YOUR CONSTRUCTION PARTNER P.O Box 59143 -00200 Tel: +254 720 733559
NAIROBI.
PSL
Our Ref:
8th July 8, 2010
INTRODUCTION Following a request to the management of Profix Systems Ltd by Mr. Innocent Kubebea and Ms. Marion Nganga of the Solidarites International, the following is a design of a modern greenhouse from locally available materials and the Bill of Quantities for the establishment of drip irrigation system for the said greenhouse. Acknowledgement is due to the client for recognizing and entrusting the expertise of the Profix Systems Ltd to undertake the following design. FRO T /SIDE ELEVATIO (Not to scale)
Opening 0.6M 0.6 M
1M
15 M (Length)
Tomato plants (two rows in one bed) 15 M (Length) path xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x xxxxxxxxxxxxxx 60CM from row to row but 30CM from plant to plant x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x bed 1 Path (0.4 M) bed 2 1M 1M path bed 3 path bed 4
Bill A (Greenhouse) POLYETHELE E SHEETS Description Dimentions Unit Cost /M Side walls (15 * 3) 2 = 90 M 75 (longer sides) Side walls (6 * 3) 2 = 36 M 75 (shorter sides) Roof (3.4 + 3.4) 15 = 102 M 75 Roof (the (6 * 1.6) 2 = 9.6 M 75 triangular side) Sub-total POSTS Dimentions quantity 3M (6 * 2) = 12 pcs (3+1+0.6) = 6 Pcs 4.6 M (6 * 6) M 6 Pcs (3.4 * 6) 2 12 Pcs M (1.6 * 3) 6 18 pcs
Description Side posts (cedar posts) Central posts Parlings Rafters Ties
= 28.8 Sub total OTHER ACCESSORIES Dimentions Unit Cost /M (2 ,2 & 3), 1kg 100 each 300 Pcs Sub total I SECT ETS (15 * 2) 1.5 = 45M
9600
Side walls 125 (longer sides) Side walls (6 * 2) 1.5 = 18M 125 (shorter sides) Top ventilation (15 * 1) = 15M 125 Sub total Labour estimation for the greenhouse construction GRA D TOTAL Bill B (Drip irrigation system)
Item
Tank Stand at least one Meter high (wooden or metallic) Tank reservoir 1000 Lts PE Pipe (32mm) Long nipple 1 with two back nuts and rubber washers CCC-TEE 1 Ball Corks 1 Plastic Disc Filter PE Female Elbow PE Elbow -CC- PE PE -Pipe Drip tape (12mm) End Caps-PE (32mm) PE Start Connectors (12mm) PE Start Connectors (12mm End Caps) PTFE Soil treatment chemicals (Black earth, Wolkazim, Bionematon and Enrich) Man-days for bed preparation Drip installation charges
Quan tity
1 Pc 10m 1 Pc 1 Pc 1Pc 1Pc 1Pc 1Pc 120 m 2 Pcs 8 Pcs 8 Pcs 1Pcs 4 days One Techni
Unit price
8000 70 300 450 700 1700 450 450 17 250 50 30 30 5000 350 4000
Total
8000 700 300 450 700 1700 450 450 2040 500 400 240 30 5000 1400 4000
Description Nails Timber (8x1) Sand Ballast Cement Wire mesh Labour cost
Quantity 2 @ shs. 150 14ft @ shs 40 3 2 1 2.5 x 2 @ 300 per square metre 2 * 500
Cost (Kshs.) 600 1120 1500 1200 900 1500 1000 7,320
47470 26360 7320
Contingencies
81,150 105,495
B: the bill doesnt include the cost of manure for the greenhouse and the stand. The bill has been computed with the local rates in the market. This of course means that it is subject to change depending on the fluctuations of the Kshs.
Designed By: P. M. KAHIGA Kenya Agricultural Research Institute Irrigation, Drainage and Problem Soils Research Programme Mathaiya_kahiga@yahoo.co.uk Tel: 0720578636/0733431772