SAIC-A-2025
WBS / BI / JO NUMBER
1-Dec-06
MECH-
CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL
EQPT CODE
SYSTEM ID.
PLANT NO.
ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL
ITEM No. A
ACCEPTANCE CRITERIA Test Package Verification: Test Diagram is submitted showing the following: A) Limits of equipment to be tested incl. test manifold & equipment included in the test. B) Test pressure of the system C) Relief valve setting D) Safety Instruction Sheet Procedure has been approved & meets the detailed requirements of SAIC-A-2001 (Review Procedure - Pressure Testing) Verify drawing conformance of pressure vessel construction. Check all nozzles, supports, attachments (orientation & dimemsion) Systematically complete, verify & accept all drawings incl. details Verify complete code construction incl. support attachments. Repairs & Pick-up (ID/OD) are accepted. ASME VIII, UG-99 (a) Weld Summary Record (SAEP-1160 Welding Database) was verified to indicate completion/acceptance of all weld joints, repairs, modifications & any applicable weld inspection reqmts (visual, NDE). Verify SAIC-W-2008 & SATR-W-2008 details as applicable All required inspection & testing (RT, MT, PT, PWHT, PMI) has been completed & inspection control sheet has been signed by SA. (ASME VIII, UG-99, Para. A-2) As applicable, an SAEP-1160 Welding Database is reviewed Safety Instruction Sheet (SIS) for vessesl/equipment is complete & approved. Verify correct test pressure for system/equipment. Test Pressure at top of vessel is verified against the SIS and conforms to the following ASME Section VIII code, as applicable: A) 1.3 times MAWP for ASME D1 vessels per UG-99 (b) B) 1.25 times MAWP for ASME D2 vessels per AT-301, Div 2 Field Verification/Pre-Test Inspection of Vessel Vents are provided at all high points in the position in which it is to be tested to purge all possible air during water filling. Vessel must be adequately supported during hydrotest if it is tested out of position The strength of existing foundation/supports shall be confirmed to be adequate for additional weight of hydrotest fluid. All joints and faying surfaces, except those specifically designed and designated as removable bolted connections, are seal welded by a continuous fillet weld (external weep holes are left unwelded). Weld Summary Record was verified to indicate completion of all weld joints & applicable weld inspection reqmts (visual and NDE). Post Weld Heat Treatment (PWHT) is complete.
REFERENCE
PASS
FAIL
N/A
RE-INSP DATE
A1
A2
SAES-A-004, Para. 7.1.1 Contract drawings 32-SAMSS-004, Section 16.3.1 SAEP-1160 & SAES-W-010, Para 16.1.2
A3
A4
A5
A6
A7
SAES-A-005, Para. 4.2 SAES-A-004, Para. 6.3.1 & 32-SAMSS-004, Section 16.3.8
A8
B1 B2 B3
ASME VIII, UG99, Para.(i) SAES-A-004, Para.6.3.1 SAES-A-004, Para.6.3.1 SAES-W-010, Para. 11.15.1 SAES-W-010, Para. 15.2 32-SAMSS-004, Section 16.3.2
B4
B5
B6
Page 1 of 3
SAIC-A-2025
WBS / BI / JO NUMBER
1-Dec-06
MECH-
CONTRACTOR / SUBCONTRACTOR
ITEM No. B7
ACCEPTANCE CRITERIA Prior to final inspection & pressure test, new vessel internal and external surfaces have been thoroughly cleaned. Any slag, scale, dirt, grit, spatter, paint, oil, and construction aids are removed. Vessel Trim (associated piping) receives a strength test except in Utility services and less when a service test can be conducted. Note: Vessel Trim piping pressure tests are often overlooked Sampling piping systems are pressure tested as an integral part of the equipment to which it is connected. All welded attachments with telltale holes shall be pneumatically tested at minimum 35 kPa (5 psi) prior to heat treatment and vessel pressure testing. Telltale holes are OPEN during pressure test. This is a Bubble Leak test per SAIC-A-2005/A-2021/A-2023 Shellacs, glues, lead, etc.are not applied on gaskets during testing. Gaskets and bolting materials are as specified on data sheet. Note: Gaskets may be used as service gaskets if the bolted joint is not disassembled after testing, example: Sumps, etc. Vertical vessels tested in horizontal position are supported such that primary stresses in any part of the vessel do not exceed 90% of minimum specified yield strength of the vessel material. Horizontal vessels shall be tested while resting on their permanent support saddles without additional supports or cribbing. Equipment or parts that are clad shall be hydrotested with water having chloride content not greater than 50 ppm. Fin fan exchangers are strength tested in-situ before final acceptance for all new projects. HOLD POINT. See Attachment 1 Jacketed Vessel exams & hydrotest sequence are planned and detailed in design & during hydrotesting (per test procedure). A) Inner vessel construction & hydrotesting is completed prior to outer jacket installation and hydrotesting. B) Construction sequence allows 100% visual inspection of welds during hydrotest. Jacket design & installation is carefully planned. [Reference: ASME VIII, UG-99 sect. (e)]
REFERENCE 32-SAMSS-004, Section 16.2.9 SAES-L-150, Para. 5.3 SAES-L-150, Para. 5.3 32-SAMSS-004, Section 16.3.3 32-SAMSS-004, Section 16.3.4 32-SAMSS-004, Section 16.3.6 32-SAMSS-004, Section 16.3.11 32-SAMSS-004, Section 16.3.12 32-SAMSS-031, Para. 10.2.1 SAES-A-004, Para. 6.4.5.1
PASS
FAIL
N/A
RE-INSP DATE
B8
B9
B10
B11
B12
B14
B18
REMARKS: REFERENCE DOCUMENTS: 1. SAES-A-004, General Requirements for Pressure Testing, (30 March, 2005) 2. SAES-A-005, Safety Instruction Sheet, (28 February 2005) 3. SAES-D-008, Repairs, Alterations, and Re-rating of Process Equipment (30 November, 2003) 4. SAES-L-150, Pressure Testing of Plant Piping and Pipelines (30 September, 2003) 5 SAES-W-010, Welding Requirements for Pressure Vessels (14 November 2005) 6. 32-SAMSS-004, Manufacture of Pressure Vessels (30 March, 2005) 7. ASME Section VIII, Division 1 - Rules for Construction of Pressure Vessels (2002 Edition) 8. ASME Section VIII, Division 2 - Rules for Construction of Pressure Vessels, Alternative Rules (2002 Edition)
Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:
Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified
QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed
PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified
QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test
Y = YES
N = NO F = FAILED
Page 2 of 3
SAIC-A-2025
1-Dec-06
MECH-
5. First thing, before it leaves the truck it arrives on! Inspection (camera) a) Look at the top row of tubes. They should be VERY, VERY STRAIGHT! b) If they aren't straight, i.e., bowed ... MAJOR PROBLEM! c) Don't even let it be unloaded BEFORE YOU TAKE PICTURES. d) Look at underside of the tubes, specifically the tube supports. e) Severe shipping damage will result in "dislodged" support members. 6. Transit & erection clips & fasteners are checked closely for damage. MAKE YOUR CLAIM RIGHT AWAY! TAKE EXTRA* PRECAUTIONS!
* The first one arrived damaged ... YOU CAN COUNT ON ALL OF THEM COMING THIS WAY "UNLESS YOU ACT QUICKLY". * All the Quality intentions in the world won't fix a badly mishandled Fin Fan Cooler.
*PLAN Proactive supervision at handling points to assure they arrive ok. 7. UNLOAD & STORE ON HARD & EXTREMELY LEVEL SITES ALWAYS. a) Use good blocks (no nails). Make sure extra support is there & level. b) NEVER exceed more a few meters between blocks. 8. Plan staging areas close to Units to minimize handling
OK, YOU DIDN'T DO SO WELL ... ORDER EXTRA PLUGS & PRAY!!! OK, YOU MADE IT THIS FAR OK ... NOW PRESERVATION EFFORT 9. Corrosion Inhibitors can solidify, beware of opening these up. 10. Limit opening for "fit up" & piping work to good dry weather. 11. Keep system closed except when absolutely necessary. 12. Plan Test at test pressure on Manufacturer's Stamp.
If Chemical Cleaning (usually around 90 psi) is req'd, utilize this opportunity to meet the reqmt. (it's usually close enough) Perform testing in accordance with good lay-up practices. Be Prepared to pull plugs and allow Proponent a visual exam. Water removal after testing at low points can be assured by spool dropouts. Test as close to start-up as practical. ALWAYS HAVE EXTRA PLUGS ON HAND (OR OVERNIGHT ACCESS AVAILABLE) IN THE EVENT OF TUBE/TUBESHEET LEAKS.
Page 3 of 3