Vodafone Green Technology Demo

Vodafone Technology Networks

Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

04 September 2013

What do you know about our Network?

What can we do to cope with the next billion of users without increasing CO2 footprint?

How much consumption per year in KWh do we have in tradition sites?

How many Solar Panels needed to power a traditional Base-station?


Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

2 Green technology demo MWC 2010

04 September 2013

This Session is about to give you all the answers and what Vodafone is doing to keep the energy situation under control and to share experience from our green technology initiatives

3 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

04 September 2013

CO2 annual emissions from use of cellular networks


Radio Base Stations consume ~80% of energy in cellular networks use.

correspond to 25 mio household average yearly consumption

*1Mt CO2 = 2TWh

Energy

~2TWh

~60TWh

~3.5TWh

~10TWh

CO

~1Mt

~30Mt 4 million Radio Stations

<2Mt 20,000 Radio Controllers


04 September 2013

~5Mt Other elements

3 billion subscribers
Source: NSN, 2009
4 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

Energy costs are escalating...


1. Typical sites in emerging market countries like India and Africa use Diesel Generators as primary power or backup solution
Percentage of sites using Diesel Generators in relation to power grid availability (source India)
Others; 20%

No DG

OFF Grid; 10%

DG run over 18 h per day

2. Diesel: Main Driver for increase of energy costs and CO2 emissions .Emerging market energy costs to climb over 70% driven primarily by network expansion but compounded by increased energy cost of between 5% Unreliable & Good and 10% per annum Grid; 50%

Poor Grid; 20%

DG run min. 10 h/day

DG run 2-6 h/day DG : Diesel Generator

5 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

04 September 2013

How to keep the energy situation under control


Vodafone Technology Networks drive Innovation in Network Efficiency and Green Technologies
> Developing 100% green powered innovative radio base station solutions.

> You cannot manage what you do not measure: Vodafone is main promoter of implementing standards energy monitoring features.
> Vodafone is implementing on large scale standardised efficient products and developing intelligent power efficiency features.

> Better control of Diesel Operation by implementing alternatives using Batteries as main power sources.
> Drive Technology innovation for renewable energy solutions using (Solar+Wind) for mass usage in emerging markets.

Design to real need


6 Green technology demo MWC 2010 Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone 04 September 2013

Vodafone Green Technology Demos

B C D E F G

Vodafone - Green Technology Programme Renewable energy sources to power the base stations

The Green Site (Diet BTS) 100% Green Innovative Radio Station Solutions

Innovative Power Efficiency Features Intelligence Power Management System

For further info about this programme For further information about the Green Site Go directly to the demo

For Further information about these features

7 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

04 September 2013

The Vodafone Green Technology Programme


Renewable energy sources to power the base stations

8 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

04 September 2013

Green Telecom sites at reasonable cost


Established joint Cooperation between Vodafone, China Mobile and Indus Towers to push the industry to deliver renewable energy technical solution for mass usage to reduce substantially diesel consumption with Payback <= 3Years (currently 6-7Y). Work closely with Key Suppliers on low Total Cost of Ownership (TCO) approaches to deliver complete green site solutions. Site in Focus OFF Grid or sites with poor Grid power

only 2 main KPIs: Power sustainability for Base Station and Payback < 3 Y

Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

04 September 2013

Parallel Pilot sites in India, China, South Africa, Ghana and Qatar during 2009
Pictures: Some of the realized green sites during 2009

Launch of parallel Pilots and Trials around the globe China India (VF-Essar & Indus Towers), Africa (VodacomSA and VF-Ghana) and Qatar

Different concepts between Solar only, Solar + Wind, Solar+ DG for different type of sites have been evaluated during 2009

10 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

04 September 2013

Vodafone Green Sites are now a reality!


South Africa
Site : Close to Kruger National park / Diet BTS 3900E Power consumption: 147W Backup time: 3*24Hours; Battery capacity: 400AH in one Batteries Bank; PV panels: 8PCS*165W

Green Site Live at the MWC2010!

India
Site : Assam Region / NOKIA Flexi BTS (2/2/2) Power consumption: 800W PV modules: 12PCS*170W = 2,05kWp Battery capacity: 800Ah Generator 15 KVA

Qatar
Site : south of Qatar/ Sector BTS (2/2/2) Power consumption: 950 W PV modules: 18PCs*170W= 3.06kWp Wind : 3kW at 45m height Battery capacity: 1800Ah ; 48h autonomy

11 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

04 September 2013

Technical findings Impact on Diesel Generator running time


BTS size and achievable DG runtime reduction
100% 80% 1.5 60% 1 40% 0.5 0 20% 0% 1 2 3 4 5 6 7 8 9 2

16

-77

-76

-70

Load [kW]

hours

24

24

Savings achieved in Diesel Generators runtime after installing renewable solution

BTS load

DG reduction

S olution 1

S olution 2

S olution 3

The higher the load the higher the CAPEX investments in batteries and solar to get same operational level For small loads around 200W no Diesel Genset is necessary, which corresponds to 100% reduction in the chart

It is technically and commercially feasible to power OFF-Grid Base stations with renewable energy sources, the smaller the load the shorter the payback
12 Green technology demo MWC 2010 Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone 04 September 2013

DG runtime reduction [%]

Effect on Diesel running time reduction DG runtime before was 16h 24h hours

2.5

120%

Vodafone Green Technology Programme


Live connect to India & Qatar performance of realized green sites working with alternative energy

Live connect to realized Green site in Qatar with ALU solutions

Live connect to realized Green site in India with NSN solutions

Find out more under http://www.alcatel-lucent.com/alternative-energy/


13 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

Find out more under www.unite.nokiasiemensnetworks.com/environment


04 September 2013

100% Green Innovative


Radio Station Solutions The Diet BTS
Outdoor Green Site shown at the MWC (live calls)! Located @ CY12B area

14 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

04 September 2013

The success story of The Diet BTS in Vodafone


Concept
Q4/2007

Definition & Development


Q2 ~ Q3/2008

1st Pilots
Q1 ~ Q2 /2009

Green Field Deployment


Q4/2009 - onwards

Vodafone develops concept in Mobile Innovation Centre


(MIC, Madrid, Spain)

High Power Efficiency

Optimized Cost with Green Power, 0 CO2 Emission


Smart Wi-Fi Transmission Easy & Fast Installation First Live Trial in South Africa

Value Proposition
100% Green innovative Base Station, designed for remote communities in emerging markets

Green Deployment Opportunities in Ghana, South Africa and Vodacom DRC (Project in DRC for deep rural site deployment)!

100% Green sites targeting an area without coverage in the Kruger park
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone 04 September 2013

15

Green technology demo MWC 2010

We have the most affordable solution for our emerging markets!


KEY BENEFITS
Antenna WiFi transmission

Lowest power consumption BTS


+

Intelligent Energy Management


Diet BTS

Optimised Transmission: All-IP, Wi-Fi, Local Management


+
Battery cabinet Solar panel Aftersun, LM

Renewable energy
+
Self-Planning & SelfOptimization Easy Installation and Configuration

Easy to Install, Easy to Maintain

Easy Network
Unique and integrated OSS Easy and Remote Fault Recovery

16 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

TCO Saving up to 40%


04 September 2013

Green Site Power Efficiency Roadmap


147W @ 30W / 2 Carriers

Power consumptions based on Diet BTS product (GSM)


130W
Q4/2009 BTS Off (sleeping) Non-BCCH TRX switch off Non-BCCH timeslot switch off Non-BCCH channel TX power degradation Q4/2010

Q3/2009 Backup time: 3*24Hours; Batteries Recharging time:10 days Battery capacity: 400AH Solar panels: 8PCS*165W

< 120W

8 Solar Panels

calls in 1 slot

6 Solar Panels

Aftersun

4 Solar Panels

17 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

04 September 2013

Thank You!

18 Green technology demo MWC 2010

Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. 2010, Vodafone

04 September 2013

You might also like