot Rolling Mill's Boiler Room Augmented Reality for Fulton Street Transit Center Fulton Street Transit Center Bentley Substation Implementation Slurry Oil Backwash Filter System ProjectWise Automated PDF Generator Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade KREOD Construction of Booster Oilrefining Station on Bayanduskoe Oil Field Huasco Viaduct Bridge SouthEast and 44th Street Interchange The Triplet Bridges Finsch GIS Remote Communities: Optimization of Water Supply Utilizing Bentley in the Hottest Spots Spaces Design for Luxury Cosmetics Betara Complex Development Project Link Net Fiber and Coax Drawing
F W
F W F
Napier City Council Nippon Steel & Sumikin Engineering Co., Ltd. NJS Engineers India Pvt Ltd Ochs Schmidhuber Architekten OJSC Magnitogorsk Gipromez Ove Arup & Partners Ove Arup & Partners
W| F
Pacific Gas and Electric Company Pall India Pvt. Ltd. Parsons Brinckerhoff
W| F
Parsons Brinckerhoff and Arup JV Pavilion Architecture PechorNIPIneft PEDELTA Colombia S.A.S. PEDELTA Colombia S.A.S. PEDELTA Colombia S.A.S.
W
2012 BE InSpIREd AwARdS
194
WINNERS W
PROJECT NAME
DearbornYpsilanti Second Track Highspeed Rail TTC Streetcar Replacement Projects Kolkata Metro Garia to Airport Line Offshore Platform Asbuilt Model Small Bore Branch Support Shop Monnalisa "Red Leaf" Farakka Bridge Across Farakka Feeder Canal New OSU Chilled Water Plants Rock Bolting Rig Park House Carbo Ceramic's Millen Proppant Facility Hill Bypass Road Kharkhari to Motichur Station Cadiriri Booster Supply Analysis Jardim Damasceno Pump Station Water Supply in Risk Area Integrated Photogrammetry Solution With MicroStation Establishment of Kingdomwide EDMS at SEC The Diamant Implementation of GIS in the Middleclass City of India Study Details of Pipes and Hoppers North Cheonan Industrial Complex Underground Piping Management (Pilot) Virginia City Hybrid Energy Center Dudley Square Municipal Building JapanChina Friendship Center HVAC Renewal Hydraulic Modeling Army Public School 3D Mining Complex Virtual Tour Greater Colombo Wastewater Management Feasibility Study on the KinshasaIlebo Railway Greater Trincomalee Integrated Water Supply Humberto de Campos Street Extension Outdoor Advertising Permitting System Data Quality Manager Implementation ROI Design Application Integration Reconstruction of the E1 15 (M8 Kholmogory) Atlanta History Center Design Competition Intelligent Quarters Renovation of Residential Building La City Progetto Ville Urbane Sharing GIS Information With Contractors: Utilities Infrastructure Portal (OPA) Hallandss Live BIM Railway Project G Project Nadaprabhu Kempegowda Green City Project Digital Definition of Paperconverting Production Line
PAGE
133 131 144 133 109 109 55 40 55 105 74 27 41 186 187 187 87 20 56 87 176 93 14, 114 65 71 188 164 102 188 134 189 137 88 30 113 145 75 56 57 164 165 172 130 57 91 128
Shaw Power Group Shawmut Design and Construction Shinryo Corporation Shirpur Municipal Council Shreecon Consultants SJM Tech S.a.s. SMEC International Private Limited SNCF Societe du Canal de Provence Sri Lanka Bureau
W F
Stanley Beaman & Sears Strmer Murphy and Partners Studio Agnellini Studio Tecnico Mannelli e Associati Studio Tecnico Mannelli e Associati swb Netze GmbH & Co. KG
195
PROJECT NAME
Extension of Conveyor Strengthening of Emergency Stock Out Conveyer at Trombay Victoria Station Upgrade Jet Grouting Visualizing Digital Terrain Models From Airborne LiDAR I57 Diverging Diamond Interchange New Toyota Factory Kansas Star Casino Interchange Design Gas Tracing at 1000m With Bentley Geo Web Publisher South Pars Gas Field Development Project Reengineering Design of Pune Bypass A New, Innovative Transit Asset Management Solution Mlarbanan ProjectWise Interoperable Real Estate Municipal Database PURA for Sangli Cluster of Maharashtra Gaya Sewerage Scheme Sewerage Master Plan of Delhi for the Year 2031 BRANZ Headquarters University of Otago Plaza Point Defiance Bypass SR 92 99th Ave NE Roundabout Wyoming Diverging Diamond Interchange Zachry's Use of ConstructSim 2 Megawattclass Offshore Wind Turbine Project Modulization Design for Ruwais Refinery Project Modular GTL Commercial Demonstration Plant Jinhua Converter Station
PAGE
165 166 64 172 145 72 146 102 93 146 131 134 88 189 190 190 58 58 147 147 148 72 110 110 122 169
196
WINNERS W
PROJECT NAME
April 4 Bridge
LOCATION
Catumbela
PAGE
35
FINALISTS
Cloudbreak Enhancement Project South Morang Rail Extension Wiggins Island Coal Export Terminal Caval Ridge Coal Mine The Lantern Intelligent Substation Information Modelling Mineral & Materials Research Hub Eastern Treatment Plant Tertiary Upgrade Western Turner Syncline Phase 1 Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade Remote Communities: Optimization of Water Supply Rock Bolting Rig
Pilbara Melbourne Gladstone Moranbah Melbourne Adelaide Adelaide Melbourne Tom Price Brisbane Northern Territory Onslow
97 151
Salzburg
17
Azersu OJSC BOLIVIA PEDELTA Colombia S.A.S. BRAZIL Camargo Corra Sabesp Sabesp Sabesp
Baku
178
La Paz
40
Jirau Hydropower Plant Cadiriri Booster Supply Analysis Jardim Damasceno Pump Station Water Supply in Risk Area Humberto de Campos Street Extension Modular GTL Commercial Demonstration Plant
Porto Velho Sao Paulo Sao Paulo Sao Paulo Blumenau Aracaju
F W
Sotepa Ltda. Zeton Inc. CANADA CIMA+ Equinox Engineering Ltd. Hatch Mott MacDonald R.V. Anderson Associates Limited CHILE PEDELTA Colombia S.A.S. CHINA Anhui Transport Consulting & Design Institute Co., Ltd. China Nerin Engineering Co., Ltd.
Turcot Interchange CNRL Primrose East Pipelines WindsorEssex Parkway TTC Streetcar Replacement Projects
Vallenar
39
Application of 3D Design Technology in Complex Bridge Design Tongling Nonferrous Metals Copper Smelting Project Gelantan Hydropower Station (GLTHPP) Chongqing Water Networks Operation Demonstration Audi 4s Construction Application of RM Bridge V8i to the Longjiang River Superlarge Bridge Qinghai Magnesium Smelter Dehydration Facility Fendou Reservoir Henan 500kilovolt Power Grid 3D Digitized and Integrated Operations Platform
Hefei City Tongling Pu'er Chongqing Guangzhou Bijie City Gomud Muling Zhengzhou
China Water Resources Beifang Investigation, Design and Research Co., Ltd. Chongqing Water Supply Co. Ltd Guangzhou Panyu District Shiqiao Architectural Design Institute Co., Ltd. Guizhou Province Traffic Planning, Survey, and Design Institute Limited Hatch Associates Pty Ltd Heilonjiang Province Investigation and Design Institute of Water Resources and Hydropower
197
PROJECT NAME
Standard Design and Application for the Pumped Storage Power Station Utilization of the Bentley LEARN Training Subscription Bao'an Oct Hotel Giant Interactive Group Corporate Headquarters ProjectWise for Railway Business Shop Monnalisa "Red Leaf" New Toyota Factory Jinhua Converter Station
LOCATION
Zunyi Changsha Shenzhen Shanghai Hong Kong Shanghai Tianjin Jinhua
PAGE
112 12 51 45 25 55 72 169
159 116 39
Kinshasa
134
Nicosia
181
Copenhagen
85
Helsinki
45
SEA Highspeed Track Bridges Using Pointcloud Data for Public Consultation for a Road Improvement A63 Motorway Widening and Improving Villa 567 Cote d'Azur Study Details of Pipes and Hoppers ProjectWise Interoperable Real Estate Municipal Database
Poitiers Pont de Veyle Salles to Saint Geours de Marennes Chteauneuf de Grasse Le Plessis Robinson Grenoble
Production Facility for Auto Body Construction Unterfhring Nursery Intelligent Quarters Sharing GIS Information With Contractors: Utilities Infrastructure Portal (OPA)
51 54 56 172
Lamia
181
Deulgaon Raja Sujal Reform Project Detailed Design of NH 6 Udaipur Ring Road Sewerage Master Plan of Delhi for Delhi Jal Board Underwater Metro Tunnel Project JammuUdhampur Section Construction Metro Rail Viaduct Construction Air Separation Unit Plant Process Structure for a Refinery Complex 200seat Capacity Auditorium Stamping Pit Four Laning of LudhianaTalwandi Section of NH 95 Auditorium at Mohali
Deulgaon Raja Howrah to Medinipur Udaipur New Delhi Kolkata Udhampur Kolkata Vishakhapatnam Eastern Ujjain Chennai Ludhiana Chandigarh
180 138 139 180 152 67 67 124 152 153 153 139 155
Aker Solutions Ashok Manhar & Associates Aswathanarayana & Eswara CDM Smith Inc CE Con Engineering
198
WINNERS W
PROJECT NAME
Sewerage Master Plan 2031 for Delhi Kerala Highspeed Rail VISA Raigarh Super Thermal Power Project TeestaIII Hydro Electric Project Nestle R&D Centre
LOCATION
New Delhi Thiruvanthapuram to Kasargod Raigarh Chugthang Village Manesar Rimuli Panvel Nagda Mathura Godhra Mumbai Mumbai Amreli Kutch Chennai Dhuvaran Koradi Anand Anand Panipat, Haryana, and Bathinda Mumbai Panipat and Bhatinda Meramandalli Jamshedpur Samakhiali Bokaro Guwahati Gondia Hingoli Kagal Agra Kolkata Farakka Haridwar Bhiwandi Shirpur Jalandhar Bangalore Jojebera Mumbai Pune Sangli Gaya Delhi
PAGE
182 132 115 156 156
Feedback Infrastructure Services Private Limited Design Rimuli to Roxy Section of NH 215 Frischmann Prabhu (India) Pvt. Ltd. F GE Water GEI Industrial Systems Ltd. Halcrow Consulting India Pvt. Ltd. Hindustan Petroleum Corp. Ltd. (HPCL) Hindustan Petroleum Corp. Ltd. (HPCL) Kirby Building Systems India Ltd. Kirby Building Systems India Ltd. Kirby Building Systems India Ltd. L&TSargent & Lundy Limited L&TSargent & Lundy Limited Larsen & Toubro Limited Larsen & Toubro Limited Larsen & Toubro Limited Larsen & Toubro Limited Larsen & Toubro Limited Larsen & Toubro Limited Larsen & Toubro Limited ECC Division Larsen & Toubro Limited ECC Division Macawber Beekay Pvt. Ltd. Mahadeo Khurd & Associates Maharashtra Jeevan Pradhikaran Maharashtra Jeevan Pradhikaran Maharashtra Jeevan Pradhikaran F NJS Engineers India Pvt Ltd Rail Vikas Nigam Limited RITES, Ltd. Saanvi Infrastructure Pvt Ltd Seh Nirman Shirpur Municipal Council Shreecon Consultants F Tandon Urban Solutions Pvt. Ltd. Tata Power Tata Power URS Scott Wilson India Pvt Ltd Vitya Consultants Pvt. Ltd WAPCOS Limited WAPCOS Limited INDONESIA F PT. Inti Karya Persada Teknik PT. Link Net Betara Complex Development Project Link Net Fiber and Coax Drawing Mega City Water Supply System Lanxess India Thermal Zero Liquid Discharge Wastewater Treatement Plant FCCU and PRU Revamp Project (A & C) Two Lane to Four Lane Widening of NH 59 IFO Cooling Facility Softened Water to DM Water Service and Condensate Heat Recovery and Integration Pipavav Shipyard Preengineered Building Works for Kalyani Global Engineering RenaultNissan Automotive India, Tamil Nadu 375 Megawatt Phase III Combined Cycle Plant Plant Structures: Interconnecting Coal Gallery 375 Megawatt GSECL Dhuvaran Heat Recovery Steam Generator 375 Megawatt GSECL Dhuvaran III Ammonia Plant Feedstock Changeover Project GDUGSU Module for MHN Project Reformer for Ammonia Syngas Plant India's Largest Coke Oven Plant TSL Raw Material Handling System Package1 SamakhialiGandhidham Road Project 1X500 Megawatt Bokaro A Cricket Stadium Hydraulic Modeling for Gondia City Hydraulic Modeling for Hingoli City Hydraulic Modeling for Kagal City JICAassisted Water Supply Project Kolkata Metro Garia to Airport Line Farakka Bridge Across Farakka Feeder Canal Hill Bypass Road Kharkhari to Motichur Station Implementation of GIS in the Middleclass City of India Hydraulic Modeling Army Public School Nadaprabhu Kempegowda Green City Project Extension of Conveyor Strengthening of Emergency Stock Out Conveyer at Trombay Reengineering Design of Pune Bypass PURA for Sangli Cluster of Maharashtra Gaya Sewerage Scheme Sewerage Master Plan of Delhi for the Year 2031
141 183 175 126 142 158 158 159 160 160 118 161 161 119 127 108 127 162 162 143 163 163 184 184 185 179 133 40 41 87 188 164 91 165 166 146 189 190 190
Jabung Jakarta
123 62
199
PROJECT NAME
South Pars Gas Field Development Project
LOCATION
Esfahan
PAGE
93
Arbil
157
Competition for New Trade Center Strategic Center for Earthquake Emergency Real Classic Mood Caf Centro Residenziale Dogana Residential Buildings Furnishing of a Pharmacy Arco D'Augusto 3D Modeling of the Village of Casette Borgo Della Neve Spaces Design for Luxury Cosmetics 3D Mining Complex Virtual Tour Renovation of Residential Building La City Progetto Ville Urbane
Scandiano Scandiano Caserta Ortonovo Milan Rome Aosta Casette Montefiore Alessandria Buggerru Lerici Pescara Pisa
HitachiGE Nuclear Energy, Ltd. Hokkaido Aero Asahi Co. Ltd. Kokusai Kogyo Co., Ltd.
Integrated Plant Construction System Suspended Power Line Route Planning Sustainable Road Maintenance Using Mobile Mapping System Tokyo International Airport Reexpansion Project JapanChina Friendship Center HVAC Renewal G Project
Hitachi Hokkaido and Tsugaru Peninsulas Minamiawaji City Tokyo Tokyo Tokyo
Nippon Steel & Sumikin Engineering Co., Ltd. Shinryo Corporation Takenaka Corporation KUWAIT Mouchel MALAYSIA Bina Puri Construction Sdn Bhd HCR Bridge Machinery (M) Sdn. Bhd. Sarawak Land and Survey Department Tenaga National Berhad MYANMAR Hyundai Heavy Industry NETHERLANDS
144
33 Units Alamesra Kelana Jaya Lightrail Transit Line Extension Integrated Photogrammetry Solution With MicroStation Visualizing Digital Terrain Models From Airborne LiDAR
Kota Kinabalu Klang Valley Sarawak Slim River, Sungkai, Tapah, and Tanah Rata
48 157 87 172
Rakhine
107
W| F
Lelystad
15, 32
Napier City Council Warren and Mahoney Warren and Mahoney NORWAY COWI India Private Limited
85 58 58
Oslo
92
PHILIPPINES Forsspac Manila Water Company POLAND 3Deling sp. z o.o. Wieliczka Salt Mine Laser Scanning Wieliczka 98 Global Gateway Logistic City Improving Efficiency of Pump Operations in Manila Clark Quezon City 183 185
200
WINNERS W
PROJECT NAME
Taxiways at RzeszowJasionka Airport
LOCATION
Rzeszw
PAGE
91
Ramboll Engineering Consultancy Services India Offshore Platform Asbuilt Model Pvt. Ltd. Ramboll Engineering Consultancy Services India Small Bore Branch Support Pvt. Ltd. RUSSIA BashNIPINeft BashNIPIneft F F CNGS Engineering Giprotyumenneftegaz JSC Mosgiprotrans OJSC Magnitogorsk Gipromez PechorNIPIneft Soyuzdorproekt Ltd Geico S.p.A. SAUDI ARABIA Daelim Industrial Co., Ltd. W Saudi Kayan Highdensity Polythylene Plant Reengineering Substation 35/6 Kilovolts Trebs Oil Field: Central Collection Point Iceresistant Offshore Platform LSP1 Booster Compressor Station on the Yurharovskoye Oil Field MoscowSt. Petersburg Highspeed Rail Line Hot Rolling Mill's Boiler Room Construction of Booster Oilrefining Station on Bayanduskoe Oil Field Reconstruction of the E1 15 (M8 Kholmogory) Automotive Paint Shop
109 109
Ufa NaryanMar Caspian Sea Nadym Moscow to St. Petersburg Magnitogorsk Usinsk Moscow
155 20
Saudi Electricity Company/Implemented by Nahil Establishment of Kingdomwide EDMS at SEC Computer Company SOUTH AFRICA Anglo American plc Geospatial Integration Project Kolomela Environmental Management Systems Finsch GIS
98 97 96
F W
Kumba Iron Ore Limited Petra Diamonds Limited SOUTH KOREA IDM E&C KEPCO Engineering & Construction Company, Inc. KEPCO Engineering & Construction Company, Inc. Korea District Heating Engineering Co., Ltd. Pall India Pvt. Ltd. Seoyeong Engineering Co., Ltd. Zentech Engineering Co., Ltd. Zentech Engineering Co., Ltd. SPAIN
Woonmoon Dam Auxiliary Spillway ShinUljin Nuclear Plant Units 1 & 2 Project Yonghung Thermal Power Plant Units 3 & 4 GoYang Samsong Combined Heat and Power Generation Slurry Oil Backwash Filter System North Cheonan Industrial Complex Underground Piping Management (Pilot) 2 Megawattclass Offshore Wind Turbine Project Modulization Design for Ruwais Refinery Project
Astiv Ingeniera CODA LiTA COMSA Falegnameria Grottaroli S.a.s. I.P.S. Vial S.L. IBUG 21, S.L. K2 Ingeniera SRI LANKA SMEC International Private Limited
Restoration of a Recycled Slag Landfill Jukbuin Multipurpose Hall of Gran Canaria Store Furnishing Global Cities and Roads Inventory Management (InCa) NIBUG Continuous Bridges Formed by Precast Beams
Zumrraga Barcelona Las Palmas de Gran Canaria Palma de Mallorca Madrid Barcelona Elche
81 76 68 50
Bentley SyStemS, Incorporated
86 70 38
Colombo Trincomalee
188 189
Societe du Canal de Provence Sri Lanka Bureau Greater Trincomalee Integrated Water Supply
201
PROJECT NAME
Friends Arena AkzoNobel Swedish Head Office Hallandss Live BIM Railway Project Mlarbanan
LOCATION
Solna Nacka Frslv to Bstad Stockholm
PAGE
47 154 130 134
The Diamant
Basel
56
25
Zonguldak
102
2X20 MW Thermal Power Plant Ruwais Refinery Expansion Project Package 2 Guardian Towers
115 126 75
Asset Information Management System Crossrail BP Quad 204 Project Upending Hinge Installation of Mono Piles King's Cross Station Redevelopment Offshore Production Platform Deluge Skid Museum of Bristol M Shed KREOD Park House Victoria Station Upgrade Jet Grouting
31 84 106 107
44 108 52 77 74 64
Data Quality Manager Implementation ROI Arizona State University New Business School South San Francisco Generator Building Sutter Health Eden Medical Center InfiPlan Office Suite LAX International Terminal Expansion Bentley Substation Implementation South Secondary Improvements Project Metro Wastewater Reclamation District, Northern Treatment Plant RTD FasTracks Eagle P3 Project Quality Control Automation Palmetto Section 5, SR 826/836 Interchange Bridge 11 Precast Segmental Carbo Ceramic's Millen Proppant Facility Atlanta History Center Design Competition Digital Definition of Paperconverting Production Line I57 Diverging Diamond Interchange Highspeed Rail NW 62nd Avenue Improvements New Bridge Inspection Software System I74 Mississippi River Crossing Corridor
Birmingham, Alabama Tempe, Arizona San Francisco, California Castro Valley, California San Jose, California Los Angeles, California San Francisco, California Denver, Colorado Denver, Colorado Denver, Colorado Denver, Colorado Miami, Florida Millen, Georgia Atlanta, Georgia Albany, Georgia Marion, Illinois Chicago, Illinois, to St. Louis, Missouri Johnston, Iowa Des Moines, Iowa Davenport, Iowa, and Moline, Illinois
30 68 154 24 61 150 13, 170 174 11, 176 21 60 37 27 75 128 145 131 137 38 21
John A. Martin & Associates, Inc. Pacific Gas and Electric Company Carollo Engineers, Inc. CH2M HILL Fluor/HDR Global Design Consultants IMMCO, Inc. Finley Engineering Group, Inc. Robins & Morton Power & Industrial
W
W| F
F W
Stanley Beaman & Sears Tata Consultancy Services Thouvenot, Wade & Moerchen, Inc.
F F
Quigg Engineering Inc. Foth Infrastructure & Environment, LLC Iowa Department of Transportation
202
WINNERS W
PROJECT NAME
Kansas Star Casino Interchange Design ProjectWise Custom PDF Publishing Huey P. Long Bridge Widening Automated Drawing Release Using ProjectWise Utilizing Bentley in the Hottest Spots Dudley Square Municipal Building The Virtual Store Project DearbornYpsilanti Second Track gINT Implementation at Mississippi Department of Transportation Design Application Integration eB Supports Nuclear Outage Management Spring Valley Wind Project New Jersey Turnpike Fuller Road and Washington Avenue Augmented Reality for Fulton Street Transit Center Fulton Street Transit Center Rehabilitation Center New OSU Chilled Water Plants Implementation of AutoPLANT and ProjectWise Lehigh/Pohopoco Bridge Replacement Stackerchase Coalblending Facility Innovative Model Data Integration Processes Outdoor Advertising Permitting System Conceptual Design With PlantWise A New, Innovative Transit Asset Management Solution Firmwide Designbuild Quality Plan ProjectWise Automated PDF Generator Virginia City Hybrid Energy Center Point Defiance Bypass SR 92 99th Ave NE Roundabout Wyoming Diverging Diamond Interchange Zachry's Use of ConstructSim
LOCATION
Mulvane, Kansas Baton Rouge, Louisiana New Orleans, Louisiana Burlington, Massachusetts Boston, Massachusetts Boston, Massachusetts Grand Rapids, Michigan DearbornYpsilanti, Michigan Jackson, Mississippi Kemper County, Mississippi Fulton, Missouri Ely, Nevada Camden County, New Jersey Albany, New York New York, New York New York, New York Concord, North Carolina Columbus, Ohio Western Oklahoma Parryville, Pennsylvania New Florence, Pennsylvania Lehigh County, Pennsylvania Columbia, South Carolina Baytown, Texas Salt Lake City, Utah Alexandria, Virginia Norfolk, Virginia Virginia City, Virginia Tacoma, Washington Lake Stevens, Washington Cheyenne, Wyoming Southeastern United States
PAGE
146 24 34 23 61 65 53 133 80 113 31 90 23 136 26 76 151 55 168 35 114 179 88 125 131 65 26 14, 114 147 147 148 72
Shaw Power Group Washington State Department of Transportation Washington State Department of Transportation Wyoming Department of Transportation Zachry Industrial
203
PROJECT NAME
Metro Wastewater Reclamation District, Northern Treatment Plant Wind Turbine Test Site Professor, University of Salzburg Integrated Plant Construction System Utilization of the Bentley LEARN Training Subscription Bentley Substation Implementation Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade Virginia City Hybrid Energy Center Jirau Hydropower Plant New Jersey Turnpike RTD FasTracks Eagle P3 Project Automated Drawing Release Using ProjectWise Sutter Health Eden Medical Center I74 Mississippi River Crossing Corridor ProjectWise Custom PDF Publishing Collaboration and Integration of ProjectWise ProjectWise for Railway Business Augmented Reality for Fulton Street Transit Center ProjectWise Automated PDF Generator Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade Construction of Booster Oilrefining Station on Bayanduskoe Oil Field Carbo Ceramics Millen Proppant Facility Establishment of Kingdomwide EDMS at SEC
paGe
11 15 17 16 12 13 10 14 22 23 21 23 24 21 24 25 25 26 26 22 27 27 20
CH2M HILL Ecofys Netherlands B.V. Guenter Maresch, Ph.D. HitachiGE Nuclear Energy, Ltd. HydroChina Zhongnan Engineering Corporation Pacific Gas and Electric Company Parsons Brinckerhoff and Arup JV Shaw Power Group CONNECTING PROJECT TEAMS Camargo Corra Dewberry
Fluor/HDR Global Design Consultants GE Water & Process Technologies GHAFARI Associates, LLC
Hanson Professional Services Inc. Louisiana Department of Transportation and Development Moh and Associates, Inc. MTR Corporation Limited Ove Arup & Partners Parsons Brinckerhoff
W| F
Parsons Brinckerhoff and Arup JV PechorNIPIneft Robins & Morton Power & Industrial Saudi Electricity Company/Implemented by Nahil Computer Company Ameren Callaway Energy Center Crossrail Ltd Ecofys Netherlands B.V. Southern Company INNOVATION IN BRIDGES Anhui Transport Consulting & Design Institute Co., Ltd. ARCADIS France
eB Supports Nuclear Outage Management Asset Information Management System Wind Turbine Test Site Data Quality Manager Implementation ROI Application of 3D Design Technology in Complex Bridge Design SEA Highspeed Track Bridges April 4 Bridge Lehigh/Pohopoco Bridge Replacement Palmetto Section 5, SR 826/836 Interchange Bridge 11 Precast Segmental Application of RM Bridge V8i to the Longjiang River Superlarge Bridge New Bridge Inspection Software System Continuous Bridges Formed by Precast Beams Huey P. Long Bridge Widening Huasco Viaduct Bridge SouthEast and 44th Street Interchange The Triplet Bridges Farakka Bridge Across Farakka Feeder Canal Hill Bypass Road Kharkhari to Motichur Station Competition for New Trade Center Strategic Center for Earthquake Emergency Real Classic Mood Caf Friends Arena Helsinki Central Library Competition Centro Residenziale Dogana 33 Units Alamesra The Lantern Residential Buildings Furnishing of a Pharmacy Store Furnishing
31 31 32 30 36 36 35 35 37 37 38 38 34 39 39 40 40 41 46 46 47 47 45 48 48 49 49 50 50
F F
Armando Rito Engenharia SA BortonLawson Finley Engineering Group, Inc. Guizhou Province Traffic Planning, Survey, and Design Institute Limited Iowa Department of Transportation K2 Ingeniera
Modjeski and Masters, Inc. PEDELTA Colombia S.A.S. PEDELTA Colombia S.A.S. PEDELTA Colombia S.A.S. RITES, Ltd. Saanvi Infrastructure Pvt Ltd INNOVATION IN BUILDING Aestudio Aestudio Andrea Girotto Architetto Arkitekterna Krook & Tjder
F
2012 BE InSpIREd AwARdS
Arthur Golding and Associates Bassani Edilizia S.p.A. Bina Puri Construction Sdn Bhd Building Studio Architects Caruso Mainardi Architetti Associati Ekofarma S.r.l. Falegnameria Grottaroli S.a.s.
204
WINNERS W
PROJECT NAME
Production Facility for Auto Body Construction Kings Cross Station Redevelopment Baoan Oct Hotel Mineral & Materials Research Hub Museum of Bristol M Shed Borgo Della Neve The Virtual Store Project Giant Interactive Group Corporate Headquarters Unterfhring Nursery Spaces Design for Luxury Cosmetics Shop Monnalisa Red Leaf New OSU Chilled Water Plants The Diamant Intelligent Quarters Renovation of Residential Building G Project BRANZ Headquarters University of Otago Plaza Quality Control Automation InfiPlan Office Suite Utilizing Bentley in the Hottest Spots Link Net Fiber and Coax Drawing Electricity of Portugal JammuUdhampur Section Construction Metro Rail Viaduct Construction Multipurpose Hall of Gran Canaria Arizona State University New Business School New Doha International Airport Cargo Facility Automotive Paint Shop Audi 4s Construction Integrated Plant Construction System Firmwide Designbuild Quality Plan NIBUG Woonmoon Dam Auxiliary Spillway Dudley Square Municipal Building JapanChina Friendship Center HVAC Renewal Victoria Station Upgrade Jet Grouting New Toyota Factory Zachrys Use of ConstructSim Jukbuin Guardian Towers Fulton Street Transit Center KREOD Park House Atlanta History Center Design Competition Restoration of a Recycled Slag Landfill gINT Implementation at Mississippi Department of Transportation
paGe
51 44 51 52 52 53 53 45 54 54 55 55 56 56 57 57 58 58 60 61 61 62 66 67 67 68 68 69 69 70 66 65 70 71 65 71 64 72 72 76 75 76 77 74 75 81 80
HitachiGE Nuclear Energy, Ltd. HNTB Corporation IBUG 21, S.L. IDM E&C
F W
Shawmut Design and Construction Shinryo Corporation Taylor WoodrowBAM Nuttall JV Tianjin FAW Toyota Motor Co., Ltd. Zachry Industrial INNOVATION IN GENERATIVE DESIGN CODA LiTA
W F F W
Robin Partington Architects Stanley Beaman & Sears Astiv Ingeniera Mississippi Department of Transportation Geotechnical Department INNOVATION IN GOVERNMENT City of Copenhagen Crossrail Ltd Georender srl I.P.S. Vial S.L
F W
Solar Exposure of Copenhagen City Crossrail Arco DAugusto Global Cities and Roads Inventory Management (InCa) GIS and Asset Management Integrated Photogrammetry Solution With MicroStation
85 84 86 86 85 87
205
PROJECT NAME
Implementation of GIS in the Middleclass City of India Outdoor Advertising Permitting System ProjectWise Interoperable Real Estate Municipal Database Taxiways at RzeszowJasionka Airport 3D Property Mapping Using SOSI Standards 3D Modeling of the Village of Casette Spring Valley Wind Project North Cheonan Industrial Complex Underground Piping Management (Pilot) Nadaprabhu Kempegowda Green City Project South Pars Gas Field Development Project Wieliczka Salt Mine Laser Scanning Cloudbreak Enhancement Project Geospatial Integration Project Wiggins Island Coal Export Terminal Caval Ridge Coal Mine Tongling Nonferrous Metals Copper Smelting Project Qinghai Magnesium Smelter Dehydration Facility Kolomela Environmental Management Systems Western Turner Syncline Phase 1 Hot Rolling Mills Boiler Room Finsch GIS 3D Mining Complex Virtual Tour Gas Tracing at 1000m With Bentley Geo Web Publisher Iceresistant Offshore Platform LSP1 Villa 567 Cote dAzur BP Quad 204 Project Shwe Gas Project Upending Hinge Installation of Mono Piles Offshore Production Platform Deluge Skid GDUGSU Module for MHN Project Tokyo International Airport Reexpansion Project Offshore Platform Asbuilt Model Small Bore Branch Support Rock Bolting Rig 2 Megawattclass Offshore Wind Turbine Project Modulization Design for Ruwais Refinery Project Stackerchase Coalblending Facility Gelantan Hydropower Station (GLTHPP) 2X20 MW Thermal Power Plant VISA Raigarh Super Thermal Power Project Fendou Reservoir Standard Design and Application for the Pumped Storage Power Station Enka de Colombia ShinUljin Nuclear Plant Units 1 & 2 Project Yonghung Thermal Power Plant Units 3 & 4 GoYang Samsong Combined Heat and Power Generation 375 Megawatt Phase III Combined Cycle Plant 375 Megawatt GSECL Dhuvaran III Virginia City Hybrid Energy Center Design Application Integration Air Separation Unit Plant
paGe
87 88 88 91 92 92 90 93 91 93 98 97 98 99 99 100 100 97 101 101 96 102 102 105 106 106 107 107 108 108 104 109 109 105 110 110 114 113 115 115 116 112 116 117 117 118 118 119 114 113 124
Shaw Power Group Southern Company INNNOVATION IN PROCESS MANUFACTURING Air Liquide Engineering India Pvt. Ltd
206
WINNERS W
PROJECT NAME
Trebs Oil Field: Central Collection Point Conceptual Design With PlantWise CNRL Primrose East Pipelines FCCU and PRU Revamp Project (A & C) Booster Compressor Station on the Yurharovskoye Oil Field Ruwais Refinery Expansion Project Package 2 Ammonia Plant Feedstock Changeover Project Reformer for Ammonia Syngas Plant Slurry Oil Backwash Filter System Betara Complex Development Project Digital Definition of Paperconverting Production Line Modular GTL Commercial Demonstration Plant Kerala Highspeed Rail MoscowSt. Petersburg Highspeed Rail Line DearbornYpsilanti Second Track Highspeed Rail Kolkata Metro Garia to Airport Line Feasibility Study on the KinshasaIlebo Railway Hallandss Live BIM Railway Project A New, Innovative Transit Asset Management Solution Mlarbanan Detailed Design of NH 6 Udaipur Ring Road Four Laning of LudhianaTalwandi Section of NH 95 Turcot Interchange Using Pointcloud Data for Public Consultation for a Road Improvement Fuller Road and Washington Avenue A63 Motorway Widening and Improving Design Rimuli to Roxy Section of NH 215 NW 62nd Avenue Improvements Two Lane to Four Lane Widening of NH 59 WindsorEssex Parkway Sustainable Road Maintenance Using Mobile Mapping System SamakhialiGandhidham Road Project Regional Road South Part Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade TTC Streetcar Replacement Projects Humberto de Campos Street Extension Reconstruction of the E1 15 (M8 Kholmogory) I57 Diverging Diamond Interchange Kansas Star Casino Interchange Design Reengineering Design of Pune Bypass Point Defiance Bypass SR 92 99th Ave NE Roundabout Wyoming Diverging Diamond Interchange Underwater Metro Tunnel Project Process Structure for a Refinery Complex South Morang Rail Extension 200seat Capacity Auditorium Stamping Pit AkzoNobel Swedish Head Office South San Francisco Generator Building Auditorium at Mohali Saudi Kayan Highdensity Polythylene Plant TeestaIII Hydro Electric Project Nestle R&D Centre Rehabilitation Center
paGe
124 125 125 126 123 126 127 127 128 123 128 122 132 132 133 131 133 134 130 131 134 138 139 139 140 140 136 141 141 137 142 142 143 143 144 138 144 137 145 145 146 146 147 147 148 152 152 151 153 153 154 154 155 155 156 156 151
Parsons Brinckerhoff and Arup JV R.V. Anderson Associates Limited Sotepa Ltda. Soyuzdorproekt Ltd Thouvenot, Wade & Moerchen, Inc. TranSystems URS Scott Wilson India Pvt Ltd Washington State Department of Transportation Washington State Department of Transportation Wyoming Department of Transportation INNOVATION IN STRUCTURAL ENGINEERING Afcons Infrastructure Limited Aker Solutions
Arup Ashok Manhar & Associates Aswathanarayana & Eswara Byggnadstekniska Byrn i Stockholm AB Carollo Engineers, Inc. CE Con Engineering Daelim Industrial Co., Ltd. Energy Infratech Pvt. Ltd. ESCOM Consultants Pvt. Ltd.
207
PROJECT NAME
Atlantic Residential Project Kelana Jaya Light Rail Transit Line Extension IFO Cooling Facility Softened Water to DM Water Service and Condensate Heat Recovery and Integration Alcaravan Bioenergy LAX International Terminal Expansion Pipavav Shipyard Preengineered Building Works for Kalyani Global Engineering RenaultNissan Automotive India, Tamil Nadu Plant Structures: Interconnecting Coal Gallery 375 Megawatt GSECL Dhuvaran Heat Recovery Steam Generator Indias Largest Coke Oven Plant TSL Raw Material Handling System Package1 1X500 Megawatt Bokaro A Cricket Stadium Army Public School La City
paGe
157 157 158 158 159 150 159 160 160 161 161 162 162 163 163 164 164 165 165 166 170 171 168 169 171 170 172 172 169 174 176 175 175 176 180 180 181 181 178 182 182 183 183 179 184 184 185 185 179 186 186 187 187 188 188 189 189 190 190
Bentleys mission is to provide innovative software and services for the enterprises and professionals who design, build, and operate the worlds infrastructure sustaining the global economy and environment for improved quality of life.
Progetto Ville Urbane Extension of Conveyor Strengthening of Emergency Stock Out Conveyer at Trombay Reengineering Substation 35/6 Kilovolts INNOVATION IN UTILITY TRANSMISSION AND DISTRIBUTION NETWORKS BashNIPINeft Enogex LLC ElectraNet Pty Ltd Intelligent Substation Information Modelling W F
W| F
Implementation of AutoPLANT and ProjectWise Suspended Power Line Route Planning Bentley Substation Implementation
Henan Electric Power Survey and Design Institute Hokkaido Aero Asahi Co. Ltd. Pacific Gas and Electric Company swb Netze GmbH & Co. KG Tenaga National Berhad
Sharing GIS Information With Contractors: Utilities Infrastructure Portal (OPA) Visualizing Digital Terrain Models From Airborne LiDAR
The Year in FInfrastructure 2012 is a Bentley Systems, publication that Station showcases Zhejiang Electric Power Design Institute Incorporated Jinhua Converter the extraordinary work of Bentley usersAND sustaining the worlds infrastructure. For additional print INNOVATION IN WATER WASTEWATER TREATMENT PLANTS W www.bentley.com/2012yearbook Carollo Engineers, Inc South Secondary Improvements Project copies, go to . For information about how to enter your innovative project for consideration in the next F GE Water Lanxess India Thermal Zero Liquid Discharge Wastewater Treatement Plant Be Inspired Awards competition or for additional information about this program, F Melbourne Water Eastern Treatment Plant Tertiary Upgrade visit www.bentley.com/beinspired . SEIMAF Ingenierie Study Details of Pipes and Hoppers
INNOVATION IN WATER, WASTEWATER, AND STORMWATER NETWORKS
W| F
CH2M HILL
Deulgaon Raja Sujal Reform Project Sewerage Master Plan of Delhi for Delhi Jal Board
digital versions of Be Inspired Awards publications are available online at AKATT S.A. Automation System of DEYA Lamias www.bentley.com/yearininfrastructure. choose to view a specific issue or search within each Artelia Cyprus Limited Greater Nicosia Sanitary Sewerage Project issue or across all issues using terms, titles, or keywords.
W Azersu OJSC
Chongqing Water Supply Co.portfolios Ltd Chongqing Water Networks also browse Bentleys Be Inspired project at www.bentley.com/projects , whichOperation Demonstration Delhi Jal fi Board Sewerage Master Plan 2031 for Delhi feature the winners and nalists in Bentleys annual Be Inspired Awards competition. through Forsspac Global Gateway Logistic City these multimedia portfolios of exemplary project achievements, Bentley shares innovative best Frischmann Prabhu (India) Pvt. Ltd. Mega City Water Supply System practices with the architects, engineers, constructors, geospatial professionals, and ownerF Gannett Fleming, Inc. Innovative Model Data Integration Processes operators who sustain the worlds infrastructure. Maharashtra Jeevan Pradhikaran Maharashtra Jeevan Pradhikaran Maharashtra Jeevan Pradhikaran Manila Water Company F NJS Engineers India Pvt Ltd Power and Water Corporation Sabesp Hydraulic Modeling for Gondia City Hydraulic Modeling for Hingoli City Hydraulic Modeling for Kagal City Improving Efficiency of Pump Operations in Manila JICAassisted Water Supply Project Remote Communities: Optimization of Water Supply Cadiriri Booster Supply Analysis Jardim Damasceno Pump Station Water Supply in Risk Area Hydraulic Modeling Greater Colombo Wastewater Management Greater Trincomalee Integrated Water Supply PURA for Sangli Cluster of Maharashtra Gaya Sewerage Scheme Sewerage Master Plan of Delhi for the Year 2031
ISBn number: 978-1-934493-19-9. Sabesp published by Bentley Systems, Incorporated Shirpur Municipal Council 685 Stockton drive SMEC International Private Limited exton, pa 19341 USa www.bentley.com WAPCOS Limited
WAPCOS Limited 208 Vitya Consultants Pvt. Ltd
2012 BE InSpIREd AwARdS
Sabesp
recognizing the critical importance of being a good corporate citizen, Bentley is uncompromisingly committed to supporting ecological sustainability. this support goes beyond the stewardship of environmental resources to include investment in strategic educational and training initiatives that foster a workforce of skilled infrastructure professionals capable of meeting the worlds growing sustainability challenges. The Year in Infrastructure 2012 is one small example of Bentleys commitment to promoting sustainable development through its business practices. as part of this effort, this publication has been printed on Forest Stewardship council (FSc) certified paper, which identifies products that contain wood fiber from wellmanaged forests.
2012 Bentley Systems, Incorporated. The Year in Infrastructure 2012 is published by Bentley Systems, Incorporated, 685 Stockton drive, exton, pa USa 19341. Bentley, the B logo, Bentley, Be, Bentley learn, Bentley map, Bentley plantSpace, Bentley plantWise, Bentley Select, autopIpe, autoplant, cloudWorx, conSpan, culvertmaster, eB, Flowmaster, Generativecomponents, GeopaK, Geo Web publisher, gInt, Hammer, Hevacomp, Inroads, InspectTech, LEAP, MicroStation, MicroStation PowerDraft,, MicroStation PowerDraft, MX, MXRAIL, MXROAD, Optram, PlantWave, PlantWise, Pointools, PondPack, PowerCivil, ProConcrete, ProjectWise, promise, ProSteel, RAM, SacS, Select, Sewercad, SewerGemS, speedikon,Staad, Staad.pro, Stormcad, Watercad, and WaterGemS are either registered or unregistered trademarks or service marks of Bentley Systems, Incorporated, or one of its direct or indirect wholly owned subsidiaries. Google earth is a trademark of Google Inc. adobe is a registered trademark of adobe Systems Incorporated in the United States and/or other countries. oracle is a registered trademark of oracle and/or its affiliates. microsoft is a registered trademark of microsoft corporation in the United States and/or other countries. other brands and product names are trademarks of their respective owners.
www.bentley.com
corporate Headquarters
685 Stockton drive exton, pa 19341 United States 1-800-Bentley (1-800-236-8539) outside the United States +1 610-458-5000
Bentley emea
2nd Floor Block 2, park place Upper Hatch Street dublin 2 Ireland +353 1 436 4600
Bentley asia
Unit 1402-06, tower 1 china central place, Beijing 100025 china +86 10 5929 7000