You are on page 1of 5

RESUME

Name Fathers Name Nationality Religion Martial Status Mailing Address Email Cell # : ZULFIQAR ALI ALVI : ABDUL RAHIM ALVI : Pakistani : Islam : Married : House # 15-A Block Amir-ud-Din Park Al-Faisal Town, Lahore, Cantt. : zalvi786@gmail.com 0323-9653296 0300-9653296 : Metric (Science) from Govt. High School lower Mal Lahore (1987) : Diploma of Associate Engineer (DAE Civil from GTTC Lahore (1988-1991) Total Experience : 22 years.

(EMPLOYMENT RECORD)
Project : Tariq Float Glass Industries Shiekhupurah. Employer : Unique Contracting Company Period : from 1st january 2012 to till dated Position Held : Project manager Discription of duties: Control and manage of total construction of Building and Infrastructure work and planning of whole project Manage the finance of project and manage the zamil steel structure.

Project Employer Period Position Held Description of duties:

: Bahria Model Village, s (Flood affected area in District Muzzafar Gargh) : Bahria Town (Pvt.) Ltd. : From 10 Oct, 2010 to 31nov, 2011 ( Project Manager)

Control and manage of total construction of Building and Infrastructure work and planning of whole project Manage the finance of project

Project

: Construction of PACE CIRCLE MIXED USE DEVELOPMENT Lahore (Project cost = 670, 000, 00, 00)

Client Employer Period Position Description of duties:

: Pace Pakistan (Pvt.) Ltd. : Trident constructs (Pvt.) Ltd. : From Nov 2009 Sept 2010 : Construction Manager (CM)

Control and manage Construction of R.C.C. structure interior and pre engineering metal buildings.

Project

: USAID earth quack recovery program Distt (Mansahara) (Project cost = 177, 28, 73, 489) Three Packages

Client Employer Period Position Held Description of duties:

: CDM. : United Engineers & Contractor (Pvt.) Ltd. : From April 2009 Nov 2009 : Project Manager (PM)

Responsible control * Manage site execution of structure and interior works complete in all respects. Plane site execution as per given time from

Project

: Construction of PACE CIRCLE MIXED USE DEVELOPMENT Lahore (Project cost = 670, 000, 00, 00)

Client Employer Period Position Held Description of duties:

: Pace Pakistan (Pvt.) Ltd. : Trident constructs (Pvt.) Ltd. : From April 2007 March 2009. : Construction Manager

Control and manage Construction of R.C.C. structure interior and pre engineering metal buildings.

Project

: E.O.1.K.R.L Pre Engineered Metal Building (Zaimal Steel) Islamabad (Project cost = 250, 000, 00)

Client Employer Period Position Held Description of duties:

: KRL : Izhar Group of companies : From Aug 2006 April 2007. : Project Manager

Responsible to site execution construction of structure and interior works. Control of time frame and complete of R.C.C. structure and interior works as per drawings. Site survey and preparation of shop drawings.

Project

: G.T.S. Fly Over Bridge Faisalabad (Project cost = 150, 000, 00)

Client Employer Period Position Held Description of duties:

: National High Way : Yaseen Brother & Co. : From Aug 2004 May 2005. : Project In charge

Responsible to site execution construction of structure and interior works. Control of time frame and complete of R.C.C. structure and interior works as per drawings. Site survey and preparation of shop drawings.

Project

: Allam Cotton Mills Raiwind. (Project cost = 120, 000, 00)

Client Employer Period Position Held Description of duties:

: Allam Cotton : Al Hussain Builder & Co. : From April 2002 July 2004. : Project In charge

Responsible to site execution construction of structure and interior works. Control of time frame and complete of R.C.C. structure and interior works as per drawings. Site survey and preparation of shop drawings.

Project

: Master textile mills (Pvt.) Ltd. (Project cost = 100, 000, 00)

Client Employer Period Position Held Description of duties:

: Master textile. : Al Hussain Builder & Co. : From March 2001 April 2002. : Project In charge

Responsible to site execution construction of structure and interior works. Control of time frame and complete of R.C.C. structure and interior works as per drawings. Site survey and preparation of shop drawings.

Project

: MK Sons Textile Mills & Shalimar Stitching Unit. (Project cost = 100, 000, 00)

Client Employer Period Position Held Description of duties:

: Mk Sons : Alcone associates. : From June 1998 March 2001. : Project In charge

Responsible to site execution construction of structure and interior works. Control of time frame and complete of R.C.C. structure and interior works as per drawings. Site survey and preparation of shop drawings.

Project

: Shahzad Saddique Industries Faisalabad. (Project cost = 850, 000, 00)

Client Employer Period Position Held Description of duties:

: Shahzad Saddique Industries : Haji Ghulam & Co. : From July 1995 May 1998. : Site Engineer

Responsible to site execution construction of structure and interior works. Control of site sub contractors labors for expenses.

Project

: Khursheed spinning mills Faisalabad. : Ishaq Spinning mills Faisalabad. (Project cost = 900, 000, 00)

Client Employer Period Position Held Description of duties:

: Khursheed Spinning Mills : Invaders Construction Co. : From July 1991 May 1995. : Sub Engineer

Responsible to site execution construction of structure and interior works. Control of site sub contractors labors for expenses.