Professional Documents
Culture Documents
5 6 0 , 0 0 m2 in R O M A N I A
CLIENT: DANIEL COUNTRY: ROMANIA DATE: 11/02/2011 OUR REF. NR. : T-041+00-11
RUFEPA TECNOAGRO, S.L. C.I.F: B-53.260.279
CAMINO LA ALMAZARA, S/N APDO. CORREOS 7 03190 Pilar de la Horadada (Alicante), Tlf. 96 535 26 26-Fax. 96 535 21 58
INDE X
A) I N TRO D U C T I O N .............................................................................................................. - 2 - B) T U N N E L ............................................................................................................................ - 3 - 1. 2. 3. 4. 5. 6. 7. 8. 9. G e n e ral desc ript ion of t h e gr ee nhouse .......................................................................... - 3 - In st alla t ion Chara c t e rist i cs............................................................................................. - 3 - G e n e ral Proj ec t Lay-Ou t ................................................................................................. - 4 - Ma t e rial s quali ty spec ifi c a t ion ........................................................................................ - 5 - Cal c ula t ion loads : ........................................................................................................... - 6 - St ru c t ur e desc ript ion ....................................................................................................... - 7 - Roof V e n t ila t ion Syst em ................................................................................................ - 12 - Side ve n t ila t ion syst em .................................................................................................. - 15 - Crop H anging Syst em ................................................................................................... - 15 -
10. Cove r ma t e rials ............................................................................................................. - 16 - C) F I N A L PRI C ES ............................................................................................................... - 22 - D) ASSE M B LY A N D SUP E RVISI O N ................................................................................ - 23 - E) O F F E R C O N D I T I O NS ................................................................................................... - 23 -
F-7.2-13
T- 041+00-11
A) I N TRO D U C T I O N
The object of this Project is the design, construction and starting of 11 production tunnel of 960,00 m2 with 9,60 bays with the Gothic roof shape.
F-7.2-13
T- 041+00-11
B) T U N N E L
F-7.2-13
T- 041+00-11
F-7.2-13
T- 041+00-11
F-7.2-13
T- 041+00-11
F-7.2-13
T- 041+00-11
A r c h s : Made from steel tube 60 mm sendzimir galvanized Z-275 g/m2, reinforced with vertical reinforcements of 32 mm and inclined reinforcements 32 mm. Fixed on the concrete foundation by screws.
The Gothi c Shap e of the arches gives specials conditions to this design to be able of great performances in o Resistance to snow loads. o More light transmission because of the bigger slope of the roof cover. o Very good conditions to drive the condensation to the side walls without any water falling on the crops. o Increasing of ventilation capacity because of the volume and the higher position of the roof windows.
F ront gabl e posts : of square hollow section 80x80x2 mm (2 posts in each front gable)
F-7.2-13
T- 041+00-11
C rop bar: Made from round steel pipe 40 mm sendzimir galvanised Z-275 g/m2.
F-7.2-13
T- 041+00-11
Cov e r fixing mat e rial s : depending on the cover type, we offer several options: Sendzimir galvanised steel profiles (to fix the plastic film).
PVC profile (are used to fix with more security the plastic film to the steel profiles).
F-7.2-13
T- 041+00-11
Triple aluminium profile 60x60 mm on ridge (to fix the plastic film on arches).
PVC profile (are used to fix with more security the plastic film to the aluminium profiles).
F-7.2-13
T- 041+00-11
O th e r compon e nts : High resistance bolts and nuts, quality 8.8 according to standards DIN 931 and DIN 933. With a corrosion protection layer of chrome, which guarantees a minimum of 400 hours before red corrosion appears inside the saline fog chamber (standard 50.021).
F-7.2-13
T- 041+00-11
This ventilation system is the best system to take advantages of the prevailing wind directions, wherever it comes.
F-7.2-13
T- 041+00-11
The ventilation system is composed by: W indow arm: made from rectangular steel tubing size 40x30x1,5 mm in sendzimir Z275 g/m2. There is 1 unit every 2,00 m. Ra c k s : sendzimir galvanised steel racks 2 mm, with steel pinion, every 2,00 m. Pow e r driv es: D e G i e r , model 350, will be installed 1 motor. Shaft: galvanised tube 32mm and 2,5 mm thickness, one line for each roof window.
F-7.2-13
T- 041+00-11
F-7.2-13
T- 041+00-11
F-7.2-13
T- 041+00-11
Greenhouse 9 Top Windows: 9 Sides: 9 Ends: Double film polyethylene Double film polyethylene Cellular sheets polycarbonate 8 mm
This Project is calculated with a double inflatable plastic film of PE: Internal film polyethylene: 150 m External film polyethylene: 200 m.
The tunnel will be inflated by special low pressure fans which will drive the air inside the chamber of the two plastic film layers by mean of a line of PVC pipes and flexible connection pipes.
F-7.2-13
T- 041+00-11
F-7.2-13
T- 041+00-11
F-7.2-13
T- 041+00-11
C e llular poly c arbonat e It is offered to cover the side and gable walls with cellular sheets of polycarbonate 8 mm. Technical information: The PC sheet is resistant to impact and saves energy. It is an ideal material for the covering of roofs for such buildings as greenhouses, commercial centres, sports stadia and even industrial buildings. UV Resistance The PC range has been submitted to a surface treatment designed especially to protect the badge against the degrading effects of of ultra-violet radiation in natural sunlight. The face that receives the treatment should be placed always toward the outsider Warranty All the sheeting retains a guarantee of 10 years against breaking, yellowing and loss of light transmission. THERMIC QUALITIES IMPACT RESISTANCE The cellular sheet offers a high resistance to impact minimising the risk of breaking due to hailstones, snow weight or even falling roof tiles. LIGHT TRANSMISSION The transmission of light for these sheets ranges from 64% to 82%. The sheet is also protected by layer of treatment which offers protection against the UV radiation from the sun.
F-7.2-13
T- 041+00-11
TYPICAL PROPERTIES Thickness Weight Light Clear Acoustic value Impact value Property Physical Weight Acoustic value Optical Light transmission Clear (112) Solar grey Mechanical Hail strength Shearing stiffness Thermal U (or K) value Coefficient of linear thermal expansion Continuous use temp. rating DIN 52612 VDE 0304/1 UL 746B W/m2K m/m.C C 3,3 7*10-5 100 ASTM D1003 % DIN67507 TNO TNO m/s N/mm >21 3.0892 82 DIN 52210 g/m2 dB 1300 18 Test Method 8 mm 1300 g/m2 82% 18 (DIN 52210 db) >21 (speed m/s) Unit Value
F-7.2-13
T- 041+00-11
In sec t proof n e t We offer insect net type 16x10 in roof and side ventilation. The technical characteristics are:
CHARACTERISTICS
B ASI C M A T T E R O F T H E WEAVE C O L OUR TOTA L W EIGHT W A RP R ESIST A N C E W E A V E R ESIST A N C E ELONGA TION TO THE W A RP B R E A K A G E ELONGA TION TO THE W E A V E BRE A K A G E SH A D I N G ST A B I L I T A T I O N B ORDER T YPE
NOMINAL
HDPE CRISTAL
UNIT
MTHOD
PANTONE
ISO 3801 ISO 1421 ISO 1421 ISO 1421 ISO 1421 ASTM G-154 NIR - 4004
F-7.2-13
T- 041+00-11
C) F I N A L PRI C ES
The price of the previously specified material (10.560,00 m2) mounts to:
Gr ee nhouse st ru c t ur e Cove r t E l ec t ri c wir es Crop H anging Syst em T O T A L PRI C E 189.246,00 17,92 P2 189.246,00 17,92 P2
T O T A L PRI C E
177.900,00
16,85 P2
E X C L USI O NS: ) Land levelling and digging foundations. ) Assembly and supervision. ) Concrete for foundation. ) Transport. ) Electrical power supply in construction site. ) Water supply in construction site. ) Civil Works. ) VAT or any other taxes. ) Any other materials not included in this quotation.
F-7.2-13
T- 041+00-11
E) O F F E R C O N D I T I O NS
VA L I D I TY O F T H E O F F E R
7 Days from the emission date of this document.
PAYM E N T :
25% on signature of the contract. 75% By Irrevocable and confirmed letter of credit issued by a first order Bank.
Project Department.