Released CREATION Completion Check List All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel.
2/6
CCL
Identification
Alcatel 9100 BTS Alcatel 9100 MBS GSM Commissioning Manual Release B9
Customer name
Equipment identification
Type:
Factory Serial number:
Site: Address:
BTS configuration:
Documents applied Document 3DF 00462 0004 AAAGA 3DF 00300 0004 UAZZA 3BK 17422 0002 PCZZA 3BK 17257 0001 RJZZA 3BK 20458 0001 RJZZA 8BL 00704 0016 DRBRA 8BL 00704 0067 DRZZA Signature and comments of the people involved
Ed
OK
NOK
Document 8BL 00704 0015 DRBRA 8BL 00471 0621 DCAGB 8BL 00704 0059 DRZZA 8BL 00704 0032 DRBRA 8BL 00704 0034 DRBRA 8BL 00704 0058 DRZZA 8BL 00704 0068 DRZZA
Ed
OK
NOK
Name
Signature
Name
Signature
Start date
General comments
End date
REPORT
Record the results as the work proceeds in table 1 Record fault details in table 2.
3/6
put a cross if task performed put a cross if task not performed not applicable (for option example) fault cleared on site for this chapter fault not cleared for this chapter
(enter the fault number from table 2) (enter the fault number from table 2)
Table 1
Chapter
2 2.1 2.2 3 3.1 3.2 3.3 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10
Preliminary Checks Before leaving for the site Before starting (on arrival at the site) Options: Connection of the GPS antenna Hardware reconfiguration SUMACA cable connection Check the Power Supply and Power Up the BTS Case 1: Alcatel 9100 BTS Indoor Case 2: Alcatel 9100 BTS FV AA Outdoor Case 3: Alcatel 9100 BTS FV BA Outdoor Case 4: Alcatel 9100 BTS AC Indoor Case 5: Alcatel 9100 BTS Evolution AC Indoor and Alcatel 9100 BTS Evolution DC Indoor Case 6: Alcatel 9100 MBS GSM AC Indoor and Alcatel 9100 MBS GSM DC Indoor and Alcatel 9100 MBS GSM AC Indoor Used as DC Case 7: Alcatel 9100 BTS Evolution Outdoor and Alcatel 9100 CPT BTS Evolution Case 8: Alcatel9100 MBS GSM Outdoor Case 9: Alcatel 9100 MBS GSM Evolution Outdoor Case10: Alcatel 9100 Compact BTS Outdoor Operation of battery back up? Yes No
4/6
Chapter
Title
work performed
yes
no
n.a.
a.r
a.n.r
5 5.1
Commissioning tests BTS Software downloading Select the frequencies Setting the antenna mapping Sector n = Sector___ Sector r = Sector___ Sector p = Sector___ Sector s = Sector___ Sector q = Sector___ Sector t = Sector___ Set TMA parameters Set TWIN TRE mode
5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11 5.12 5.13
Check RF Cabling BTS Initialization Perform BTS Inventory Set the PM18 Parameters Check the PM18R Failure Alarm Option: Inhibit Power Down Timer Set the Number of Supervised PM12 Modules Set the BTS Class Set the Battery Parameters Set and Check the External Alarms Check the Status of Modules Check the Antenna VSWR
On load - VSWR2 - (if appropriate): ANX __ : ____ ____ ANX__ : ____ ANX__ : ____ ____ ANX__ : ____ ANX__ : ____ ____ ANX__ : ____ On antenna - VSWR1 - (if appropriate): ANX __ : ____ ____ ANX__ : ____ ANX__ : ____ ____ ANX__ : ____ ANX__ : ____ ____ ANX__ : ____ ____ ____ ____ ____ ____ ____
5.14 5.15 6 7 8
Disable antenna ports not connected Abis Loop Test End of Commissioning Set Transmission Module Parameters Qmux address: ____ Connect the BSC Finish Commissioning
5/6
Comments Table 2 Number Method chapter : 1 Fault report reference : Method chapter : 2 Fault report reference : Method chapter : 3 Fault report reference : Method chapter : 4 Fault report reference : Method chapter : 5 Fault report reference : Method chapter : 6 Fault report reference : Method chapter : 7 Fault report reference : Method chapter : 8 Fault report reference : date : date: date : date: name : date : date: name : date : date: name : date : date: name : date : date: name : date : date:: name : date : date: name : Notes - Comments - Faults Description Cleared name :
6/6