You are on page 1of 19

End user power apportioning

Electrical KWH consumption at Feeder No.1 on (6th 11th) Jan. 2012

High KWH

Lowest KWH

Remarks: 1- High KWH consumption about 575 KW at 3:00 pm 2- The lowest KWH consumption about 75 KW during no load at the building after office hours.

Page 1 of 19

End user power apportioning


Electrical KWH consumption at Feeder No.2 on (12th 18th) Jan. 2012

Highest KWH

Lowest KWH

Remarks: 1- High KWH consumption about 550 KW on 8:00 am 4:00 pm 2- The lowest KWH consumption about 190 KW after office hours

Page 2 of 19

End user power apportioning

Finding and recommendation: 1- Energy consumption at feeder No. 1 as below: Daily Working days Saturday Sunday Holidays KWH per day 7,500 5,420 2,110 2,500 Monthly KWH consumption Days / months 20.5 4 4 1.5 Total KWH consumption 153,750 21,680 8,440 3,750 187,620

Found High power consumption from 4:00 to 6:30 pm

2- Energy consumption at feeder No.2 as below: Daily Working days Saturday Sunday Holidays KWH per day 9,525 6,320 6,850 6,500 Monthly KWH consumption Days / months 20.5 4 4 1.5 Total KWH consumption 195,262 25,280 27,400 9,750 257,692

Found High power consumption from 8:00 am to 4:00 pm Estimate building energy consumption per month for two feeders = 187,620 KWH + 257,692 KWH = 445,312 KWH

Page 3 of 19

End user power apportioning


AC power consumption per month as below:

The air conditioning system at the building with capacity as in the schedule below: No. 1 Equipment York Centrifugal water cooled chiller. (Cooling capacity 550 RT) York screw water cooled chiller 2 (Cooling capacity 180 RT) 3 4 5 6 7 8 9 Primary chilled water pump No.1 &2 Primary chilled water pump No.3 Secondary chilled water pump No.1&2 Secondary chilled water pump No. 3 Condenser water pump No. 1&2 Condenser water pump No. 3 Cooling tower with three cells (700 RT) 15 KW 5.5 KW 30 KW 11 KW 55 KW 15 KW 30 KW 15 KW 10 AHU (Air Handling Units with different capacity) 11 KW 7.5 KW 11 12 Chilled water fan coils with different capacity Fresh air ventilation fan 15 KW 2 1 2 1 2 1 2 1 8 19 18 2 Office area At roof top Page 4 of 19 Office area For chiller No.1 &2 For chiller No. 3 For chiller No.1 &2 For chiller No. 3 For chiller No.1 &2 For chiller No. 3 108 KW 1 Chiller No.3 Rated KW 314 KW Qty 2 Remarks Chiller No.1 &2

End user power apportioning


ELECTRICAL POWER ANALYSIS AT PLANT ROOM Chiller No.1 KWH power consumption on 26th & 27th Jan. 2012

Remarks: 1- Records high KWH consumption about 257 KW at 4:00 6:30 pm 2- Chiller operate at 6:30 am & OFF at 6:30 pm Page 5 of 19

End user power apportioning


Chiller No.2 KWH power consumption on 1st to 8th Feb. 2012

Remarks: 1- Records High KW about 264 KW at (4:00- 6:00 pm ) 2- Chiller operate from 6:30 am to 6:30 pm

Page 6 of 19

End user power apportioning


Chiller No.3 KWH power consumption on 1st to 8th Feb. 2012

Remarks: 1- Record average KW about 96 KW at (7:45 am to 4:00 pm ) 2- Chiller operation at normal working days / 12:00 am to 2:00 am (at average load 62 kw) / 4:00 am 6:00 am (at average load 62 kw) / 7:45 am to 4:00 pm (at average 95 kw) / 7:15 pm to 8:00 pm (at average load 110 kw) / 9:00pm to 10:00 pm ( at average load 62 kw) 3- Chiller operation at week end and holidays /12:00 am to 2:00 am (at average load 62 kw) / 4:00 am 6:00 am (at average load 62 kw) / 7:15 pm to 10:00 pm (at average load 75kw)

Page 7 of 19

End user power apportioning


AC power consumption as below: 1- Chiller No. 1 or 2 Daily Working days Off days

KWH per day 2,700 1,650 Monthly KWH consumption

Days / months 12 9

Total KWH consumption 56,700 14,850 71,550

2- Chiller No.1 &2 (Primary & secondary Chilled water pumps + condenser water pump) + cooling tower Daily KWH per day Days / months Working days 600 30 Monthly KWH consumption 3- Chiller No.3 Daily Working days Off days KWH per day 1,200 530 Monthly KWH consumption Days / months 21 9

Total KWH consumption 18,000 18,000

Total KWH consumption 25,200 4,770 29,970

4- Chiller No.3 (Primary & secondary Chilled water pumps + condenser water pump) + cooling tower Daily KWH per day Days / months Working days 480 21 Off Day 200 9 Monthly KWH consumption 5- Server room ACSU / VRV / Precession AC
No. 1 2 3 AC ACSU VRV Precession AC Total KW KW 55.5 18.75 45 119.25

Total KWH consumption 10,080 1,800 11,880

KWH/ Month 15,084 13,500 32,400 60,984

Page 8 of 19

End user power apportioning

6- AHU & Fan coil Daily Working days KWH per day 1,800 Monthly KWH consumption Days / months 21 Total KWH consumption 37,800 37,800

Total AC power consumption: Item Chiller No. 1& 2 Primary and Secondary chilled water + Condenser water + cooling tower fan motors Chiller No.3 Primary and Secondary chilled water + Condenser water + cooling tower fan motors ACSU / VRV / Precession AC AHU blower fan motors + fan coils Total AC consumption (KW) KWH 260 46 96 33 119 150 704 Monthly KWH consumption 71,550 18,000 29,970 11,880 60,984 37,800 230,184

Page 9 of 19

End user power apportioning


Lighting system power calculation: 1- Electrical KWH consumption on office area lighting
Light fitting Level Qty 100 10 19 18 17 16 15 12 176 10 178 10 178 10 178 10 188 10 14 13 12 11 9 154 10 178 10 156 164 10 10 17 Watt / Fitting 88 36 50 88 36 88 36 88 36 88 36 88 36 88 88 36 88 36 88 88 36 36 Total KW 8.80 0.36 0.60 15.49 0.36 15.66 0.36 15.66 0.36 15.66 0.36 16.54 0.36 0.79 13.55 0.36 15.66 0.36 13.73 14.43 0.36 0.61 Monthly operation Hours Hours / Day 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 Days/Month 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 Monthly KWH consumption 2,587 106 176 4,553 106 4,605 106 4,605 106 4,605 106 4,864 106 233 3,984 106 4,605 106 4,036 4,243 106 180 Page 10 of 19

End user power apportioning


Light fitting Level 9 Qty 164 10 47 19 20 100 111 14 6 118 56 46 71 54 32 10 10 6 7 7 Total KWH Watt / Fitting 88 36 50 18 25 44 50 18 44 88 88 50 44 18 28 14 7 88 44 55 Total KW 14.43 0.36 2.35 0.34 0.50 4.40 5.55 0.25 0.26 10.38 4.93 2.30 3.12 0.97 0.90 0.14 0.07 0.53 0.31 0.39 203 Monthly operation Hours Hours / Day 14 14 14 14 12 5 5 5 14 14 14 14 14 14 14 14 14 14 14 14 Days/Month 21 21 26 26 26 26 26 26 26 21 21 21 21 21 21 21 21 21 21 21 Monthly KWH consumption 4,243 106 855 124 156 572 722 33 96 3,053 1,449 676 918 286 263 41 21 155 91 113 58,204

3 2 1

Total KWH/ Month

Page 11 of 19

End user power apportioning


2- Electrical KWH consumption on External lighting Existing flood light installation at OCBC No Location Rating KW Time : 3 hours Daily load (KW) 12.075 58.8 5.775 10.5 17.5 12.25 34.2 4.032 KWH/ Month Monthly load (KWh) 30 days 362 1,764 173 315 525 368 1,026 121 4,654

1 2 3 4 5 6 7

Level: 19 Level: 9 Level: 4 Level: 2 Jln Tun Perak Jln Melayu External walk way lighting Total KW

150w x 23pcs 400w x 42pcs 150w x 11pcs 150w x 20pcs Neon signage Neon signage 19* 150 Watt 12* T5

3 17 2 3 5 4 3 0 33

3.5 3.5 3.5 3.5 3.5 3.5 12 12

Page 12 of 19

End user power apportioning


3- Electrical KWH consumption on Car park & staircase Lighting Light fitting Level 8 7 6 5 4 B1 B2 ST 1 ST2 Lower Roof top Qty 38 60 64 62 68 34 34 20 20 11 Total KW Watt / Fitting 44 44 44 44 44 28 28 44 44 44 Total KW 1.67 2.64 2.82 2.73 2.99 0.95 0.95 0.88 0.88 0.48 17.00 Monthly operation Hours Hours / Day 12 12 12 12 12 24 24 24 24 24 Days/Month 30 30 30 30 30 30 30 30 30 30 Monthly KWH consumption 602 950 1,014 982 1,077 685 685 634 634 348 7,612

Total KWH /month

Page 13 of 19

End user power apportioning


4- Electrical KWH consumption on Lift lobby
Level 19 Place Lift Lobby 1 Lift lobby 2 Lift Lobby 1 Lift lobby 2 Lift Lobby 1 Lift lobby 2 Lift Lobby 1 Lift lobby 2 Lift Lobby 1 Lift lobby 2 Lift Lobby 1 Lift lobby 2 Lift Lobby 1 Lift lobby 2 Lift Lobby 1 Lift lobby 2 Lift Lobby 1 Lift lobby 2 Lift Lobby 1 Lift lobby 2 Fitting QTY 5 1 5 2 5 2 5 2 5 1 5 2 5 1 5 2 5 2 5 2 Watt/ Fitting 36 88 36 88 36 88 36 88 36 88 36 88 36 88 36 88 36 88 36 88 KW consumption 0.18 0.09 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.09 0.18 0.18 0.18 0.09 0.18 0.18 0.18 0.18 0.18 0.18 Hours/day 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 Day / Month 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 Monthly KWH consumption 129.6 63.36 129.6 126.72 129.6 126.72 129.6 126.72 129.6 63.36 129.6 126.72 129.6 63.36 129.6 126.72 129.6 126.72 129.6 126.72

18

17

16

15

14

13

12

11

10

Page 14 of 19

End user power apportioning

Level 9

Place Lift Lobby 1 Lift lobby 2

Fitting QTY 5 1 5 5 2 5 2 5 2 4 20

Watt/ Fitting 36 88 36 36 88 36 88 36 88 36 44 7 18 36 36

KW consumption 0.18 0.09 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.14 0.88 0.07 0.68 0.18 0.18 6.95

Hours/day 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Day / Month 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30

Monthly KWH consumption 129.6 63.36 129.6 129.6 126.72 129.6 126.72 129.6 126.72 103.68 633.6 50.4 492.48 129.6 129.6 5,004

8 3

Lift lobby 1 Lift Lobby 1 Lift lobby 2 Lift Lobby 1

Lift lobby 2 Lift Lobby 1

Lift lobby 2 Lift lobby

E- Lobby G B1 B2 Lift Lobby Lift Lobby KW

10 38 5 5

KWH/Month

Page 15 of 19

End user power apportioning


5- KWH consumption at Toilet lighting KW consumption 1.584 1.584 0.396 0.396 0.108 0.108 0.018 0.018 0.486 0.486 0.054 0.018 0.018 5

Level

Place Male Toilet

Fitting QTY 88 88 22 22 6 6 1 1 27 27 3 1 1 Total KWH

Watt/ Fitting 18 18 18 18 18 18 18 18 18 18 18 18 18

Hours/day 8 8 0.5 0.5 8 8 8 0.5 8 8 0.5 8 8

Day / Month 21 21 21 21 21 21 21 21

Monthly KWH consumption 266 266 4 4 18 18 3

9 to 19 floor

Female Toilet Handicap Toilet Executive toilet Male Toilet Female Toilet

8th floor

staff Toilet Handicap Toilet Male Toilet

0 21 21 21 1 21 21 Monthly KWH 3 3 750 82 82

1st to 3rd floor

Female Toilet Handicap Toilet Toilet Toilet

M G

Page 16 of 19

End user power apportioning


6- Electrical KWH Consumption on pantry lighting KW consumption 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.02 0.09 0.13 3

Level 19 18 17 16 15 14 13 12 11 10 9 3 2 1

Place Pantry Pantry Pantry Pantry Pantry Pantry Pantry Pantry Pantry Pantry Pantry Pantry Pantry Pantry

Fitting QTY 5 5 5 5 5 5 5 5 5 5 5 1 2 3 Total KW

Watt/ Fitting 44 44 44 44 44 44 44 44 44 44 44 18 44 44

Hours/day 14 14 14 14 14 14 14 14 14 14 14 14 14 14

Day / Month 21 21 21 21 21 21 21 21 21 21 21 21 21 21

Monthly KWH consumption 65 65 65 65 65 65 65 65 65 65 65 5 26 39 781

KWH/Month

Page 17 of 19

End user power apportioning


Summary of KWH consumption in lighting system: Item 1 2 3 4 5 6 7 Place Office Area External Lighting Staircase and car park Lift lobby Toilet Food court Pantry Total KWH End user power consumption as below: Item 1 2 3 4 Place AC Lighting Power plug and other load Total KW 704 272 174 1,150 Monthly KWH 230,184 79,868 135,260 445,312 Load % 52% 18% 30% 100.00 KW 203 33 17 7 5 4 3 272 Monthly KWH 58,204 4,654 7,612 5,004 750 2,863 781 79,868

Remarks: Other load = Total (AC load + Lighting load)


Page 18 of 19

End user power apportioning

Monthly KWH consumption

Power plug and other load 30% AC 52%

Lighting 18%

Power plug and other loads cover: 1234567Power distribution load Server power load UPS Lift system Domestic pumps system Other Ventilation fan Load Others
Page 19 of 19