Professional Documents
Culture Documents
7/14/2013
SCREEN
1 2 3 4 5
Dont Panic Switch Off All Electrical Equipment Dont Run, Walk Fast! Go to the Assembly Point Wait for the Final Instruction
7. Weekly Inspection
Committee Inspection Weekly Inspection
8. Incident Reports 9. Medical Cases 10. Environmental Issues 11. Action Plans
Ujin Seoyong (Infra) Hilalco
7/14/2013
7/14/2013
NO.
ITEMS
ACTION PLANS
A comparison was made on number of findings reported by every Subcontractor and findings raised by HSJV/KEPCO. Both Seoyong and Hilalco failed to exceed number of HSE findings. Both companies are requested to prepare action plans and report on next meeting. Medical cases reported by subcontractors should include preventive actions to be taken by immediate supervisor.
ACTION BY
DUE DATE
STATUS
Hilalco Seoyong
Next Meeting
D Done
HSJV
Next Meeting
Done
Meeting Attendance
A letter should be issued to UJIN requesting explanation on their absent from HSE meeting. Medical case from UJIN will be reported again on next meeting.
UJIN
Next Meeting
Done
7/14/2013
Description All vehicles leaving Gate 3 should take roundabout at west part of BNPP before proceeding to Gate 1. Speed limit at service road is set at maximum of 60 kph kph, , and overtaking is prohibited on this road.
BARAKAH NUCLEAR POWER PLANT PROJECT
Description As part of work preparation every Subcontractor must prepare and submit daily work plan to HSE Department. Night work and holiday shall be included on this form. This will ease monitoring activities at site.
BARAKAH NUCLEAR POWER PLANT PROJECT
7/14/2013
Description Inclusive I l i Dates D t : 16 ~ 19 A Aug. 2013 Training Provider : TAPROOT, U.S.A Training Participants : HSJV HSJV, , KEPCO, Subcontractors Benefits : Determine root causes of an incident and preventing recurrence of such case. Incident from safety or quality.
7/14/2013
Item
Near Misses
Over speeding
First Aid Cases (FA) Medical Treatment Cases (MTC) Restricted Work Cases (RWC) LTIs Property/Vehicle Accidents Environmental Release
0 0 0 0 0 0 0 0
0 0 4 3 3 0 4 0
0 0 0 0 0 0 0 0
0 0 0 1 1 0 1 0
0 0 3 0 0 0 0 0
2 0 10 5 0 0 4 0
0 0 0 0 0 0 0 0
18 0 45 12 4 3 7 0
0 0 0 0 0 0 0 0
0 1 7 0 0 0 2 0
0 0 0 0 0 0 0 0
0 0 3 1 0 0 1 0
0 0 3 0 0 0 0 0
20 1 68 22 8 3 19 0
Cumulative 133*
Legend : Ancillary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipment Shop Power Block Cut Off Wall, Wharf Area, Concrete Block Area * : 41 cases (Oct- Dec. 2011), 64 cases (2012), 27 (2013)
BARAKAH NUCLEAR POWER PLANT PROJECT
7/14/2013
Issued Findings
K E P C O H S J V
S U B C O N
Status
Total
Open
KEPCO HSJV Subcon KEPCO
Closed
HSJV Subcon
0 12 0 12
0 12 0 12
0 5 0 5
0 0 0 0
0 0 0 0
0 10 56 66
0 0
0
8 8
13 13 12 11
15
19 19
22 21
27 26 26
31 31 30
35 34 33
10
15
20
25
30
35
40
7/14/2013
1
Ensure scaffold have guard rail, supervisor to check completeness (CWDC, Gusan) Gusan) Clear scaffold platform of unnecessary materials (ADB, Seobon) Seobon) Scaffold inspectors to thoroughly check for damaged section (STC, Hanlim E&C) Use of standard scaffold materials in railings and platform (CWIS, Hilalco) Hilalco) Banks men should control ground personnel movement during backfilling works (Office Area, Jonghap) Jonghap) Install operational reverse alarm for tanker (CWDC, WBG)
2
Ensure continuous supply of p water in the workplace. (RCB, Samjin) Samjin) Sufficient amount of ORS should be on hand for heat stress prevention (Power Block, Advan) Advan) Maintain minimum stock of medical items in the first aid kit (TGB1, D&I) Ensure condition of water is cold and drinkable (STC, Hyundai C&I)
Ensure motor chain are installed with safety guards (Batch Plant, Eugene) I Install t ll whip hi check h k arrestor t and fire extinguisher available in air compressor. (CWIC, Hilalco)
Scaffolding
BARAKAHNUCLEARPOWERPLANTPROJECT
7/14/2013
Village1 48 10%
FindingsperArea
AncillaryArea 65 13% CampArea 2 0%
Elec 61 12%
OfficeArea 93 19%
FindingsperCompany(ArchPB)
50 40 30 20 10 0 Advan D&I DOW Isam Kabbani Seobon Seoyong (PB) Ujin 14 1 9 2 21 40 46
FindingsperCause(ArchPB)
WorkingatHeight WasteManagement Training Signs,Barriers&Barricades ff ldi Scaffolding PTW PPE PoorIllumination Plant&Equipment MaterialManagement Lifting Housekeeping HotWorks Health&Welfare Hand&PowerTools FirePrevention FallProtection Environmental ElectricalSafety Documents ColorCoding Access&Egress
5 5 1 4 8 3 7 1 7 5 4 14 6 16 5 4 11 1 9 2 8 7 0 5 10 15 20
FindingsperArea(ArchPB)
40 35 30 25 20 15 10 5 0 34 22 15 2 5 2 1 1 6 1 13 9 3 4 7 1 1 6
Corrective Action Ensure that toilets have continuous supply of water. Completion of basic supplies inside the first aid kit. Proper arrangement of cables be maintained at all times.
BARAKAH NUCLEAR POWER PLANT PROJECT
10
7/14/2013
FindingsperCompany(ArchInfra)
40 30 20 20 10 0 Hanlim Seobon Towerstech Uwell YooA 17 2 18 38
FindingsperCause(ArchInfra)
WorkingatHeight WasteManagement Supervision Signs,Barriers&Barricades Scaffolding PTW PPE PoorIllumination Plant&Equipment MaterialManagement Housekeeping Health&Welfare Hand&PowerTools
2 7 2 6 8 1 3 4 10 4 6 4 5 10 5 3 7 3 5 0 2 4 6 8 10 12
FindingsperArea(ArchInfra)
50 40 30 20 10 0 AncillaryArea CampArea OfficeArea Village1 18 1 45 31
Corrective Action
Repair air compressor and prevent equipment from oil leakage. Use of gas cylinders will be supported by fire extinguishers. Air compressor must be kept in drip tray to contain possible leaks.
BARAKAH NUCLEAR POWER PLANT PROJECT
FindingsperCompany(Civil)
120 100 80 60 40 20 0 104
FindingsperCause(Civil)
WorkingatHeight WasteManagement Training Supervision Signs,Barriers&Barricades Scaffolding RoadSafety PPE PoorIllumination Plant&Equipment MaterialManagement Lifting Housekeeping HotWorks Health&Welfare Hand&PowerTools FirePrevention FallProtection Excavation Environmental ElectricalSafety ocuments Documents ConfinedSpace ColorCoding Access&Egress
2 4 3 4 4 13 1 4 5 11 6 10 14 3 4 2 4 6 2 4 4 2 2 14 16 0 5 10 15 20
7 AlRaeel
1 Athena
3 Eugene Gusan
15
14
Hilalco
WBG
FindingsperArea(Civil)
100 80 60 40 20 0 90
17
Corrective Action Removal of unnecessary materials at the scaffold platform. Install safe access for rebar works. Conduct inspection on grinder and sling belt and have items properly attached with color code.
BARAKAH NUCLEAR POWER PLANT PROJECT
11
7/14/2013
FindingsperCompany(Mech)
20 15 10 10 5 0 Hwachon Samjin Seil YounChang 9 7 16
FindingsperCause(Mech)
WasteManagement Training Scaffolding PPE PoorIllumination Plant&Equipment MaterialManagement Lifting Housekeeping HotWorks Health&Welfare Hand&PowerTools FirePrevention 1 2 2 5 2 4 2 1 0 2 4 6 8 10 2 1 3 2 3 1 1 8 2
FindingsperArea(Mech)
20 15 10 5 0 Ancillary Area OfficeArea PBCLP PBLaydown PBRCBUnit PBWorkshop 1 7 5 3 1 7 19
Corrective Action
Use of suitable hand protection during hot works activities. Replace damage fitting of oxy-acetylene tanks. Arrangement of argon hose line to avoid possible hazards.
BARAKAH NUCLEAR POWER PLANT PROJECT
FindingsperCompany(Piping)
12 10 8 6 4 2 0 11 8
FindingsperCause(Piping)
WasteManagement Scaffolding 3 4 2 1 2 2 1 1 2 1 2 0 1 2 3 4 5
PPE Lifting
Hwachon
SungChang
YounChang
FindingsperArea(Piping)
14 12 10 8 6 4 2 0 AncillaryArea OfficeArea PBABUnit1 PBLaydown Village1 2 4 1 1 13
ColorCoding
Corrective Action Ensure toe board and guard rails are complete while scaffold is put into use. Observe proper segregation of waste- paper, and plastic segregated.
BARAKAH NUCLEAR POWER PLANT PROJECT
12
7/14/2013
FindingsperCompany(Elec)
40 30 20 10 0 Daemyung HyundaiC&I Jonghap JongHap(PB) 3 15 6 37
FindingsperCause(Elec)
WorkingatHeight Training Supervision Signs,Barriers&Barricades Scaffolding PTW PPE PoorIllumination Plant&Equipment MaterialManagement Lifting Housekeeping HotWorks Health&Welfare Hand&PowerTools FirePrevention FallProtection Excavation Environmental ElectricalSafety Documents ColorCoding Access&Egress 0 1 3 3 2 1 1 2 2 1 3 3 2 3 1 6 7 1 3 6 3 4 1 1 2 2 3 4 5 6 7 8
FindingsperArea(Elec)
45 40 35 30 25 20 15 10 5 0 39
12
Village1
Maintain quality of drinking water ensuring cold water are distributed on site.
BARAKAH NUCLEAR POWER PLANT PROJECT
13
7/14/2013
100 90 80 70 60 50 40 30 20 10 0
91
37 26 10 1 5 4 10 1 15 5 6 6 4 6 18 19 7 10 7
100 90 80 70 60 50 40
8,Housekeeping 6,Health& Welfare 2,Plant&Equipment ,ElectricalSafety y 2, 3,Housekeeping 3,Scaffolding 13,Housekeeping
30 6,Health&Welfare 20 10 0
RoadSafety Excavation ConfinedSpace PTW Environmental Documents Training Supervision PoorIllumination WorkingatHeight Hand&PowerTools HotWorks Signs,Barriers&Barricades WasteManagement MaterialManagement FirePrevention ElectricalSafety PPE Lifting Plant&Equipment FallProtection ColorCoding Health&Welfare Access&Egress Scaffolding Housekeeping
14
100 90 80 70 60 50 40 30 20 10 0
Seoyong Seoyong(PB) TowersTech Gusan Jonghap Jonghap(PB) YounChang YounChang(PB) Hwachon WBG Hilalco Advan Hanlim Uwell YooA HyundaiC&I Samjin Eugene Daemyung Seobon D&I AlRaeel DOW Samho Geumhwa Sungchang Seil
BARAKAH NUCLEAR POWER PLANT PROJECT
7/14/2013
15
7/14/2013
FindingsScore=NumberofCausalxRisk(FactorScore)
23.2
Source: CAR, Near Miss, Walkthrough and Observation Card reported by KEPCO & HSJV
3.0
3.0
16
7/14/2013
ColorCoding,12
Nos 12 12
PPE,3 FallProtection,4
Training,2 Supervision,2
Control Measure
Due Date
Housekeeping,12 Material Management,6
Observeregular housekeepingatsite, Continuous organizeteamstocarryout thetask Inspection ofequipment, equipment andliftingapparatuswith colorcodemarking.
Done
Lifting,8 Scaffolding,10 Access& Egress,11
Hand&Power Tools,5
FallProtection,4
Nos 5 4
Control Measure
Done
Done
17
7/14/2013
18
7/14/2013
FindingsperCompany
5 4 3 2 1 0
D&I Gusan Hanlim Seobon Seoyong
4 2 1 2 1
FindingsperCausal
Plankswithgap IncompleteGuardRail NotInspected Housekeeping IncompleteBracing SubstandardScaffold UnsafeAccess 0 0.5 1 1 1 1 1 2 2 2
19
7/14/2013
No.
Source of Injury
Area
Description
Immediate Action
Geumhwa
TIGWelder littlefingerof lefthandafter WeldingSchool 1 contactwith (Welding hotobject TrainingCenter) (bli t ) (blister) 09072013 10:30am AssessedbyDr. Anand Antibiotic ointment applied Wound dressing applied Providewarning signsonhot surfaces Awarenesstoall workers U of Use fappropriate i t PPE
Accidentallytouchhottube whilecheckingit.
No.
Source of Injury
Area
Description
Immediate Action
AssessedbyDR :Kim Rigger Painonthe4th Leftchestwall ribcage Hewasaccidentallyhitbya pain Powerblock Salonpaspatch 2 scaffoldingmaterialonhischest secondaryto applied TGBarea whileworking theinjury Advisedfor chestxray 10072013 Referredto Hospital 10:00
Geumhwa
20
7/14/2013
No.
Source of Injury
Area
Description
Immediate Action
Samjin
Construction Engineer
2
Syncope
Awarenesstoall personnelon AssessedbyDr. signsofheat KIM stress Vitalsignstaken Coordinate with andmonitored HSEonsite Restprovided conditionand Oralrehydration heatstressindex. solutiongiven Newworker to undergo acclimatization.
Area
Description
Immediate Action
Ujin
CommonLabour
5
21
7/14/2013
D. Manager
D. Manager
D. Manager
D. Manager
D. Manager
D. Manager
D. Manager
O&M Team
Housekeeping Housekeeping Housekeeping Housekeeping Housekeeping Housekeeping Housekeeping Manpower Manpower Manpower Manpower Manpower Manpower Team
Description Site Housekeeping team has been organized to keep workplace clean. KEPCO and HSJV is maintaining and managing the team.
BARAKAH NUCLEAR POWER PLANT PROJECT
22
7/14/2013
Description Assigned responsible person for each location each level of building.
BARAKAH NUCLEAR POWER PLANT PROJECT
23
7/14/2013
Marine Works Wharf Phase 2 Crawler Crane on barge observed discharging heavy black smoke while dredging works. Ensure to conduct preventive maintenance according to manufacturers specification OPEN
No.0
Date
Action by Company
Status
Closing Date
Expiration Date
Main Area
Sub-Area
Issued By
Issuer Company
11 July 2013
Athena
Crawler Crane on barge with body number LIMA 2400-B observed discharging heavy black smoke from the exhaust system while dredging works in progress which contributes to degradation of ambient air quality.
OPEN
16 July 2013
16 June 2013
1621
Wharf
Phase 2
Renato Ponce
HSJV
24
7/14/2013
WASTETYPE
Paper Metal Construction Concrete Wood(Good) Wood(Bad) Plastic Municipal p Hazardous TotalSolidWaste
Lastweek
Recycle(%)
45 45 0 0 0 0 45 0 0 135 21.96%
0 45 0 0 45 0 0 0 0 90 13.72%
Legend: Collected WastefromSitetoTemporaryStorageArea Disposal WastefromTemporaryStorageAreatoLandfillArea Recycle Treatedwaste(GMET)toRecyclingPlants BARAKAH NUCLEAR POWER PLANT PROJECT
25
7/14/2013
26
7/14/2013
27