SCHEDULE FOR 10 MWp SPV POWER PLANT AT NTPC UNCHAHAR

SL NO ACTIVITY
1 2 Month JULY-13 3 4 5 6 AUG-13 7 8 9 10 SEP-13 11 12 13 14 OCT-13 15 16 17 18 NOV-13 19 20 21 22 DEC-13 23 24

Summary

1. Supply 2. Civil Works 3. Erection 4. Commissioning ENGINEERING ( Drawing, Data sheet,


Inverter Pile Structure DC cable LTAC cable HT cable HT panel SMU SCADA Transformer 220KV Switchyard Equipment Battery with FCBC UPS

MQP
Inverter Pile Structure DC cable LTAC cable HT cable SMU SCADA Transformer 220KV Switchyard Equipment Battery with FCBC

SL NO UPS

ACTIVITY
1 2

Month JULY-13 3 4 5 6 AUG-13 7 8 9 10 SEP-13 11 12 13 14 OCT-13 15 16 17 18 NOV-13 19 20 21 22 DEC-13 23 24

SUPPLY
Structures for Modules Mounting SMU Cables- DC, LT, HT, Control, Communication Inverters Transformers HT Panels and VCB Panels 33 KV switchyard Equipment 220KV Switchyard Equipment Transmission line components ( Insulator, saddle, pole etc.) SCADA Auxillary transformer weather station Battery with FCBC SL NO ACTIVITY
1 2 Month JULY-13 3 4 5 6 AUG-13 7 8 9 10 SEP-13 11 12 13 14 OCT-13 15 16 17 18 NOV-13 19 20 21 22 DEC-13 23 24

CIVIL WORKS

Land Levelling & grading PV Array Structure Pedestals Augering ( No. of tractors) Barbending Pile casting Inverter Rooms Foundation Plinth beam casting Roof casting Brick Work upto lintel lintel level beams/sunshade beams Parapet wall construction Outer Plastering Ceiling plastering Plastering inside Fixing doors, windows etc Cable trench excavation in room PCC work Barbending Casting of trenches and completion Flooring White washing, painting, etc, finishing works Control Room - Elec Wiring & fitting Plumbing Windows shutters Tile flooring

SL NO

ACTIVITY
1 2

Month JULY-13 3 4 5 6 AUG-13 7 8 9 10 SEP-13 11 12 13 14 OCT-13 15 16 17 18 NOV-13 19 20 21 22 DEC-13 23 24

Switchyard Work - near inverter stations & main Switchyard) Marking


civil works for platforms

Transformer base 1 nos. HT panel base Aux. Transformer Main transformer Assembly Earthing, Cable trenchs etc Control Room Foundation Plinth beam casting Roof casting Brick Work upto lintel lintel level beams/sunshade beams Parapet wall construction Outer Plastering Ceiling plastering Plastering inside Fixing doors, windows etc Cable trench excavation in room PCC work Barbending Casting of trenches and completion Flooring White washing, painting, etc, finishing works Control Room - Elec Wiring & fitting Plumbing Windows shutters Tile flooring SL NO ACTIVITY
1 2 Month JULY-13 3 4 5 6 AUG-13 7 8 9 10 SEP-13 11 12 13 14 OCT-13 15 16 17 18 NOV-13 19 20 21 22 DEC-13 23 24

ERECTION
Solar PV Modules Structures for Modules Mounting Cables Interwiring of PV modules Wiring of strings to SMU Excavation for cable trenchs Preparation of trenches Wiring of SMU to inverter Cabling inverter to Tx Cabling TX to VCB panel Cabling VCB panel to main switchyard Spreading 40mm Stones in switchyards Chain Link Fencing with gate Approval from CEIG / state authotiry Inverters Transformers Switchyard Equipment Other Items

COMMISSIONING
No. of Augering Machines Employed 2 nos No. of Barbending teams employed 55 No. of teams & no. of Labour Employed per team 55 forPile casting No.of labour employed for structure mounting 60 No.of labour employed for module mounting 60