Steel Outlook
Steel consumption in India is projected to reach 113 MT by 2016-17 as against 70.9 Mt in 2011-12, at a CAGR of 9.7%. ( As per 12th 5-year plan) Crude steel capacity to reach 149 MT against current capacity of 89 MT. Major Capacity additions to come from Integrated steel producers. Steel producer attempting to reduce production cost by opting for alternative steel making technologies. (eg. DRI, Itmk3 and COREX) Producers are targeting high growth segments (Auto, Construction, Ship building etc.)
SAIL-an Overview
SAIL has achieved a turnover of more than Rs. 50,000 Crores from a level of Rs 15000 Crs in 2001-02. SAIL has steadily shown growth in production since 10th and 11th five year plans. SAIL has been enriching its product mix by increasing the Finished steel component and decreased Semis in the overall product Mix over the years. SAIL finished Mild Steel market share in 2011-12 is at 14.9% out of total Indian steel market of 66.4MT. SAIL share shall increase to 15.6% in 2016-17 after implementation of expansion program.
25 0.89 20 15 10 5 0 Present After current brown field expansion 0.34 0.5 4.36 2.2 1.9 1.8 7 3.93 2.5 Spl Steel Plants 4.6 ISP 4.2 BSL RSP DSP BSP
Increase in Hot Metal and Crude Steel capacity is higher than expanded capacity as it also incorporates the loss due to phasing out of certain facilities
12000
11280
11021
10000
8000
4000
9th Plan (1997-2002) Rs 4,870 cr
2071
2000
1246 777 426 350 200102 350 224 200203 224
2181
0
Rs. Crore
199798 2071
199899 1246
199900 777
200001 426
200708 2181
200809 5233
200910 10606
201011 11280
201112 11021
Energy savings (Like Basic Oxygen Furnace, Continuous Casting) Finishing Capacities Enriching product mix Environment control norms
Apart from these, schemes related to the existing assets of the plants such as technological upgradation, value addition and sustenance also envisaged. envisaged .
11
13
Current Status
78% 62% No No No Partial coverage Partly
No
After Expansion
100% ~100% Yes Yes Yes Full coverage 100%
Yes
78%
97%
EAF BOF THF EAF
BOF
THF
6% 30%
70% 94%
Ingot CC Ingot CC
41%
Commodity
Commodity
12%
41%
Semi Finished
Long Products
Flat Prodcuts
Semi Finished
Long Products
Flat Prodcuts
Product profile
GP/GC, 2% CR C/S, 6% PET, 2% Strls, 4%
Plates, 26% HR Coils, 34% CR C/S, 12% HR Coils, 18% GP/GC, 4% PET, 1% Strls, 16%
Plates, Wire Rods and Strls share in SAIL product mix 18%
Rly Prdts, 9%
will improve
Commissioning Schedule
Plant SSP ISP BSP RSP BSL DSP Commissioning (Current Phase) Sep10 (completed) Major facilities progressively by Mar13 Sep13 Mar13 Oct12 (New CRM) Mar13
19
Aims to acquire radically new technologies, the plan specifically targets Production of Cold Rolled Grain Oriented (CRGO) electrical steels Development of alternative iron making technologies, Endless strip production, Carbon dioxide reduction and sequestration, and Optimising land use by designing compact steel plants .
Input Management
Strategies Iron ore: Use of pellets and micro fines in sintering to increase. Slime Beneficiation Use higher quantities of beneficiated iron ore Alternative technologies like ITMK3, Hismelt,
Coking Coal: Reducing dependence on coking coal through following: Increasing auxiliary fuel consumption (primarily CDI) and nut coke to the extent possible. Use of higher content of semi coking and non-coking coal in the coke oven blend through use of technologies like Stamp charged batteries at BSL etc. Introduction of alternate iron making technologies which can use non coking coal and iron ore fines.
THANK YOU
24
25
Major Facilities
New Steel Melting Shop (180,000 tpa) tpa) New Cold Rolling Mill Complex (146,000 tpa) tpa) Up Up-gradation of Existing Cold Rolling Mill Roll grinder for Hot Rolling Mill
Status: Status :
Under regular operation since Sep Sep10 10. .
26
Major Facilities
New Cold Rolling Mill Complex (1.2 mt mt) ) Modernisation & Upgradation of existing SMS SMS-II Rebuilding of COBCOB-1 & 2 with Pollution Control measures Up Up-gradation of Blast Furnace No.2 Augmentation of infrastructure facilities
28
Major Facilities
Coke Oven BatteryBattery-11 (7 m tall) 2nd Sinter M/c in SPSP-3 (360 m2) Blast Furnace (4060 m3) Steel Melting Shop III (4.0 mt mt) ) with secondary refining units 1 x 4 Strand Billet Cum Bloom Caster 2 x 6 Strand Billet Caster 1 x 3 Strand Beam Blank Caster Bar & Rod Mill (0.9 mt mt) ) Universal Rail Mill (1.2 mt mt) )
29
Major Facilities
Bloom-cum round caster (0.75 mt Bloommt) ) Medium Structural Mill (1.0 mt mt) ) Rebuilding of Coke Oven BatteryBattery-2 Ladle furnace RMHS & Coal handling facilities Revamping of By Product Plant Dolomite plant New slag yard
30
Major Facilities
Coke Oven Battery (0.78 Mt) Sinter Plant (3.8 Mt) Blast Furnace (4060 m3) (2.7 Mt) Basic Oxygen Furnace (BOF) Shop (2.56 Mt) Billet Caster (1.67 Mt) & Beam Blank/Bloom Caster (0.8 Mt) Heavy Section Mill (0.6 Mt) Wire Rod & Bar Mill (1.25 Mt)
31