1.

a pipe has a thickness designation of "40S". what does the "S" mean? A pneumatic pressure test is to be conducted on a Normal Service piping system. During pipe erection, how many of the joint assemblies should be examined? A PQR test coupon with a shell thickness of "T" can generally be used to qualify a wall thickness on the WPS up to. A pressure test is always required:

stainless steel 100 %

17.

2.

During pipe fabrication who has overall responsibility for compliance with the code? During welding, non-esential variables:

owner/user

18.

Must be recorded only on the WPS and must be followed by the welder. excessive forces coming from thermal growth in the attached piping system inside the nut within 1 thread of the nut face bolts to crack and corrode .010 or 10 mils 2 inches

3.

2T

19.

Excessive repairs to pump bearings may be a result of:

4.

whenever the authorized inspector believes one is necessary Class 1 Process for 6 months Blind flanges

20.

Flange bolts are unacceptable if the bolt threads do not extend. Flange leaks in certain fluids can cause: for welded pipe, the normal thickness of under-tolerance is? Generally socket-welded pipe is not used for nominal pipe sizes above: Generally, raised face flanges should have a surface finish of: Graphitization of carbon steels begins to occur when metal temperatures exceed: Heat Tracing could cause cracking in carbon steel piping which is in: In severe refinery services which type of pipe is normally used? Liquid thermal relief valves should be set at a pressure not higher than: Loose or broken anchor bolts at pipe supports are most easily detected by: Per B31.3 how much of the fabrication should be visually examined for a pipe in severe cyclic service: Per B31.3, how much RT is conducted on circumferential welds of a pipe in normal service. Preheat should never be substituted for PWHT if:

21.

5.

A propane piping system should be classified as? A welder becomes unqualified when he has not welded using the: According to ASME/ANSI B16.5 flanges from plate materials can only be used for: According to B31.3, a welder's qualification records from a previous employer can: An inservice process pipe should be classified as Class 1 when the % of H2S exceeds: ASME/ANSI B16.5 requires flanges to be:

22.

6.

23.

7.

24.

125-250 micro- inches 800 F

8.

Be accepted if the inspector approves 3%

25.

9.

26.

Caustic service

10.

marked with the class rating. a chrome steel piping system. Vertical groove 100 footcandles left uninsulated 300 F

27.

seamless 120 %

11.

Carbon steel materials are most likely to be incorrectly substituted in. Describe the 3G welding test position. During a direct visual exam of a pipe weld, the minimum light intensity should be: During a hydrotest, all joints should be: During a pipe repair, preheat is substituted for the required PWHT. What is the minimum preheat temperature. During an API 570 pipe repairs, which welding discontinuity is always unacceptable?

28.

29.

hammer testing

12.

13.

30.

100 %

14.

31.

10%

15.

32.

16.

Cracks and Inadequate fusion

The PWHT was designed to prevent environmental cracking

33.

Pressure applied inside a pipe creates stress in the pipe wall. These stresses are highest on which weld orientation? Seal welding pipe threads: The corrosiveness of soils can be determined by measuring the soils: The material verification program specified by API 578 covers: The RT procedure used for a pipe repair must conform to the requirements of: Thickness measurements are suggested at pipefittings since: What do you call a groove in the parent metal at the toe of a weld? what is the interval for thickness measurements on a class 1 piping system? What is the minimum holding time for all pressure tests on piping? When a relief device or valve is removed for repair, the inspector should: When calibrating a UT instrument, that has a delay line with single element unit, use: When can radiography not be used to qualify a welder? When fabricating pipe, unknown materials: When performing preheat prior to welding, the preheat zone must extend how far beyond the edge of the weld When performing soil-to air inspections on uncoated lines, it is recommended to excavate the soil: when qualifying a weld procedure the esential variables must:

longitudinal weld

49.

When welding together piping components of different thicknesses, the thicker part should be trimmed with a: Who has the responsibility to determine the extent of PMI performed?

30 degree taper. owner/user

50.

34.

may be used to prevent leaks Resistivity

35.

36.

only pressure containing components. Sec 5

37.

38.

directional changes generally create increased turbulence. undercut lesser of 5 years or half life of the pipe 10 mins

39.

40.

41.

42.

inspect the inside of the inlet and outlet piping where the valve was removed. At least 2 test blocks with thicknesses near the max and min. to be examined. when using the GMAW process with the short circuit mode Should never be used (except for door stops) 1 inch

43.

44.

45.

46.

47.

6-12"

48.

be recorded on both the WPS & PQR