You are on page 1of 23

Access to Space

ISROs Current Launch Capabilities & Commercial Opportunities

S Somanath Project Director, GSLV Mk III VSSC, ISRO

Indian Strides in Space Transportation System 1963 - 2010


Heavy Cryogenics Large Boosters (Solid and Liquid)

Two Launch Pads

1963

Sounding Rockets

Two Launch Pads for PSLV, GSLV & LVM3 Facilities for Launch vehicle integration and storage. Multiple Facilities for Spacecraft servicing.

PSLV at Second Launch pad

Launch Vehicles of ISRO


GSLV PSLV LVM3

ASLV

SLVSLV -3

10000 4500 3000 LEO PAYLOADS (KG)

Launch Vehicle Lift-off weight


(kg)

SLV 17 40 (LEO)

ASLV 40 150 (LEO)

PSLV 295 1600 (SSO)

GSLV 450 2000 (GTO)

GSLV Mk-3
(Under development)

640 4000 (GTO)

Payload

(kg)

PSLV Variants and Payload capability


UNDER DEVELOPMENT

BASE CONFIGURATION

CORE ALONE VEHICLE, NO STRAPSTRAP -ONs


S139 + PL40+ HPS3 + PS4

PSLV WITH EXTENDED STRAPSTRAP -ON (PSOM PSOM-XL)


(6S12 +S139) + PL40+ HPS3 + PS4

PSLV-XL WITH PSLVHIGH PERFORMANCE PS4


(6S12 +(S139) + PL40+ HPS3 + PS4

PS2 & STRAP STRAP-ONs REMOVED

(6S9 +S139) + PL40+ HPS3 + PS4

S139 + HPS3 + PS4

LEO SSPO
(622 Km)

3200 1600 1150

2100 1100 -

3800 1750 1300

4000 1900 1440

550 -

GTO
(240 x 24000 km)

PSLV PAYLOAD ACCOMMODATION

MULTI SATELLITE LAUNCH CAPABILITY OF PSLV

PSLV C9: Spacecraft accommodation


DEPLOYMENT OF TEN SATELLITES
CARTOSAT 2 INDIA686kg

NLS5

IMS 1 INDIA83kg

RUBIN8 GERMANY

PSLV-C15 / PSLV-C16 Missions


DEPLOYMENT OF MULTIPLE SATELLITES
CARTOSAT 2B 693kg RESOURCESAT2 1200kg

ALSAT2A 116kg

YOUTHSAT 90kg XSAT 108kg NLS6.1/6.2 / STUDSAT

637.3 km SSPO

822 km SSPO

GSLV Variants
GTO CAPABILITY
Orbitsize,Incln (kmxkm,deg)
GSLVMKII GSLVMKIIA 170X36,000,20.7 170x36,000, 19.4

P/L (kg)
2200 2350

GSLV MkII
GS1: (4L40H+S139) GS2:L37.5H GS3:C12

GSLV MkIIA
GS1:(4L40H+S139) GS2:L37.5H GS3:C15

GSLV MkIIC
GS1:(4L40H+S139) GS2:L40H GS3:C15 GS4:PAM

SSPO CAPABILITY Orbit size, , Inclin. (km x km, deg) GSLV MkIIA 700 x 700, 98.2 P/L (kg) 3100

MEO Mission for Navigation satellites

SPACECRAFT SEPARATION 19140 km CIRCULAR, , i=64.8 DEG. ORBIT PAM FIRING AT FIRST APOGEE

LIFT OFF

PAM-G Stage

C15 SHUT OFF (PAM+S/C) COMPOSITE SEPARATION 150 X 19140 km, i=51.56 DEG. ORBIT

Payload Assist Module (PAM-G) for direct injection to the orbit GEO direct injection capability : 955 kg

Spacecraft mass: ~1400 kg Orbit : 19140 km circular Period : 11 :15 : 40 hr Inclination : 64.8 deg

LVM3 DEVELOPMENT
CONFIGURATION CON FIGURATION 2S200+L110+C25

L110 stage test

C25 TP tests

S200 static test

PAYLOAD ACCOMMODATION OPTIONS IN LVM3


SINGLE PAYLOAD Payload Envelope: 4.5m Diameter, 5 m height, 110 m3 volume l MULTIPLE PAYLOADS

SINGLE PAYLOAD

MULTIPLE PAYLOADS

DUAL LAUNCH ADAPTER EQUIPMENT BAY

CapabilityforLunar&Inter planetarymissions
Lunar capabilities
Launch Vehicle
PSLV GSLV MkII with CUS12 GSLV MkII with CUS15 GSLV Mk III

EPO Size (km x km)


250 x 22860 170 x 36000 170 70 x 24000 000 170 x 36000 170 x 24000 180 x 36000

EPO mass (kg)


1380 2233 2533 533 2457 2757 4283

LPO mass (kg)


720 1174 1220 0 1294 1332 2285

y capabilities Inter-Planetary
Launch Vehicle PSLV GSLV LVM3 Orbital capabilities (kg) Moon (LPO) 720 1294 2285 MARS 150 230 350 530 650 1010

PSLV

TOTAL SANCTIONED COST: Rs 3233 Cr

Total cost F1 to F16: Rs 3551 Cr

UNITCOSTOFLAUNCHVEHICLES
8% 9% 25%

PSLV

PS1 PS0 PS2

Cost break up for launch vehicle


Fabrication 34% Materials Materials & bought out items 57% Propellant 9%

8% 2% 10% 15% 13% 9% 1%

HPS3 PS4 LIGHTALLOYSTRUCTRES SAS AVN CONTROLSYSTEMS INTEGRATION

6% 6% 6% 4% 2%

GSLV Mk II
15% S139 L40 GS2 CRYO EGC SAS

90 % of the launch vehicle unit cost is through industries

18%

35%

AVN INTEGN LAUNCHCOMPLEX

8%

CURRENTLEVELOFINDUSTRYPARTICIPATION
Interstage structuresandtanks production Motorcasesmaterialsand fabrication LiquidEnginesubsystemsand controlcomponents p realisation Compositesystemsproduction Productionandtestingof electronic e ect o cpac packages ages Productionofliquid&solid propellants Productionofrawmaterials Subsystemlevelintegrationand testing FacilitybuildupinISRO&in industriesfundedbyISRO

More than 150 industries all over India

Industry participation in Propulsion systems realisation


Vikas Engine M/s Godrej & M/s MTAR M/s Brahmos Propellant tanks M/s ASD HAL PS2/GS2/L40/CUS/L1 10/C25 M/s Bhramos Aerospace L40 L40 Stage Integration Components & Modules M/s MTAR PS2/GS2/L40/ S/c Valves (IPCM) M/s LTE TVC/RCT/PS4/PAM/ S/c Valves (IPCS) M/s LTE DC torque motor for TVC & DC motor for motorised valves S/C propellant tanks M/s BHEL M/s/KCP Umbilical M/ Microfine M/s Mi fi Bushings Bellows & Metallic fl ibl hosesflexible h HRCM Hoses/TVC Hoses/L40 Hoses M/s Metallic Bellows PTFE Flexible Hoses M/s MIL Ind. PS4 Engine M/s ASACO Transducers M/s LTE M/ Brahmos Aerospace M/s

M/s ASD HAL CUS Engine/ C25 g Engine M/s Godrej & M/s MTAR

Propellant production UH25, MMH, LH2, N2O4 M/s ASL , M/s HOCL

LVM3Development
Development & test flight of two vehicles including facility build up.

MAJORFACILITIES
1. 2. 3. 4. 5. 6. VEHICLESYSTEMSFACILITIESATVSSC L110&C25INTEGRATION&TESTINGFACILITIESATLMF/LPSC STRUCTURALTESTFACILITIESATVSSC&SDSC MANUFACTURINGFACILITESATWORKCENTRES SOLIDPROPELLANTPLANTATSDSC LAUNCHCOMPLEXFACILITIES
700 600

Rs. 1300 Cr for facility build up

PROGRAMME ELEMENTS DISTRIBUTION

R s in C ro ores

500 400 300 200 100 0 VSSC LPSC SHAR INDUSTRY

Productionthroughputrequiredfromindustry

BatchProductioninindustrialenvironmentconsidering economyofscale g ofStages g andAssembliesby yIndustry y Integration Indigenizationofmaterials IndigenousfacilitiesforMaterialprocessing Facilitybuildupfornewprojectsonturnkeybasis

1or2LV VM3

PS1motorcases PS0motorcases Lightalloystructures Propellanttanks Vikas Engines Precision components Avionicsub assemblies Integration&testing

GS1motorcases L40stages Propellanttanks g Vikas Engines CUSengines Precision components Avionicsub assemblies Integration&testing Lightalloystructures Compositehardware

4mdia lightalloy structures 5mdia CFRPheat shield Propellanttanks 3.2mdia motor cases Vikas Engines C25Engines Precision components Avionicsub assemblies Integration&testing

4P PSLV

2G GSLV

Conclusion
Launch Capability Development
PSLV payload l d capability, bilit Mission Mi i flexibility, fl ibilit GSLV launch l h capability bilit LVM3 to provide 4 ton to GTO capability by 2012.

L Launch h Service S i Oportunities O t iti


Mini/Mico satellite launch capability in PSLV. Various spacecraft dispensing schemes developed and qualified. Limited dedicated launch feasibility exists in PSLV & GSLV for various types of missions

I d t Participation Industry P ti i ti
60 % of 11th plan outlay was planned through Indian industries. Policy to have Industry as a risk sharing partner in the future endeavors of ISRO ISRO. Increased throughput from industries to cater to the higher launch frequency planned.

ThankYou

s_somanath@vssc.gov.in

You might also like