SCHEDULE 'A' SECTION-I (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Sl.No Description of Building Drg.No Unit Rate per unit in figures & words No. of units required Amount (Rs) Period of completion of individual item(s) after date of handing over of site 8 Refer Note No. 4 of Schedule 'A' on Serial Page No. 12 to 13 for all items of this schedule Remarks
1 1
2
Completion of Balance works and rectificatioin of defects as required for Construction of block no.1 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings.
3 4 5 Refer List Each Rs._______________________________ of Block __ drawings (Rupees___________________________ for all __ items of _________________________________ this ___ schedule _________________________________ ___ _________________________________ only).
6 1
7 Rs. ______________________
9 Refer all notes of Schedule 'A' on Serial Page No. 12 to 24 and notes of this schedule for all items of this schedule
Completion of Balance works and rectificatioin of defects as required for Construction of block no.2 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings.
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
Rs. ______________________
26
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 3 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.3 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.4 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
Rs. ______________________
27
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 5 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.5 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.6 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
Rs. ______________________
28
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 7 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.7 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.8 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
Rs. ______________________
29
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 9 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.9 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.10 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
10
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
Rs. ______________________
30
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 11 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.11 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.12 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
12
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
Rs. ______________________
31
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 13 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.13 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.14 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
14
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
Rs. ______________________
32
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 15 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.15 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.16 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
16
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
Rs. ______________________
33
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 17 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.17 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.18 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
18
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
Rs. ______________________
34
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 19 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.19 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.20 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
20
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
Rs. ______________________
35
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 21 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.21 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.22 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
22
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
Rs. ______________________
36
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 23 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.23 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.24 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
24
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
Rs. ______________________
37
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 25 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.25 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.26 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
26
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
Rs. ______________________
38
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 27 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.27 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.28 of 4 Dewlling Units for "Officers" at Gopalpur, in double storeyed construction (ground + 01 storey), including covered garages, covered staircase (Staircasel), entrance verandahs, rear verandahs, dry out verandahs, balconies, dry out balconies, ramps, covered passages, platforms, servant quarters (one for each DU) each comprising of servant room, its wash & WC, staircase for servant rooms (Staircase-II), plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
28
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
Rs. ______________________
39
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 29 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.29 of 1 Dewlling Unit for "Officers" at Gopalpur, in single storeyed construction including covered garages, entrance verandah, rear dry out verandah, platforms, ramp, connecting platform between dwelling unit and garage, servant quarter comprising of servant room, its wash & WC & platform, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.30 of 1 Dewlling Unit for "Officers" at Gopalpur, in single storeyed construction including covered garages, entrance verandah, rear dry out verandah, platforms, ramp, connecting platform between dwelling unit and garage, servant quarter comprising of servant room, its wash & WC & platform, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.1 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
30
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
31
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
Rs. ______________________
40
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 32 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.2 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.3 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.4 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
33
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
34
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
Rs. ______________________
41
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 35 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.5 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.6 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
36
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
37
Completion of Balance works and Each Rs._______________________________ rectificatioin of defects as required for Block __ Construction of block no.7 of 6 Dewlling (Rupees___________________________ Units for "JCOs" at Gopalpur, in triple __ storeyed construction (ground + 02 _________________________________ storey), including covered scooter and car ___ garages, covered staircase, entrance _________________________________ verandah, lobby, balconies, dry out ___ balconies, ramps, platforms, plinth _________________________________ protection around the block, steps etc. only). complete all as specified and shown on drawings. Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
Rs. ______________________
Rs. ______________________
42
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 38 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.8 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.9 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.10 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
39
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
40
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
Rs. ______________________
43
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 41 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.11 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.12 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.13 of 5 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
42
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
43
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
Rs. ______________________
44
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 44 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.14 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.15 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no.16 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
45
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
46
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
Rs. ______________________
45
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 47 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no.17 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, verandah, entrance verandah, lobby, balconies, dry out balconies, dryout verandah, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Construction of block nos.18, 19, 20, 21 & 22 of 6 Dewlling Units for "JCOs" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter and car garages, covered staircase, entrance verandah, lobby, balconies, dry out balconies, ramps, platforms, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Construction of block nos. 1, 2, 3, 4, 5, 6, 7 & 8 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
48
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
49
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
Rs. ______________________
46
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 50 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 9 of 5 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 10 of 5 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 11 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
51
Rs. ______________________
52
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
Rs. ______________________
47
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 53 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 12 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 13 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 14 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
54
Rs. ______________________
55
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
Rs. ______________________
48
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 56 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 15 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 16 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 17 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
57
Rs. ______________________
58
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
Rs. ______________________
49
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 59 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 18 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 19 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 20 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
60
Rs. ______________________
61
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
Rs. ______________________
50
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 62 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 21 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 22 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 23 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
63
Rs. ______________________
64
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
Rs. ______________________
51
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 65 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 24 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 25 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
66
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
Rs. ______________________
52
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 67 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 26 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 27 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 28 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
68
Rs. ______________________
69
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
Rs. ______________________
53
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 70 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 29 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 30 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Construction of block no. 31 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
71
Rs. ______________________
72
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
Rs. ______________________
54
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 73 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 32 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 33 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 34 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
74
Rs. ______________________
75
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
Rs. ______________________
55
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 76 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 35 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 36 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 37 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
77
Rs. ______________________
78
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
Rs. ______________________
56
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 79 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 38 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 39 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 40 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
80
Rs. ______________________
81
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
Rs. ______________________
57
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 82 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 41 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 42 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 43 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
83
Rs. ______________________
84
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73
Rs. ______________________
58
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 85 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 44 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 45 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Construction of block nos. 46 & 47 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
86
Rs. ______________________
87
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73
Rs. ______________________
59
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 88 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 48 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 49 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 50 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
89
Rs. ______________________
90
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73
Rs. ______________________
60
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 91 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 51 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 52 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. onstruction of block no. 53 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
92
Rs. ______________________
93
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73
Rs. ______________________
61
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 94 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 54 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 55 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 56 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
95
Rs. ______________________
96
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73
Rs. ______________________
62
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 97 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 57 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 58 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 59 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
98
Rs. ______________________
99
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73
Rs. ______________________
63
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 100 2 Construction of block nos. 60, 61 & 62 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 63 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Construction of block nos. 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76 & 77 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 3 7 Rs. ______________________ 8 9
101
Rs. ______________________
102
14
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73
Rs. ______________________
64
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 103 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 78 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 79 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 80 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
104
Rs. ______________________
105
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73
Rs. ______________________
65
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 106 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 81 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 82 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 83 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
107
Rs. ______________________
108
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 74
Rs. ______________________
66
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 109 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 84 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 85 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 86 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
110
Rs. ______________________
111
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 74
Rs. ______________________
67
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 112 2 Completion of Balance works and rectificatioin of defects as required for Construction of block no. 87 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Construction of block nos. 88, 89 & 90 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 91 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. 3 4 5 Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). 6 1 7 Rs. ______________________ 8 9
113
Rs. ______________________
114
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 74
Rs. ______________________
68
SCHEDULE 'A' SECTION-I (CONTD../-) (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1 115 2 Construction of block no. 92 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Completion of Balance works and rectificatioin of defects as required for Construction of block no. 93 of 6 Dewlling Units for "OR" at Gopalpur, in triple storeyed construction (ground + 02 storey), including covered scooter sheds, covered staircase, verandahs, entrance lobbies, balconies, dry out balconies, ramps, plinth protection around the block, steps etc. complete all as specified and shown on drawings. Construction of block of Garbage Bin including plinth protection aroung Garbage Bin at Gopalpur complete all as specified and shown on drawings. 3 4 5 6 1 7 Rs. ______________________ 8 9
116
Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only). Each Rs._______________________________ Block __ (Rupees___________________________ __ _________________________________ ___ _________________________________ ___ _________________________________ only).
Rs. ______________________
117
17
Rs. ______________________
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 74
Rs. ______________________
69
SUMMARY OF SCHEDULE 'A' SECTION-1 (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
1) 2) 3) 4) 5) 6) 7) 8)
Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No.
25 26 27 28 29 30 31 32
Signature of Contractor
DEPMC
70
SUMMARY OF SCHEDULE 'A' SECTION-1 (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No.
33 34 35 36 37 38 39 40
Signature of Contractor
DEPMC
71
SUMMARY OF SCHEDULE 'A' SECTION-1 (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No.
41 42 43 44 45 46 47 48
Signature of Contractor
DEPMC
72
SUMMARY OF SCHEDULE 'A' SECTION-1 (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No.
49 50 51 52 53 54 55 56
Signature of Contractor
DEPMC
73
SUMMARY OF SCHEDULE 'A' SECTION-1 (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No.
57 58 59 60 61 62 63 64
Signature of Contractor
DEPMC
74
SUMMARY OF SCHEDULE 'A' SECTION-1 (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No. Total amount brought forward from Sl. Page No.
65 66 67 68
Total amount of Schedule 'A' Section-I carried over to General Summary on Serial Page No. 137
Signature of Contractor
DEPMC
76
SCHEDULE 'A' SECTION-II (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL WATER SUPPLY)
Period of completion of individual item(s) after date of handing over of site
Sl.No
Drg.No
Rates (Rs.)/Unit
Amount (Rs)
Remarks
1 1
2 3 Supply and fixing Rotational moulded double layer HDPE Refer list water storage tanks (cylindrical vertical with closed top) of of 1000 liters capicity hoisted and fixed in position complete all drawings as specified and as directed by project manager for all items of Supply and fixing Rotational moulded double layer HDPE this water storage tanks (cylindrical vertical with closed top) of schedule. 500 liters capicity hoisted and fixed in position complete all as specified and as directed by project manager Supply and fixing Rotational moulded double layer HDPE water storage tanks (cylindrical vertical with closed top) of 300 liters capicity hoisted and fixed in position complete all as specified and as directed by project manager Supply and laying tudes, medium grade, galvanished of following bores with all fittings such as bends, eldows, tees, short pieces, connectors, bolts, nuts, diminishing pieces, caps, plugs, unions etc. laid in trenches complete all as specified and as directed by project manager a) 20mm dia b) 25mm dia
4 4139.47 /Each
5 114
2381.23 /Each
687
1477.14 /Each
114
Refer Note Refer all No. 4 of notes of Schedule 'A' Schedule 'A' on Serial Page on Serial No. 12 to Page No. 1635905.01 13 for all 12 to items of this 24 and schedule notes of this schedule 168393.96 for all items of this schedule
6 471899.58
92.17/R.M 117.41/R.M
1602 7670
Total Carried over to Summary of Schedule 'A' Section-II on Serial Page No. 80
77
SCHEDULE 'A' SECTION-II (CONTD/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL WATER SUPPLY)
1 5 2 Supply and laying tudes, medium grade, galvanished of following bores with all fittings such as bends, eldows, tees, short pieces, connectors, bolts, nuts, diminishing pieces, caps, plugs, unions etc. laid in trenches complete all as specified and as directed by project manager a) 15mm dia b) 20mm dia c) 25mm dia 6 Supply & Fixing 15mm bore Bid taps, cast copper alloy,chromium plated fancy type screwed down, screwed for iron pipe or for brass ferrule complete all as specified and as directed by project manager Supply & Fixing fancytype chromium plated stop valve, screwed down, high pressure, with fancy knob, with long shank and cup (concealed type) screwed both ends for 15mm bore dia pipes and fittings or for unions complete all as specified and as directed by project manager Supply & fixing gun metal globe or gate valve with iron sheel head, screwed both ends for G.I. pipes and fittings of following bore complete all as specified and as directed by project manager. (a) 15 mm dia (b) 20 mm dia (c) 25 mm dia 173.15 /Each 213.35 /Each 355.55 /Each 915 1602 801 158432.25 341786.70 284795.55 9598013.95 3 4 5 6
208.74 /Each
6405
1336979.70
Total Carried over to Summary of Schedule 'A' Section-II on Serial Page No. 80
78
SCHEDULE 'A' SECTION-II (CONTD/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL WATER SUPPLY)
1 9 2 Supply & fixing straight plain brass ferrules (or connecting screws), screwed both ends, for 25mm bore dia pipe complete all as specified and as directed by project manager Supply & fixing straight plain brass ferrules (or connecting screws), screwed both ends, for 20mm bore dia pipe complete all as specified and as directed by project manager Supply & fixing Ball brass valves, high pressure, withpolythene float & flynut complete, screwed for 20mm bore dia iron pipes and fittings or brass ferrules complete all as specified and as specified by project manager Supply & fixing Ball brass valves, high pressure, withpolythene float & flynut complete, screwed for 25mm bore dia iron pipes and fittings or brass ferrules complete all as specified and as specified by project manager Supply & fixing CP brass shower with revolving bass joint Make : Gem, Cat Part No. 34010 with shower arm Make : Gem Cat. Part No. 34510 or equivalent, as approved by Project Manager complete all as specifed and as directed by Project manager. Supply & fixing Brass chromium plated shower roses with swivel joints, 125mm including fixing to pipe or union complete and as specified by Project Manager Supply & fixing PVC connection pipes with C P brass nuts and washers 15mm dia, complete all as specified and as directed by Project manager. 3 4 450.44 /Each 5 801 6 360802.44
10
366.46 /Each
1062
389180.52
11
203.53 /Each
124
25237.72
12
273.12 /Each
801
218769.12
13
547.00 /Each
1716
938652.00
14
109.25 /Each
1716
187473.00
15
38.00 /Each
3546
134748.00
Total Carried over to Summary of Schedule 'A' Section-II on Serial Page No. 80
2254862.80
79
SCHEDULE 'A' SECTION-II (CONTD/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL WATER SUPPLY)
1 16 2 Supply & fixing brass chromium plated connection, 450mm long with 2 Nos. brass chromium plated couplingcomplete all as specifed and as speicified by Project manager Supply & Fixing 15mm bore wall mixer with two nos, cast copper alloy,chromium plated fancy type screwed down, screwed for iron pipe or for brass ferrule complete all as specified and as directed by project manager 3 4 50.00 /Each 5 1830 6 91500.00
17
3845.00 /Each
1029
3956505.00
Total Carried over to Summary of Schedule 'A' Section-II on Serial Page No. 80
4048005.00
80
SUMMARY OF SCHEDULE 'A' SECTION-II (LIST OF ITEMS OF WORKS & PRICES FOR INTERNAL WATER SUPPLY)
(a)
76
(b) Total amount brought forward from Sl. Page No. 77 (c)
Total amount brought forward from Sl. Page No. 78
Total amount of Schedule 'A' Section-II carried over to General Summary on Serial Page No. 137 = Rs. 19225271.34
Signature of Contractor
DEPMC
82
SCHEDULE 'A' SECTION-III (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL ELECTRIFICATION)
Period of completion of individual item(s) after date of handing over of site
Sl.No
Drg.No
Rates (Rs.)/Unit
Amount (Rs)
Remarks
1 1
2 3 M&L for point wiring with 2 runs of 1.5 Sq mm PVC insulated, Refer list unsheathed stranded , copper conductor in and including concealed PVC of conduit with proper size, fixing brass screw boxes and laminated top drewings sheet cover 3 mm thick including using same size of copper conductor for all cable with different colour as earth continuity conductor connected to items of common earth dolly, all as specified for the following:this schedule. (a) One light/call bell/fan point controlled by one switch, one way (b) Ditto as (a) but two way point controlled by two nos. two way (c) All as per item 1(a) above but excluding concealed PVC conduit (d) All as per item 1(a) above but excluding concealed PVC conduit (e ) One 3 pin socket outlet point 5 amps independent M&L for point wiring with2 runs of 1.5 Sq mm PVC insulated, unsheathed stranded , copper conductor in and including concealed PVC conduit with proper size, fixing brass screw boxes and laminated top sheet cover 1.5 mm thick including using same size of copper conductor cable with different colour as earth continuity conductor connected to common earth dolly, all as specified for the following:(a) One light/call bell/fan point controlled by one switch, one way (b) Ditto as (a) but two way point controlled by two nos (C) One 3 pin socket outlet point 5 amps independent two way
Refer Note Refer all No. 4 of notes of Schedule 'A' Schedule 'A' on Serial Page on Serial No. 12 to Page No. 13 for all 12 to items of this 24 and schedule notes of this 3934838.70 schedule 767665.80 for all items of 678365.15 this schedule 107392.00 1544483.20
Total Carried over to Summary of Schedule 'A' Section-III on Serial Page No. 93
83
SCHEDULE 'A' SECTION-III (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL ELECTRIFICATION)
1 2 3(a) M&L for point wiring with 2 runs of 4 Sq mm PVC insulated,FRLS stranded , copper conductor in and including concealed PVC conduit including tees, bends ,elbows , jun ction box with proper size, fixing brass screw boxes and laminated top sheet cover 3 mm thick including one runs of 4 Sq.mm PVC conductor cable with different colour as earth continuity conductor connected to common earth dolly for one power 15 amps complete all as specified and as directed by Project Manager. 3 (b) All as per item 3(a) above but excluding concealed PVC conduit 4(a) M&L for point wiring with 2 runs of 4 Sq mm PVC insulated,FRLS stranded , copper conductor in and including concealed PVC conduit including tees, bends ,elbows , junction box with proper size,including suitable size of GI box along with modular top plate cover for required Nos of module suitable for modular sitch/ socket and one runs of 4 Sq.mm PVC insulated FRLS Stranded copper conductor cable with different colour as earth continuity conductor connected to common earth dolly for one power 15 amps complete all as specified and as directed by Project Manager. 4 (b) All as per item 4(a) above but excluding concealed PVC conduit 5 M&L switch modular type, 5 Amps, Single pole, one way on the existing mouldar plate, switch box including connection etc, complete as required, all as specified and as directed by Project Manager. 3 4 5 6
614.14/POINT
1837
1128175.18
429.90/POINT
224
96297.60
614.14/POINT
961
590188.54
614.14/POINT
407
249954.98
48.00/EACH
5014
240672.00 2305288.30
Total Carried over to Summary of Schedule 'A' Section-III on Serial Page No. 93
SCHEDULE 'A' SECTION-III (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL ELECTRIFICATION)
1 6 2 M&L bell push modular type, 5 Amps, Single pole switch, one way on the existing mouldar plate, switch box including connection etc. as required and specified and as directed by Project Manager. M&L switch modular type, 5 Amps, Single pole switch, Two way on the existing mouldar plate, switch box including connection etc, complete as required, all as specified and as directed by Project Manager. M&L modular type, 2 in 1, six pin, 5&16 Amp, socket, 230V on the existing mouldar plate, switch box including connection etc. as required and specified and as directed by Project Manager. M&L modular type motor starter A/C plug & socket switch 16 Amp, 230V on the existing mouldar plate, switch box including connection etc. as required and specified and as directed by Project Manager. M&L modular type socket outlet, three pin, 5 Amp, 230V on the existing mouldar plate, switch box including connection etc. as required and specified and as directed by Project Manager. Supply and fixing modular type blanking plate on the existing modular plate & switch box excluding modular plate as requred and specified and as directed by Project Manager. M&L ceiling rose surface bakelite two to three terminal 65 x 50 mm complete all as specified and as directed by Project Manager S&F four single core PVC insulated cable 1100V stranded unsheathed 10 Sq mm with Copper conductor and drawing into PVC conduit complete all as specified and as directed by Project Manager (conduit and conduit accessories measured separately), S&F of 25mm dia. rigid PVC conduits exclusive of boxes (junction/terminal) but inclusive of all tees, bends, elbows, reducers, bellmouth tube ends and all fixing accessories such as couplers, locknuts, saddles, pipe hook, etc, (TV, Telephone S sub main wirng)complete all as specified and as directed by Project Manager. 3 4 47.00/EACH 5 228 6 10716.00
84
53.00/EACH
1928
102184.00
8 9
107.00/EACH
1368
146376.00
72.00/EACH
342
24624.00
10 11 12 13
14
23.38/R.M
29960
700464.80
Total Carried over to Summary of Schedule 'A' Section-III on Serial Page No. 93
4119687.26
SCHEDULE 'A' SECTION-III (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL ELECTRIFICATION)
1 15 16 17 2 S&F junction box with cover, any number or types or outlets as ordered for 25mm dia rigid steel conduit complete all as specified and as directed by project Manager. S&F Junction Boxes (1 to 4 way) 25mm dia, dia rigid non-metallic PVC conduit all as specified and as directed by Project Manager. 3 4 23.96/EACH 22.21/EACH 5 12585 18300 6 301536.60 406443.00
85
Supply and labour earthing complete with galvanised steel earth plate electrode 600x600x6mm thick buried directly in ground not lessthan 2.25 mtrs deep below ground level with top edge of the plate not less than 1.5 mtr below ground level connected to galvanised iron wire 8 SWG as earthing lead by means of bolts, check nuts& washers of galvanised iron or steel all as shown in Electrical Plate No.3 of MES Schedule part-I connected to earthing testpoint all as specified or indicated with & including excavation & earth work in any type of soil and removal of excavated soil upto earth lead protection Gl pipe of 15mm dia, wire mesh, charcoals salt and etc. including 4mm GI wire from test post to main distribution panel including testing complete all as specified and as directed by Project Manager. 18(a) S&F single core PVC unsheathed stranded copper conductor cable (FRLS) 1 run of PVC isolated unsheathed stranded copper conductor cable of green colour as earth continuity conductor including drawing into PVC conduit complete all as specified and as directed by project manager. (a) 2X4 sq.mm + 1X4 Sq.mm (earth wire) 18(b) S&F single core PVC unsheathed stranded copper conductor cable (FRLS) 1 run of PVC isolated unsheathed stranded copper conductor cable of green colour as earth continuity conductor including drawing into PVC conduit complete all as specified and as directed by project manager. (b) 2X6 Sq.mm + 1X6Sq.mm (earth wire). 19(a) S&F prewired sheet steel phosphatised powder painted consumer unit type MCB distribution board (SPN) with 12 ways complete with 200A rated bus bar 240V complete all as specified and as directed by Project Manager.
2400.00/EACH
290
696000.00
90.00/R.M
8580
772200.00
120.00/R.M
16950
2034000.00
668.10/EACH
686
458316.60 4668496.20
Total Carried over to Summary of Schedule 'A' Section-III on Serial Page No. 93
86
SCHEDULE 'A' SECTION-III (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL ELECTRIFICATION)
1 2 19(b) All as per item 19(a) above but excluding prewired sheet steel phosphatised powder painted consumer unit. 20(a) S&F prewired sheet steel phosphatised powder painted consumer unit type MCB distribution board (SPN) with 4 ways complete with 200A rated bus bar 240V complete all as specified and as directed by Project Manager. 20(b) All as per item 20(a) above but excluding prewired sheet steel phosphatised powder painted consumer unit. 21(a) Supply and fixing prewired sheet steel phosphatised powder painted consumer unit type MCB distribution board (TPN) with 4 incomer 8 outgoings ways complete with 200A rated bus bar 240V Complete all as specified and as directed by Project Manager. 21(b) All as per item 21(a) above but excluding prewired sheet steel phosphatised powder painted consumer unit. 22 23 24 Supply and fixing single pole & neutral (SPN) 10 KA MCB 6-32 Amps 240V 50Hz C series complete all as specifed and as directed by Porject Manager. Supply and fixing MCB single pole 240V, 6-32 Amps. 10 KA 240V 50Hz B series complete all as specified and as directed by Project Manager. Supply and fixing Ceiling fan 1200 mm sweep complete with capacitor canopyand down rod including electronic speed regulator with provisionof flexible wire 23/0.0076 twin core copper conductor from ceilingrose/connector to fan and speed regulator complete all as specified and as directed by Project Manager. 3 4 467.75/EACH 5 1 6 467.75
457.02/EACH
112
51186.24
319.90/EACH
639.80
2994.20/EACH
113
338344.60
1 801 5490
1398.00/EACH
114
159372.00
Total Carried over to Summary of Schedule 'A' Section-III on Serial Page No. 93
1500619.49
87
SCHEDULE 'A' SECTION-III (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL ELECTRIFICATION)
1 25 2 Supply and fixing Ceiling fan 1400 mm sweep complete with capacitor canopyand down rod including electronic speed regulator with provisionof flexible wire 23/0,0076 twin core copper conductor from ceiling rose/connector to fan and speed regulator complete all as specified and as directed by Project Manager. Supply and fixing exhaust fan 300 mm dia 99 rpm complete with louvers and provision of cable from ceiling rose/connector to fan complete all as specified and as directed by Project Manager. Supply and fixing fluorescent tube light fitting, single tube, energy efficient T5 tube, box type complete with electronics ballast capacitors, spring loaded rotor type lamp holders, connector block etc. and allaccessories pre wired with 1 x 28W FTL complete all as specified and as directed by Project Manager. Supply and fixing fluorescent tube light fitting, single tube, energy efficient T5 tube, patti type complete with electronics ballast capacitors, spring loaded rotor type lamp holders, connector block etc. and allaccessories pre wired with 1 x 14W FTL complete all as specified and as directed by Project Manager. Supply and fixing decorative 20 W CFL made out of CRCA sheet steel pre-wired upto main connections white powder coated with bi-brass lamp holder and dome shaped frosted glass 160 mm dia completed as shown in sketch no LF-1 complete all as specified and as directed by project manager. 3 4 5 6
1495.00/EACH
2876
4299620.00
26 27
1571.00/EACH
801
1258371.00
759.00/EACH
4648
3527832.00
28
682.00/EACH
1193
813626.00
29
145.49/EACH
2075
301891.75
Total Carried over to Summary of Schedule 'A' Section-III on Serial Page No. 93
10201340.75
88
SCHEDULE 'A' SECTION-III (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL ELECTRIFICATION)
1 30 2 Supply and fixing decorative 20 W CFL made out of CRCA sheet steel pre-wired upto main connections white powder coated with bi-brass lamp holder and dome shaped frosted glass 160 mm dia completed as shown in sketch no LF-2 complete all as specified and as directed by project manager. S&F light fitting complete as specified and conforming to sketchno, 11 w CFL made out of CRCA sheet steel pre-wired upto main connections white powder coated with bi-brass lamp holder and dome shaped frosted glass 200 mm dia complete as shown in sketch no LF-3 completed all as specified and as directed by project manager Supply and Fixing electronic retrofit type CFL lamp with built in choke 11 W PF-0.85 complete all as specified and as directed by Project Manager. S&F of Bell AC, 240V, single pole type 5 Amp. Make and model -Anchor 8363 or equivalent as complete all as specified and as directed by Project Manager. S&F of main distribution board indoor type wall mounted vermin proof factory made fabricated 14SWG sheet door fixed with hinges and complete with locking arrangement, spare space for 2nos. SPN MCBs and painted with special two coats of synthetic enamel paints over one coat of red oxide primer suitable for 3phase, 415V, 50 Hz. Busbar : 100 Amps, 415V, 50 Hz, 3 phase, 4 wire Aluminium busbar Incoming : 63A TPN 10 KA MCCB - 1 No. Outgoing : 32 Amps, TPN, 10 KA MCB - 5 Nos. 16Amps, SPN, 10KA MCB-1 No. 5 - 25 Amps Three phase (KWH) Electronic Energymeter tamper proof features with log memory -6 nos 3 4 5 6
292.55/EACH
1029
301033.95
31
151.28/EACH
5570
842629.60
32 33 34
129.65/EACH 84.01/EACH
10211 687
1323856.15 57714.87
85442.25/EACH
256326.75
Total Carried over to Summary of Schedule 'A' Section-III on Serial Page No. 93
2781561.32
89
SCHEDULE 'A' SECTION-III (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL ELECTRIFICATION)
1 35 2 S&F of main distribution board indoor type wall mounted vermin proof factory made fabricated 14SWG sheet door fixed with hinges and complete with locking arrangement, spare space for 2nos. SPN MCBs and painted with special two coats of synthetic enamel paints over one coat of red oxide primer suitable for 3phase, 415V, 50 Hz. Busbar : 100 Amps, 415V, 50 Hz, 3 phase, 4 wire Aluminium busbar Incoming : 63A TPN 10 KA MCCB - 1 No. Outgoing : 32 Amps, TPN, 10 KA MCB - 5 Nos. 16Amps, SPN, 10KA MCB-1 No. 5 - 25 Amps Three phase (KWH) Electronic Energymeter tamper proof features with log memory -7 nos S&F of main distribution board indoor type wall mounted vermin proof factory made fabricated 14SWG sheet door fixed with hinges and complete with locking arrangement, spare space for 2nos. SPN MCBs and painted with special two coats of synthetic enamel paints over one coat of red oxide primer suitable for 3phase, 415V, 50 Hz. Busbar : 150 Amps, 415V, 50 Hz, 3 phase, 4 wire Aluminium busbar Incoming : 100A TPN 10 KA MCCB - 1 No. Outgoing : 40 Amps, TPN, 10 KA MCB - 4 Nos. 16Amps, SPN, 10KA MCB-1 No. 10 - 40 Amps Three phase (KWH) Electronic Energymeter tamper proof features with log memory -4nos 5 - 25 Amps Single phase (KWH) Electronic Energymeter tamper proof features with log memory -2 nos S&F of main distribution board indoor type wall mounted vermin proof factory made fabricated 14SWG sheet door fixed with hinges and complete with locking arrangement, spare space for 2nos. SPN MCBs and painted with special two coats of synthetic enamel paints over one coat of red oxide primer suitable for 3phase, 415V, 50 Hz. Busbar : 150 Amps, 415V, 50 Hz, 3 phase, 4 wire Aluminium busbar Incoming : 100A TPN 10 KA MCCB - 1 No. Outgoing : 40 Amps, TPN, 10 KA MCB - 4 Nos. 16Amps, SPN, 10KA MCB-1 No. 10 - 40 Amps Three phase (KWH) Electronic Energymeter tamper proof features with log memory -4 Nos 5 - 25 Amps Single phase (KWH) Electronic Energymeter tamper proof features with log memory -5 Nos 3 4 5 6
89360.00/EACH
21
1876560.00
36
60800.00/EACH
121600.00
37
93800.00/EACH
28
2626400.00
Total Carried over to Summary of Schedule 'A' Section-III on Serial Page No. 93
4624560.00
90
SCHEDULE 'A' SECTION-III (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL ELECTRIFICATION)
1 38 2 Supply and fixing main distribution board indoor type wall mounted vermin proof factory made fabricated 14SWG sheet door fixed with hinges and complete with locking arrangement, spare space for 2nos. SPN MCBs and painted with special two coats of synthetic enamel paints over one coat of red oxide primer suitable for 3phase, 415V, 50 Hz. Busbar : 150 Amps, 415V, 50 Hz, 3 phase, 4 wire Aluminium busbar Incoming : 100A TPN 10 KA MCCB - 1 No. Outgoing : 32 Amps, TPN, 10 KA MCB - 6 Nos. 16Amps, SPN, 10KA MCB-1 No. 5 - 25 Amps Single phase (KWH) Electronic Energymeter tamper proof features with log memory -7 nos Supply and fixing geysers single phase, 230V storage vertical type 25 Itrscapacity including necessary fittings and fixtures such as non return valves, nipples, PVC connections, etc. complete all as specified and as directed by Project Manager. Supply and fixing 4 pole MCB Isolator 240V, 63 Amps complete all as specified and as directed by Project Manager. Supply and fixing 1X50 watt HPSV Street light lumanaries single piece die cast, deep drawn aluminium housing complete with control gear compartment, Pf improvement capacitors, acrylic cover UV stablize, ballast of dual taping, dynamic power saving device to reduce power & wattage to 100 watt after six hours peak load, prewired complete with and including 1 X 150 watt HPSV lamp with and including fixing Gi bracket of suitable size Fl clamps, nuts, bolts & washers, point wiring and switches at entrance area of the building and also connecting complete all as specified and as directed by Project Manager. Supply and Fixing ABS Fresh air fan 200 mm dia complete with louvers with plastic body and connecting up aomplete with and including provision of cable from Ceiling rose / connector to fan complete all as specified and as directed by Project Manager. 3 4 5 6
89635.68/EACH
91
8156846.88
39
5000.00/EACH 509.77/EACH
915 114
4575000.00 58113.78
40 41
9600.00/EACH
640
6144000.00
42
1260.00/EACH
1160
1461600.00 20395560.66
Total Carried over to Summary of Schedule 'A' Section-III on Serial Page No. 93
91
SCHEDULE 'A' SECTION-III (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL ELECTRIFICATION)
1 43 2 Supply and fixing PVC pipe of 40 mm dia from in JCOs blocks of 5 DUs and 6 DUs officers blocks of 4 DUs, JCOs blocks of 6 DUs and OR blocks of 6 du at bhubaneswar from terrace to plinth protection with necessary tees and branch pipes for running Telephone and TV cables including making holes in the external walls fixing pipes into the room as directed by Project Manager, all fixtures like PVC clamps to suit the dia of pipe, cleats, screws, fixing to the walls etc complete as requied all as specified and as directed by Project Manager. S&F PVC pipe of 40 mm dia from in officers blocks of 1 DUs at gopalpur from terrace to plinth protection with necessary tees and branch pipes for running Telephone and TV cables including making holes in the external walls fixing pipes into the room as directed by Project Manager, all fixtures like PVC clamps to suit the dia of pipe, cleats, screws, fixing to the walls etc complete as requied all as specified and as directed by Project Manager. M&F switch piano, flush button, Single pole, one way 5/6 Amps complete all as specified and as specified and as directed by project manager M&F switch flush type, Single pole, two way 5/6 Amps complete all as specified and as specified and as directed by project manager 3 4 5 6
1147.50/EACH
286
328185.00
44
630.00/EACH
1260.00
45 46
24.76/EACH 25.44/EACH
14282 3470
Total Carried over to Summary of Schedule 'A' Section-III on Serial Page No. 93
92
SCHEDULE 'A' SECTION-III (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR INTERNAL ELECTRIFICATION)
2 M&F bell push flush type 5 Amps complete all as specified and as specified and as directed by project manager 48 M&F socket outlet 5 pin 5 Amps flush type complete all as specified and as specified and as directed by project manager 49 M&F socket outlet 2 in 6 pin 5 amps and 3 pin 15 Amps flush type complete all as specified and as specified and as directed by project manager 50 M&F switch piano. Flush button, single pole one way 15 Amps flush type complete all as specified and as specified and as directed by project manager 51 S&F of wall mounted fan oscillating 400mm sweep complete with speed regulator and as directed by project manager 52(a) Supply and fixing 20 Amps 240 Volts single pole and neutral with a 2 pin and eath plug and socket complete with one single pole MCB complete all as specified and as directed by P.M 52(b) Alll as per item 53(a) above but completion off incomplete works. 53 Supply and fixing of Lamp holIders insulated body with back plate for batten fitting complete all as specified and as directed by Project manager 1 47 3 4 24.17/EACH 31.69/EACH 77.46/EACH 41.13/EACH 1150.00/EACH 559.70/EACH 391.80/EACH 20.82/EACH 5 687 4384 2748 2748 114 938 87 1537 6 16604.79 138928.96 212860.08 113025.24 131100.00 524998.60 34086.60 32000.34 1203604.61
Total Carried over to Summary of Schedule 'A' Section-III on Serial Page No. 93
93
SUMMARY OF SCHEDULE 'A' SECTION-III (LIST OF ITEMS OF WORKS & PRICES FOR INTERNAL ELECTRIFICATION)
(a) (b) (c) (d) (e) (f) (g)
Total amount brought forward from Sl. Page No. 82 Total amount brought forward from Sl. Page No. 83 Total amount brought forward from Sl. Page No. 84 Total amount brought forward from Sl. Page No. 85 Total amount brought forward from Sl. Page No. 86 Total amount brought forward from Sl. Page No. 87 Total amount brought forward from Sl. Page No. 88
= Rs. 9783436.89 = Rs. 2305288.30 = Rs. 4119687.26 = Rs. 4668496.20 = Rs. 1500619.49 = Rs. 10201340.75 = Rs. 2781561.32 = Rs. 4624560.00 = Rs. 20395560.66 = Rs. 771344.12 = Rs. 1203604.61
(h) Total amount brought forward from Sl. Page No. 89 (i) (j) (k)
Total amount brought forward from Sl. Page No. 90 Total amount brought forward from Sl. Page No. 91 Total amount brought forward from Sl. Page No. 92
Total amount of Schedule 'A' Section-II carried over to General Summary on Serial Page No. 137 = Rs. 62355499.60
Signature of Contractor
DEPMC
95
SCHEDULE 'A' SECTION-IV (LIST OF ITEMS OF WORKS AND PRICES FOR ROAD, PATH AND CULVERT)
Period of completion of individual item(s) after date of handing over of site 9 Refer Note No. 4 of Schedule 'A' on Serial Page No. 12 to 13 for all items of this schedule
Sl.No
Drg.No
Unit
Rates (Rs.)
Amount (Rs)
Remarks
1 1
2 3 4 Rolling and consolidating formation surfaces in Refer list Ten cutting using power roller exceeding 8 tonne of Square but not exceeding 12 tonne complete all as drewings Metre specified and as directed by Project Manager. for all items of Providing and laying 150 mm thick Wet Mix Cubic this Macadam (WMM) base as per technical schedule. Metre specification clause 406 of Specification for Road and Bridge (MoRT &H - 4th revision) complete all as specified and as directed by Project Manager. Providing and constructing 150 mm thick Cubic Granular sub base by providing close Metre graded material, mixing in a mechanical mix plant at OMC, carrying of mixed material to work site and spreading in uniform layers with motor grader etc. complete with suitable fresh material as per Technical Specification Clause No. 401, Table 400-1, Grade of Specification for Road & Bridge Works (MoRT & H - 4th revision ) complete all as specified and as directed by Project Manager Preparing surfaces of unsurfaced WMM by Ten brushing with wire brushes for removing Square caked mud etc. sweeping with brooms and Metre finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc. complete all as specified and as directed by Project Manager.
5 7 1671.99 Rs. ______________________ ____ (Rupees________________ ______________________ 2533.32 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ 1731.62 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ ______________________ _______________ only)
10 Refer all notes of Schedule 'A' on Serial Page No. 12 to 24 and notes of this schedule for all items of this schedule
Total Carried over to Summary of Schedule 'A' Section-IV on Serial Page No. 101
96
SCHEDULE 'A' SECTION-IV (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR ROAD, PATH AND CULVERT)
1 5 2 Material and labour for applying evenly a priming/tack coat with bituminous primer @ 10 kg / 10 square metre using paving bitumen complete all specified and as directed by Project Manager. Providing and laying 50 mm thick (compacted thickness) Semi-Dense Bituminous Concrete by hot mix plant laid in two layers of 25 mm thick (compacted thickness) each, using hard blasted granite crushed aggregates of Grading -2 as per table 500-15 of Specification 508 of MoRT&H (4th Revision), premixed with bituminous binder 60/70 grade @ 5% by weight of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 508 (4th Revision) complete for finished item of work in all respects all as specified and as directed by Project Manager. (Note: - Each layer of 25 mm thick (compacted thickness) shall be laid and rolled separately to achieve the desired compaction as per MoRT & H Specifications. Rate quoted by the contractor shall be deemed to include for this provision and nothing extra shall be admissible on this account). 3 4 Ten Square, Metre 5 7 8 9 10
Cubic Metre
2958.48 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ ______________________ 1479.24 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ ______________________ _______________ only)
Total Carried over to Summary of Schedule 'A' Section-IV on Serial Page No. 101
97
SCHEDULE 'A' SECTION-IV (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR ROAD, PATH AND CULVERT)
1 7 2 Material and labour PCC 1:4:8 type D-2 using 40mm graded stone aggregate as in foundations, filling and mass concrete complete all as specified and as directed by Project Manager. Material and labour Precast cement concrete block of PCC 1:2:4 mix type B-1 (using 20 mm graded stone aggregate) of size and shape as approved by Project Manager, laid and set in cement mortar 1:4, complete all as specified and as directed by Project Manager. (Note: - The unit rate quoted shall be deemed to include for necessary use and waste of form work required and therefore use and waste of form work shall not be measured and paid for separately). 3 4 Cubic Metre 5 7 8 9 10
Cubic Metre
460.08 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ 710.21 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ ______________________ _______________ only)
10
Material and labour 75mm thick PCC 1:4:8 Square 22167.84 Rs. type D-2 using 40 mm graded stone Metre ______________________ aggregate as in sub base complete all as ____ specified and as directed by Project (Rupees________________ Manager. ______________________ Providing & laying 50 mm thick coloured Square 10664.94 Rs. interlocking tiles of approved proprietary Metre ______________________ manufacturer over compacted PCC sub ____ base and sand fill including joints filled with (Rupees________________ sand & leveled to falls complete all as ______________________ specified and as directed by Project ______________________ Manager. ______________________ (Note: - (i) Tiles shall be approved by Project _______________ only) Manager (ii) PCC sub base and sand fill underneath tiles shall be measured and paid for separately. However, sand filling in joints shall be deemed to be included in the unit rate quoted and therefore the same shall not be measured and paid for separately) Total Carried over to Summary of Schedule 'A' Section-IV on Serial Page No. 101
98
SCHEDULE 'A' SECTION-IV (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR ROAD, PATH AND CULVERT)
1 11 2 Supplying, spreading & leveling sand under foot-path blocks complete all as specified and as directed by Project Manager. Material & labour for painting road surface marking with two or more coats to give uniform finish with ready mixed road marking paint conforming to IS:164, on bituminous surface in white / yellow shade including cleaning the surface of all dirt, scales, oil, grease and foreign materials etc before application of paint complete all as specified and as directed by Project Manager. (Note: - The number of coats required shall be adequate to achieve the desired results all as directed by Project Manager. However, number of coats shall not be less than two coats. Unit rate quoted shall be deemed to include for application of more than two coats, till the time desired results are achieved to the entire satisfaction of Project Manager. Nothing extra shall be admissible if more than two coats are applied for achieving the desired results). Material and labour GI sign boards of size 0.45m x 0.45m x 5mm size alongwith GI sign posts, including painting boards with reflective radium paint complete all as specified and as directed by Project Manager 3 4 Cubic Metre Square Metre 5 7 8 9 10
12
696.85 Rs. ______________________ ____ Rs. 2312.15 (Rupees________________ ______________________ ____ (Rupees________________ ______________________ ______________________ ______________________ _______________ only)
13
14
45.00 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ Material and labour GI display boards of size Each 13.00 Rs. 2.00m x 1.20m x 5mm size alongwith GI sign Set ______________________ posts, including painting boards with reflective ____ radium paint complete all as specified (Rupees________________ and as directed by Project Manager. ______________________ ______________________ ______________________ Total Carried over to Summary of Schedule 'A' Section-IV on Serial Page No. 101
Each Set
99
SCHEDULE 'A' SECTION-IV (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR ROAD, PATH AND CULVERT)
1 15 2 Material and labour cement concrete tiles 20 cm x 20 cm x 20 mm thick, with grey cement and pigment, machine pressed, set, jointed and pointed in neat cement slurry in floors and cut and polished complete all as specified and as directed by Project Manager. Material and labour plain cement concrete 1:3:6 type C-2, using 40 mm graded stone aggregate as in surface channels and drains complete all as specified and as directed by Project Manager Material and labour plain cement concrete 1:3:6 type C-2, using 40 mm graded stone aggregate as in foundations, filling and mass concrete complete all as specified and as directed by Project Manager. Material and labour reinforced cement concrete 1:2:4 type B-1 (nominal mix), using 20mm graded stone aggregate as in slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like complete all as specified and as directed by Project Manager. Use and waste of formwork to soffits of suspended slabs such a roof slabs, floor slabs, landings and similar work, not exceeding 200mm thick (Horizontal or sloping) for flat rough finished surfaces of concrete complete all as specified and as directed by Project Manager. 3 4 Square Metre 5 7 8 9 10
16
Cubic Metre
17
Cubic Metre
5624.00 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ ______________________ 225.00 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ 151.88 Rs. ______________________ ____ (Rupees________________ ______________________ Rs. 900.48 ______________________ ______________________ ____ (Rupees________________ ______________________ ______________________ ______________________ _______________ only) 2234.13 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ ______________________
18
Cubic Metre
19
Square Metre
Total Carried over to Summary of Schedule 'A' Section-IV on Serial Page No. 101
100
SCHEDULE 'A' SECTION-IV (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR ROAD, PATH AND CULVERT)
1 20 2 Material and labour TMT steel reinforcement bars 10mm dia and over, cut to length, bent to shape required including cranking, bending spirally for hooping for columns, hooking ends and binding with mild steel wire (annealed) not less than 0.9 mm dia or securing with clips quality conforming to IS 1786 complete all as specified and as directed by Project Manager. Material and labour for rendering 12mm thick on fair faces of brickwork or concrete surfaces in cement mortar 1:3 including finishing the surface even and smooth without using extra cement complete all as specified and as directed by Project Manager. 3 4 Kilogra m 5 7 8 9 10
61030.84 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ ______________________ _______________ only) 1350.00 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ ______________________ _______________ only) 0.00 Rs. ______________________ ____ (Rupees________________ ______________________ ______________________ ______________________ _______________ only) No. 101
21
Square Metre
22
Add to or deduct from Sl.Item No.21 here-inRunning before for each 25mm girth or part of thereof Metre over or under 30 cm ditto. (Note : - The contractor's quoted rate for this item shall be used for the purpose of adjustment of rate of Sl.Item No.21 here-inbefore if the girth of drain being finished under Sl.Item No.21 here-in-before is more or less than 30cm. Total Carried over to Summary of Schedule 'A' Section-IV on Serial Page
101
SUMMARY OF SCHEDULE 'A' SECTION-IV (LIST OF ITEMS OF WORKS & PRICES FOR ROAD, PATH AND CULVERT)
Total amount brought forward from Sl. Page No. 95 Total amount brought forward from Sl. Page No. 96 Total amount brought forward from Sl. Page No. 97 Total amount brought forward from Sl. Page No. 98 Total amount brought forward from Sl. Page No. 99 Total amount brought forward from Sl. Page No. 100
Total amount of Schedule 'A' Section-IV carried over to General Summary on Serial Page No. 137 = Rs.
Signature of Contractor
DEPMC
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13 SCHEDULE 'A' SECTION-V (LIST OF ITEMS OF WORKS AND PRICES FOR AREA DRAINAGE)
Sl.No
Drg.No
Rates (Rs.)/Unit
Amount (Rs)
1 1
2 3 Material and labour Plain cement concrete 1:3:6 Refer list type C-2, using 40mm graded stone aggregate, as of in foundations, filling and mass concrete complete drewings all as specified and as directed by Project Manager. for all items of this Material and labour rendering 12mm thick in cement schedule. mortar 1:3 on fair faces of brick work or concrete surfaces including finishing the surface even and smooth without using extra cement complete all as specified and as directed by Project Manager Extra for forming fair finished drain or channel 30 cm inner girth in cement concrete, using extra cement including forms, moulds, mitred / stopped ends etc.complete all as specified and as directed by Project Manager.
Period of completion of individual Remarks item(s) after date of handing over of site
1588.37/CUM
823.68
1308308.60
71.73/SqM 3
17564.54
1259904.45
Refer Note Refer all No. 4 of notes of Schedule 'A' Schedule on Serial 'A' Page on Serial No. 12 to Page No. 13 for all 12 to items of this 24 and schedule notes of this schedule for all items of this schedule
8.59/R.M
9612.00
82567.08
3(a) Add to or deduct from Sl.Item No.3 here-in-before for each 25mm girth or part of thereof over or under 30 cm ditto. (Note : - This item shall be operated for adjustment of rate of Sl.Item No.3 here-in-before if the girth of drain to be fair finished is more or less than 30cm. Material and labour sand filling under floors or in 4 foundations including watering and onsolidation complete all as specified and as directed by Project Manager.
1.06/R.M
0.00
0.00
302.52/CUM
1015.92
307336.12 2958116.25
Total Carried over to Summary of Schedule 'A' Section-V on Serial Page No. 105
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13 SCHEDULE 'A' SECTION-V (Contd/-) (LIST OF ITEMS OF WORKS AND PRICES FOR AREA DRAINAGE) 1 5 2 Material and labour TMT steel reinforcement bars 10mm dia and over, cut to length, bent to shape required including cranking, bending spirally for hooping for columns, hooking ends and binding with mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed by Project Manager. Material and labour Plain cement concrete 1:3:6 type C-2, using 40mm graded stone aggregate, as in surface channels and drains complete all as specified and as directed by Project Manager. 1624.67/CUM 7 Material and labour precast reinforced cement concrete 1:2:4 type B-1, using 20mm graded stone aggregate in cover slabs set in cement mortar 1:4 including necessary use and waste of form work complete all as specified and as directed by Project Manager. (Note:- Reinforcement shall be measured and paid for separately under appropriate item of this schedule.) 2669.25 4336650.40 3 4 5 6
32.20/Kg
62235.26
2003975.37
2746.33/CUM
471.51
1294922.06 7635547.83
Total Carried over to Summary of Schedule 'A' Section-V on Serial Page No. 105
105
SUMMARY OF SCHEDULE 'A' SECTION-V (LIST OF ITEMS OF WORKS & PRICES FOR AREA DRAINAGE)
(a) (b)
Total amount brought forward from Sl. Page No. 103 Total amount brought forward from Sl. Page No. 104 Total amount of Schedule 'A' Section-V carried over to General Summary on Serial Page No. 138
Signature of Contractor
DEPMC
107
SCHEDULE 'A' SECTION-VI (LIST OF ITEMS OF WORKS & PRICES FOR SECURITY WALL FENCING AND GATES)
Period of completion of individual Amount item(s) (Rs) after date of handing over of site 6 7 Refer Note No. 4 of Schedule 'A' on Serial 419425.94 Page No. 12 to 13 for all items of this schedule 1571852.10
Sl.No
Drg.No
Rates (Rs.)/Unit
Remarks
1 1
2 3 Material and labour plain cement concrete 1:4:8 type D- Refer list 2, using 40mm graded stone aggregate as in foundations, of filling and mass concrete complete all as specified and as drewings directed by Project Manager. for all items of Material and labour brickwork using sub class 'B' (old this size) burnt clay bricks, straight or curved on plan schedule exceeding 6 m mean radius built in cement mortar 1:3 . complete all as specified and as directed by Project Manager. Material and labour cement concrete 1:2:4 type B1 using 20mm graded stone aggregate as in lintels upto 1.5 m clear span, cills, steps, seismic and other similar bands, plinth courses, string courses lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs, water troughs and the like including weathering slightly rounded or chamfered angles and throating including necessary use and waste of formwork complete all as specified and as directed by Project Manager.
1414.59/CUM
296.50
1526.07/CUM 3
1030.00
8 Refer all notes of Schedule 'A' on Serial Page No. 12 to 24 and notes of this schedule for all items of this schedule
2461.95/CUM Total Carried over to Summary of Schedule 'A' Section-VI on Serial Page No. 112
55.00
135407.25 2126685.29
108
SCHEDULE 'A' SECTION-VI (Contd./-) (LIST OF ITEMS OF WORKS & PRICES FOR SECURITY WALL FENCING AND GATES)
1 4 2 Use and waste of formwork to sides of concrete foundations, footings, bases of columns, raft & raft beams, sides and soffits (if any) of foundation & plinth beams and similar work, vertical or to batter for rough finished flat surfaces of concrete complete all as specified and as directed by Project Manager. Material and labour rendering 15mm thick in cement mortar 1:4 on fair faces of brick work or concret surfaces and finishing the surface even and smoot without using extra cement complete all as specifie and as directed by Project Manager. 71.56/SqM 6 Preparation of newly plastered surfaces of walls and applying two coats of cement based paint materia and labour complete all as specified and as directe by Project Manager. 20.31/SqM 7 Supply & fixing galvanised, 2 strand, steel barbe wire 2.24 mm dia barbed with 2 mm dia barbs at 75 mm spacings and straining and fixing to any type of standard rails straining bolts, including securing or tying at crossings with and provision of galvanised mild steel wire, staples or steel pins etc. complete all as specified and as directed by Project Manager. (Note: - Each line wire shall be measured for the purpose of payment). 4397.94 89322.16 4397.94 314716.59 3 4 5 6 7 8
97.90/SqM 5
2420.16
236933.66
441.41/100 R.M
320.00
141251.20 782223.61
Total Carried over to Summary of Schedule 'A' Section-VI on Serial Page No. 112
109
SCHEDULE 'A' SECTION-VI (Contd./-) (LIST OF ITEMS OF WORKS & PRICES FOR SECURITY WALL FENCING AND GATES)
1 8 2 Supply, fixing and erecting steel gate 4 metre wide made of 45mm square MS Box section framing, 20 mm square bar in verticals, including steel pillars, xcavation and earthwork in any type of soil & removal of surplus soil upto 50m,PCC foundation, locking arrangement, heavy duty hinges, lugs, 100mm dia heavy duty roller with and including rail embedded in road surface, applying 2 coats of synthetic enamel paint over a coat of red oxide primer on steel surfaces complete all as specified, as shown on drawings and as directed by Project Manager. Supplying, fixing and erecting steel gate 5.5 metre wide made of 45mm square MS Box section framing, 20 mm square bar in verticals, including steel pillars, excavation and earthwork in any type of soil & removal of surplus soil upto 50m, PCC foundation, locking arrangement, heavy duty hinges, lugs, 100mm dia heavy duty roller with and including rail embedded in road surface, applying 2 coats of synthetic enamel paint over a coat of red oxide primer on steel surfaces complete all as specified, as shown on drawings and as directed by Project Manager. Supplying, fixing and erecting steel gate 2 metre wide made of 45mm square MS Box section framing, 20 mm square bar in verticals, including steel pillars, excavation and earthwork in any type of soil & removal of surplus soil upto 50m, PCC foundation, locking arrangement, heavy duty hinges, lugs, 100mm dia heavy duty roller with and including rail embedded in road surface, applying 2 coats of synthetic enamel paint over a coat of red oxide primer on steel surfaces complete all as specified, as shown on drawings and as directed by Project Manager. 3 4 5 6 7 8
33000/Job 9
66000.00
40000/Job
21
840000.00
10
25000/Job
130
3250000.00 4156000.00
Total Carried over to Summary of Schedule 'A' Section-VI on Serial Page No. 112
110
SCHEDULE 'A' SECTION-VI (Contd./-) (LIST OF ITEMS OF WORKS & PRICES FOR SECURITY WALL FENCING AND GATES)
1 11 2 Supply and fixing mild steel work as in posts and struts in fencing including cutting tops to shape as required and directed, drilling holes, notching for wire etc. and similar work conforming to Fe 410-O or Fe 310-O complete all as specified and as directed by Project Manager. Preparation of new surfaces and applying two coats of synthetic enamel paint over a coat of red oxide zinc chromate primer on new steel or iron surfaces of any description, exceeding 10 cm in width or girth when unconnected with other painting or when painted in a different tint, material and labour complete all as specified and as directed by Project Manager. Supply only chain link mild steel galvanised fencing, any size or type complete all as specified and as directed by Project Manager. (Note: - Fixing only chain link fencing including fixing of line wire shall be measured and paid for separately under appropriate items of this schedule). Fixing only chain link fencing including line wires, any mesh, size and type to any type of standards, rails, straining bolts etc, including provision of binding wire complete all as specified and as directed by Project Manager. Supply and fixing mild steel work as in flat iron supports for chain link fencing including drilling holes, conforming to Fe-410-O or Fe-310-O complete all as specified and as directed by Project Manager. Supply only mild steel round bars conforming to Fe- 410-O for line wire complete all as specified and as directed by Project Manager. 3 4 5 6 7 8
36.34/Kg
37287.67
1355033.93
12
45.36/SqM
3318.18
150512.64
13
30.40/Kg
38131.2
1159188.48
14
3.24/SqM
9532.8
30886.27
15
48.21/Kg
6267.17
302140.27
16
26.85/Kg
31776
853185.60 3850947.19
Total Carried over to Summary of Schedule 'A' Section-VI on Serial Page No. 112
111
SCHEDULE 'A' SECTION-VI (Contd./-) (LIST OF ITEMS OF WORKS & PRICES FOR SECURITY WALL FENCING AND GATES)
1 17 2 Supply and fixing mild steel screw bolts (machine made) with hexagonal or square heads at one end and screwed the other, or screwed both ends, each screwed end to be fitted with washers and one hexazonal or square nut, length of bolt exceeding 5 cm but not exceeding 10 cm long and dia of shank 11 to 15 mm complete all as specified and as directed by Project Manager. Material and labour precast reinforced cement concrete 1:2:4 type B-1, using 20mm graded stone aggregate in cover slabs set in cement mortar 1:4 including necessary use and waste of form work complete all as specified and as directed by Project Manager. (Note:- Reinforcement shall be measured and paid for separately under appropriate item of this schedule.) 2746.33/CUM 19 Material and labour TMT steel reinforcement bars 10mm dia and over, cut to length, bent to shape required including cranking, bending spirally for hooping for columns, hooking ends and binding with mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed by Project Manager. Supply and fixing of 4 mm thick white acrylic sheet fixed by screws to 40x40x6 mm MS angle frame on four sides. 4.03 11067.71 3 4 5 6 7 8
51.93/Kg
2372.41
123199.25
18
32.20/Kg 500.00/SqM
373.31 49.2
20
Total Carried over to Summary of Schedule 'A' Section-VI on Serial Page No. 112
SUMMARY OF SCHEDULE 'A' SECTION-VI (LIST OF ITEMS OF WORKS & PRICES FOR SECURITY WALL, FENCING AND GATES)
Total amount brought forward from Sl. Page No. 107 Total amount brought forward from Sl. Page No. 108 Total amount brought forward from Sl. Page No. 109 Total amount brought forward from Sl. Page No. 110 Total amount brought forward from Sl. Page No. 111 Total amount of Schedule 'A' Section-VI carried over to General Summary on Serial Page No. 138
= Rs. 2126685.28 = Rs. 782223.61 = Rs. 4156000.00 = Rs. 3850947.19 = Rs. 170887.54 = Rs. 11086743.63
Signature of Contractor
DEPMC
114
SCHEDULE 'A' SECTION-VII (LIST OF ITEMS OF WORKS & PRICES FOR STREET LIGHTING)
Period of completion of individual item(s) after date of handing over of site 9 Refer Note No. 4 of Schedule 'A' on Serial Page No. 12 to 13 for all items of this schedule
Sl.N o
Drg.No
Unit
Rates (Rs.)
Amount (Rs)
Remarks
1 1
2 3 Material & labour sand filling in and around the Refer list cable including in and around punning down for of cushioning complete all as specified and as drewings directed by Project Manager. for all items of Supplying & laying burnt clay building bricks, this subclass 'B' (old size bricks) laid in trenches for schedule. protection of cable complete all as specified and as directed by Project Manager Supplying, fixing, testing and commissioning 150W HPSV fitting for street lighting fixed on poles complete with and including ballast igniter with and including 150W HPSV lamp and other accessories all as specified as directed by Project Manager Supplying, erecting, testing and commissioning 15 metre high galvanized mast suitable for lantern symmetrically fitted alongwith their control gear and having two point suspension including necessary foundation as per manufacturer's instructions and as approved by Project Manager complete all as specified.
Cubic Metre
Each
Each Set
7 Rs. __________________ ________ (Rupees___________ 143 __________________ Rs. __________________ ________ (Rupees___________ 63500 __________________ Rs. __________________ ________ (Rupees___________ __________________ __________________ 152 __________________ Rs. __________________ ________ (Rupees___________ __________________ __________________ __________________ 10 __________________ ______________ Serial Page No. 119
10 Refer all notes of Schedule 'A' on Serial Page No. 12 to 24 and notes of this schedule for all items of this schedule
115
SCHEDULE 'A' SECTION-VII (Contd/-) (LIST OF ITEMS OF WORKS & PRICES FOR STREET LIGHTING)
1 5 2 Supplying, fixing, testing and commissioning flood light fitting, complete with switch gear, control gear unit, lamp and fixing for 150 Watt metal halide (MH) complete all as specified and as directed by Project Manager. 3 4 5 7 Rs. __________________ ________ (Rupees___________ __________________ 40 __________________ __________________ Rs. __________________ ________ 73 (Rupees___________ __________________ Rs. __________________ ________ (Rupees___________ __________________ __________________ __________________ __________________ ______________ only) 8 9 10
Each Material and labour for Cement Concrete (1:2:4) Type B2 using 40 mm graded stone aggregate as in foundations and coping of poles complete all as specified and as directed by Project Manager laying, testing and commissioning in 7 (A) Supplying, trenches XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric cable (heavy duty) with aluminium conductor, 1100 Volts grade, ISI marked, of following sizes complete all as specified and as directed by Project Manager. (a) 16 Sqmm 4 core (Note for Sl. Item No. 07 here-in-before: Excavation and earthwork shall be measured and paid for separately under appropriate items of Schedule 'A' Section-X. However, sand cushioning and cover and cable protection shall be measured and paid for separately under appropriate items of this schedule). 6 7 (B) (b) 10 Sqmm 4 core (Note for Sl. Item No. 07 here-in-before: Excavation and earthwork shall be measured and paid for separately under appropriate items of Schedule 'A' Section-X. However, sand cushioning and cover and cable protection shall be measured and paid for separately under appropriate items of this schedule).
Cubic Metre
Running Metre
1600
Rs. __________________ ________ (Rupees___________ __________________ __________________ __________________ __________________ Running ______________ Metre 5000 only) Total Carried over to Summary of Schedule 'A' Section-VII on Serial Page No. 119
116
SCHEDULE 'A' SECTION-VII (Contd/-) (LIST OF ITEMS OF WORKS & PRICES FOR STREET LIGHTING)
1 8 2 Material and labour for Reinforced Cement Concrete Pipes 150mm dia NP2 class, laid and jointed complete with collars complete all as specified and as directed. (Note: Earthwork shall be measured and paid under Schedule 'A' Section-X) Supplying, jointing, testing and commissioning indoor cable gland of brass/gun metal including appropriate size of Aluminium thimble, crimping suitable for 10 to 16 sqmm XLPE Aluminium conductor cable complete all as specified and as directed by Project Manager 3 4 5 7 Rs. __________________ ________ (Rupees___________ __________________ __________________ 160 __________________ __________________ Rs. 8 9 10
Running Metre
10
11
__________________ ________ (Rupees___________ __________________ __________________ __________________ Each 90 __________________ Supply and erecting steel tubular swaged poles, Rs. Type 410 SP-31 (9 metres long) single swan __________________ neck bent to shape complete with cast iron base ________ plate finial taper plug bolts, nuts and screws (Rupees___________ with and including painting two coats of __________________ aluminium paint over a coat of red oxide zinc __________________ chromate primer complete all as specified and __________________ as directed by Project Manager __________________ ______________ Each 152 only) Supply and drawing three single core PVC Rs. sheathed coper conductor (FRLS) cable 1.5 sq __________________ mm drawing in all as specified and directed ( 2 x ________ Running 1.5 sqmm + 1 x 1.5 ) sqmm earth wire (Rupees___________ Metre 6750 __________________ Total Carried over to Summary of Schedule 'A' Section-VII on Serial Page No. 119
117
SCHEDULE 'A' SECTION-VII (Contd/-) (LIST OF ITEMS OF WORKS & PRICES FOR STREET LIGHTING)
1 12 2 Manufacturing, supply, installation, laying and commissioning of cubical type totally enclosed free standing dust free damp and vermin proof & water proof out door (IP-65) feeder pillar fabricated out of 2mm thick CRCA sheet duly powder coated & including supplying & fixing the following items & inter connection wiring with suitable size wire / cable and including all civil work like excavation / CC brick work pedestal plastering refilling, etc., and as per specification as required Incomer: 63 Amp TNP MCB 415V 50Hz (ICU value 10 KA) - 1 No. Bus Bar: 100 Amp TPN bus bar of high conductivity electrolytic aluminium alloy - 1 set Outgoing: a) 6-32 Amps 4 pole MCB (ICU value 10 KA) - 4 Nos b) Providing & fixing digital time switch similar to L&T Cat No.Micron Supply and fixing Junction box of street light pole made out of 1.2mm CRCA sheet phosphatised powder coated suitable to accommodate loop in / loop out cable terminals, with bus bar and 6 A SPN MCB, fixing arrangement to pole including making interconnections with the fixtures complete including mounting on poles with 2 Nos. 25x3 mm flat iron clamps and shutter to be opened / closed vertically with retained ball locking system with size of box not less than 200mm x 100mm x 100mm complete with two coats of synthetic enamel paint over a coat of red oxide zinc chromate primer after preparation of surfaces complete all as specified and as directed by P.M 3 4 5 7 Rs. __________________ ________ (Rupees___________ __________________ __________________ __________________ __________________ ______________ only) 8 9 10
Each set
10 Rs. __________________ ________ (Rupees___________ __________________ __________________ __________________ __________________ ______________ only)
13
Each set
152
Total Carried over to Summary of Schedule 'A' Section-VII on Serial Page No. 119
118
SCHEDULE 'A' SECTION-VII (Contd/-) (LIST OF ITEMS OF WORKS & PRICES FOR STREET LIGHTING)
1 14 2 Earthing complete with galvanised steel pipe electrode, 40mm bore, medium grade, 2.5 metres length, buried directly and preferably vertically in ground with top edge not less than 1.25 metres below ground level connected with earthing lead of 4mm dia galvanised iron or steel wire all to the earthing testpoint all as specified and indicated including testing 3 4 5 7 8 9 10
15
Rs. __________________ ________ (Rupees___________ __________________ __________________ __________________ __________________ ______________ Each set 79 only) Earth continuity conductor or maiin earthing Rs. lead fixed to wall on batten or recess or chases __________________ or buried in ground or drawn in conduit / pipe or ________ fixed to poles or any other indicated situation for (Rupees___________ loop earthing etc., as required 2mm galvanised __________________ iron or steel wire __________________ Running __________________ Metre 5000 __________________ ______________ Total Carried over to Summary of Schedule 'A' Section-VII on Serial Page No. 119
119
SUMMARY OF SCHEDULE 'A' SECTION-VII (LIST OF ITEMS OF WORKS & PRICES FOR STREET LIGHTING)
Total amount brought forward from Sl. Page No. 114 Total amount brought forward from Sl. Page No. 115 Total amount brought forward from Sl. Page No. 116 Total amount brought forward from Sl. Page No. 117 Total amount brought forward from Sl. Page No. 118 Total amount of Schedule 'A' Section-VII carried over to General Summary on Serial Page No. 138
Signature of Contractor
DEPMC
121
SCHEDULE 'A' SECTION-VIII (LIST OF ITEMS OF WORKS & PRICES FOR GROUND WATER RECHARGE)
Period of completion of individual Amount item(s) after (Rs) date of handing over of site 6 7 Refer Note 37336.10 No. 4 of Schedule 'A' on Serial Page 99114.29 No. 12 to 13 for all items of this schedule 628830.54
Sl.No
Drg.No
Rates (Rs.)/Unit
Remarks
1 1
2 Material and labour for hand packing stone soling (any thickness) below foundations to the required level complete all as specified and as directed by Project Manager. Material and labour plain cement concrete 1:3:6 type C-2 using 40mm graded stone aggregate as in foundations, filling and mass concrete complete all as specified and as directed by Project Manager. Material and labour for walling of squared rubble, regular coursed well bonded, bedded and soilidly hearted, built in cement mortar 1:4 complete all as specified and as directed by Project Manager. Material and labour cement concrete 1:2:4 type B1 using 20mm graded stone aggregate as in lintels upto 1.5 m clear span, cills, steps, seismic and other similar bands, plinth courses, string courses lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs, water troughs and the like including weathering slightly rounded or chamfered angles and throating including necessary use and waste of formwork complete all as specified and as directed by Project Manager.
4 398.89/CUM
5 93.6
1588.37/CUM
62.40
1492.95/CUM
421.20
2461.95/CUM
10.53
25924.33
8 Refer all notes of Schedule 'A' on Serial Page No. 12 to 24 and notes of this schedule for all items of this schedule
Total Carried over to Summary of Schedule 'A' Section-VIII on Serial Page No. 123
791205.27
122
SCHEDULE 'A' SECTION-VIII (Contd/-) (LIST OF ITEMS OF WORKS & PRICES FOR GROUND WATER RECHARGE)
1 5 2 3 4 Material and labour for flush pointing to squared 177.10/SqM rubble, regular coursed stone masonry in cement mortar 1:4 complete all as specified and as directed by Project Manager Precast cement concrete blocks CC 1:3:6 type C1 2083.56/CUM 20mm graded aggregates set in cement mortar 1:4 with solid blocks exceeding 10cms in width and setting in mortar complete Total Carried over to Summary of Schedule 'A' Section-VIII on Serial Page No. 123 5 62.4 6 11051.04 7 8
6.13
12772.2228
23823.26
123
SUMMARY OF SCHEDULE 'A' SECTION-VIII (LIST OF ITEMS OF WORKS & PRICES FOR GROUND WATER RECHARGE)
(a) (b)
Total amount brought forward from Sl. Page No. 121 Total amount brought forward from Sl. Page No. 122 Total amount of Schedule 'A' Section-VIII carried over to General Summary on Serial Page No. 138
Signature of Contractor
DEPMC
125
SCHEDULE 'A' SECTION-IX (LIST OF ITEMS OF WORKS & PRICES FOR RETAINING WALL)
Period of completion of individual item(s) after date of handing over of site 7 Refer Note No. 4 of Schedule 'A' on Serial Page No. 12 to 13 for all items of this schedule
Sl.N o
Drg.No
Rates (Rs.)/Unit
Amount (Rs)
Remarks
1 1
2 3 Material and labour for hand packing stone Refer list soling (any thickness) below foundations to the required of level complete all as specified and as directed by Project drewings Manager. for all items of Material and labour plain cement concrete 1:3:6 type Cthis 2 using 40mm graded stone aggregate as in schedule. foundations, filling and mas concrete complete all as specified and a directed by Project Manager. Material and labour for walling of squared rubble, regular coursed well bonded, bedded and soilidly hearted, built in cement mortar 1:4 complete all as specified and as directed by Project Manager. Material and labour cement concrete 1:2:4 type B1 using 20mm graded stone aggregate as in lintels upto 1.5 m clear span, cills, steps, seismic and other similar bands, plinth courses, string courses lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs, water troughs and the like including weathering slightly rounded or chamfered angles and throating including necessary use and waste of formwork complete all as specified and as directed by Project Manager.
4 398.89/CUM
5 228.71
6 91230.13
1588.37/CUM
372.41
591524.87
1492.95/CUM
2192.92
3273919.91
8 Refer all notes of Schedule 'A' on Serial Page No. 12 to 24 and notes of this schedule for all items of this schedule
2461.95/CUM
49.36
121521.85
Total Carried over to Summary of Schedule 'A' Section-IX on Serial Page No. 127
4078196.77
126
SCHEDULE 'A' SECTION-IX (CONTD/-) (LIST OF ITEMS OF WORKS & PRICES FOR RETAINING WALL)
1 5 2 Material and labour for flush pointing to squared rubble, regular coursed stone masonry in cement mortar 1:4 complete al as specified and as directed by Project Manager. Precast cement Concrete blocks cc( 1:3:6) type c1 (20 mm graded agreegates set in cement mortar (1:4) with solid blocksexceeding 10 cm in width and setting in mortar complete PVC (SWR) pipe single socketed in any length with 75 mm dia. 3 4 177.10/SqM 5 267.37 6 47351.23 7 8
2083.56/CUM
23.95
49901.26
70.91/R.M
1064.50
75483.70 172736.18
Total Carried over to Summary of Schedule 'A' Section-IX on Serial Page No. 127
SUMMARY OF SCHEDULE 'A' SECTION-IX (LIST OF ITEMS OF WORKS & PRICES FOR RETAINING WALL)
(a) (b)
Total amount brought forward from Sl. Page No. 125 Total amount brought forward from Sl. Page No. 226 Total amount of Schedule 'A' Section-IX carried over to General Summary on Serial Page No. 139
Signature of Contractor
DEPMC
129
SCHEDULE 'A' SECTION-X (LIST OF ITEMS OF WORKS & PRICES FOR EXCAVATION, EARTHWORK & SITE CLEARANCE)
Period of completion of individual Amount item(s) after (Rs) date of handing over of site 6 7 378550.62 Refer Note No. 4 of Schedule 'A' on Serial Page 379251.57 No. 12 to 13 for all items of this schedule
Sl.No
Drg.No
Rates (Rs.)/Unit
Remarks
1 1
2 Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in soft / loose soil complete all as specified and as directed by Project Manager. Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m deep in soft / loose soil for foundation etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sq.m on plan and not exceeding 1.5 m in depth and getting out complete all as specified and as directed by Project Manager. Returning, filling in (soil), including spreading, levelling, watering and well ramming in layers not exceeding 25 cm in soft / loose soil complete all as specified and as directed by Project Manager. Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m deep in hard / dense soil for foundation etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sq.m on plan and not exceeding 1.5 m in depth and getting out complete all as specified and as directed by Project Manager.
4 7.11/SqM
5 53242.00
51.41/CUM
7377.00
18.65/CUM
25382.00
473374.30
8 Refer all notes of Schedule 'A' on Serial Page No. 12 to 24 and notes of this schedule for all items of this schedule
90.42/CUM
21774.20
1968823.16
Total Carried over to Summary of Schedule 'A' Section-X on Serial Page No. 132
3199999.65
130
SCHEDULE 'A' SECTION-X (CONTD/-) (LIST OF ITEMS OF WORKS & PRICES FOR EXCAVATION, EARTHWORK & SITE CLEARANCE)
1 5 2 Removing excavated material exceeding 250 m but bot exceeding 500 m and depositing where directed complete all as specified and as directed by Project Manager. Excavation over areas, not exceeding 1.5 m deep and getting out in hard / dense soil complete all as specified and as directed by Project Manager. Grubbing up tree trunk including cutting of trunk portion protruding over ground, digging out roots, filling holes and levelling of ground, stacking of serviceable material and removing of unserviceable material to a distance not exceeding 50 m and clearing site, girth of tree exceeding 150 cm and not exceeding 200 cm measured at 1 m above ground level complete all as specified and as directed by Project Manager. Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in hard/dence soil Excavation in trenches n exc. 1.5 m wide and n exc 1.5 m deep for foundation etc are for shafts,bells, cesspitts,manholes and pier holes not exc 10 sqm on plan in soft disintegrated rocks. 3 4 72.26/CUM 5 31018.00 6 2241360.68 7 8
60.28/CUM
23426.00
1412119.28
450.28/Each
1565.00
704688.20
12.46/SqM
107937.00
1344895.02
206.56/CUM
7215
1490330.40
10
Excavation in trenches exc. 1.5 m wide and n exc 3.0 232.29/CUM m deep for foundation etc are for shafts,bells,cesspitts,manholes nd pier holes not exc 10 sqm on plan in soft disintegrated rocks. Total Carried over to Summary of Schedule 'A' Section-X on Serial Page No. 132
2612
606741.48
7800135.06
131
SCHEDULE 'A' SECTION-X (CONTD/-) (LIST OF ITEMS OF WORKS & PRICES FOR EXCAVATION, EARTHWORK & SITE CLEARANCE)
1 11 2 Returning filling in trenches including spreading levelling watering and well ramming in layers not eceeding 25 cm in rocks Removing excavated material exceeding 250 m but bot exceeding 500 m and depositing where directed complete all as specified and as directed by Project Manager. 3 4 24.82/CUM 5 8256 8 204913.92 9 10
12
96.94/CUM
1571
152292.74
Total Carried over to Summary of Schedule 'A' Section-X on Serial Page No. 132
357206.66
132
SUMMARY OF SCHEDULE 'A' SECTION-X (LIST OF ITEMS OF WORKS & PRICES FOR EXCAVATION, EARTHWORK & SITE CLEARANCE)
(a)
(b) Total amount brought forward from Sl. Page No. 130 (c)
Total amount brought forward from Sl. Page No. 131 Total amount of Schedule 'A' Section-IX carried over to General Summary on Serial Page No. 139
Signature of Contractor
DEPMC